SITE IMPROVEMENT PLANS FOR
LOCATION MAP
48 HOURS BEFORE YOU DIG
CALL J.U.L.I.E. 1-800-892-0123
SHEET INDEX
# TITLE DESCRIPTION
REVISIONS
# DESCRIPTION DATE
ORIGINAL PLAN DATE:
PLAN LEGEND
XXX.XX XXX.XX
PIPE TRENCH BACKFILL
WATER MAIN (W/ SIZE)
TELEPHONE LINES
SANITARY SEWER
680 CONTOUR
CENTERLINE
SETBACK LINE
PROPERTY LINE
FENCE
ELECTRIC LINE
EASEMENT
RIGHT-OF-WAY
GAS MAIN
STORM SEWER
DRAIN TILE
SHRUB & PROPOSED
TREE, EVERGREEN,
GUARDRAIL
SANITARY MANHOLE
OVERLAND FLOW ROUTE
FLARED END SECTION
VALVE & VAULT, VALVE
PRESSURE CONNECTION
DRAINAGE SLOPE
CONTROL POINT
SPOT ELEVATION
STORM MANHOLE
UTILITY POLE
STREET LIGHT
SIGN
FIRE HYDRANT
INLET
CATCH BASIN
SUMP STRUCTURE
LINETYPESEXISTING PROPOSED
TREE TO REMOVE
680
LOCATION DESCRIPTION
AGENCY DATE PERMIT #
PERMITS
EXPIRATION DATE: 04/30/2019
PROFESSIONAL DESIGN FIRM NO. 184.007317
P: 630.443.7755 F: 630.443.0533 WWW.WBKENGINEERING.COM
116 WEST MAIN STREET, SUITE 201, ST. CHARLES, ILLINOIS 60174
SHT NO.
WBK PROJECT NO. 18-0181
WARRENVILLE, ILLINOIS
& WETLAND RESTORATION - PHASE 2
SPRING BROOK No. 1 CREEK
FOREST PRESERVE DISTRICT OF DUPAGE COUNTY
N
S
EW
N.T.S.(630) 933-7200
WHEATON, ILLINOIS 60189
3S580 NAPERVILLE ROAD
OF DUPAGE COUNTY
FOREST PRESERVE DISTRICT
CLIENT
EXPIRATION DATE: 11/30/2019
AND EXPIRATION DATE OF SEAL OF THE ENGINEER
CONSIDERED VOID WITHOUT THE SIGNATURE , SEAL
THESE PLANS OR ANY PART THEREOF SHALL BE
DATE
DATEENGINEER
ENGINEER
ILLINOIS REGISTRATION NO.: 081-005671
ILLINOIS REGISTRATION NO.: 062-041816
EXPIRATION DATE: 11/30/2020
AND EXPIRATION DATE OF SEAL OF THE ENGINEER.
CONSIDERED VOID WITHOUT THE SIGNATURE , SEAL
THESE PLANS OR ANY PART THEREOF SHALL BE
ST. CHARLES, ILLINOIS 60174
116 WEST MAIN STREET, SUITE 201
WBK ENGINEERING, LLC
JOHN J. WILLS, P.E.
CIVIL ENGINEER
ST. CHARLES, ILLINOIS 60174
116 WEST MAIN STREET, SUITE 201
WBK ENGINEERING, LLC
JOHN S. PERADOTTI, P.E., S.E.
STRUCTURAL ENGINEER
OF
ENGINEER
PROFESSIONAL
LICENSED
062-041816
SLLIW NH
O
J
SIONILLI
CV1
GN1
ATB1-4
PRF1-6
SS1-9
LP1-13
OV1
PP1-4
1
4
5
3126
32 35
48
68
6 REM1
7 10
PP536
37 45
ERO1-861
60
GR1-1115
11 14
TX1-4
1/3/2019
PENDINGPENDING
DT1-246 47
T
IT
REDAS.
081-005671
P
H
N
JO
STRUCTURAL
LICENSED
IO
LF LIN
I
TE
SA
T
O
ENGINEER
O
S
(ALL SHEETS EXCEPT SA1-6 & SB1-9)
(SHEETS SA1-6 & SB1-9)
72 77
78 86
SA1-6
SB1-9
XS1-987 95
SOQ1-22 3
25
WBK ENGINEERING, LLC
MOT1-37169
2/14/019
LRC-2015-00319
IEPA (NOI) PENDING PENDING
(STORMWATER)
DU PAGE COUNTY
PENDING PENDING(HIGHWAY)
DU PAGE COUNTY
INDR-OWR (DELEGATION) 12/17/2019 N/A
OF ENGINEERS
US ARMY CORPS
2/14/2019
LOCATION
PROJECT
COVER SHEET
GENERAL NOTES
TYPICAL SECTIONS
EXISTING CONDITIONS & REMOVAL PLAN
STREAM PROFILE
EROSION & SEDIMENT CONTROL STAGING PLAN
STREAM STABILIZATION PLAN
LANDSCAPE & PLANTING PLAN
STRUCTURAL PLANS - PEDESTRIAN BRIDGE
OVERALL PLAN
PLAN & PROFILE - ARROW ROAD
STRUCTURAL PLANS - ARROW ROAD BRIDGE
SUMMARY OF QUANTITIES
GRADING PLAN
ALIGNMENTS, TIES, AND BENCHMARKS
MAINTENANCE OF TRAFFIC PLAN
STABILIZATION DETAILS
STREAM CROSS SECTIONS
PLAN & PROFILE - TRAIL
SOQ1
N/A
NO.
PAY ITEM
PROVISION
SPECIALUNIT
QUANTITY
TOTAL
NO.
PAY ITEM
PROVISION
SPECIALITEM DESCRIPTION ITEM DESCRIPTION UNIT
QUANTITY
TOTAL
2
SU
MM
AR
Y O
F
QU
AN
TIT
IES
1322
1321
1320
1319
1318
1317
1314
1313
1312
1311
1310
1309
1308
1307
1306
1305
1304
1303
1302
1301
1204
1203
1202
1201
1113
1112
1111
1110
1109
1108
1107
1106
1103
1102
1101
1003
1002
1001
NOTE: ALL QUANTITIES LISTED ON THIS PAGE ARE TOTAL CONTRACT QUANTITIES. ALL QUANTITIES LISTED ON OTHER SHEETS ARE NOT IN ADDITION TO QUANTITIES LISTED HERE. THESE QUANTITIES ARE SUPERCEDED BY THOSE LISTED IN ANY MORE CURRENT BID DOCUMENTS AND ADDENDUMS.
