site plans - franklin nh
TRANSCRIPT
3U.S Route 3 Central Street
SITE
Feet0 1000 2000
\\V
HB
\G
BL\P
RO
J\B
ED
FO
RD
\52528.01 FR
AN
KLIN
P
HA
SE 1\C
AD
\LD
\P
LA
NSET\52528.01_C
OV
17 Ju
ne 2020
Owner
VH
B P
ro
ject :
vh
b.co
m
Site Plans
Issued for
Date Issued
Latest Issue
Issu
ed
fo
r :
City of Franklin
316 Central Street
Franklin, NH 03235
Applicant
City of Franklin
316 Central Street
Franklin, NH 03235
Assessor's Map:
Lots:
Assessor's Map: 134
237, 238, 239, 412, 413
Mill City Park
Phase 1
Central Street (U.S Route 3)
Franklin, New Hampshire
Permitting
June 15, 2020
June 15, 2020
52
52
8.0
1 M
ill C
ity P
ark
Perm
ittin
g 6
/15
/2
02
0
Sheet Index
No.Drawing Title
Latest Issue
C-1Legend and General Notes June 15, 2020
C-2 Site PlanJune 15, 2020
C-3 Site Details 1June 15, 2020
C-4 Site Details 2June 15, 2020
2 Bedford Farms Drive
Suite 200
Bedford, NH 03110
603.391.3900
SIAMESE CONNECTION
ACCESSIBLE CURB RAMP
ACCESSIBLE PARKING
VAN-ACCESSIBLE PARKING
COMPACT PARKING STALLS
DOUBLE YELLOW LINE
STOP LINE
CROSSWALK
PARKING COUNT
MAJOR CONTOUR
MINOR CONTOUR
STREAM / POND / WATER COURSE
HAY BALES
SILT FENCE
DETENTION BASIN
RETAINING WALL
STOCKADE FENCE
STONE WALL
FENCE
TREE LINE
WIRE FENCE
PATH
WOOD GUARDRAIL
STEEL GUARDRAIL
GUY WIRE & ANCHOR
MATCHLINE
GUY POLE
HAND HOLE
PULL BOX
ELECTRIC MANHOLE
POST INDICATOR VALVE
TRANSFORMER PAD
TELEPHONE MANHOLE
UTILITY POLE
LIGHT POLE
ELECTRIC METER
WATER WELL
GAS GATE
GAS METER
FIRE HYDRANT
WATER METER
EXTRUDED CONCRETE CURB
BUILDING ENTRANCE
BOLLARD
DOUBLE SIGN
DUMPSTER PAD
SIGN
BUILDING
LOADING DOCK
MONOLITHIC CONCRETE CURB
PRECAST CONC. CURB
LIMIT OF CURB TYPE
SLOPED GRAN. EDGING
SAWCUT
VERT. GRAN. CURB
EDGE OF PAVEMENT
BITUMINOUS CURB
CURB AND GUTTER
CONCRETE CURB
GRAVEL ROAD
BITUMINOUS BERM
WETLAND LINE WITH FLAG
200' RIVERFRONT AREA
TO FLOODING
LIMIT OF DISTURBANCE
WETLAND BUFFER ZONE
NO DISTURB ZONE
FLOODPLAIN
Exist. Prop.
RIGHT-OF-WAY/PROPERTY LINE
CONSTRUCTION LAYOUT
TOWN LINE
ZONING LINE
BASELINE
BUILDING SETBACK
EASEMENT
PROJECT LIMIT LINE
PROPERTY LINE
DOUBLE CATCH BASIN CONCENTRIC
SEWER MANHOLE CONCENTRIC
FLARED END SECTION
CURB STOP & BOX
TAPPING SLEEVE, VALVE & BOX
WATER VALVE & BOX
HEADWALL
DRAIN MANHOLE CONCENTRIC
PLUG OR CAP
TRENCH DRAIN
CLEANOUT
CATCH BASIN CONCENTRIC
GUTTER INLET
MONITORING WELL
DOMESTIC WATER
FIRE PROTECTION
ELECTRIC
CABLE TV
FIRE ALARM
TELEPHONE
GAS
ROOF DRAIN
SEWER
OVERHEAD WIRE
WATER
DRAIN
UNDERDRAIN
CONSTRUCTION EXIT
HEAVY DUTY PAVEMENT
CONCRETE
TOP & BOTTOM OF WALL ELEVATION
TOP OF CURB ELEVATION
BORING LOCATION
TEST PIT LOCATION
BOTTOM OF CURB ELEVATION
SPOT ELEVATION
Prop.Exist.
RIPRAP
STEAM
FORCE MAIN
ABAN ABANDON
ACR ACCESSIBLE CURB RAMP
ADJ ADJUST
APPROX APPROXIMATE
BIT BITUMINOUS
BS BOTTOM OF SLOPE
BWLL BROKEN WHITE LANE LINE
CONC CONCRETE
DYCL DOUBLE YELLOW CENTER LINE
EL ELEVATION
ELEV ELEVATION
EX EXISTING
FDN FOUNDATION
FFE FIRST FLOOR ELEVATION
GRAN GRANITE
GTD GRADE TO DRAIN
LA LANDSCAPE AREA
LOD LIMIT OF DISTURBANCE
MAX MAXIMUM
MIN MINIMUM
NIC NOT IN CONTRACT
NTS NOT TO SCALE
PERF PERFORATED
PROP PROPOSED
REM REMOVE
RET RETAIN
R&D REMOVE AND DISPOSE
R&R REMOVE AND RESET
SWEL SOLID WHITE EDGE LINE
SWLL SOLID WHITE LANE LINE
TS TOP OF SLOPE
TYP TYPICAL
CB CATCH BASIN
CMP CORRUGATED METAL PIPE
CO CLEANOUT
DCB DOUBLE CATCH BASIN
DMH DRAIN MANHOLE
CIP CAST IRON PIPE
COND CONDUIT
DIP DUCTILE IRON PIPE
FES FLARED END SECTION
FM FORCE MAIN
F&G FRAME AND GRATE
F&C FRAME AND COVER
GI GUTTER INLET
GT GREASE TRAP
HDPE HIGH DENSITY POLYETHYLENE PIPE
HH HANDHOLE
HW HEADWALL
HYD HYDRANT
INV INVERT ELEVATION
I= INVERT ELEVATION
LP LIGHT POLE
MES METAL END SECTION
PIV POST INDICATOR VALVE
PWW PAVED WATER WAY
PVC POLYVINYLCHLORIDE PIPE
RCP REINFORCED CONCRETE PIPE
R= RIM ELEVATION
RIM= RIM ELEVATION
SMH SEWER MANHOLE
TSV TAPPING SLEEVE, VALVE AND BOX
UG UNDERGROUND
UP UTILITY POLE
PARKING SETBACK
SILT SOCK / STRAW WATTLE
LegendAbbreviations
General
Utility
BORDERING LAND SUBJECT
BUILDINGS
DRAIN MANHOLE ECCENTRIC
SEWER MANHOLE ECCENTRIC
DOUBLE CATCH BASIN ECCENTRIC
CATCH BASIN ECCENTRIC
General
1. THE INTENT OF THESE PLANS ARE TO THE SUPPORT THE LOCAL APPROVALS PROCESS FOR PHASE 1 OF
THE MILL CITY PARK LAND BASED PROJECT.
2. CONTRACTOR SHALL NOTIFY "DIG-SAFE" (1-888-344-7233) AT LEAST 72 HOURS BEFORE EXCAVATING.
3. CONTRACTOR SHALL BE RESPONSIBLE FOR SITE SECURITY AND JOB SAFETY. CONSTRUCTION ACTIVITIES
SHALL BE IN ACCORDANCE WITH OSHA STANDARDS AND LOCAL REQUIREMENTS.
4. ACCESSIBLE ROUTES, PARKING SPACES, RAMPS, SIDEWALKS AND WALKWAYS SHALL BE CONSTRUCTED
IN CONFORMANCE WITH THE FEDERAL AMERICANS WITH DISABILITIES ACT AND WITH STATE AND
LOCAL LAWS AND REGULATIONS (WHICHEVER ARE MORE STRINGENT).
