STUDENT INDUSTRIAL TRAINING (SIT)PCSB - PMO
NABEELA BT ABU KASIM16329
ELECTRICAL AND ELECTRONICS DEPARTMENT
PRESENTATION OUTLINE
Overview of Company
Knowledge Gained
Conclusion
Projects Involvement
Activities
OVERVIEW OF COMPANY
• PETRONAS - Petroliam Nasional Berhad• Established in 17 August 1974 led by Tengku
Razaleigh Hamzah, with RM 10M investment by government
• Listed in FORTUNE Global 500 - sole representative of Malaysia
• Current President & CEO of PETRONAS group - Tan Sri Dato Shamsul Azhar Abbas
• Current chairman - Tan Sri Sidek Hassan
PETRONAS
Vision Statement
To be a Leading Oil and Gas Multinational of Choice
Mission Statement
• We are a business entity• Petroleum is our core business• Our primary responsibility is to develop and add value to this national
resource• Our objective is to contribute to the well-being of the people and the
nation
OVERVIEW OF COMPANY
VISION AND MISSION
BUSINESS, PRODUCTS & SERVICES
Upstream & Downstream OperationOil / PetchemGas / PowerLogistics / MaritimeTechnology / EngineeringPropertiesEducation
OVERVIEW OF COMPANY
Founded on 11th May 1978
OVERVIEW OF COMPANYPETRONAS CARI GALI SDN BHD
Domestic
International
PCSBExploration &
Production Operation
OVERVIEW OF COMPANYPCSB Domestic Operation
Sarawak Operation
(SKO)
Peninsular Malaysia
Operation(PMO)
Sabah Operation
(SBO)
INSTRUMENTED CONTROL PANEL
DOCUMENT SEARCH
ANALYZEP & ID
INSTRUMENT INDEX UPDATE
DULANG INSTRUMENT UPGRADE FOR IO
PROJECT
DISCUSSION WITH VENDOR
FACTORY ACCEPTANCE TEST
FOR COMPACT ORIFICE
FACTORY ACCEPTANCE TEST
FOR FLOW CONTROL VALVE
FACILITIES IMPROVEMENT
PROJECT AT TINGGI-A
DOCUMENT SEARCH
PREPARE DATASHEET
FIRE AND GAS
DISCUSSION WITH VENDOR
DOCUMENT SEARCH
LCV 2024 UPGRADE AT PULAI A
DOCUMENT SEARCH
PREPARE DATASHEET
PROJECTS INVOLVEMENT
ONSHORE GAS TERMINAL
SITE VISIT WITH INSTRUMENT
ENGINEER
ACTIVITIES
Factory Acceptance Test (FAT) for Compact Orifice
Hand pump HART communicator
Multimeter Calipers
Tools used during FAT
Orifice – A plate that is used to create differential pressure to get the reading of flow.Compact orifice – Transmitter consist of orifice plate, strainer & temperature sensor
• The valve (LCV 120) is leaking due to sand erosion
• A new valve need to be replaced thus a new datasheet is needed
ACTIVITIES
•Piping and instrument diagram of the LCV 120 at Tinggi A
•P & ID is important in completing a datasheet
Prepare datasheet for LCV 120 for Facilities Improvement Project at Tinggi - A
Valve that need to be replaced
Preparing Datasheet
The completed datasheet will be send to vendor for sizing and quotation
Service – Data will be given from Process Department
General – Data from P&ID
Body – Data will be given from Mechanical Department
Actuator, Positioner, Transducer – Data will be given from Instrument Department
Prepare datasheet
Fire and gas de-tection system
Flow, Temper-ature, Pressure,
Level
Understand basic P&ID
KNOWLEDGE GAINED
• Exposed to industrial real-life working experience• Gained new skills and knowledge related to the line of study• Opportunity to strengthen communication and management skills
CONCLUSION