ACRE
FOOT
FOOT
EACH
EACH
L SUM
FOOT
FOOT
FOOT
EACH
EACH
EACH
L SUM
L SUM
SQ YD
FOOT
FOOT
POUND
ACRE
SQ YD
TON
CU YD
CU YD
CU YD
FOOT
SQ YD
FOOT
FOOT
FOOT
EACH
EACH
FOOT
ACRE
ACRE
ACRE
UNIT
L SUM
L SUM
13.74
40
20
100
2
1
60
7,080
7,820
3
3
1
1
1
840
9,513
1,995
2,000
33.4
29,900
1,800
2,800
10,330
43,400
44
365
45
35
63
1
1
1,000
19.64
42.79
29.12
370,000
1
1
1601
1527
1526
1525
1524
1523
1522
1521
1520
1519
1518
1517
1516
1515
1514
1513
1512
1511
1510
1509
1508
1507
1506
1505
1504
1503
1502
1501
1412
1411
1410
1408
1407
1406
1405
1403
1402
1401
MAINTENANCE AND MANAGEMENT NATIVE COMMUNITIES YEAR 1
SEEDING, CLASS 2A
SEEDING, CLASS 1
WILDLIFE FENCE PROTECTION
WOODLAND COMMUNITY WOODLAND SEEDING
WETLAND COMMUNITY REMNANT WETLAND PLANTINGS
WETLAND COMMUNITY REMNANT WETLAND SEEDING
WETLAND COMMUNITY WETLAND PLANTINGS
WETLAND COMMUNITY EMERGENT PLANTINGS
RIVER COMMUNITY SUBMERGENT PLANTINGS
RIVER COMMUNITY RIVER EDGE PLANTINGS
BUFFER COMMUNITY MESIC PRAIRIE SEEDING
WETLAND COMMUNITY WETLAND SEEDING
RIVER COMMUNITY RIVER EDGE SEEDING
TREE, ZANTHOXYLUM AMERICANUM (PRICKLY ASH), 1 1/2"
TREE, SALIX NIGRA (BLACK WILLOW), 1 1/2"
TREE, SALIX DISCOLOR (PUSSY WILLOW), 1 1/2"
TREE, QUERCUS MACROCARPA (BUR OAK), 1 1/2"
TREE, QUERCUS BICOLOR (SWAMP WHITE OAK), 1 1/2"
TREE, PTELEA TRIFOLIATA (WAFER ASH), 1 1/2"
TREE, PLATANUS OCCIDENTALIS (SYCAMORE), 1 1/2"
TREE, CELTIS OCCIDENTALIS (HACKBERRY), 1 1/2"
SHRUB, VIBURNUM LENTAGO (NANNY-BERRY)
SHRUB, SAMBUCUS NIGRA SSP. CANADENSIS (ELDERBERRY)
SHRUB, LINDERA BENZOIN (SPICEBUSH)
SHRUB, CORNUS SERICEA (RED STICK DOGWOOD)
SHRUB, AMORPHA FRUITICOSA (INDIGO BUSH)
SEED PREPARATION HERBICIDE
ALTERNATIVE BANK STABILIZATION
REACH B BANKS
PERFORATED DRAIN TILE, 4"
TOPSOIL FABRIC WRAP
COBBLE, 6" TO 16"
COBBLE, 2" TO 6"
MEANDER WOOD TOE STABILIZATION
RIFFLE SILL
BANK BARB
STONE TREATMENT 10"
ACRE
ACRE
ACRE
ACRE
ACRE
EACH
ACRE
EACH
EACH
EACH
EACH
ACRE
ACRE
ACRE
EACH
EACH
EACH
EACH
EACH
EACH
EACH
EACH
EACH
EACH
EACH
EACH
EACH
ACRE
CU YD
CU YD
FOOT
FOOT
TON
TON
FOOT
FOOT
FOOT
SQ YD
97
0.1
0.31
38.86
25.27
3,600
3.52
30,220
47,240
4,280
14,670
17.54
29.59
1.2
4
4
4
8
12
4
4
4
40
36
20
40
20
97
363
2,160
4,320
2,043
881
420
275
275
4,133
18,977
MULCH, METHOD 3A
REMOVE AND REPLACE CONCRETE C&G
CURB CUT
TREE PROTECTION
CONCRETE WASHOUT
TRAFFIC CONTROL AND PROTECTION
TEMPORARY CULVERT, 12"
AGGREGATE HAUL ROAD
TEMPORARY FENCE
TEMPORARY CROSSING
TEMPORARY DIVERSION
TEMPORARY DIVERSION CHANNEL
DEWATERING
TEMPORARY COFFERDAM
STABILIZED CONSTRUCTION ENTRANCE
SILT FENCE, DUAL ROW
SILT FENCE
TEMPORARY EROSION CONTROL SEEDING
MULCH, METHOD 2
EROSION CONTROL BLANKET
POROUS GRANULAR EMBANKMENT
BORROW EXCAVATION
TOPSOIL FURNISH AND PLACEMENT
EARTH EXCAVATION
SAW CUTS
PAVEMENT REMOVAL
PIPE CULVERT REMOVAL, 84"
PIPE CULVERT REMOVAL, 30"
PIPE CULVERT REMOVAL, 24"
WEIR STRUCTURE REMOVAL
STRUCTURE REMOVAL
FIELD TILE REMOVAL
LIGHT SELECTIVE REMOVAL
HEAVY SELECTIVE REMOVAL
CLEARING FOR GRADING
MISCELLANEOUS ITEMS ORDERED BY PROJECT REPRESENTATIVE
CONSTRUCTION LAYOUT AND AS-BUILT SURVEY
MOBILIZATION
SP-18
SP-34
SP-33
SP-32
SP-31
SP-30
SP-29
SP-28
SP-27
SP-26
SP-25
SP-24
SP-23
SP-22
SP-21
SP-20
SP-20
SP-19
SP-18
SP-17
SP-16
SP-14
SP-13
SP-12
SP-11
SP-10
SP-9
SP-9
SP-9
SP-8
SP-7
SP-6
SP-5
SP-5
SP-4
SP-3
SP-2
SP-1
SP-50
SP-47
SP-47
SP-49
SP-46
SP-48
SP-46
SP-48
SP-48
SP-48
SP-48
SP-46
SP-46
SP-46
SP-45
SP-45
SP-45
SP-45
SP-45
SP-45
SP-45
SP-45
SP-45
SP-45
SP-45
SP-45
SP-45
SP-44
SP-43
SP-42
SP-41
SP-40
SP-39
SP-39
SP-38
SP-37
SP-36
SP-35
DATE :
DRAWING NO.
TIT
LE :
DS
GN.
CH
KD.
SC
ALE :
DW
N.
NA
TU
RE O
F R
EVISIO
NN
O.
DA
TE
SHEET
CLIE
NT :
PROJECT NO.
OF
1 2 3 4 5 6 7 8
FIL
E
NA
ME
W:\
Projects\2018\180181 Spring
Brook
Ph2_3\cadd\
Civil\
Dgn\
Sht\
SO
Q_01.d
gn
===P
LO
T
DA
TE
US
ER
NA
ME
slavanne
2/6/2019
,E
NGIN
EE
RIN
G
WB
KL
LC
(630) 443-7
755
ST.
CH
AR
LES, IL
LIN
OIS 6
0174
116 W
EST M
AIN S
TR
EET, S
UIT
E 2
01
JS
L
JS
L
JJ
W
CR
EE
K & W
ET
LA
ND
SP
RIN
G B
RO
OK N
o. 1
RE
ST
OR
ATIO
N - P
HA
SE 2
18-0181
FO
RE
ST P
RE
SE
RV
E D
IST
RIC
T
OF D
UP
AG
E C
OU
NT
Y
3S
580 N
AP
ER
VIL
LE R
OA
DW
HE
AT
ON, IL 6
0189
(630)
933-7
200
2/14/2019
95
SOQ2
N/A
NO.
PAY ITEM
PROVISION
SPECIALUNIT
QUANTITY
TOTAL
NO.
PAY ITEM
PROVISION
SPECIALITEM DESCRIPTION ITEM DESCRIPTION UNIT
QUANTITY
TOTAL
3
SU
MM
AR
Y O
F
QU
AN
TIT
IES
NOTE: ALL QUANTITIES LISTED ON THIS PAGE ARE TOTAL CONTRACT QUANTITIES. ALL QUANTITIES LISTED ON OTHER SHEETS ARE NOT IN ADDITION TO QUANTITIES LISTED HERE. THESE QUANTITIES ARE SUPERCEDED BY THOSE LISTED IN ANY MORE CURRENT BID DOCUMENTS AND ADDENDUMS.
1901
1820
1819
1818
1817
1816
1815
1814
1813
1812
1811
1810
1809
1808
1807
1806
1805
1804
1803
1801
1711
1710
1709
1708
1707
1706
1705
1704
1703
1702
1701
1605
1604
1603
1602
PERFORMANCE AND PAYMENT BONDS
LOAD POSTING SIGN
GRANULAR BACKFILL FOR STRUCTURES
PEDESTRIAN TRUSS SUPERSTRUCTURE
PORTLAND CEMENT MORTAR FAIRING COURSE
WATERPROOFING MEMBRANE SYSTEM
NAME PLATES
PILE SHOES
TEST PILE METAL SHELLS
DRIVING PILES
FURNISHING METAL SHELL PILES 14" X 0.250"
FURNISHING METAL SHELL PILES 12" X 0.250"
BICYCLE RAILING
REINFORCEMENT BARS, EPOXY COATED
PRECAST PRESTRESSED CONCRETE DECK BEAMS (27" DEPTH)
CONCRETE ENCASEMENT
CONCRETE SUPERSTRUCTURE
CONCRETE STRUCTURES
STRUCTURE EXCAVATION
COBBLE FOR BRIDGES, 6" - 16"
STONE RIPRAP, CLASS A3
TRENCH BACKFILL
FLARED END SECTION, 12"
PIPE CULVERT, 12"
HOT-MIX ASPHALT SURFACE COURSE, MIX "D", N50
HOT-MIX ASPHALT BINDER COURSE, IL-19.0, N50
GEOTECHNICAL FABRIC FOR GROUND STABILIZATION
AGGREGATE SHOULDERS, TYPE B
LIMESTONE TRAIL SURFACE, 2"
AGGREGATE BASE COURSE, TYPE B, 6"
AGGREGATE SUBGRADE IMPROVEMENT, 12"
MAINTENANCE AND MANAGEMENT NATIVE COMMUNITIES YEAR 5
MAINTENANCE AND MANAGEMENT NATIVE COMMUNITIES YEAR 4
MAINTENANCE AND MANAGEMENT NATIVE COMMUNITIES YEAR 3
MAINTENANCE AND MANAGEMENT NATIVE COMMUNITIES YEAR 2
L SUM
EACH
CU YD
SQ FT
FOOT
SQ YD
EACH
EACH
EACH
FOOT
FOOT
FOOT
FOOT
POUND
SQ FT
CU YD
CU YD
CU YD
CU YD
SQ YD
SQ YD
CU YD
EACH
FOOT
TON
TON
SQ YD
SQ YD
SQ YD
SQ YD
SQ YD
ACRE
ACRE
ACRE
ACRE
1
4
51
1,260
319
156
1
18
3
249
117
132
124
7,500
1,530
8
3.9
46.2
77
388
7
1.6
2
18
149
333
2,270.4
318.11
2,064
2,064
1,562
97
97
97
97
2002
2001
MAINTENANCE AND MANAGEMENT NATIVE COMMUNITIES YEAR 7
MAINTENANCE AND MANAGEMENT NATIVE COMMUNITIES YEAR 6
ACRE
ACRE
97
97
BID ALTERNATE 1 (PAY ITEMS ONLY INCLUDED IN CONTRACT IF BID ALTERNATE 1 IS ACCEPTED BY THE DISTRICT)
SP-67
SP-65
SP-64
SP-63
SP-66
SP-66
SP-66
SP-66
SP-66
SP-66
SP-66
SP-66
SP-66
SP-66
SP-58
SP-66
SP-66
SP-66
SP-66
SP-62
SP-60
SP-59
SP-58
SP-57
SP-56
SP-56
SP-55
SP-54
SP-53
SP-52
SP-51
SP-50
SP-50
SP-50
SP-50
SP-50
SP-50
DATE :
DRAWING NO.