5. AREAS DISTURBED DURING CONSTRUCTION AND NOT RESTORED WITH IMPERVIOUS SURFACES
(BUILDINGS, PAVEMENTS, WALKS, ETC.) SHALL RECEIVE 6 INCHES LOAM AND SEED.
6. WITHIN THE LIMITS OF THE BUILDING FOOTPRINT, THE SITE CONTRACTOR SHALL PERFORM
EARTHWORK OPERATIONS REQUIRED UP TO SUBGRADE ELEVATIONS.
7. WORK WITHIN THE LOCAL RIGHTS-OF-WAY SHALL CONFORM TO LOCAL MUNICIPAL STANDARDS.
WORK WITHIN STATE RIGHTS-OF-WAY SHALL CONFORM TO THE LATEST EDITION OF THE STATE
HIGHWAY DEPARTMENTS STANDARD SPECIFICATIONS FOR HIGHWAYS AND BRIDGES.
8. UPON AWARD OF CONTRACT, CONTRACTOR SHALL MAKE NECESSARY CONSTRUCTION NOTIFICATIONS
AND APPLY FOR AND OBTAIN NECESSARY PERMITS, PAY FEES, AND POST BONDS ASSOCIATED WITH
THE WORK INDICATED ON THE DRAWINGS, IN THE SPECIFICATIONS, AND IN THE CONTRACT
DOCUMENTS. DO NOT CLOSE OR OBSTRUCT ROADWAYS, SIDEWALKS, AND FIRE HYDRANTS, WITHOUT
APPROPRIATE PERMITS.
9. TRAFFIC SIGNAGE AND PAVEMENT MARKINGS SHALL CONFORM TO THE MANUAL ON UNIFORM
TRAFFIC CONTROL DEVICES.
10. AREAS OUTSIDE THE LIMITS OF PROPOSED WORK DISTURBED BY THE CONTRACTOR'S OPERATIONS
SHALL BE RESTORED BY THE CONTRACTOR TO THEIR ORIGINAL CONDITION AT THE CONTRACTOR'S
EXPENSE.
11. IN THE EVENT THAT SUSPECTED CONTAMINATED SOIL, GROUNDWATER, AND OTHER MEDIA ARE
ENCOUNTERED DURING EXCAVATION AND CONSTRUCTION ACTIVITIES BASED ON VISUAL, OLFACTORY,
OR OTHER EVIDENCE, THE CONTRACTOR SHALL STOP WORK IN THE VICINITY OF THE SUSPECT
MATERIAL TO AVOID FURTHER SPREADING OF THE MATERIAL, AND SHALL NOTIFY THE OWNER
IMMEDIATELY SO THAT THE APPROPRIATE TESTING AND SUBSEQUENT ACTION CAN BE TAKEN.
12. CONTRACTOR SHALL PREVENT DUST, SEDIMENT, AND DEBRIS FROM EXITING THE SITE AND SHALL BE
RESPONSIBLE FOR CLEANUP, REPAIRS AND CORRECTIVE ACTION IF SUCH OCCURS.
13. DAMAGE RESULTING FROM CONSTRUCTION LOADS SHALL BE REPAIRED BY THE CONTRACTOR AT NO
ADDITIONAL COST TO OWNER.
14. CONTRACTOR SHALL CONTROL STORMWATER RUNOFF DURING CONSTRUCTION TO PREVENT ADVERSE
IMPACTS TO OFF SITE AREAS, AND SHALL BE RESPONSIBLE TO REPAIR RESULTING DAMAGES, IF ANY, AT
NO COST TO OWNER.
15. THIS PROJECT DISTURBS MORE THAN ONE ACRE OF LAND AND FALLS WITHIN THE NPDES
CONSTRUCTION GENERAL PERMIT (CGP) PROGRAM AND EPA JURISDICTION. PRIOR TO THE START OF
CONSTRUCTION CONTRACTOR IS TO FILE A CGP NOTICE OF INTENT WITH THE EPA AND PREPARE A
STORMWATER POLLUTION PREVENTION PLAN IN ACCORDANCE WITH THE NPDES REGULATIONS.
CONTRACTOR SHALL CONFIRM THE OWNER HAS ALSO FILED A NOTICE OF INTENT WITH THE EPA.
Utilities
1. THE LOCATIONS, SIZES, AND TYPES OF EXISTING UTILITIES ARE SHOWN AS AN APPROXIMATE
REPRESENTATION ONLY. THE OWNER OR ITS REPRESENTATIVE(S) HAVE NOT INDEPENDENTLY VERIFIED
THIS INFORMATION AS SHOWN ON THE PLANS. THE UTILITY INFORMATION SHOWN DOES NOT
GUARANTEE THE ACTUAL EXISTENCE, SERVICEABILITY, OR OTHER DATA CONCERNING THE UTILITIES,
NOR DOES IT GUARANTEE AGAINST THE POSSIBILITY THAT ADDITIONAL UTILITIES MAY BE PRESENT
THAT ARE NOT SHOWN ON THE PLANS. PRIOR TO ORDERING MATERIALS AND BEGINNING
CONSTRUCTION, THE CONTRACTOR SHALL VERIFY AND DETERMINE THE EXACT LOCATIONS, SIZES, AND
ELEVATIONS OF THE POINTS OF CONNECTIONS TO EXISTING UTILITIES AND, SHALL CONFIRM THAT
THERE ARE NO INTERFERENCES WITH EXISTING UTILITIES AND THE PROPOSED UTILITY ROUTES,
INCLUDING ROUTES WITHIN THE PUBLIC RIGHTS OF WAY.
2. WHERE AN EXISTING UTILITY IS FOUND TO CONFLICT WITH THE PROPOSED WORK, OR EXISTING
CONDITIONS DIFFER FROM THOSE SHOWN SUCH THAT THE WORK CANNOT BE COMPLETED AS
INTENDED, THE LOCATION, ELEVATION, AND SIZE OF THE UTILITY SHALL BE ACCURATELY DETERMINED
WITHOUT DELAY BY THE CONTRACTOR, AND THE INFORMATION FURNISHED IN WRITING TO THE
OWNER'S REPRESENTATIVE FOR THE RESOLUTION OF THE CONFLICT AND CONTRACTOR'S FAILURE TO
NOTIFY PRIOR TO PERFORMING ADDITIONAL WORK RELEASES OWNER FROM OBLIGATIONS FOR
ADDITIONAL PAYMENTS WHICH OTHERWISE MAY BE WARRANTED TO RESOLVE THE CONFLICT.
3. SET CATCH BASIN RIMS, AND INVERTS OF SEWERS, DRAINS, AND DITCHES IN ACCORDANCE WITH
ELEVATIONS ON THE GRADING AND UTILITY PLANS.
4. RIM ELEVATIONS FOR DRAIN AND SEWER MANHOLES, WATER VALVE COVERS, GAS GATES, ELECTRIC
AND TELEPHONE PULL BOXES, AND MANHOLES, AND OTHER SUCH ITEMS, ARE APPROXIMATE AND
SHALL BE SET/RESET AS FOLLOWS:
A. PAVEMENTS AND CONCRETE SURFACES: FLUSH
B. ALL SURFACES ALONG ACCESSIBLE ROUTES: FLUSH
C. LANDSCAPE, LOAM AND SEED, AND OTHER EARTH SURFACE AREAS: ONE INCH ABOVE
SURROUNDING AREA AND TAPER EARTH TO THE RIM ELEVATION.
5. THE LOCATION, SIZE, DEPTH, AND SPECIFICATIONS FOR CONSTRUCTION OF PROPOSED PRIVATE UTILITY
SERVICES SHALL BE INSTALLED ACCORDING TO THE REQUIREMENTS PROVIDED BY, AND APPROVED BY,
THE RESPECTIVE UTILITY COMPANY (GAS, TELEPHONE, ELECTRIC, FIRE ALARM, ETC.). FINAL DESIGN
LOADS AND LOCATIONS TO BE COORDINATED WITH OWNER AND ARCHITECT.
