site planretirementstyle.co.za/wp-content/uploads/2018/03/rubicon-site-plan.pdfcarports c a r-p o r...
TRANSCRIPT
sto
p
stop stop stop
sto
p
sto
psto
p
DESCRIPTION:PROJECT NAME:THE COPYRIGHT ACT (98 OF 1978)
COPYRIGHT VESTED WITH THE ARCHITECTS IN TERMS OF
MESS'S KLIPKOPPIE DEVELOPMENTS
DU PREEZ STREET ORCHARDS SUB'B
ERF 3361 NELSPRUIT EXTENSION 29
NEW RUBICON RETIREMENT VILLAGE
D E P A R T E M E N T / C L I E N T
Collfin Property Group
Mess,s Klipkoppie Developments
SACAP
SCALE
DRAWN
CHECKEDJB
JB
7656DATE
DRAWING No.
Rev. accordingly before any work is put in hand.
Engineer and all foundations and/or bearing surfaces are to be designed
* A proper geotechnical soil investigation need to be done by a qualified
Engineer's drawings, specifications and instructions.
work are to be in accordance with SABS 1200 as per a Registered
* All structural work / components, foundations and civil engineering
with accuracy level 2 (as min.) of SABS 0155.
* Figured dimensions enjoy preference to scale. Building work to comply
and Local Authority By-Laws and/or regulations.
relevant SABS specifications, National Building Regulations (SANS 10400)
* All material and methods of construction to be in accordance with the
is put in hand. Refer all discrepancies to the author for clearing.
* All dimensions and heights are to be checked on site before any work
construction related activities on site
* Comply with relevant OSH Act Safety and Health requirements for all
said parties are aware of site circumstances if they commence work.
conditions on site before work is put in hand. It is accepted that
* Contractors and sub-contractors should avail themselves of existing
and true to ensure proper storm water run-off over the entire site.
the site after completion. Finish the new or exist. ground level even
* Keep the site clean at all times and remove all building rubble from
damage to existing components / structures of employer & neighbours, etc.
* All new work to be done in such a manner to minimise dust, noise and
to be done by a Regist.Surveyor before any building work is put in hand.
A proper survey of the site to determine exact falls & boundaries need
* Establish a site datum level and maintain for duration of the Contract.
* Expansion joints in the structure per Eng. spec. & drwg's. if required.
13/01/14 1530/06/08 06 Add leisure centre block A and block B
Add screen walls & stairs between units in centre blocks 0630/06/08
16/08/11
27/08/08
17/07/08
02/07/08
02/07/08 07
08
09
10
11 Revised Unit layout; Centre Block & South Blocks
Change screen wall layout units 49-52: Entrance gate layout
Add Leisure Centre residential Block C
Change A2 unit #55 to double garage; adjust dimensions
Change & adjust Leisure Centre Block A Fire Stair
14/01/13 12 Revised Site Sub-Division as per Land Surveyor
27/12/06 14 Revise Unit Types on Stands 18 - 23 & 85 - 86
Add Fire Hydrant detail per 2008 approved Building Plans
SITE DEVELOPMENT PLAN LAYOUT
1110/01sd
04/09/14 17 Revised Existing and New Unit Layout; Revised Schedules
10/09/14 18 Revised Existing and New Unit Layout; Revised Schedules
carp
ort
K1
ce
ce
SmS K3 K3m
PROPOSED BUSINESS STAND
SCALE 1:400
SITE PLAN
D
Du Pre
ez Street 20
m
43
FUTURE DEVELOPMENT AFTER
APPROPRIATE ZONING APPROVAL
MainEntrance
Manhole
3500 building line
124 8
70
yard yard yard
patiopatio
patio patio
carp
ort
yard
parkin
g
parkin
g
A2 dg
55
garage
57 58
K1m S
59 60
Sm
56
A2
62
K1mK1
61
garage
car-
port
gara
ge
gara
ge
Office
Security
patio
patio
patio patio patio patio
Port 2
Re 80
gara
ge
car-
port
gara
ge
7778
FH
parkin
g
91
road as p
er eng
T1 T1m
T1mT1 T1m
92