TIT
LE :
DS
GN.
CH
KD.
SC
ALE :
DW
N.
NA
TU
RE O
F R
EVISIO
NN
O.
DA
TE
SHEET
CLIE
NT :
PROJECT NO.
OF
1 2 3 4 5 6 7 8
FIL
E
NA
ME
W:\
Projects\2018\180181 Spring
Brook
Ph2_3\cadd\
Civil\
Dgn\
Sht\
SO
Q_02.d
gn
===P
LO
T
DA
TE
US
ER
NA
ME
slavanne
2/6/2019
,E
NGIN
EE
RIN
G
WB
KL
LC
(630) 443-7
755
ST.
CH
AR
LES, IL
LIN
OIS 6
0174
116 W
EST M
AIN S
TR
EET, S
UIT
E 2
01
JS
L
JS
L
JJ
W
CR
EE
K & W
ET
LA
ND
SP
RIN
G B
RO
OK N
o. 1
RE
ST
OR
ATIO
N - P
HA
SE 2
18-0181
FO
RE
ST P
RE
SE
RV
E D
IST
RIC
T
OF D
UP
AG
E C
OU
NT
Y
3S
580 N
AP
ER
VIL
LE R
OA
DW
HE
AT
ON, IL 6
0189
(630)
933-7
200
2/14/2019
95
GE
NE
RA
L N
OT
ES
GN1
4
GENERAL NOTES
ACCESS
UTILITIES
STAKING
MISCELLANEOUS
PERMITS
WILDLIFE PROTECTION
MATERIAL HANDLING AND WASTE MANAGEMENT
N/A
HAVE ANY MANAGEMENT GAPS.
VEGETATION AND CONTROLLING INVASIVE SPECIES REGARDLESS OF THE AREAS DISTURBED DURING CONSTRUCTION. THE FOOTPRINT SHALL NOT
ALL AREA WITHIN THE FOOTPRINT DESIGNATED IN THESE PLANS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR FOR MANAGING NATIVE 32.
THE OWNER SHALL BE NOTIFIED OF ALL SPILLS OF HAZARDOUS MATERIALS AS REASONABLY PRACTICEABLE ON THE DAY OF THE OCCURRENCE.31.
MOVEABLE MATERIALS AND OR EQUIPMENT MUST BE FLOOD PROOFED OR REMOVED OUTSIDE OF THE FLOOD PLAIN ON A DAILY BASIS.30.
ENOUGH TO DISCHARGE TO SURFACE WATER WILL BE REPORTED TO THE LOCAL FIRE DEPARTMENT AND HAZARDOUS MATERIAL RESPONSE TEAMS.
ABSORBENT MATERIALS AND RAGS WILL BE HAULED OFF-SITE IMMEDIATELY AFTER THE SPILL IS CLEANED UP FOR DISPOSAL. SPILLS LARGE
SPILL KITS WILL BE WITHIN THE MATERIALS STORAGE AREA. ALL SPILLS WILL BE CLEANED UP IMMEDIATELY UPON DISCOVERY. SPENT 29.
VEHICLES AND EQUIPMENT THAT ARE PARKED OVERNIGHT.
CHECKED FOR LEAKING OIL AND FLUIDS. VEHICLES LEAKING FLUIDS WILL NOT BE ALLOWED ON-SITE. DRIP PANS WILL BE PLACED UNDER ALL
VEHICLES AND EQUIPMENT WILL BE MAINTAINED OFF SITE. ALL VEHICLES AND EQUIPMENT INCLUDING SUBCONTRACTOR VEHICLES WILL BE
SPILL PREVENTION AND CONTROL PROCEDURES:28.
HAZARDOUS WASTE SHALL BE STORED OUTSIDE THE FLOODPLAIN.
FEDERAL, STATE, AND MUNICIPAL REGULATIONS. HAZARDOUS WASTE MATERIALS WILL NOT BE DISPOSED OF INTO THE ON-SITE DUMPSTERS.
COMMERCIALLY AVAILABLE SPILL PALLETS. ADDITIONALLY, ALL HAZARDOUS WASTE MATERIALS WILL BE DISPOSED OF IN ACCORDANCE WITH
CONTAINMENT WILL BE PROVIDED FOR ALL WASTE MATERIALS IN THE HAZARDOUS MATERIALS STORAGE AREA AND WILL CONSIST OF
WILL BE STORED IN APPROPRIATE AND CLEARLY MARKED CONTAINERS AND SEGREGATED FROM OTHER NON-WASTE MATERIALS. SECONDARY
STORED IN STRUCTURALLY SOUND AND SEALED SHIPPING CONTAINERS, WITHIN A HAZARDOUS MATERIALS STORAGE AREA. HAZARDOUS MATERIALS
ALL HAZARDOUS WASTE MATERIALS SUCH AS OIL FILTERS, PETROLEUM PRODUCTS, PAINT, AND EQUIPMENT MAINTENANCE FLUIDS WILL BE
HAZARDOUS WASTE MATERIALS:27.
DEBRIS.
DEPOSITED IN THE DUMPSTER. ALL PERSONNEL WILL BE INSTRUCTED REGARDING THE CORRECT DISPOSAL OF TRASH AND CONSTRUCTION
DRAINS, AND MEET ALL FEDERAL , STATE, AND MUNICIPAL REGULATIONS. ONLY TRASH AND CONSTRUCTION DEBRIS FROM THE SITE WILL BE
MATERIALS STORAGE AREA. DUMPSTERS WILL HAVE A SECURE WATERTIGHT LID, BE PLACED AWAY FROM STORMWATER CONVEYANCES AND
ALL WASTE MATERIALS WILL BE COLLECTED AND DISPOSED OF INTO METAL TRASH DUMPSTERS PROVIDED BY THE CONTRACTOR IN A
WASTE MATERIALS:26.
ALL PERFORMANCE CRITERIA.
IS EVIDENT, ADDITIONAL MEASURES WILL BE REQUIRED TO ARREST DAMAGE. ALL PREDATION CONTROL SHALL BE REMOVED AT ATTAINMENT OF
SPECIAL PROVISIONS. NO LOUD NOISE, ELECTRICAL DEVICES, OR WILDLIFE CHASING BY DOMESTIC ANIMALS SHALL BE ALLOWED. IF PREDATION
DURATION OF THE PROJECT. THIS INCLUDES BUT IS NOT LIMITED TO CAGES, STRING NETS, STAKING, AND FENCING IN ACCORDANCE WITH THE
THE CONTRACTOR SHALL PROVIDE ALL PREDATION CONTROL NECESSARY TO PROTECT THE PLANTINGS FROM HERBIVORY THROUGHOUT THE
PREDATION CONTROL:25.
EXCAVATION ACTIVITIES SO THAT THE OWNER'S STAFF CAN BE PRESENT TO PERFORM THE RELOCATION OF INDIVIDUAL ANIMALS.
OWNER TO REFUGE SELECTED BY THE OWNER. THE CONTRACTOR SHALL NOTIFY THE OWNER AT LEAST 48 HOURS IN ADVANCE OF ANY
REPTILES, AMPHIBIANS, AND FISH AND MUSSELS FOUND IN TILES, CREEK, DITCH, AND OTHER EXCAVATED AREAS MAY BE RELOCATED BY THE
REPTILE, AMPHIBIAN, FISH AND MUSSEL RELOCATION BY OWNER:24.
CONTRACTOR SHALL POST ANY REQUIRED BONDS FOR ACCESS.
THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL OF THE ROAD PERMITS FOR VEHICLES, EQUIPMENT, AND MATERIAL HAULING. THE 23.
WATER CONSERVATION DISTRICT PERMIT, AND IDNR-OWR PERMITS.
ENGINEERS SECTION 404 PERMIT, A DUPAGE COUNTY STORMWATER PERMIT, AN IEPA WATER QUALITY CERTIFICATION, KANE-DUPAGE SOIL AND
ANY WORK THAT MAY OCCUR IN FLOODPLAIN OR WETLANDS CANNOT BEGIN PRIOR TO OWNER RECEIVING AN EXECUTED U.S. ARMY CORPS OF 22.
INVASIVE SPECIES MANAGEMENT
PLANS AND WITH THE SPECIAL PROVISIONS.
ALL AREAS DISTURBED DURING THE CONSTRUCTION OPERATIONS SHALL BE SEEDED AND PROTECTED FROM EROSION IN ACCORDANCE WITH THESE 21.
SHALL NOT CAUSE PONDING OF STORM WATER EXCEPT AS DESIGNED BY DRAWINGS.
MAKE REPAIRS AS NECESSARY TO CORRECT DAMAGE AT HIS OWN EXPENSE. THE GRADING AND CONSTRUCTION OF THE PROPOSED IMPROVEMENTS
THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO STREETS, ROADWAYS OR CURBINGS AND ASSOCIATED STRUCTURES AND SHALL 20.
CONSTRUCTION AS SHOWN.
THE PROPOSED GRADING ELEVATIONS SHOWN ON THE PLANS ARE FINISHED GRADE, ALLOW FOR THICKNESS OF TOPSOIL OR OTHER ELEMENTS OF 19.
DO NOT SCALE DRAWINGS IF COORDINATES AND DIMENSIONS ARE GIVEN.18.
BURN PLAN REVIEWED AND AUTHORIZED BY THE OWNER PRIOR TO IGNITION.
ENGINEER. BURNING BRUSH PILES AND/OR PRESCRIBED BURNING IS ALLOWED BY PERMISSION OF THE OWNER UNDER A PROPERLY SUBMITTED
NO BURNING OR INCINERATION OF RUBBISH OR CONSTRUCTION DEBRIS WILL BE PERMITTED ON SITE EXCEPT BY PERMISSION OF THE OWNER OR 17.
THE SITE CONDITIONS AS INDICATED ON THE DRAWINGS.
THE CONTRACTOR IS RESPONSIBLE FOR EXAMINING ALL SITE CONDITIONS PRIOR TO COMMENCEMENT OF CONSTRUCTION AND IS TO COMPARE 16.
HEAVY EQUIPMENT DEPLOYMENT/DROP OFF MAY OCCUR PRIOR TO THE 7:00 AM DAILY START TIME.
WEEKDAYS, 7:00 A.M. TO 4:00 P.M. SATURDAY, AND NO WORK SHALL BE PERFORMED ON SUNDAYS OR HOLIDAYS, PER COUNTY ORDINANCE. NO
AND NOISE POLLUTION. CONSTRUCTION OPERATIONS SHALL BE CONFINED TO THE PERIOD BEGINNING AT 7:00 A.M. AND ENDING AT 6:00 P.M.
POLLUTION CONTROL: THE CONTRACTOR WILL BE REQUIRED TO COMPLY WITH S.W.P.P.P. AND THE STATE REGULATIONS REGARDING AIR, WATER 15.
MATERIALS ARE REQUIRED, THE ITEM WILL BE ADDED (O.B.E.) TO THE CONTRACT AND ADDITIONAL COMPENSATION WILL BE ALLOWED.
WILL BE DEDUCTED FROM THE CONTRACT AND NO ADDITIONAL COMPENSATION WILL BE ALLOWED. IF, IN THE ENGINEER'S OPINION, ADDITIONAL
PAY ITEMS IN THE SUMMARY OF QUANTITIES HAVE BEEN ESTIMATED. IF, IN THE ENGINEER'S OPINION, THE WORK IS NOT REQUIRED, THE ITEM 14.
CONDITIONS EXISTING IN THE FIELD PRIOR TO ORDERING MATERIALS AND BEGINNING CONSTRUCTION.
DIMENSIONS: IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY ALL DIMENSIONS, MATERIALS SUPPLIED BY THE OWNER, AND 13.
AND HUBS.
UNTIL AN AUTHORIZED SURVEYOR HAS WITNESSED OR OTHERWISE REFERENCED THEIR LOCATIONS, INCLUDING ALL ESTABLISHED BENCHMARKS
THE CONTRACTOR SHALL PROTECT AND CAREFULLY PRESERVE ALL SECTION OR SUBSECTION MONUMENTS OR PROPERTY OR REFERENCE MARKERS 12.
CALL J.U.L.I.E. 800-892-0123 FOR FIELD LOCATIONS OF BURIED ELECTRIC, TELEPHONE, CABLE AND GAS FACILITIES.11.
OWNER OF THE TIME AND PLACE OF THE JOINT UTILITY MEET.
THE CONTRACTOR SHALL UTILIZE A JOINT UTILITY MEET FOR THE LOCATION OF UTILITIES. CONTRACTOR SHALL NOTIFY THE ENGINEER, AND 10.
COORDINATION OF ALL UTILITY WORK INVOLVED IN THE CONSTRUCTION AREA WILL BE DISCUSSED AT THE PRE-CONSTRUCTION CONFERENCE.9.
OF THE ENGINEER, UTILITY OWNER, AND OWNER. THIS WORK SHALL BE SOLELY AT THE CONTRACTORS EXPENSE.
BE SHOWN ON THE PLANS. ANY UTILITY THAT IS DAMAGED DURING CONSTRUCTION SHALL BE REPAIRED OR REPLACED TO THE SATISFACTION
THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION OF ALL UNDERGROUND OR SURFACE UTILITIES EVEN THOUGH THEY MAY NOT 8.
EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES.
THE DRAWINGS. THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH ARE OCCASIONED BY HIS FAILURE TO
MAY INTERFERE WITH CONSTRUCTION OPERATIONS AND REPORT TO THE ENGINEER OMISSIONS AND DIFFERENCE FROM THE LOCATIONS SHOWN ON
LINES, MANHOLES, CATCH BASINS, AND SIMILAR STRUCTURES. THE CONTRACTOR SHALL VERIFY THE EXACT LOCATION OF ALL UTILITIES THAT
INFORMATION REGARDING UTILITIES, EITHER PUBLIC OR PRIVATE SUCH AS SEWERS, GAS AND WATERMAINS, TELEPHONE AND ELECTRICAL DUCT
COMPANIES AND SURVEYS, HOWEVER, THE OWNER AND WBK ENGINEERING, LLC DO NOT GUARANTEE THE COMPLETENESS OR ACCURACY OF THE
THE APPROXIMATE LOCATIONS OF EXISTING UTILITIES ARE SHOWN ON THE DRAWINGS ACCORDING TO INFORMATION OBTAINED FROM UTILITY 7.
CONTRACTOR SHALL COOPERATE WITH ALL UTILITY OWNERS AS PROVIDED FOR IN THE STANDARD SPECIFICATIONS.
APPURTENANCES MAY BE LOCATED AND ADJUSTED OR MOVED, IF NECESSARY, PRIOR TO THE START OF CONSTRUCTION OPERATIONS. THE
THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING THE OWNERS OF ALL EXISTING FACILITIES SO THAT THE UTILITIES AND THEIR 6.
SHALL EXTEND INTO THE OWNERS PROPERTY.
UTILITIES, PEDESTRIANS AND VEHICULAR TRAFFIC, AND SUCH SAFETY PRECAUTIONS TO PROTECT AND PROVIDE ACCESS TO PRESERVE USERS
THE CONTRACTOR SHALL TAKE ALL NECESSARY SAFETY PRECAUTIONS TO PROTECT AND PROVIDE ACCESS TO THE ABUTTING PROPERTIES, 5.
THE CONTRACTOR SHALL COORDINATE ACCESS WITH THE OWNER.4.
THE DURATION OF THE CONSTRUCTION PERIOD IN ACCORDANCE WITH THE REQUIREMENTS OF ANY GOVERNING AGENCIES.
THE CONTRACTOR SHALL COORDINATE CONSTRUCTION OPERATIONS TO ENSURE TRAFFIC MAINTENANCE, SURFACE DRAINAGE, ETC. THROUGHOUT 3.
WITH THE SPECIAL PROVISIONS.
ALL TRAFFIC CONTROL AND OTHER ADVISORY SIGNS NEEDED FOR CONSTRUCTION ARE TO BE FURNISHED BY THE CONTRACTOR IN ACCORDANCE
ANY REFERENCE TO STANDARDS THROUGHOUT THE PLANS OR SPECIAL PROVISIONS SHALL BE INTERPRETED AS THE LATEST IDOT STANDARD. 2.