6. CONTRACTOR SHALL MAKE ARRANGEMENTS FOR AND SHALL BE RESPONSIBLE FOR PAYING FEES FOR
POLE RELOCATION AND FOR THE ALTERATION AND ADJUSTMENT OF GAS, ELECTRIC, TELEPHONE, FIRE
ALARM, AND ANY OTHER PRIVATE UTILITIES, WHETHER WORK IS PERFORMED BY CONTRACTOR OR BY
THE UTILITIES COMPANY.
7. UTILITY PIPE MATERIALS SHALL BE AS FOLLOWS, UNLESS OTHERWISE NOTED ON THE PLAN:
A. WATER PIPES SHALL BE CLASS 52 CEMENT-LINED DUCTILE IRON PIPE (DI). WATER PIPES 2" OR
SMALLER TO BE TYPE K COPPER TUBING OR APPROVED EQUAL.
B. SANITARY SEWER PIPES SHALL BE SDR 35 POLYVINYL CHLORIDE (PVC) SEWER PIPE
C. STORM DRAINAGE PIPES SHALL BE SMOOTH INTERIOR, CORRUGATED, HIGH DENSITY
POLYETHYLENE PIPE (HDPE) UNLESS OTHERWISE NOTED
8. CONTRACTOR SHALL COORDINATE WITH ELECTRICAL CONTRACTOR AND SHALL FURNISH EXCAVATION,
INSTALLATION, AND BACKFILL OF ELECTRICAL FURNISHED SITEWORK RELATED ITEMS SUCH AS PULL
BOXES, CONDUITS, DUCT BANKS, LIGHT POLE BASES, AND CONCRETE PADS. SITE CONTRACTOR SHALL
FURNISH CONCRETE ENCASEMENT OF DUCT BANKS IF REQUIRED BY THE UTILITY COMPANY AND AS
INDICATED ON THE DRAWINGS.
9. CONTRACTOR SHALL EXCAVATE AND BACKFILL TRENCHES FOR GAS IN ACCORDANCE WITH GAS
COMPANY'S REQUIREMENTS.
10. ALL DRAINAGE AND SANITARY STRUCTURE INTERIOR DIAMETERS (4' MIN.) SHALL BE DETERMINED BY
THE MANUFACTURER BASED ON THE PIPE CONFIGURATIONS SHOWN ON THESE PLANS AND LOCAL
MUNICIPAL STANDARDS. FOR MANHOLES THAT ARE 20 FEET IN DEPTH AND GREATER, THE MINIMUM
DIAMETER SHALL BE 5 FEET.
Layout and Materials
1. DIMENSIONS ARE FROM THE FACE OF CURB, FACE OF BUILDING, FACE OF WALL, AND CENTER LINE OF
PAVEMENT MARKINGS, UNLESS OTHERWISE NOTED.
2. CURB RADII ARE 4 FEET UNLESS OTHERWISE NOTED.
3. CURBING SHALL BE BITUMINOUS BERM WITHIN THE SITE UNLESS OTHERWISE INDICATED ON THE
PLANS.
4. SEE ARCHITECTURAL DRAWINGS FOR EXACT BUILDING DIMENSIONS AND DETAILS CONTIGUOUS TO
THE BUILDING, INCLUDING SIDEWALKS, RAMPS, BUILDING ENTRANCES, STAIRWAYS, UTILITY
PENETRATIONS, CONCRETE DOOR PADS, COMPACTOR PAD, LOADING DOCKS, BOLLARDS, ETC.
5. PROPOSED BOUNDS AND ANY EXISTING PROPERTY LINE MONUMENTATION DISTURBED DURING
CONSTRUCTION SHALL BE SET OR RESET BY A PROFESSIONAL LAND SURVEYOR.
6. PRIOR TO START OF CONSTRUCTION, CONTRACTOR SHALL VERIFY EXISTING PAVEMENT ELEVATIONS AT
INTERFACE WITH PROPOSED PAVEMENTS, AND EXISTING GROUND ELEVATIONS ADJACENT TO
DRAINAGE OUTLETS TO ASSURE PROPER TRANSITIONS BETWEEN EXISTING AND PROPOSED FACILITIES.
Demolition
1. CONTRACTOR SHALL REMOVE AND DISPOSE OF EXISTING MANMADE SURFACE FEATURES WITHIN THE
LIMIT OF WORK INCLUDING BUILDINGS, STRUCTURES, PAVEMENTS, SLABS, CURBING, FENCES, UTILITY
POLES, SIGNS, ETC. UNLESS INDICATED OTHERWISE ON THE DRAWINGS. REMOVE AND DISPOSE OF
EXISTING UTILITIES, FOUNDATIONS AND UNSUITABLE MATERIAL BENEATH AND FOR A DISTANCE OF 10
FEET BEYOND THE PROPOSED BUILDING FOOTPRINT INCLUDING EXTERIOR COLUMNS.
2. EXISTING UTILITIES SHALL BE TERMINATED, UNLESS OTHERWISE NOTED, IN CONFORMANCE WITH
LOCAL, STATE AND INDIVIDUAL UTILITY COMPANY STANDARD SPECIFICATIONS AND DETAILS. THE
CONTRACTOR SHALL COORDINATE UTILITY SERVICE DISCONNECTS WITH THE UTILITY
REPRESENTATIVES.
3. CONTRACTOR SHALL DISPOSE OF DEMOLITION DEBRIS IN ACCORDANCE WITH APPLICABLE FEDERAL,
STATE AND LOCAL REGULATIONS, ORDINANCES AND STATUTES.
4 THE DEMOLITION LIMITS DEPICTED IN THE PLANS IS INTENDED TO AID THE CONTRACTOR DURING THE
BIDDING AND CONSTRUCTION PROCESS AND IS NOT INTENDED TO DEPICT EACH AND EVERY ELEMENT
OF DEMOLITION. THE CONTRACTOR IS RESPONSIBLE FOR IDENTIFYING THE DETAILED SCOPE OF
DEMOLITION BEFORE SUBMITTING ITS BID/PROPOSAL TO PERFORM THE WORK AND SHALL MAKE NO
CLAIMS AND SEEK NO ADDITIONAL COMPENSATION FOR CHANGED CONDITIONS OR UNFORESEEN OR
LATENT SITE CONDITIONS RELATED TO ANY CONDITIONS DISCOVERED DURING EXECUTION OF THE
WORK.
5. UNLESS OTHERWISE SPECIFICALLY PROVIDED ON THE PLANS OR IN THE SPECIFICATIONS, THE ENGINEER
HAS NOT PREPARED DESIGNS FOR AND SHALL HAVE NO RESPONSIBILITY FOR THE PRESENCE,
DISCOVERY, REMOVAL, ABATEMENT OR DISPOSAL OF HAZARDOUS MATERIALS, TOXIC WASTES OR
POLLUTANTS AT THE PROJECT SITE. THE ENGINEER SHALL NOT BE RESPONSIBLE FOR ANY CLAIMS OF
LOSS, DAMAGE, EXPENSE, DELAY, INJURY OR DEATH ARISING FROM THE PRESENCE OF HAZARDOUS
MATERIAL AND CONTRACTOR SHALL INDEMNIFY AND HOLD HARMLESS THE ENGINEER FROM ANY
CLAIMS MADE IN CONNECTION THEREWITH. MOREOVER, THE ENGINEER SHALL HAVE NO
ADMINISTRATIVE OBLIGATIONS OF ANY TYPE WITH REGARD TO ANY CONTRACTOR AMENDMENT
INVOLVING THE ISSUES OF PRESENCE, DISCOVERY, REMOVAL, ABATEMENT OR DISPOSAL OF ASBESTOS
OR OTHER HAZARDOUS MATERIALS.
Erosion Control
1. PRIOR TO STARTING ANY OTHER WORK ON THE SITE, THE CONTRACTOR SHALL NOTIFY APPROPRIATE
AGENCIES AND SHALL INSTALL EROSION CONTROL MEASURES AS SHOWN ON THE PLANS AND AS
IDENTIFIED IN FEDERAL, STATE, AND LOCAL APPROVAL DOCUMENTS PERTAINING TO THIS PROJECT.