93
T1
T1m
90
8988
19 20a
22 23 24
C
E
2292 BLOCK F
18
Garages
8910111213141516171819202122232425262728
29 30 31 33 34
39
69
70
71
Emergency
Loadin
g
Loadin
g
Gara
ge
Gara
ge
Gara
ge
Gara
ge
Gara
ge
Gara
ge
Garage
Garage
Garage
carp
ort
carp
ort
conc. block paving
road as per eng
35363738
32
carp
ort
pool
splash
Gen-S
et
BLOCK B LEISURE CENTRE
BL
OC
K E
BLOCK D
Re 84
111 112
113 114 115 116 117
patio patio
patio patio
patiopatio
yard
yard
1/2
991
16 17 18 19 20 21
C
B
114 2
30
1065b
404142434445464748
Em
erg
ency
Em
erg
ency
FH
49
87
65 66 67 68 69
patio
5a 11874321
A
Port 1
50
55 56 57 58 59 60 61 62 63 64
5152
5354
BLOCK A LEISURE CENTRE
36
9
3837K1m
patio
patio
gara
ge
double
patiopatio
patiopatio
39
K1
40
K1m
K4 K4m41 42
43 444645
K4 K4mK4 K4mK1 K1m
patiopatio
patiopatio
patio patio
patio patiopatio patio
patio patiopatio patio
patio patio
gara
ge
gara
ge
gara
ge
gara
ge
gara
ge
gara
ge
gara
ge
gara
ge
gara
ge
gara
ge
41
4243
44
69
70
73
74
75
76
77
78
79
80 81 82 83 84
1 2 3 4 5 6
paving
Area
Refuse
deckdeck deck
deck deck
deck
85
Erf 3362
Service
Entrance
294 380
Erf 3361Re 80
21a 22a 24a 25 26
G
J
K
23a
D
E
20b
22b
1234567
72
73
74
75
BLOCK C LEISURE CENTRE
Erf 3360
247 270
3000 building line
23 22 21 20 19 18
Re 80
carports
car-
port
car-
port
gara
ge
gara
ge
J7 J7mJ3c J3c
mJ3a J3a
m
gara
ge
gara
ge
C
conc. block paving
road as per eng
yard
yard
16
patio
F2
J1m
12F2
gara
ge
patio
9
yard
15
J3
car-
port
car-
port
J3m
14
J1
13
car-
port
J3
11 10
J3m
car-
port
gara
ge
gara
ge
F2m
gara
ge
patio
8
gara
ge
7
J2 J2m
6
gara
ge
5
patio
gara
ge
F2
yard
1 2
35
garage
garage
79
gara
ge
F2m
gara
ge
patio
17
yard yardyard yard
yard yard
yard yard
yard
patio patiopatio patio
patiopatio
patio patio patio patio patio patiopatio patio
R/2
991
Erf 3411/8
85 86
yardyardyard
patiopatiopatio
gara
ge
gara
ge
gara
ge
carp
ort
J1mJ1 J1m
27 26 Re 82
BPrudential Citrus Estates 1
31 JUPortion 13 South African
48 660
patio
gara
ge
F2
32yardyardyardyard
patiopatio
patiopatio
gara
ge
gara
ge
gara
ge
carp
ort
carp
ort
J7m
J3a J1 J1m
31 30 29 28
35
F2b
patio
patiopatio
gara
ge
gara
ge
gara
ge
double
3334
11
gara
ge
gara
ge
yardyard
R Rm
Re 80
A
yard yard
67
89
1011
12131415161718192021
22
23
242526272829
303132
3334
3536
3738
39
40
4546
4748
49 50 51 5253 54 55 56 57 58 59 60 61 62
63
64 65 66 67 68
yard
yard
J3a J3am
patio patio
patio patio
patio
patio patio
patio
patio
patiopatioT1
Laundry
Admin Offices
Lounge
Resident
Lift
Stair
Stair
Kitchen Servery
Dining Room
StaffToilets
patio patio patio patio
patio patio patio patio
patio patio patio patio
patio
patio
Stair
Stair
Stair
Lift
Lobby
Entrance
Entrance
4
1902/07/15
PHASE 1
PHASE 2
PHASE 3
PHASE 4
Open Open
PHASE 5
101 10099 98
97 96
95
102 103 104 105 106107 108
109
patio
conc. block p
avin
g
94
FH
71
72
T1m
110
patiopatio patio
patio patiopatio patio
patio patio
12
11
10
9
8
7
carp
orts
T1T1mT1T1mT1m
T1mT1T1
T1m T1T1m T1m
T1 T1mT1
yard
yard
yardyard
yard
yardyard yard
yard yard
75
F4 F4m F4 F4mF4
75.1 75.2 75.4 75.575.3
75.6 75.7 75.975.8 75.10
F3 F3m F3 F3mF3
02/07/15 20 Revised Colour of Development Phases
Simplify layout with block indications only
28/06/17 21 ADD Phase 5 Development comprising 26 units
269 Pleiades Avenue,
Waterkloof Ridge,
PO Box 25040,
Monument Park,
Pretoria, 0105.
+27 12 347 0333
86
87
89 9088
949591 92
93
F4 F4m
F3 F3m
118
PHASE 6
23
16 August 2017
F4 F4m
F3 F3m
F4 F4m
F3 F3m
3000
3000
3000
3000
3600
3600
3550
1450
2000
2000
1000
600
25/07/17 22
Revise Phase 5 Development comprising 26 units27/11/13 13 Add New Units 18 - 23, 85 - 94 and Carport
ADD Phase 6 Development comprising 19 units
16/08/17 23