ADOPTED APRIL1, 2016 AND THE "SUPPLEMENTAL SPECIFICATIONS AND RECURRING SPECIAL PROVISIONS", ADOPTED APRIL 1, 2016.
ALL CONSTRUCTION SHALL BE DONE IN ACCORDANCE WITH THE IDOT "STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION", 1.
EXISTING DRAIN TILES
FOR THIS WORK PRIOR TO COMMENCING THE WORK.
THIS WORK SHALL BE COMPLETED TO THE SATISFACTION OF THE ENGINEER. THE OWNER AND THE CONTRACTOR SHALL NEGOTIATE THE PAYMENT
DRAIN TILES ARE ENCOUNTERED DURING CONSTRUCTION THEY SHALL BE RESTORED TO MAINTAIN SERVICE TO UPSTREAM LANDS AND DRAIN TILES.
ATTEMPTS HAVE BEEN MADE TO IDENTIFY AND LOCATE ALL EXISTING DRAIN TILES AS SHOWN ON THE PLANS. IN THE EVENT THAT ADDITIONAL 33.
DATE :
DRAWING NO.
TIT
LE :
DS
GN.
CH
KD.
SC
ALE :
DW
N.
NA
TU
RE O
F R
EVISIO
NN
O.
DA
TE
SHEET
CLIE
NT :
PROJECT NO.
OF
1 2 3 4 5 6 7 8
FIL
E
NA
ME
W:\
Projects\2018\180181 Spring
Brook
Ph2_3\cadd\
Civil\
Dgn\
Sht\
GN_01.d
gn
===P
LO
T
DA
TE
US
ER
NA
ME
slavanne
2/6/2019
,E
NGIN
EE
RIN
G
WB
KL
LC
(630) 443-7
755
ST.
CH
AR
LES, IL
LIN
OIS 6
0174
116 W
EST M
AIN S
TR
EET, S
UIT
E 2
01
JS
L
JS
L
JJ
W
CR
EE
K & W
ET
LA
ND
SP
RIN
G B
RO
OK N
o. 1
RE
ST
OR
ATIO
N - P
HA
SE 2
18-0181
FO
RE
ST P
RE
SE
RV
E D
IST
RIC
T
OF D
UP
AG
E C
OU
NT
Y
3S
580 N
AP
ER
VIL
LE R
OA
DW
HE
AT
ON, IL 6
0189
(630)
933-7
200
2/14/2019
95
OV1
OV
ER
AL
L P
LA
N
5
1"=
150'
N
S
EW
0' 150' 300' 450'
S
WIN
FIE
LD
DR
MACK RD
MAI
N DR
ALIGNMENT
PR. SPRING BROOK NO.1
SERVICE ROAD
PR. AGGREGATE
SILVER LAKE
MAIN DR
STA. 1+66.85
PROJECT BEGINS
STA. 56+81.24
PROJECT ENDS
ARR
OW
RO
AD
FOREST PRESERVE
BLACKWELL
FOREST PRESERVE
BLACKWELL
(TYP)
LIMITS OF GRADING
SPRIN
G BRO
OK N
O.1
PR ROADWAY BRIDGE
REACH A
REACH B
REACH C
PR. TRAIL
PR TRAIL BRIDGE
TRAIL
0
5
10
0
5
10
15
20
5
10
15
20
25
30
35
40
45
50
55
DATE :
DRAWING NO.
TIT
LE :
DS
GN.
CH
KD.
SC
ALE :
DW
N.
NA
TU
RE O
F R
EVISIO
NN
O.
DA
TE
SHEET
CLIE
NT :
PROJECT NO.
OF
1 2 3 4 5 6 7 8
FIL
E
NA
ME
W:\
Projects\2018\180181 Spring
Brook
Ph2_3\cadd\
Civil\
Dgn\
Sht\
OV_P
LA
N_01.d
gn
===P
LO
T
DA
TE
US
ER
NA
ME
slavanne
2/6/2019
,E
NGIN
EE
RIN
G
WB
KL
LC
(630) 443-7
755
ST.
CH
AR
LES, IL
LIN
OIS 6
0174
116 W
EST M
AIN S
TR
EET, S
UIT
E 2
01
JS
L
JS
L
JJ
W
CR
EE
K & W
ET
LA
ND
SP
RIN
G B
RO
OK N
o. 1
RE
ST
OR
ATIO
N - P
HA
SE 2
18-0181
FO
RE
ST P
RE
SE
RV
E D
IST
RIC
T
OF D
UP
AG
E C
OU
NT
Y
3S
580 N
AP
ER
VIL
LE R
OA
DW
HE
AT
ON, IL 6
0189
(630)
933-7
200
2/14/2019
95
REM1
1"=
200'
S
WIN
FIE
LD
DR
MAI
N DR
SILVER LAKEMAIN DR
STA. 1+66.83
PROJECT BEGINS
FOREST PRESERVE
BLACKWELL
FOREST PRESERVE
BLACKWELL
ARR
OW
RO
AD
6
RE
MO
VA
L P
LA
N
OV
ER
AL
L C
LE
ARIN
G &
MACK ROAD
OAK LANE
TRAIL
12.02 ACRES
CLEARING FOR GRADING
7.18 ACRES
CLEARING FOR GRADING
2.02 ACRES
CLEARING FOR GRADING
3.09 ACRES
CLEARING FOR GRADING
STA. 57+82.93
PROJECT ENDS
ALIGNMENT
PR TRAIL
PARCEL BOUNDARY (TYP)
R.OW. BOUNDARY (TYP)
ALIGNMENT
PR SPRING BROOK NO. 1
FOREST PRESERVE
ST JAMES FARM
EXISTING WETLAND (TYP)
CLEARING FOR GRADING
LEGEND
1 EACH
STRUCTURE REMOVAL,
(INCLUDED IN EARTHWORK)
AGGREGATE ROADWAY REMOVAL
HEAVY SELECTIVE REMOVAL
LIGHT SELECTIVE REMOVAL
0.09 ACRES
LIGHT SELECTIVE REMOVAL
(INCLUDED IN EARTHWORK)
AGGREGATE TRAIL REMOVAL
2.32 ACRES
HEAVY SELECTIVE REMOVAL,
5.48 ACRES
HEAVY SELECTIVE REMOVAL,
ARROW ROAD ALIGNMENT
0.72 ACRES
HEAVY SELECTIVE REMOVAL,
7.22 ACRES
HEAVY SELECTIVE REMOVAL,
6.12 ACRES
LIGHT SELECTIVE REMOVAL,
1.77 ACRES
HEAVY SELECTIVE REMOVAL,
6.14 ACRES
LIGHT SELECTIVE REMOVAL,
3.53 ACRES
LIGHT SELECTIVE REMOVAL,
3.52 ACRES
LIGHT SELECTIVE REMOVAL,
0.24 ACRES
LIGHT SELECTIVE REMOVAL,
2.57 ACRES
CLEARING FOR GRADING
TO SAVE SELECT TREES.
THE GRADING LIMITS AND MAY ADJUST GRADING/REMOVALS
THE ENGINEER SHALL REVIEW AND EVALUATE TREES WITHIN
OF GRADING IN REACH A PRIOR TO COMPLETE CLEARING.
THE CONTRACTOR SHALL STAKE THE STREAM ~ AND LIMITS 2.
CONSIDERED INCIDENTAL TO THE HAUL ROAD INSTALLATION.
ADDITIONAL CLEARING REQUIRED FOR HAUL ROADS IS 1.
NOTE:
HEAVY SELECTIVE REMOVAL, 22.97 ACRES
0.34 ACRES
CLEARING FOR GRADING
1.90 ACRES
CLEARING FOR GRADING
1000 LF
FIELD TILE REMOVAL,
30 LF
PIPE CULVERT REMOVAL, 24"
33 LF
PIPE CULVERT REMOVAL, 24"
35 LF
PIPE CULVERT REMOVAL, 30"
0
5
10
0
5
10
15
20
0
5
10
15
20
25
30
35
40
45
50
55
DATE :
DRAWING NO.
TIT
LE :
DS
GN.
CH
KD.
SC
ALE :
DW
N.
NA
TU
RE O
F R
EVISIO
NN
O.
DA
TE
SHEET
CLIE
NT :
PROJECT NO.
OF
1 2 3 4 5 6 7 8
FIL
E
NA
ME
W:\
Projects\2018\180181 Spring
Brook
Ph2_3\cadd\
Civil\
Dgn\
Sht\
RE
M_01.d
gn
===P
LO
T
DA
TE
US
ER
NA
ME
slavanne
2/6/2019
,E
NGIN
EE
RIN
G
WB
KL
LC
(630) 443-7
755
ST.