2. CONTRACTOR SHALL INSPECT AND MAINTAIN EROSION CONTROL MEASURES ON A WEEKLY BASIS
(MINIMUM) OR AS REQUIRED PER THE STORMWATER POLLUTION PREVENTION PLAN (SWPPP). THE
CONTRACTOR SHALL ADDRESS DEFICIENCIES AND MAINTENANCE ITEMS WITHIN TWENTY-FOUR HOURS
OF INSPECTION. CONTRACTOR SHALL PROPERLY DISPOSE OF SEDIMENT SUCH THAT IT DOES NOT
ENCUMBER OTHER DRAINAGE STRUCTURES AND PROTECTED AREAS.
3. CONTRACTOR SHALL BE FULLY RESPONSIBLE TO CONTROL CONSTRUCTION SUCH THAT
SEDIMENTATION SHALL NOT AFFECT REGULATORY PROTECTED AREAS, WHETHER SUCH
SEDIMENTATION IS CAUSED BY WATER, WIND, OR DIRECT DEPOSIT.
4. CONTRACTOR SHALL PERFORM CONSTRUCTION SEQUENCING SUCH THAT EARTH MATERIALS ARE
EXPOSED FOR A MINIMUM OF TIME BEFORE THEY ARE COVERED, SEEDED, OR OTHERWISE STABILIZED
TO PREVENT EROSION.
5. UPON COMPLETION OF CONSTRUCTION AND ESTABLISHMENT OF PERMANENT GROUND COVER,
CONTRACTOR SHALL REMOVE AND DISPOSE OF EROSION CONTROL MEASURES AND CLEAN SEDIMENT
AND DEBRIS FROM ENTIRE DRAINAGE AND SEWER SYSTEMS.
Existing Conditions Information
1. BASE PLAN: THE PROPERTY LINES SHOWN WERE DETERMINED FROM AVAILABLE RECORD PLANS AND
PARTIAL FIELD SUREY PERFORMED BY VHB, IN MARCH 2020.
A. STREAM TOP-OF-BANK AND ORDINARY HIGH WATER ALONG THE WINNIPESAUKEE RIVER WAS
DELINEATED ON MAY 18, 2018 BY VHB WETLAND SCIENTIST, KRISTOPHER WILKES (CWS #288) IN
ACCORDANCE WITH ENV-WT 101.07 & RSA 483-B:4 (XI-E)." NO JURISDICTIONAL RESOURCE
AREAS WERE IDENTIFIED WITHIN THE PROJECT LIMITS ON MARCH 2020.
2. TOPOGRAPHY: ELEVATIONS ARE BASED ON NAVD 1988.
3. GEOTECHNICAL DATA INCLUDING TEST PIT AND BORING LOCATIONS AND ELEVATIONS WERE
OBTAINED FROM NOBIS, CONCORD, NH, IN MARCH 2020.
Document Use
1. THESE PLANS AND CORRESPONDING CADD DOCUMENTS ARE INSTRUMENTS OF PROFESSIONAL
SERVICE, AND SHALL NOT BE USED, IN WHOLE OR IN PART, FOR ANY PURPOSE OTHER THAN FOR
WHICH IT WAS CREATED WITHOUT THE EXPRESSED, WRITTEN CONSENT OF VHB. ANY UNAUTHORIZED
USE, REUSE, MODIFICATION OR ALTERATION, INCLUDING AUTOMATED CONVERSION OF THIS
DOCUMENT SHALL BE AT THE USER'S SOLE RISK WITHOUT LIABILITY OR LEGAL EXPOSURE TO VHB.
2. CONTRACTOR SHALL NOT RELY SOLELY ON ELECTRONIC VERSIONS OF PLANS, SPECIFICATIONS, AND
DATA FILES THAT ARE OBTAINED FROM THE DESIGNERS, BUT SHALL VERIFY LOCATION OF PROJECT
FEATURES IN ACCORDANCE WITH THE PAPER COPIES OF THE PLANS AND SPECIFICATIONS THAT ARE
SUPPLIED AS PART OF THE CONTRACT DOCUMENTS.
3. SYMBOLS AND LEGENDS OF PROJECT FEATURES ARE GRAPHIC REPRESENTATIONS AND ARE NOT
NECESSARILY SCALED TO THEIR ACTUAL DIMENSIONS OR LOCATIONS ON THE DRAWINGS. THE
CONTRACTOR SHALL REFER TO THE DETAIL SHEET DIMENSIONS, MANUFACTURERS' LITERATURE, SHOP
DRAWINGS AND FIELD MEASUREMENTS OF SUPPLIED PRODUCTS FOR LAYOUT OF THE PROJECT
FEATURES.
State Permits
1. NEW HAMPSHIRE DEPARTMENT OF ENVIRONMENTAL SERVICES (NHDES) SHORELAND PROTECTION
PERMIT: PENDING
Notes
of
Project Number
Sheet
Drawing Number
Drawing Title
Issued for
Checked byDesigned by
Appvd.DateRevisionNo.
Saved
W
ed
nesd
ay, Ju
ne 17, 2020 2:07:34 P
M K
HA
DLEY
P
lo
tted
W
ed
nesd
ay, Ju
ne 17, 2020 2:10:35 P
M H
ad
ley, K
yle
\\vhb\gbl\proj\Bedford\52528.01 Franklin Phase 1\cad\ld\Planset\52528.01-LG.dwg
vh
b.co
m
Date
Mill City Park
Central Street (U.S. Route 3)
Franklin, New Hampshire
Permitting
Not Approved for Construction
June 15, 2020
5
52528.01
2 Bedford Farms Drive
Suite 200
Bedford, NH 03110
603.391.3900
Legend and
General Notes
C-1
EKG EKG
2
BENCHMARK
NAIL SET IN 12" POPLAR
ELEV.=368.01'
NAVD 88
BENCHMARK
NAIL SET IN UP #210
ELEV.=359.63'
NAVD 88
22"MAPLE
6"BIRCH
12"POPLAR
10"MAPLE
10"HICKORY
10"MAPLE
12"MAPLE
16"MAPLE
6"MAPLE
6"MAPLE
6"MAPLE
14"MAPLE
18"MAPLE
(P
3
)
R=356.39'
I=350.0' 15"CMP (P1)
I=350.2' 12"CMP (P2)
I=349.8' 15"CMP (P3)
(
P
1
)
(P
2
)
R=356.12'
I=354.3' 4"HDPE (P4)
I=352.8' 12"CMP (P2)
(
P
4
)
R=355.61'
I=348.9' 8"CLAY (P5)
I=348.5' 10"CLAY (P6)
I=348.8' 8"CLAY (P7)
I=348.2' 10"CLAY (P8)
(
P
5
)
(
P
6
)
(P
7)
(
P
8
)
UP#210
w/TRANS
& RISERS
UP#210
UP#46
40' WIDE
CITY OF FRANKLIN
UTILITY EASEMENT
H
IS
T
O
R
IC
D
IS
T
R
IC
T
4"x4" GRANITE
BOUND w/DH
(FLUSH)
4"x4" GRANITE
BOUND w/DH
(FLUSH)
4"x4" GRANITE
BOUND w/DH
(UP 0.15')
4"x4" GRANITE
BOUND w/DH
(UP 0.2')
C
E
N
T
R
A
L
S
T
R
E
E
T
(
U
.
S
.
