无线基站勘察培训无线基站勘察培训
The training of site surveyThe training of site survey
Table of ContentsTable of Contents
The step of site surveyThe step of site surveyThe content of site surveyThe content of site surveyThe usage of tools and softwareThe usage of tools and softwareThe choice of siteThe choice of siteThe record on spotThe record on spotThe site survey reportThe site survey reportThe drawing model of site designingThe drawing model of site designing
The training of site surveyThe training of site survey
The step of site surveyThe step of site surveyReceiving the site
survey task
Collecting the Information about the sites network planning
Surveying on spot
Recording the survey Information on spot
Making sure the site designing (including the transmission)with NT staff on spot
Applying the site report to NT
Preparing and checking up the tools
Making sure the survey course and setting down the survey order with NT staff
Making out the site survey report and list
Confirming the designing for the second site
Design and Making out the site drawing
Delivering the site drawing to project department ,then begin to construct thesite
equipment.
Feeding back to the project leader or the network planner in
time,then we make sure .
Table of ContentsTable of Contents
The step of site surveyThe step of site surveyThe content of site surveyThe content of site surveyThe usage of tools and softwareThe usage of tools and softwareThe choice of siteThe choice of siteThe record on spotThe record on spotThe site survey reportThe site survey reportThe drawing model of site designingThe drawing model of site designing
The training of site surveyThe training of site survey
The content of site surveyThe content of site survey
Site survey for the traffic distributingSite survey for the traffic distributingThe covering users types:Residential area 、highway、detached
houses ;The development of the covering users and economy;The altitude of the hot area and its distance to the site.
The description of the site position:Longitude 、Latitude 、Building Altitude, and so on;
The whole description of the site environment :landforms、surface features,such as mountainous area、river、plain;
The description of the barrier:its character、height、distance ;The electromagnetism environment description around the site:
Microwave site、TV station、transformer、high voltage lines and so on.
Site survey for wireless transmission environmentSite survey for wireless transmission environment
The content of site surveyThe content of site survey
Site survey on spot Site survey on spot
Inside the room:size of room、 size of equipments、equipment layout、Cable Ladder 、 Cable Route and so on;
outside the room:tower、 Antenna\Feeder Cable System、outdoor cable tray、Cable Route and so on;
AC importing:position of transformer、 AC power line route ;Grounding System :Earthing Bar;Others :room bearing.
Table of ContentsTable of Contents
The step of site surveyThe step of site surveyThe content of site surveyThe content of site surveyThe usage of tools and softwareThe usage of tools and softwareThe choice of siteThe choice of siteThe record on spotThe record on spotThe site survey reportThe site survey reportThe drawing model of site designingThe drawing model of site designing
The training of site surveyThe training of site survey
Main tools for Site surveyMain tools for Site survey::
GPS、range finder、tape、steel rule(5m)、camera、compass、board、pen、telescope 、nite writer pen;
Main software for Site surveyMain software for Site survey::
MapInfo、Google Earth、photoshop、autocad、office
Tools and software for Site surveyTools and software for Site survey
GPSGPS::
The main purpose:Save the site ;navigation;Measure the distance between two sites。
The precision of the GPS must be more than5~8meters ,when we note the longitude and the latitude,so we must wait a while after open the GPS.
Tools for Site surveyTools for Site survey
Tools for Site surveyTools for Site survey
Range finder:Range finder:
The main The main purposepurpose::Measure the dimension of the BTS room;Measure the height of the building。
software for Site surveysoftware for Site survey
MapinfoMapinfo and Google Earth and Google Earth ::
PhotoshopPhotoshop
Outocad2006Outocad2006
Table of ContentsTable of Contents
The step of site surveyThe step of site surveyThe content of site surveyThe content of site surveyThe usage of tools and softwareThe usage of tools and softwareThe choice of siteThe choice of siteThe record on spotThe record on spotThe site survey reportThe site survey reportThe drawing model of site designingThe drawing model of site designing
The training of site surveyThe training of site survey
基站站址选择基站站址选择
as close as possible to the planning site,make for the network optimization later;distance between sites in dense urban area: 200~300m,deviationshould be less than 50 m ;distance between sites in urban area: 400~500m, deviation should be less than 100 m ;distance between sites in suburban or rural area: 800~1000m,deviation should be less than 200 m .