CH
AR
LES, IL
LIN
OIS 6
0174
116 W
EST M
AIN S
TR
EET, S
UIT
E 2
01
JS
L
JS
L
JJ
W
CR
EE
K & W
ET
LA
ND
SP
RIN
G B
RO
OK N
o. 1
RE
ST
OR
ATIO
N - P
HA
SE 2
18-0181
FO
RE
ST P
RE
SE
RV
E D
IST
RIC
T
OF D
UP
AG
E C
OU
NT
Y
3S
580 N
AP
ER
VIL
LE R
OA
DW
HE
AT
ON, IL 6
0189
(630)
933-7
200
2/14/2019
95
N
S
EW
0' 200' 400' 600'
PAVEMENT REMOVAL, 365 SQ YD
SAW CUTS, 22 LF
SAW CUTS, 22 LF
2.31 ACRES
HEAVY SELECTIVE REMOVAL
WEIR STRUCTURE REMOVAL, 1 EACH
45 LF
PIPE CULVERT REMOVAL, 84"
TX1
TY
PIC
AL S
EC
TIO
NS
7
RE
AC
H A
3
2
1
4 TOPSOIL PLACEMENT, 6"
LEGEND, STREAM SECTIONS
7
*
*SEE PLANS FOR LOCATIONS AND TYPE
5 EXISTING GROUND SURFACE
6 PROPOSED FINISHED GRADE
8
9
10
EXISTING TOP OF SEDIMENT
EXISTING BOTTOM OF SEDIMENT
STONE TREATMENT, 10"
EXISTING TOPSOIL (NOTE 1)
11
(12" TOPSOIL DEPTH) (NOTE 2)
TOPSOIL FABRIC WRAP
2
1
4
4
5
5
15.0'
7.5' 7.5'
2.0'
TO 2.5'
VA
RIES
2.5:1 TO 3:1
2.5:1 TO 3:1
1.5'1.5'
TYPICAL SECTION A-2
PROPOSED STREAM
VARIES VARIES
0%
5.0'
5.0'
5.0'
2
1
4
4
5
5
15.0'
7.5' 7.5'
2.0'
TO 2.5'
VA
RIES
2.5:1 TO 3:1
2.5:1 TO 3:1
0%
1.5'1.5'
WITHIN STATIONS 1+75 TO 21+15
APPLIES ON NON-POOL SECTIONS
TYPICAL SECTION A-1
PROPOSED STREAM
VARIES VARIES
4
7 5
"OUTSIDE" OF CURVE "INSIDE" OF CURVE
1
64
22.5'22.5'4.0'
4.5'5.0'
10:1 AND V
ARIES
10:1 AND V
ARIES
2
~
PROP
~
PROP
PGL
2.0' 8.0'
2.0'
TYPICAL SECTION A-3
PROPOSED STREAM
VARIES
2.0'8.0'
2.0'
1.5'
2:1
2:1
2.5
0'
2.2
5'
1.0'
.40'
7
1.0'
4
5
"OUTSIDE" OF CURVE"INSIDE" OF CURVE
1
6 4
22.5' 22.5'4.0'
4.5' 5.0'
10:1 AND VARIES
10:1 AND VARIES
2
~
PROP
~
PROP
PGL
TYPICAL SECTION A-4
PROPOSED STREAM
VARIES
2.0' 8.0'
2.0'
1.5'
2:1
2.5
0'
2.2
5'
.40'
7
1.0'
(POOL 3)
WITHIN STATIONS 6+95 TO 16+05
APPLIES ON STREAM BENDS
~
PROP
~
PROP
STATIONS 5+00.00 TO 6+25.00
APPLIES ON POOL 1
2'
MA
X
VA
RIES
2.0'6.0'
MEANDER WOOD TOE STABILIZATION
3.1
3.2
FOUNDATION LOG
MEANDER WOOD TOE STABILIZATION
ROOT WAD LOG
MEANDER WOOD TOE STABILIZATION
3.3LIMITS OF EXCAVATION BELOW FINISHED GRADE
MEANDER WOOD TOE STABILIZATION
3.4T0PSOIL FABRIC WRAP
MEANDER WOOD TOE STABILIZATION
3.5BACKFILL
MEANDER WOOD TOE STABILIZATION
**
**
**
**
**
**
**
6 6
3.4
3.1 3.2 3.3
3.5
(POOLS 2 & 4)
WITHIN STATIONS 6+95 TO 16+05
APPLIES ON STREAM BENDS
2
1
45
2.5:1 TO 3:1
0%
VARIES
~
PROP
610
VARIES
(SEE NOTE 3)
(MAY BE MIRRORED OR ADAPTED TO ALTERNATIVE GEOMETRY)
WHERE IN SITU BANK SOIL IS UNSTABLE
TO BE APPLIED AT THE DIRECTION OF THE ENGINEER
4" PERFORATED DRAIN TILE
TYPICAL SECTION
ALTERNATIVE BANK
12 COBBLE, 6' - 16"
12
STABILIZATION (SEE NOTES AND PLAN VIEW SHEET TX2)
3.1 - 3.5 ARE ALL PAID FOR AS MEANDER WOOD TOE
BANK COBBLE
PAID FOR AS ALTERNATIVE BANK STABILIZATION.3.
SEPARATELY AS TOPSOIL EXCAVATION AND PLACEMENT.
THE TOPSOIL FABRIC WRAP. THE TOP 6" OF TOPSOIL SHALL BE PAID FOR
6" OF TOPSOIL AND EXCAVATION REQUIRED SHALL BE INCLUDED IN THE COST OF
SLOPE WHERE SHOWN IN THE LANDSCAPING AND PLANTING PLAN. THE ADDITIONAL
TOPSOIL FABRIC WRAP SHALL BE USED TO RETAIN THE TOP OF THE CHANNEL 2.
WITHIN THE FOOTPRINT OF THE EXISTING IMPOUNDMENT AREA OF REACH B.
RESPREAD AT ALL LOCATIONS WITHIN THE LIMITS OF DISTURBANCE, EXCEPT
6" OF EXISTING TOPSOIL SHALL BE REMOVED AND SALVAGED ON-SITE FOR 1.
NOTES:
DATE :
DRAWING NO.
TIT
LE :
DS
GN.
CH
KD.
SC
ALE :
DW
N.
NA
TU
RE O
F R
EVISIO
NN
O.
DA
TE
SHEET
CLIE
NT :
PROJECT NO.
OF
1 2 3 4 5 6 7 8
FIL
E
NA
ME
W:\
Projects\2018\180181 Spring
Brook
Ph2_3\cadd\
Civil\
Dgn\
Sht\
TY
P_01.d
gn
===P
LO
T
DA
TE
US
ER
NA
ME
slavanne
2/6/2019
,E
NGIN
EE
RIN
G
WB
KL
LC
(630) 443-7
755
ST.
CH
AR
LES, IL
LIN
OIS 6
0174
116 W
EST M
AIN S
TR
EET, S
UIT
E 2
01
JS
L
JS
L
JJ
W
CR
EE
K & W
ET
LA
ND
SP
RIN
G B
RO
OK N
o. 1
RE
ST
OR
ATIO
N - P
HA
SE 2
18-0181
FO
RE
ST P
RE
SE
RV
E D
IST
RIC
T
OF D
UP
AG
E C
OU
NT
Y
3S
580 N
AP
ER
VIL
LE R
OA
DW
HE
AT
ON, IL 6
0189
(630)
933-7
200
2/14/2019
95
TX2
TY
PIC
AL S
EC
TIO
NS
8
RE
AC
H A
4
7 5
"OUTSIDE" OF CURVE "INSIDE" OF CURVE
1
64
22.5'12.5'6.0'
2.5'
5.0'
2.5'
1.0'
10:1 AND V
ARIES
10:1 AND V
ARIES
2
PGL
TYPICAL SECTION A-4
PROPOSED STREAM
VARIES
2.0'8.0'
2.0'
1.5'
.40'
1.0'
7
2:1
2:1
2.0' 8.0'
2.0'
1.0'
~
PROP
~
PROP
4
5
"OUTSIDE" OF CURVE"INSIDE" OF CURVE
1
4
22.5' 12.5' 6.0'
2.5'
5.0'
2.5'
1.0'
10:1 AND VARIES
10:1 AND VARIES
2
PGL
TYPICAL SECTION A-4
PROPOSED STREAM
VARIES
2.0' 8.0'
2.0'
1.5'
.40'
1.0'
7
2:1
~
PROP
~
PROP
2.0'8.0'
~
PROP
2
1
4
4
5
5
2.0'
TO 2.5'
VA
RIES
2.5:1 TO 3:1
2.5:1 TO 3:1
0%
10' 10'
20'
1.5' 1.5'
WITHIN STATIONS 21+65 TO 24+35
APPLIES ON TANGENT SECTIONS
TYPICAL SECTION A-2
PROPOSED STREAM
VARIES VARIES
3.1 3.2 3.3
3.43.5
6
3
2
1
4 TOPSOIL PLACEMENT, 6"
LEGEND, STREAM SECTIONS
7
*
5 EXISTING GROUND SURFACE
6 PROPOSED FINISHED GRADE
8
9
10
EXISTING TOP OF SEDIMENT
EXISTING BOTTOM OF SEDIMENT
STONE TREATMENT, 10"
EXISTING TOPSOIL (NOTE 1)
11
(12" TOPSOIL DEPTH) (NOTE 2)
TOPSOIL FABRIC WRAP
MEANDER WOOD TOE STABILIZATION
3.1
3.2
FOUNDATION LOG
MEANDER WOOD TOE STABILIZATION
ROOT WAD LOG
MEANDER WOOD TOE STABILIZATION
3.3LIMITS OF EXCAVATION BELOW FINISHED GRADE
MEANDER WOOD TOE STABILIZATION
3.4T0PSOIL FABRIC WRAP
MEANDER WOOD TOE STABILIZATION
3.5BACKFILL
MEANDER WOOD TOE STABILIZATION
**
**
**
**
**
**
759
(POOL 5)
WITHIN STATIONS 16+05 TO 21+15
APPLIES ON STREAM BENDS
(POOLS 6)
WITHIN STATIONS 16+05 TO 21+15
APPLIES ON STREAM BENDS
4" PERFORATED DRAIN TILE
PLACEMENT.