R
O
U
T
E
3
)
WIL
LOW
STREET
ED
GE O
F L
IMIT
ED
GR
OU
ND
SU
RV
EY
Central Street
(U.S. Route 3)
Winnipesaukee River
340
3
3
0
3
5
0
3
6
0
350
3
5
0
S
a
n
b
o
r
n
S
t
r
e
e
t
358
3
5
8
3
4
4
3
4
6
354
3
5
6
3
6
2
3
5
8
3
6
4
3
6
6
368
3
7
0
3
6
2
342
3
4
8
3
3
8
3
6
0
3
5
6
3
6
4
3
6
8
8
3
2
N/F
CITY OF FRANKLIN
MAP 134, LOT 238
N/F
CITY OF FRANKLIN
MAP 134, LOT 237
N/F
CITY OF FRANKLIN
MAP 134, LOT 239
N/F
CITY OF FRANKLIN
MAP 134, LOT 412
N/F
MILL CITY PARK AT
FRANKLIN
MAP 134, LOT 240
N/F
DKERN III, LLC
MAP 134, LOT 235
N/F
CITY OF FRANKLIN
MAP 117, LOT 345
N/F
CITY OF FRANKLIN
MAP 117, LOT 346
N/F
CITY OF FRANKLIN
MAP 134, LOT 413
TP-1
TP-1
TP-2
TP-12
TP-3
TP-4
TP-5
TP-6
TP-7
TP-8
TP-10
TP-11
2
5
'
R
4
9
'
R
2
4
'
R
1
5
'
R
EOG
EO
G
EOG
1% GTD
11
12
GRAVEL
PARKING AREA
1% GTD
1% GTD
1% GTD
FUTURE PUBLIC BATHROOM
PLACE CRUSHED STONE PAD
FUTURE WATER SERVICE
CONNECTION
8'
8' WIDE SHARED USE PATH
(STONE DUST) CONFIRM LIMITS
OF STONE DUST IN FIELD
CONNECT TO BRIDGE
SHARED USE PATH PROJECT
(PROVIDE TEMP
BARRICADES AS NECESSARY)
2
2
'
TEMP VEHICLE TURN
FUTURE PARKING
LOT EXPANSION
CONNECTION
REPLACE EXIST 12"
CULVERT
(INV=364±)
366.5
23
RE-USED GRANITE
BLOCK REMNANTS
(FROM CITY)
ELECTRICAL
SERVICE
CONNECTION
1% GTD
CONNECT GRAVEL
DRIVEWAY TO
WILLOW STREET,
MATCH EXIST
TIMBER FRAME
PAVILION (BY
OTHERS)
369
2
4
'
5% MAX
8'
WOOD RAIL FENCE
8'± WIDE IMPROVED TRAIL (SLOPE
AT 5% MAX, FIELD ADJUST AS
NECESSARY TO PROTECT EXISTING
MATURE VEGETATION AND
MAINTAIN 5% MAX. SLOPE)
367
366.5
366.0
365.0
364.0
363.0362
361.0
359.0
360.0
358.0
5% MAX
RAIN GARDEN
INV=355.00
WEIR=355.75
365
350
3
5
5
3
4
5
355
350
3
4
0
PERIMETER MULCH
BERM EROSION
CONTROL
VAN
R7-8
R7-8A
R7-1
CONCRETE PAD
(OR APPROVED EQUAL)
ACR (TYP M)
ACR
BB
INSTALL BIT BERM
ALONG EXIST EDGE
OF PAVEMENT
24'
9'
18'
DETENTION BASIN
WITH RIPRAP APRON
FOR RUNOFF
PROTECTION
PERIMETER MULCH
BERM EROSION
CONTROL
PROTECT
EXISTING
TREES
PROTECT
EXISTING
TREES
PROVIDE CRUSHED
STONE PAD AT
PAVILION. REFER TO
FINAL PAVILION PLANS
FOR STONE
REQUIREMENTS
CITY OF FRANKLIN TO CONFIRM IF HYDRANT IS
ACTIVE AND NEEDS TO BE REPLACED. PROVIDE 3'
MIN. CLEARANCE BETWEEN PATH AND HYDRANT
EXIST SMH FROM RECORD DRAWINGS. INV
-8.35' BELOW RIM ELEVATION. INV
ASSUMED TO BE 355.7'±. CONNECT FUTURE
BATH ROOM AT INV=356'±. CONTRACTOR
TO FIELD VERIFY AND CONFIRM
SEWER INSULATION
EXIST SWALE (NJDA)
TO REMAIN
RELOCATED 3' WIDE
GRASSED SWALE ALONG
BASE OF SLOPE
356.75
355.75
SEDIMENT FOREBAY
INV=356.00
WEIR=356.75
RAIN GARDEN
INV=364.30
WEIR=365.10
SEDIMENT FOREBAY
INV=365.9
WEIR=366.3
FES INV=361
6" HDPE ROOF DRAIN
INV=357.5
STUB SEWER
INV=357±
INFILTRATING DRIP
EDGE (2'W x 3'D, w/ 8"
PIPE)
24'
360
360
EROSION CONTROL BLANKET ON
2:1 SLOPE
of
Project Number
Sheet
Drawing Number
Drawing Title
Issued for
Checked byDesigned by
Appvd.DateRevisionNo.
Saved
Tu
esd
ay, Ju
ne 16, 2020 11:00:13 A
M K
HA
DLEY
P
lo
tted
W
ed
nesd
ay, Ju
ne 17, 2020 2:30:08 P
M H
ad
ley, K
yle
\\vhb\gbl\proj\Bedford\52528.01 Franklin Phase 1\cad\ld\Planset\52528.01-SP.dwg
vh
b.co
m
Date
Mill City Park
Central Street (U.S. Route 3)
Franklin, New Hampshire
Permitting
Not Approved for Construction
June 15, 2020
5
52528.01
2 Bedford Farms Drive
Suite 200
Bedford, NH 03110
603.391.3900
Site Plan
C-2
3
Feet60300 15
RESERVEDPARKING
VANA C C E S S I B L E
ANY
NOPARKING
TIME
Sign Summary
M.U.T.C.D.
Number
Specification
Desc.
WidthHeight
Shrub Planting
N.T.S.Source: VHB
LD_600
1/16
NOTES
1. LOOSEN ROOTS AT THE OUTER EDGE
OF ROOTBALL OF CONTAINER
GROWN SHRUBS.
HOLE - THREE TIMES ROOT BALL DIAMETER
WITH SLOPED SIDES
RO
OT B
ALL
DEP
TH
SIT ROOT BALL ON
EXISTING UNDISTURBED SOIL
OR ON COMPACTED SUBGRADE
PLANT BACKFILL MIXTURE
SLOPE TO FORM SAUCER.
UNTIE AND CUT AWAY BURLAP
FROM
1
3
(MIN.) OF ROOT BALL;
IF SYNTHETIC WRAP IS USED,
REMOVE COMPLETELY
3" PINE BARK MULCH. DO NOT
COVER STEMS OR TRUNK.
TOP OF ROOT BALL
1 INCH ABOVE
FINISH GRADE
REV
Tree Planting (For Trees Under 4" Caliper)
N.T.S.Source: VHB
LD_602
9/18
NOTES
1. STAKING IS NOT REQUIRED FOR TREES
UNDER 3" CALIPER.
HOLE - THREE TIMES ROOTBALL DIAMETER
WITH SLOPED SIDES
18"
3' MULCH CIRCLE
3"
SIT ROOTBALL ON EXISTING
UNDISTURBED SOIL OR ON
COMPACTED SUBGRADE
UNTIE AND CUT AWAY BURLAP
FROM
1
3
OF ROOTBALL (MIN.);
IF SYNTHETIC WRAP IS USED,
REMOVE COMPLETELY
PLANT BACKFILL MIXTURE.
SLOPE TO FORM
3" HIGH SAUCER
3" BARK MULCH,
DO NOT PLACE MULCH
WITHIN 3" OF TRUNK
TRUNK FLARE SHALL BE
COMPLETELY EXPOSED, SET
2" ABOVE THE ESTABLISHED
FINISH GRADE
TREE SHALL BE SET PLUMB,
AFTER SETTLEMENT
2"X2"X8' HARDWOOD STAKE
(2 STAKES PER TREE)
(PLACE WITHIN 6" OF ROOTBALL)
PAINT TOP 6" OF STAKES ORANGE
OR REFLECTIVE RED TAPE
NYLON TREE TIE WEBBING
(LOOSELY TIED)
TRUNK
TREE TIE
ROOTBALL
TREE PIT
HARDWOOD STAKES
OR DEADMEN (TYP.)
PLAN
REV
2"
Stabilized Construction Exit
N.T.S.Source: VHB
LD_682-NH
5/17
3' 5
:1
NOTES
1. EXIT WIDTH SHALL BE A TWENTY-FIVE (25) FOOT MINIMUM, BUT NOT
LESS THAN THE FULL WIDTH AT POINTS WHERE INGRESS OR EGRESS
OCCURS.
