    Site Location Analysis

  • 8/13/2019 Site Location Analysis 1

    2/23

    Power plants types

  • 8/13/2019 Site Location Analysis 1

    3/23

    S.No Major factors to be tracked DataBasic & social indicators

    1 Location

    2 Area of that country

    3 Land boundaries

    4 Border countries

    5 Climate

    6 Natural resources

    7 Population

    8 Population density

    9 Population growth

    10 Poverty rate

    11 life expectation

    12 Literate rate13 Labor force based on sectors

    13.1 In agriculture

    13.2 In industry

    13.3 In services

    14 Unemployment

    15 Religions

  • 8/13/2019 Site Location Analysis 1

    4/23

    S.No Major factors to be tracked Data

    Political scenario

    1 Political system

    2 Political parties

    3 Attitude of consumers in host country

    4 Attitude of host government

    5 Blockage of fund transfers

    6 Currency inconvertibility7 War

    8 Bureaucracy

    9 Corruption

    Economic scenario

    1 Domestic economic

    1.1 GDP composition

    1.2 GDP growth rate

    1.3 GDP per capital

    1.4 Openness ratio

  • 8/13/2019 Site Location Analysis 1

    5/23

    S.No Major factors to be tracked Data

    1 Type of the project

    2 Location of the project area

    2.1 Latidude and longitude

    2.2 Districts

    2.3 Village

    3 Access to the project site

    3.1 By Air3.2 BY Rail

    3.3 By Road

    3.4 By ferry

    3.5 Near by sea-port

    4 climatic conditions in the project area.

    5 General descriptions of project area

    5.1 topography

    5.2 Physiography

    5.3 Geology

  • 8/13/2019 Site Location Analysis 1

    6/23

    S.No Major factors to be tracked Data

    6 Historical background of the project6.1 Earlier proposal

    6.2 Present proposal

    7 Need for the project

    7.1 possible options

    7.2 justification

    8

    Alternative studies carried out for various major

    components of the project and final choice of the projectparameters.

    9 Natural resources of the State/Region.

    10 Socio-economic aspects

    10.1 tribal

    10.2 Backward areas

    10.3 Drought areas

    11 Land required for the project construction

    11.1 forest land

    11.2 village land

    11.3 agricultural land

    11.4 total area of the land being submerged.

  • 8/13/2019 Site Location Analysis 1

    7/23

    S.No Major factors to be tracked Data12 Population affected by the project

    13 occupation of the people affected.

    14 Environmental aspects15 Inter State / Inter-national aspects

    16 Defence angle

    17 Cost of the scheme

    18 Benefits of the scheme

    19 Construction Programme

    Surveys and investigations

    1 Topographical surveys1.1 Establishment of G.T's ,bench marks

    1.2 River course /canal

    1.3 Head works

    1.4 Diversion site

    1.5 By-pass system

    1.6 Water conductor system

    1.7 Penstock1.8 Fore-bay

    1.9 Power house

    1.1 Switchyard

    1.11 Tailrace

    1.12 Camps and buildings

    1.13 Communication and approach roads

  • 8/13/2019 Site Location Analysis 1

    8/23

    S.No Major factors to be tracked Data2 Hydrological surveys

    2.1 For high head/medium head schemes

    2.1.1 River/stream cross sections

    2.1.2 Guage and discharge stations2.1.3 Tail water curves

    2.2 Canal fall schemes2.2.1 Canal discharge data

    3 Meterological surveys1 Rain gage stations

    2 Meterological observatories

    4 Water resources (HYDROLOGY)4.1 Surface water

    4.1.1 Catchment area4.1.2 Existing uses

    4.1.3 Rainfall data4.1.4 Climatological parameters

    (a) Temperature(b) Humidity

    Wind(d) Sunshine

    4.2 Guage and discharge data

    4.3 Sediment in flow4.4 Flood estimation

    4.5 water quality4.5.1 Dissolved and suspended materials

    4.5.2 Suitability of water4.6 Design flood

  • 8/13/2019 Site Location Analysis 1

    9/23

    S.No Major factors to be tracked Data

    5 Geology5.1 For medium/high head schemes

    5.1.1 Regional geology

    5.1.2 Geology of diversion site

    5.1.3 Geological explorations

    5.1.4 Drill holes

    5.1.5 Pitts

    5.1.6 Seismicity

    5.2 Canal fall schemes

    5.2.1 Soil bearing capacity under structures proposed

    6 Technical issues

    6.1 Basic criteria for release of water

    6.2 Guidelines for downstream impact studies

    6.3Need and recommendations for soil conservationmeasures in the catchment

  • 8/13/2019 Site Location Analysis 1

    10/23

    Hydro power plant

    Main Equipments

    1.Dam 2.Water reservoir 3.Intake or controlled gates 4.pen stock 5.Water turbines