TOP 6" OF TOPSOIL SHALL BE PAID FOR SEPARATELY AS TOPSOIL EXCAVATION AND
EXCAVATION REQUIRED SHALL BE INCLUDED IN THE COST OF THE TOPSOIL FABRIC WRAP. THE
SHOWN IN THE LANDSCAPING AND PLANTING PLAN. THE ADDITIONAL 6" OF TOPSOIL AND
TOPSOIL FABRIC WRAP SHALL BE USED TO RETAIN THE TOP OF THE CHANNEL SLOPE WHERE 2.
THE EXISTING IMPOUNDMENT AREA OF REACH B.
ALL LOCATIONS WITHIN THE LIMITS OF DISTURBANCE, EXCEPT WITHIN THE FOOTPRINT OF
6" OF EXISTING TOPSOIL SHALL BE REMOVED AND SALVAGED ON-SITE FOR RESPREAD AT 1.
NOTES:
12
BANK COBBLE
*SEE PLANS FOR LOCATIONS AND TYPE
**
12 COBBLE, 6' - 16"
STABILIZATION (SEE NOTES AND PLAN VIEW THIS SHEET)
3.1 - 3.5 ARE ALL PAID FOR AS MEANDER WOOD TOE
DATE :
DRAWING NO.
TIT
LE :
DS
GN.
CH
KD.
SC
ALE :
DW
N.
NA
TU
RE O
F R
EVISIO
NN
O.
DA
TE
SHEET
CLIE
NT :
PROJECT NO.
OF
1 2 3 4 5 6 7 8
FIL
E
NA
ME
W:\
Projects\2018\180181 Spring
Brook
Ph2_3\cadd\
Civil\
Dgn\
Sht\
TY
P_02.d
gn
===P
LO
T
DA
TE
US
ER
NA
ME
slavanne
2/11/2019
,E
NGIN
EE
RIN
G
WB
KL
LC
(630) 443-7
755
ST.
CH
AR
LES, IL
LIN
OIS 6
0174
116 W
EST M
AIN S
TR
EET, S
UIT
E 2
01
JS
L
JS
L
JJ
W
CR
EE
K & W
ET
LA
ND
SP
RIN
G B
RO
OK N
o. 1
RE
ST
OR
ATIO
N - P
HA
SE 2
18-0181
FO
RE
ST P
RE
SE
RV
E D
IST
RIC
T
OF D
UP
AG
E C
OU
NT
Y
3S
580 N
AP
ER
VIL
LE R
OA
DW
HE
AT
ON, IL 6
0189
(630)
933-7
200
2/14/2019
95
ROOT WAD LOGS
PR
OP
OS
ED C
HA
NN
EL
FOUNDATION LOGS
TYPICAL PLAN VIEW
MEANDER WOOD TOE STABILIZATION
COMPACTED WITH A HAND TAMPER OR MECHANICAL TAMPER.
THE SPACE BETWEEN LOGS SHALL BE BACKFILLED WITH SAND/GRAVEL MIX AND 7.
DISTRICT AS AVAILABLE.
STREAMSIDE END OF FABRIC WRAP. ACTUAL SPECIES TO BE USED TO BE DETERMINED BY
LIVE WILLOW CUTTINGS TO BE INSTALLED AT TRANSITION BETWEEN ROOTWAD AND 6.
THE LOGS USED.
ILLUSTRATIVE PURPOSES ONLY. ACTUAL LAYOUT WILL VARY WITH THE DIMENSIONS OF
PLAN VIEW MAY NOT REPRESENT ACTUAL LOG LAYOUT AND IS INTENDED FOR 5.
BETWEEN TRUNKS.
ROOT WADS SHALL BE PLACED AS CLOSE TOGETHER AS POSSIBLE TO MINIMIZE GAPS 4.
MORE THAN 3' APART.
OVERLAP AND SECURED WITH STAKES THROUGH BOTH ROLLS. THE STAKES MAY BE NO
WIDTH, ROLLS MAY BE STITCHED TOGETHER WITH A MINIMUM 1' OVERLAP OR USE A 5'
FABRIC GREATER THAN 13'. WHERE MULTIPLE ROLLS ARE REQUIRED TO ACHIEVE DESIRED
TOPSOIL FABRIC WRAP TO BE DIMENSIONED AS SHOWN. THIS MAY REQUIRE A WIDTH OF 3.
SHALL BE TRIMMED TO THE TRUNK.
ROOT MASS SHALL BE BETWEEN 12" TO 20". ALL BRANCHES ABOVE THE ROOT MASS
AT THE TOP END. THE DIAMETER THROUGH THE ENTIRE LENGTH OF THE LOG ABOVE THE
SHALL RETAIN A SIGNIFICANT PORTION OF ROOT MASS. THE LOGS SHALL BE CLEANLY CUT
ROOT WAD LOGS SHALL BE A MINIMUM LENGTH OF 10' ABOVE THE ROOT MASS. THE LOGS 2.
LOG SHALL BE BETWEEN 12" TO 20". ALL BRANCHES SHALL BE TRIMMED TO THE TRUNK.
BE CLEANLY CUT AT BOTH ENDS. THE DIAMETER THROUGH THE ENTIRE LENGTH OF THE
FOUNDATION LOGS AND FACE LOGS SHALL BE A MINIMUM LENGTH OF 10'. THE LOGS SHALL 1.
MEANDER WOOD TOE STABILIZATION NOTES:
0%
2.0'
18" 18
"
TX3
TY
PIC
AL S
EC
TIO
NS
9
~
PROP
2.5:1
2.5:1
1
10
98
11
2.5'
20.0'
10.0' 10.0'
10.0' 10.0'
% VAR. % VAR.
6
10 2
EXCAVATED MATERIALSPLACEMENT OF
MAXIMUM ELEVATION 705.1
MAXIMUM ELEVATION 705.1
VARIES
(SEE GRADING PLANS)(SEE GRADING PLANS)
VARIES
% VAR.% VAR.
~
PROP
2
1
4
4
5
5
20.0'
10.0' 10.0'
2.0'
TO 2.5'
VA
RIES
2.5:1 TO 3:1
2.5:1 TO 3:1
0%
7 5
"OUTSIDE" OF CURVE "INSIDE" OF CURVE
1
64
10:1 AND V
ARIES
10:1 AND V
ARIES
2
~
PROP
~
PROP
PGL
1.5' 1.5'
RE
AC
HE
S B & C
TYPICAL SECTION C-1
PROPOSED STREAM
WITHIN REACH C
APPLIES ON TANGENT SECTIONS
TYPICAL SECTION C-2
PROPOSED STREAM
WITHIN REACH C
APPLIES ON STREAM BENDS
TYPICAL SECTION B-1
PROPOSED STREAM
APPLIES THROUGHOUT REACH B
2:1
2:1
VARIES VARIES
4
VARIES
2.0'8.0'
2.0'
1.5'
.40'
1.0'
2.5
0'
2.2
5'2
:1
22.5'22.5'6.5'4.5'5.0'
2.0' 8.0'
2.0'
1.0'
2.0'
7
3
2
1
4 TOPSOIL PLACEMENT, 6"
LEGEND, STREAM SECTIONS
7
*
*SEE PLANS FOR LOCATIONS AND TYPE
5 EXISTING GROUND SURFACE
6 PROPOSED FINISHED GRADE
8
9
10
EXISTING TOP OF SEDIMENT
EXISTING BOTTOM OF SEDIMENT
STONE TREATMENT, 10"
EXISTING TOPSOIL (NOTE 1)
11 4" PERFORATED DRAIN TILE (NOTE 3)
(12" TOPSOIL DEPTH) (NOTE 2)
TOPSOIL FABRIC WRAP
MEANDER WOOD TOE STABILIZATION
3.1
3.2
FOUNDATION LOG
MEANDER WOOD TOE STABILIZATION
ROOT WAD LOG
MEANDER WOOD TOE STABILIZATION
3.3LIMITS OF EXCAVATION BELOW FINISHED GRADE
MEANDER WOOD TOE STABILIZATION
3.4T0PSOIL FABRIC WRAP
MEANDER WOOD TOE STABILIZATION
3.5BACKFILL
MEANDER WOOD TOE STABILIZATION
**
**
**
**
**
**
**
6
(SEE DETAIL SHEET TX2)
MEANDER WOOD TOE STABILIZATION
3.1 - 3.5 ARE ALL PAID FOR AS
BANK COBBLE (PAID FOR AS REACH B BANKS, SEE NOTE 5)
SHALL BE MAINTAINED AT ALL TIMES THROUGH REACH B.