2. THE EXIT SHALL BE MAINTAINED IN A CONDITION WHICH SHALL
PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC
RIGHTS-OF-WAY. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH
ADDITIONAL STONE AS CONDITIONS DEMAND AND REPAIR OR
CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT. ALL
SEDIMENT SPILLED, DROPPED, WASHED OR TRACKED ONTO PUBLIC
RIGHTS-OF-WAY MUST BE REMOVED IMMEDIATELY. BERM SHALL BE
PERMITTED. PERIODIC INSPECTION AND MAINTENANCE SHALL BE
PROVIDED AS NEEDED.
3. STABILIZED CONSTRUCTION EXIT SHALL BE REMOVED PRIOR TO FINAL
FINISH MATERIALS BEING INSTALLED.
PLAN VIEW
CROSS-SECTION
3" CRUSHED STONE
FILTER
FABRIC
3" HIGH MOUNTABLE BERM
EXISTING
PAVEMENT
50' (MIN.)
SITE
6" (MIN.)
25'
(M
IN
.)
10'
10'
EXISTING
PAVEMENT
10' (MIN.)
50' (MIN.)
SITE
REV
Sign Post - Type 'A'
N.T.S.Source: VHB
LD_701
1/16
16" OR 12" DIA.
CONCRETE SUPPORT
LANDSCAPED AREA
2
1
2
" DIA. STEEL POST
(PAINT COLOR SELECTED
BY ARCHITECT)
TYPICAL SIGN
CAP STEEL PIPE POST
24"
7'
Stonedust Path
N.T.S.Source: VHB
LD_847
1/16
FINISH GRADE
COMPACTED
SUBGRADE
4"
4"
12" ALUMINUM SPIKE
24" ON CENTER
PERMASTRIP BLACK DURA-FLEX
ALUMINUM EDGING
COMPACTED GRAVEL BASE
STONE DUST SURFACE
(2-2" COURSES)
REV
COMPACTED SUBGRADEFILTER FABRIC
8" COMPACTED
GRAVEL
(NHDOT 304.2)
1' 1'
EXISTING GROUND
VARIES
SEE PLAN
4" CRUSHED
AGGREGATE
(NHDOT 304.33)
Temporary Sediment Trap
N.T.S.Source:
LD_
3/18
3
1
COMPACTED SUBGRADE
SECTION A-A
PLAN VIEW
DIKE TO DIVERT FLOW,
IF REQUIRED
FLOW
VEGETATE WITHIN
3 DAYS OF
CONSTRUCTION
F
L
O
W
F
L
O
W
F
L
O
W
NOTES
1. TEMPORARY SEDIMENT TRAP TO BE REMOVED UPON APPROVAL OF ENGINEER AND WHEN ALL UPSTREAM
AREAS HAVE BEEN STABILIZED.
2. DESIGN AND MAINTENANCE REQUIREMENTS SHALL BE IN ACCORDANCE WITH ENV-WQ 1506.10. WHICH
INCLUDE, BUT ARE NOT LIMITED TO:
· MINIMUM SEDIMENT STORAGE FOR SEDIMENT BASIN SHOULD BE 3,600 CF PER ACRE OF DRAINAGE
AREA (MAXIMUM CONTRIBUTING AREA OF 5 ACRES).
· SEDIMENT TRAP SHALL BE CLEANED WHEN 50 PERCENT OF THE ORIGINAL VOLUME IS FILLED.
C
R
E
S
T
L
E
N
G
T
H
(
F
T
)
6
X
D
R
A
I
N
A
G
E
A
R
E
A
(
A
C
)
A
A
STABILIZED SIDE
SLOPE (3:1 MAX)
Gravel Drive / Parkining Section
N.T.S.Source: VHB
LD_4
7/08
12" MIN.
24"
MIN
Section
Pervious Berm - Erosion Control Barrier
N.T.S.Source: VHB
NOTES
1. BERM SHALL CONSIST OF TREE AND STUMP GRINDINGS, SHREDDED BARK,
OR COMPOST BARK FROM PROJECT SITE AND SHALL HAVE BETWEEN 80%
AND 100% ORGANIC MATERIAL. GRINDINGS SHALL BE FIBEROUS AND
ELONGATED AND BE PRODUCT OF SHREDDED BARK, STUMP GRINDINGS OR
COMPOSTED BARK.
2. GROUND CONSTRUCTION DEBRIS OR REPROCESSED WOOD PRODUCTS
SHALL NOT BE USED AS REQUIRED ORGANIC MATERIAL.
3. THE BERM SHALL NOT CONTAIN SILTS, CLAYS OR FINE SANDS, REFUSE,
PHYSICAL CONTAMINANTS OR MATERIAL TOXIC TO PLANT GROWTH.
PERVIOUS BERM
Bituminous Berm (BB)
N.T.S.Source: VHB
LD_407
1/16
VARIES
SLOPE
COMPACTED
SUBGRADE
COMPACTED
GRAVEL
COMPACTED GRAVEL
(1
1
2
" MAX STONE SIZE)
NOTES
ALL CURBING TO BE MACHINE EXTRUDED
2"
2"6"
SURFACE
TREATMENT
VARIES
12" BITUMINOUS BERM
4"
BITUMINOUS
CONC. PAVEMENT
(TOP COURSE)
BITUMINOUS
CONC. PAVEMENT
(BINDER COURSE)
REV
Erosion Control Blanket Slope Installation
N.T.S.Source: VHB
LD_680
1/16
NO. 11 GAUGE WIRE
TYPICAL STAPLES
NOTES
1. BEGIN AT THE TOP OF BLANKET INSTALLATION AREA BY ANCHORING BLANKET IN A 6"
DEEP TRENCH BACKFILL AND COMPACT TRENCH AFTER STAPLING.
2. ROLL THE BLANKET DOWN THE SWALE IN THE DIRECTION OF THE WATER FLOW.
3. THE EDGES OF BLANKETS MUST BE STAPLED WITH APPROX. 4 INCH OVERLAP WHERE 2
OR MORE STRIP WIDTHS ARE REQUIRED.
4. WHEN BLANKETS MUST BE SPLICED DOWN THE SWALE, PLACE UPPER BLANKET END
OVER LOWER END WITH 6 INCH (MIN.) OVERLAP AND STAPLE BOTH TOGETHER.
5. METHOD OF INSTALLATION SHALL BE AS PER MANUFACTURER'S RECOMMENDATIONS.
6. EROSION CONTROL BLANKETS SHALL BE USED IN ALL AREAS WHERE SLOPES EXCEED 3:1.
6"
1
1
2
" 1
1
2
"
10"
6" LOAM & SEED
STAPLE 12"
ON CENTER
6" O
VER
LA
P
(M
IN
.)
4"
OVERLAP
(MIN.)
6"
STAPLES 12"
ON CENTER
STAPLES 12"
ON CENTER
Accessible Parking Space
N.T.S.Source: VHB
LD_552
1/16
NOTES
1. ALL DIMENSIONS TO EDGES OF 4" PAVEMENT STRIPING.
2. 8' STALL WIDTH REFERS TO 8' CLEAR BETWEEN INSIDE EDGES OF
PAVEMENT MARKINGS.
3. ALL SLOPES THROUGHOUT THE ACCESSIBLE PARKING AND AISLE
AREAS SHALL NOT EXCEED 1.5%.
45°
5'(MIN.)
8'(MIN.)
(11' FOR VAN)
SEE DETAIL
ACCESSIBLE PARKING
SEE P
LA
NS
4'
4'
BLUE SKID-
RESISTANT
PAINT
3" WIDTH
(PAINTED WHITE)
4" WIDTH
(PAINTED BLUE)
ACCESS AISLE
4" BLUE LINES
24" ON CENTER
4" WIDTH
(PAINTED BLUE)
DETAIL
Accessible Curb Ramp (ACR) Type 'M-D'
N.T.S.Source: VHB
LD_512
1/16
NOTES
1. THE MAXIMUM ALLOWABLE SIDEWALK AND CURB RAMP CROSS SLOPES SHALL BE 1.5
(1% MIN.).