    6. Generators 7.Transformers 8.Tail race (Water discharge)

  • 8/13/2019 Site Location Analysis 1

    11/23

    Hydro power plants

  • 8/13/2019 Site Location Analysis 1

    12/23

    For Hydro power plant

    S.No Major factors DataBasin development

    1 The course of the river

    2 Power potential of the river basin

    3 stages of development

    4 Whether trans-basin diversion of waters involved

    5 Fitment of the scheme in the overall basin development

    6 Fitment of the scheme in the power potential assessment studiescarried out by any organization

    2 Hydrological surveys

    2.1 For high head/medium head schemes

    2.1.1 River/stream cross sections

    2.1.2 Guage and discharge stations

    2.1.3 Tail water curves

    2.2 Canal fall schemes2.2.1 Canal discharge data

    3 Meterological surveys

    1 Rain gage stations

    2 Meterological observatories

  • 8/13/2019 Site Location Analysis 1

    13/23

    S.No Major factors Data4 Water resources (HYDROLOGY)

    4.1 Surface water

    4.1.1 Catchment area

    4.1.2 Existing uses4.1.3 Rainfall data

    4.1.4 Climatological parameters

    (a) Temperature

    (b) Humidity

    Wind

    (d) Sunshine

    4.2 Guage and discharge data4.3 Sediment in flow

    4.4 Flood estimation

    4.5 water quality

    4.5.1 Dissolved and suspended materials

    4.5.2 Suitability of water

    4.6 Design flood

    5 Geology5.1 For medium/high head schemes

    5.1.1 Regional geology

    5.1.2 Geology of diversion site

    5.1.3 Geological explorations

    5.1.4 Drill holes

    5.1.5 Pitts

    5.1.6 Seismicity

    5.2 Canal fall schemes

    5.2.1 Soil bearin ca acit under structures ro osed

  • 8/13/2019 Site Location Analysis 1

    14/23

    S.No Major factors DataPower potential and installed capacity

    Conventional H.E. Schemes1 Type of power plant

    1.1 run-of-river

    1.2 storage type

    1.3 Assessment of power potential of the scheme

    2 Studies for optimisation of storage

    3 Monthwise availability of power and energy

    4Optimisation of installed capacity and unit-size studies carriedout may be discussed

    Pumped Storage Schemes

    1 Type of scheme

    1.1 Daily regulated

    1.2 weekly regulated

    2 Optimisation of storage capacity

    3 Optimisation of installed capacity and number of units

    4Operating criteria of the project in generating and pumpingmode

    5 Cycle efficiency of the scheme.

  • 8/13/2019 Site Location Analysis 1

    15/23

    Power plantCoal fired

  • 8/13/2019 Site Location Analysis 1

    16/23

    The coal is brought and crushed to powder. This is feed to Boiler for producing heat

    In Boiler the water is converted to steam.

    In Super heater the moisture content is removed from the steam and that steam is called super heated steam

    The superheated steam rotates the shaft of the High pressure turbine

    The Exhausted steam is sent to preheater and the steam then rotates the Intermediate pressure(IP) Turbine

    The steam from the IP turbine is then feed to low pressure turbine.

    The turbine shaft is connected to the Generator, which produces Electric Power.

    The power generated is then Transmitted.

    Operation MechanismPower plant

  • 8/13/2019 Site Location Analysis 1

    17/23

    Process flow diagramCoal fired power plant

  • 8/13/2019 Site Location Analysis 1

    18/23

    Coal fired Power plants

  • 8/13/2019 Site Location Analysis 1

    19/23

    BOILER / STEAM TURBINE-GENERATOR

    INDUSTRIAL CO-GENERATION

    Boiler

    Fuel

    100%

    Air

    Stack

    15%

    Steam Turbine Generator

    15% Electricity

    Transmission

    Steam 5% Aux. Power + Losses

    Process Steam

    65%

    Process Plant

    THERMAL EFFICIENCY - 80%

  • 8/13/2019 Site Location Analysis 1

    20/23

    For Coal fired power plant

    S.No Major facilities Data

    1 Power plant

    2 electro static prespitators

    3 fuel gas desulfurisation units

    4 Coal handling & Processing system

    5 Cooling water system

    6 Water supply pipeline

    7 Water treatment system

    8 Waste water management system

    9 Access roads

    10 Ash disposal system

    11 Residential complex12 Site drainage

    13 water canal

    14 Transmission lines

  • 8/13/2019 Site Location Analysis 1

    21/23

    Gas fired power plant

  • 8/13/2019 Site Location Analysis 1

    22/23

    Air

    CompressorTransmissionGenerator

    GAS TURBINE

    COMBINED CYCLE POWER PLANT

    20%

    Stack

    100% Fuel

    Combuster Exhaust Gas

    Stack

    Turbine

    Steam Turbine

    Steam

    Generator Transmission

    Steam Condenser

    Lake

    28%

    6% Aux. Power + Losses

    12-15% Electricity

    35-40% Electricity

    Supplementary

    Fuel (Optional)

    Thermal Efficiency - 45-55%