site position choice for early establishment should meet the coverage in hot area, such as highway、market or temple ;
site position choice in dense urban buildings should avoid the tall buildings or the construction of tall buildings near the antenna ;
General PrinciplesGeneral Principles
基站站址选择基站站址选择
Try to avoid large electromagnetic interference, the choice to the electromagnetic environment around the site should avoid radar stations, power stations or high voltage lines (> 30 m);
Leasehold BTS room is the primary choice,building the roof top tower,reducing investment ,attention to the building load-bearing;
With transmission conditions.
General PrinciplesGeneral Principles
Table of ContentsTable of Contents
The step of site surveyThe step of site surveyThe content of site surveyThe content of site surveyThe usage of tools and softwareThe usage of tools and softwareThe choice of siteThe choice of siteThe record on spotThe record on spotThe site survey reportThe site survey reportThe drawing model of site designingThe drawing model of site designing
The training of site surveyThe training of site survey
Site EquipmentsSite Equipments
BTS Equipment ConfigurationBTS Equipment Configuration
580x400x284 (without base, mm)1O28202
640x555x330 (mm)1S222(outdoor)8206
1S222(indoor)
1S444
1S666
2S444+S444
1600x600x550(H*W*D mm)
2S444+S666
8018 indoor BTS
Rack size per 1 rackRack Qty.Site typemodel
Power Products ConfigurationPower Products Configuration
Site EquipmentsSite Equipments
GSM 900 Antenna, 12 dBi Omni O2
SIZE:φ60×3245mm
GSM900M Dual Polarized Directional Antenna
MB900-65-17DT/MB900-65-17DT3(S444: 3 degree electronical Down Tilt)(S222: 0 degree electronical Down Tilt)
SIZE:1600×280×100mm
Antenna Antenna Products ConfigurationProducts ConfigurationSite EquipmentsSite Equipments
Antenna Products ConfigurationAntenna Products Configuration
GSM 1800M Antenna 18 dBi, 65 degree(S444、S666)
MB1800-65-18DT3SIZE:1820×200×75mm
GSM Dual Band Antenna 16 dBi, 65 degree
ODP-065R17B6/18C66 degree electronical Down Tilt
(fixed)SIZE:2345×320×195mm
Site EquipmentsSite Equipments
Antenna Products ConfigurationAntenna Products Configuration
WCDMA AntennaType:MB3F-65-18DT2electronical Down Tilt= 2 degreeMechanical Down Tilt >12 degree
Site EquipmentsSite Equipments
Cable TransmissionCable Transmission① Optical fiber transmission
SDH(16~63E1、N×63E1)
PDH(4~16E1)
DDF
DDF module
DDB
imitating siemens
Transmission choiceTransmission choice
Transmission choiceTransmission choice
Cable TransmissionCable Transmission② IP transmission G.SHDSL support DSL line distance
of at least 3.3 km(0.4 mm cable) for E1
75 Ohms unbalanced impedance.
-48V DC power
Rear Panel
Front Panel
TC-200GT
Wireless transmissionWireless transmission Microwave
One hop of Microwave Transmission Equipment Unit
Frequency:4-38 GHz
Link Capacity:4E1 16E1 N×1 STM-1Antenna&ODU
Antenna&ODU
If there is no phone line or the distance of the line is more than 3Km,Microwave must be chosen.
?
Microwave transmission condition :view range!