2. THE MAXIMUM ALLOWABLE SLOPE OF ACCESSIBLE ROUTE EXCLUDING CURB RAMPS
SHALL BE 5%.
3. THE MAXIMUM ALLOWABLE SLOPE OF ACCESSIBLE ROUTE AT CURB RAMPS SHALL BE
7.5%.
4. A MINIMUM OF 3 FEET CLEAR SHALL BE MAINTAINED AT ANY PERMANENT OBSTACLE
IN ACCESSIBLE ROUTE (I.E., HYDRANTS, UTILITY POLES, TREE WELLS, SIGNS, ETC.).
5. CURB TREATMENT VARIES, SEE PLANS FOR CURB TYPE.
6. RAMP, CURB AND ADJACENT PAVEMENTS SHALL BE GRADED TO PREVENT PONDING.
7. SEE TYPICAL SIDEWALK SECTION FOR RAMP CONSTRUCTION.
8. WHERE ACCESSIBLE ROUTES ARE LESS THAN 5' IN WIDTH (EXCLUDING CURBING) A 5'
x 5' PASSING AREA SHALL BE PROVIDED AT INTERVALS NOT TO EXCEED 200 FEET.
9. ELIMINATE CURBING (OTHER THAN VERTICAL CURBING, WHICH SHALL BE SET FLUSH)
WHERE IT ABUTS ROADWAYS.
10. DETECTABLE WARNINGS SHALL CONTRAST VISUALLY WITH ADJOINING SURFACES.
11. DETECTABLE WARNINGS SHALL BE INSTALLED PERPENDICULAR TO THE ACCESSIBLE
ROUTE.
L
A
N
D
S
C
A
P
E
A
R
E
A
L
A
N
D
S
C
A
P
E
A
R
E
A
2
'
C
U
R
B
T
R
A
N
S
I
T
I
O
N
2
'
C
U
R
B
T
R
A
N
S
I
T
I
O
N
4
'
(
M
I
N
.
)
7
.
5
%
(
M
A
X
)
R
A
M
P
A
C
C
E
S
S
I
B
L
E
S
I
D
E
W
A
L
K
C
U
R
B
C
U
R
B
1
4
" LIP MAX.
SEE NOTE 9.
AREA OF COLORED SURFACE
TRUNCATED DOMES
2.35"
(TY
P.)*
2.35" (TYP.)*
0.9"
0.2"
2
'
-
0
"
(PROFILE)
TRUNCATED DOMES
(PLAN VIEW)
*DIMENSIONS ARE CENTER TO CENTER
of
Project Number
Sheet
Drawing Number
Drawing Title
Issued for
Checked byDesigned by
Appvd.DateRevisionNo.
Saved
W
ed
nesd
ay, Ju
ne 17, 2020 2:07:12 P
M K
HA
DLEY
P
lo
tted
W
ed
nesd
ay, Ju
ne 17, 2020 2:11:37 P
M H
ad
ley, K
yle
\\vhb\gbl\proj\Bedford\52528.01 Franklin Phase 1\cad\ld\Planset\52528.01-DT.dwg
vh
b.co
m
Date
Mill City Park
Central Street (U.S. Route 3)
Franklin, New Hampshire
Permitting
Not Approved for Construction
June 15, 2020
5
52528.01
2 Bedford Farms Drive
Suite 200
Bedford, NH 03110
603.391.3900
Site Details 1
C-3
4
Flared End Section (FES) with Stone Protection
N.T.S.Source: VHB
LD_134
3/19
NOTES: SAFETY BARS TO BE
OMITTED WHERE
INDICATED ON PLANS.
CRUSHED STONE
BEDDING
(2" STONE SIZE)
FILTER FABRIC
COMPACTED SUBGRADE
ENERGY DISSIPATION BOWL
PIP
E
DIA
.
D
APPROX. LIMITS
OF ENERGY
DISIPATION
BOWL
12"
3D
SEE PLANS
SEE P
LA
NS
APRON EDGE TO
BE SET LEVEL
WITH FLARED END
INVERT ELEVATION
(TYP.)
PRECAST CONCRETE FLARED
END SECTION
SLOPE 1:1 (MAX.)
STONE FOR PIPE ENDS
STONE DIA. (D50=6")
Z
FINISH
GRADE
6"
8"
(M
IN
.)
1'
4' 4'
SECTION A-A
PLAN
REV
Grassed Swale
N.T.S.Source: VHB
LD_171
1/16
3
1 1
3
6" BLANKET
EMBEDMENT (TYP.)
COMPACTED
SUBGRADE
EXISTING
GROUND
6" LOAM AND SEED
EROSION CONTROL BLANKET
3'
1.5
2'
(TYP.)
SWALE TABLE
SWALE
DESIGNATION
W D
REV
Utility Trench (Water & Drain)
N.T.S.Source: VHB
LD_300-NH
1/16
NOTES
1. WHERE UTILITY TRENCHES ARE CONSTRUCTED THROUGH DETENTION BASIN BERMS OR OTHER SUCH
SPECIAL SECTIONS, PLACE TRENCH BACKFILL WITH MATERIALS SIMILAR TO THE SPECIAL SECTION
REQUIREMENTS.
2. USE METALLIC TRACING/WARNING TAPE OVER ALL PIPES.
3. FOR HDPE PIPE, DIMENSION IS 24 INCHES.
4. MINIMUM COVER REQUIREMENTS:
A. WATER: 5-FT
C. DRAIN: AS SPECIFIED ON PLANS
5. EMBEDMENT MATERIALS:
A. WATER: GRAVEL (NHD0T 304.2-MODIFIED FOR 1-1/2 IN MAX. STONE SIZE)
C. DRAIN: GRAVEL (NHD0T 304.2-MODIFIED FOR 1-1/2 IN MAX. STONE SIZE)
6. WITHIN RIGHT OF WAY BACKFILL MUST BE PLACED IN 12" LIFTS AND COMPACTED.
1
1
DEP
TH
V
AR
IES
COMPACTED BEDDING
HAND TAMPED HAUNCHING
WARNING TAPE
DEPTH AND SURFACE
TREATMENT VARIES
COMPACTED
SUBGRADE
12"
(MIN.)
6"
(M
IN
.)
PIP
E
DIA
.
12" SEE
NO
TE 3.
CO
MP
AC
TED
BED
DIN
G
5'-0" M
AX
IM
UM
VA
RIES
SAWCUT
COMPACTED GRANULAR FILL
COMMON FILL/
ORDINARY BORROW
PAVED AREA
SEE APPLICABLE
PAVEMENT SECTION LANDSCAPED AREA
Sewer Trench
N.T.S.Source: VHB
LD_300S-NH
1/16
1
1
NOTES
1. USE METALLIC TRACING/WARNING TAPE OVER ALL PIPES.
2. EMBEDMENT MATERIALS:
A. PIPE BEDDING MATERIAL SHALL EXTEND FROM A HORIZONTAL PLANE THROUGH THE PIPE AXIS TO 6
INCHES BELOW THE BOTTOM OF THE PIPE'S OUTSIDE SURFACE.
B. PIPE BLANKET MATERIAL SHALL COVER THE PIPE A MINIMUM OF 12 INCHES ABOVE THE CROWN OF
THE PIPE'S OUTSIDE SURFACE.
C. COMPACTION SHALL BE IN 6 INCH (MAX) LAYERS FOR BEDDING MATERIALS MATERIALS AND 12 IN
(MAX) LAYERS FOR BLANKET MATERIALS.
3. MAXIMUM ALLOWABLE TRENCH WIDTH AT A PLANE 12 INCHES ABOVE THE PIPE SHALL BE 36 INCHES
(PIPE DIAMETERS UP TO 15 INCHES).
4. WATER LINES SHALL BE LOCATED AT LEAST 10-FT HORIZONTALLY FROM SEWER LINES. A MINIMUM
VERTICAL SEPARATION OF 18-IN SHALL BE PROVIDED WHERE SEWER AND WATER LINES CROSS AND THE
WATER LINE SHALL BE LOCATED ABOVE THE SEWER LINE.