REMOVED. A MINIMUM "BANK LINING" OF 18" OF COBBLE, 2"-6"
FIRM SUPPORTIVE SOIL AND LOOSE SEDIMENT HAS BEEN
SET BY THE ELEVATION WHERE THE COBBLE CAN BE PLACED ON
THE BOTTOM OF THE REACH B BANKS INSTALLATION IS TO BE 5.
RESERVED4.
THE COFFERDAM OR AS SPECIFIED BY THE ENGINEER.
BEYOND THE TOE-OF SLOPE WHERE PRACTICAL WITHIN LIMITS OF
DEPTH IS GREATER THAN 18". DRAIN TILES ARE TO EXTEND 30'
FIELD TILE TO BE PLACED AT 30' SPACING WHERE SEDIMENT 3.
FOR SEPARATELY AS TOPSOIL EXCAVATION AND PLACEMENT.
TOPSOIL FABRIC WRAP. THE TOP 6" OF TOPSOIL SHALL BE PAID
EXCAVATION REQUIRED SHALL BE INCLUDED IN THE COST OF THE
PLANTING PLAN. THE ADDITIONAL 6" OF TOPSOIL AND
THE CHANNEL SLOPE WHERE SHOWN IN THE LANDSCAPING AND
TOPSOIL FABRIC WRAP SHALL BE USED TO RETAIN THE TOP OF 2.
EXISTING IMPOUNDMENT AREA OF REACH B.
OF DISTURBANCE, EXCEPT WITHIN THE FOOTPRINT OF THE
ON-SITE FOR RESPREAD AT ALL LOCATIONS WITHIN THE LIMITS
6" OF EXISTING TOPSOIL SHALL BE REMOVED AND SALVAGED 1.
NOTES:
SE
DI
ME
NT
DEP
TH
VA
RIES
W/
BANKS WHERE NECESSITATED BY SEDIMENT DEPTHWEDGE REQUIRED FOR SELF-SUPPORTING REACH B
OF COBBLE BANK (SEE NOTE 4).OVEREXCAVATION FOR INSTALLATION
REACH B BANKS WHEN NO SEDIMENT IS PRESENTDASHED LINE ILLUSTRATES MINIMUM EXTENTS OF
DATE :
DRAWING NO.
TIT
LE :
DS
GN.
CH
KD.
SC
ALE :
DW
N.
NA
TU
RE O
F R
EVISIO
NN
O.
DA
TE
SHEET
CLIE
NT :
PROJECT NO.
OF
1 2 3 4 5 6 7 8
FIL
E
NA
ME
W:\
Projects\2018\180181 Spring
Brook
Ph2_3\cadd\
Civil\
Dgn\
Sht\
TY
P_03.d
gn
===P
LO
T
DA
TE
US
ER
NA
ME
slavanne
2/6/2019
,E
NGIN
EE
RIN
G
WB
KL
LC
(630) 443-7
755
ST.
CH
AR
LES, IL
LIN
OIS 6
0174
116 W
EST M
AIN S
TR
EET, S
UIT
E 2
01
JS
L
JS
L
JJ
W
CR
EE
K & W
ET
LA
ND
SP
RIN
G B
RO
OK N
o. 1
RE
ST
OR
ATIO
N - P
HA
SE 2
18-0181
FO
RE
ST P
RE
SE
RV
E D
IST
RIC
T
OF D
UP
AG
E C
OU
NT
Y
3S
580 N
AP
ER
VIL
LE R
OA
DW
HE
AT
ON, IL 6
0189
(630)
933-7
200
2/14/2019
95
4:1
1.5%1.5%
3
2
1
LEGEND, SERVICE ROAD
1
4
~
EXIST
20.0'
10.0'10.0'
0.5'
TX4
TY
PIC
AL S
EC
TIO
NS
10
NOTES:
TYPICAL SECTION
PROPOSED ARROW ROAD
3.0'
6 5 2
5
6
7
3
3.0'
4:1
4
2" - HMA SURFACE COURSE, MIX "D", N50
5" - HMA BINDER COURSE, IL-19.0, N50
AGGREGATE SUBGRADE IMPROVEMENT, 12"
EXISTING GROUND
7
~
PROP
3:1 3
:1 3:1
5% 5%
3
2
1
AGG BASE COURSE, TY B, 6"
4 EXISTING GROUND
3.5'
TOPSOIL PLACEMENT, 6" (NOTE 6)
2.0' VAR. 5'
5GROUND STABILIZATION
GEOTECHNICAL FABRIC FOR
LIMESTONE TRAIL SURFACE, 2"
1.5' 1.5'
6
234 5 16
~
PROP
3:1 3
:1
5% 5%
3.5' 5'
1.5' 1.5'
234 5 16
VAR.
.5'
.5'
TYPICAL SECTION
PROPOSED TRAIL
TYPICAL SECTION
PROPOSED TRAIL
STATION 4+46.08 TO 20+75.00
STATION 1+25.00 TO 3+53.92
NOTE: SEE PEDESTRIAN BRIDGE PLANS FOR STATION 3+53.92 TO 4+46.08
STATION 4+36.86 TO 5+81.83
STATION 0+50.00 TO 3+71.08 &
TOPSOIL FURNISH AND PLACEMENT, 6" MIN. (SEE NOTE 4)
4.
3.
2.
1.
7" - AGGREGATE SHOULDERS, TYPE B
1.0' 1.0'
0.5'
5' 3.5'
10'
5' 3.5'
TR
AIL & A
RR
OW R
OA
D
SEE GRADING PLAN.
GRADING BEYOND AGGREGATE SHOULDERS MAY VARY.
3+7.08 TO 4+36.86
SEE ARROW ROAD BRIDGE PLANS FOR STATIONS
EXCAVATION.
ROAD SHALL BE INCLUDED IN THE COST OF EARTH
THE REMOVAL OF EXISTING AGGREGATE ALONG ARROW
AREAS.
THE TRAIL. REFER TO LANDSCAPING PLANS FOR
TURF MIX SHALL BE USED ALONG THE SHOULDERS OF
1.5% TO 2% CROSS SLOPE
1.5% TO 2% CROSS SLOPE
10'
LEGEND, TRAIL
EMBANKMENT
EMBANKMENT
DATE :
DRAWING NO.
TIT
LE :
DS
GN.
CH
KD.
SC
ALE :
DW
N.
NA
TU
RE O
F R
EVISIO
NN
O.
DA
TE
SHEET
CLIE
NT :
PROJECT NO.
OF
1 2 3 4 5 6 7 8
FIL
E
NA
ME
W:\
Projects\2018\180181 Spring
Brook
Ph2_3\cadd\
Civil\
Dgn\
Sht\
TY
P_04.d
gn
===P
LO
T
DA
TE
US
ER
NA
ME
slavanne
2/6/2019
,E
NGIN
EE
RIN
G
WB
KL
LC
(630) 443-7
755
ST.
CH
AR
LES, IL
LIN
OIS 6
0174
116 W
EST M
AIN S
TR
EET, S
UIT
E 2
01
JS
L
JS
L
JJ
W
CR
EE
K & W
ET
LA
ND
SP
RIN
G B
RO
OK N
o. 1
RE
ST
OR
ATIO
N - P
HA
SE 2
18-0181
FO
RE
ST P
RE
SE
RV
E D
IST
RIC
T
OF D
UP
AG
E C
OU
NT
Y
3S
580 N
AP
ER
VIL
LE R
OA
DW
HE
AT
ON, IL 6
0189
(630)
933-7
200
2/14/2019
95