Transmission choiceTransmission choice
Wireless transmissionWireless transmission Microwave
sites
Centrol Room
Transmission choiceTransmission choice
Wireless transmissionWireless transmission
Microwave Equipment
Microwave
Microwave Antenna
Transmission choiceTransmission choice
ShelterShelter
14.14 7502 9703 120
Square(m2)Length(mm)L
Width(mm)W
Height(mm) H
Shelter Dimension
Site EquipmentsSite Equipments
TowerTower
5m rooftop tower5M.pdf8m rooftop tower8m.pdf18m Ground tower18m20m Ground tower20M
Site EquipmentsSite Equipments
Ground SystemGround System
5/8m rooftop tower屋顶塔接地示意图.dwg18m Ground tower18M自立塔接地示意图.dwg20m Ground tower20m三角塔接地示意图.dwg
Ground SystemGround System
The record on spot The record on spot
Existing site (indoor photos)Existing site (indoor photos)
① Site name ② inside whole ③ REC
④ Battery 300AH/Group II ⑤ BTS
⑥ AC BOX andlighting-proof box
Existing site (indoor photos)Existing site (indoor photos)
LCD of the RECTIFIER
The record on spot The record on spot
Existing site (indoor photos)Existing site (indoor photos)
The maximal power of BTS B8206/B8202 is 380W ,and the air switch we should select is 16A.
The maximal power of BTS B8018 is 3400W ,and the air switch we should select is 63A &32A
The information of the air switch!The information of the air switch!
The record on spot The record on spot
Existing site (indoor photos)Existing site (indoor photos)
The information of the feeder and the feeder windowThe information of the feeder and the feeder window
The record on spot The record on spot
Existing site (indoor photos)Existing site (indoor photos)
The information of AirThe information of Air--condition!condition! Manufacturer?Manufacturer?Capacity?Capacity?Working or not?Working or not?
Reused & change?Reused & change?
The record on spot The record on spot
How to draw the BTS room and the equipment??How to draw the BTS room and the equipment??
The record on spot The record on spot
Existing site (outdoor photos)Existing site (outdoor photos)
① the whole tower
② the outdoor ladder and the Router
③ the antenna and the poles
The record on spot The record on spot
Existing site (outdoor photos)Existing site (outdoor photos)The record on spot The record on spot
Existing site (outdoor photos)Existing site (outdoor photos)The record on spot The record on spot
How to draw the plan of outside??How to draw the plan of outside??
The record on spot The record on spot
How to draw the plan of outside??How to draw the plan of outside??
The record on spot The record on spot
New siteNew site
Finding out the information of the new site:site config、the amount of the equiment、the demand about the room area;
Marking down the new site position on the map,then input the longitude and the latitude to the GPS;
Reaching the exact position of the new site with GPS、surveying around environment、finding out the hot area;
Surveying the site and recording all the information。
Confirming the new site ,talking about the leasehold room with its owner ;
Site survey Site survey
New siteNew site
① Site name ② inside whole ③ window
④ rooftop⑤ Ground ⑥ building
The record on spot The record on spot
New siteNew siteThe record on spot The record on spot
How to draw the plan of NEW SITE??How to draw the plan of NEW SITE??
The record on spot The record on spot
How to draw the plan of NEW SITE??How to draw the plan of NEW SITE??
The record on spot The record on spot
How to draw the plan of NEW SITE??How to draw the plan of NEW SITE??
The record on spot The record on spot
How to draw the plan of NEW SITE??How to draw the plan of NEW SITE??
The record on spot The record on spot
Table of ContentsTable of Contents
The step of site surveyThe step of site surveyThe content of site surveyThe content of site surveyThe usage of tools and softwareThe usage of tools and softwareThe choice of siteThe choice of siteThe record on spotThe record on spotThe site survey reportThe site survey reportThe drawing model of site designingThe drawing model of site designing
The site survey reportThe site survey report
The site survey reportThe site survey report
The site survey reportThe site survey report
Table of ContentsTable of Contents
The step of site surveyThe step of site surveyThe content of site surveyThe content of site surveyThe usage of tools and softwareThe usage of tools and softwareThe choice of siteThe choice of siteThe record on spotThe record on spotThe site survey reportThe site survey reportThe drawing model of site designingThe drawing model of site designing
The training of site surveyThe training of site survey
All kinds of drawing modelsAll kinds of drawing models
The drawing modelThe drawing model
5m/8m rooftop tower(cross-shaped)5m/8m rooftop tower(I-shaped)18m Ground tower20m Ground tower
S222S444S444/S444S444/S666ShelterExisting site (change HUAWEI’S BTS)