5. INSTALL INSULATION ABOVE SEWER LINES WHEN THEY CROSS UNDER DRAIN LINES WITHIN 10-FT OF A
DRAINAGE STRUCTURE. INSULATION SHALL BE 2-IN (MIN.) RIGID INSULATION PLACED 30-IN (MIN.)
ACROSS THE TRENCH AND SHALL EXTEND 5-FT ON EITHER SIDE OF THE CROSSING.
(10" FOR 15" DIA. PIPE)
6" (M
IN
.)
12" (M
IN
)
(LED
GE)
PIP
E
DIA
.12"
EM
BED
MEN
T
MA
TER
IA
LS
5'-0" M
AX
IM
UM
VA
RIES
WARNING TAPE
12"
(MIN.)
36" (MAX.)
(12" ABOVE
PIPE
DEP
TH
V
AR
IES
BEDDING MATERIAL
(
3
4
" CRUSHED STONE)
BLANKET MATERIAL
(SAND)
DEPTH AND SURFACE
TREATMENT VARIES
COMPACTED
SUBGRADE
COMMON FILL/
ORDINARY BORROWCOMPACTED GRANULAR FILL
SAWCUT
PAVED AREA
SEE APPLICABLE
PAVEMENT SECTIONS LANDSCAPED AREA
Bioretention Basin
N.T.S.Source: VHB
LD_353
1/16
NOTES
1. SIDE SLOPES SHALL BE 3:1 MAX. 2% MIN.
1% SURFACE
SLOPE TYP.
1% SURFACE
SLOPE TYP.
S
ID
E
S
L
O
P
E
S
ID
E
S
L
O
P
E
UNCOMPACTED SUBGRADE
FILTER FABRIC MIRAFI 140N
1
1
2
" DOUBLE WASHED ,
CRUSHED STONE LAYER
BIORETENTION
SOIL MIXTURE
12"
24"
(M
IN
.)
18"
MINIMUM 3' WIDE SOD BORDER
LOAM & SEED
18" MAXIMUM PONDING DEPTH
PLANTS AND SEED MIX
FINAL PLANTS TBD (PER UNH RECOMMENDATIONS)
REV
3'-6"
(M
IN
.)
3'-6"
GRADE
UNDISTURBED, OR COMPACTED
BASE/COMPACTED BACKFILL
5'-0"
1"
5
1 2
"3
1 2
"
8"
3
1 2
"3
1
2
"5
1 2
"5
1 2
"5
1
2
"
PREBORE
3
32
" DIA. LEAD HOLE, COUNTERBORE
9
16
" DIA. x 1
11
16
"; PROVIDE 1" x
1
2
" DEEP
COUNTERBORE FOR SCREW HEAD AND
WASHER (FIELD DRILLED) (TYP.)
2x6 TIMBER CAPROUND OFF EDGE
4x4 TIMBER POST
2x4 TIMBER RAIL
3
16
" DIA. x 3" LAG SCREW
WITH
5
16
" DIA. WASHER
(TYP.)
INSIDE ELEVATION VIEW
Wood Rail Fence
N.T.S.Source: VHB
NOTES
1. ALL POSTS SHALL CONFORM TO
709.01 - STRUCTURAL LUMBER
AND TIMBER, AND ALL OTHER
LUMBER SHALL CONFORM TO
709.02 - NON STRUCTURAL
LUMBER. ALL HARDWARE SHALL
BE GALVANIZED.
2. ALL WOOD SHALL BE PRESSURE
TREATED.
8' WIDE TRAIL
2'
3'
4' 1'
4
:1
2%»
2%
3
:1
4
:1
2
:1
12"
(M
AX
)
6"
(M
AX
)
>12"
4
:1
3
:1
2
:1
2' (M
AX
)
1'
(M
AX
)
>2'
GRANULAR TRAIL
SURFACE
4" LOAM & SEED (TYP)
TYPICAL SECTION (FILL)
TYPICAL SECTION (CUT)
FENCE OR RAIL (AS SHOWN
ON PLANS, 2' MIN)
EXISTING GRADE (TYP)
SEE SECTIONS FOR
DIRECTION
1.5% (TYP)
CO
NST. B
ASELIN
E
AN
D G
RA
DELIN
E
2'
EXISTING
GRADE (TYP)
3'3'
10'
MINIMUM CLEARING LIMITS
4
"
4"
4
"
8"
COMPACTED GRAVEL
(NHDOT 304.2)
(SEE NOTES)
Trail Typical Section
N.T.S.Source: VHB
NOTES
1. TYPICAL SECTION PROVIDED TO ILLUSTRATE GENERAL DESIGN
INTENT FOR TRAIL CONSTRUCTION. CONTRACTOR SHALL
REVIEW TRAIL PLAN, PROFILES, AND CROSS-SECTIONS TO
DETERMINE LINES AND GRADES FOR SPECIFIC AREAS ALONG
THE TRAIL.
2. THE GRANULAR TRAIL SURFACE SHALL CONSIST OF ITEM 304.7
STONE DUST WEARING SURFACE. SEE SPECIAL PROVISIONS
FOR DETAILS.
3. CONTRACTOR SHALL SCRAPE UNSUITABLE SOILS, WEEDS,
ROOTS, ROCKS, AND ORGANIC MATERIALS FROM LIMITS OF
PROPOSED GRANULAR TRAIL (SUBSIDIARY). CONTRACTOR
SHALL FINE GRADE AND COMPACT SURFACE PRIOR TO
APPLICATION OF GRANULAR SURFACE MATERIAL.
4. COMPACT THE STONE DUST WEARING SURFACE MATERIAL
USING A 12 TON MIN. VIBRATORY COMPACTOR.
5. TRAIL SIGNS SHALL BE SET 3 FT (MIN.) AND 5 FT (MAX.) FROM
EDGE OF TRAIL.
6. THE MINIMUM CLEARING LIMITS SHOWN ARE THE MINIMUM
REQUIRED. ACTUAL CLEARING LIMITS MAY BE LARGER
DEPENDING ON CUT AND FILL LIMITS ALONG EACH SECTION
OF THE TRAIL.
»
WEIR OVERFLOW
Sewer Line Insulation
N.T.S.Source: VHB
LD_219
1/16
NOTES
1. SEWER LINE SHALL BE INSULATED WHEN COVER IS LESS THAN
FOUR (4) FEET AND WHERE SHOWN ON PLANS.
2. BACKFILL PLACED IN UTILITY TRENCHES INCLUDING DISTURBED
AREAS SURROUNDING UTILITY TRENCHES SHALL BE PLACED AND
COMPACTED IN 12" (MAX.) VERTICAL LIFTS.
1
1
COMPACTED
SUBGRADE
2" EXTRUDED
POLYSTYRENE
INSULATION BOARD
WARNING TAPE
DEPTH AND SURFACE
TREATMENT VARIES
COMMON FILL/
ORDINARY BORROW
2"
8"
DEP
TH
V
AR
IES
COMPACTED
GRANULAR FILL
LANDSCAPED AREAPAVED AREA
VA
RIES
VA
RIES
6"
(M
IN
.)
PIP
E
DIA
.12"
CO
MP
AC
TED
GR
AV
EL
18"
(TYP.)
24"
of
Project Number
Sheet
Drawing Number
Drawing Title
Issued for
Checked byDesigned by
Appvd.DateRevisionNo.
Saved
W
ed
nesd
ay, Ju
ne 17, 2020 2:07:12 P
M K
HA
DLEY
P
lo
tted
W
ed
nesd
ay, Ju
ne 17, 2020 2:11:41 P
M H
ad
ley, K
yle
\\vhb\gbl\proj\Bedford\52528.01 Franklin Phase 1\cad\ld\Planset\52528.01-DT.dwg
vh
b.co
m
Date
Mill City Park
Central Street (U.S. Route 3)
Franklin, New Hampshire
Permitting
Not Approved for Construction
June 15, 2020
5
52528.01
2 Bedford Farms Drive
Suite 200
Bedford, NH 03110
603.391.3900
Site Details 2
C-4
5