sit presentation

22
STUDENT INDUSTRIAL TRAINING (SIT) PCSB - PMO NABEELA BT ABU KASIM 16329 ELECTRICAL AND ELECTRONICS DEPARTMENT

Upload: hakeym-larh

Post on 23-Dec-2015

524 views

Category:

Documents


32 download

DESCRIPTION

Sample of UTP SIT Slide

TRANSCRIPT

STUDENT INDUSTRIAL TRAINING (SIT)PCSB - PMO

NABEELA BT ABU KASIM16329

ELECTRICAL AND ELECTRONICS DEPARTMENT

PRESENTATION OUTLINE

PRESENTATION OUTLINE

Overview of Company

Knowledge Gained

Conclusion

Projects Involvement

Activities

OVERVIEW OF COMPANY

• PETRONAS - Petroliam Nasional Berhad• Established in 17 August 1974 led by Tengku

Razaleigh Hamzah, with RM 10M investment by government

• Listed in FORTUNE Global 500 - sole representative of Malaysia

• Current President & CEO of PETRONAS group - Tan Sri Dato Shamsul Azhar Abbas

• Current chairman - Tan Sri Sidek Hassan

PETRONAS

Vision Statement

To be a Leading Oil and Gas Multinational of Choice

Mission Statement

• We are a business entity• Petroleum is our core business• Our primary responsibility is to develop and add value to this national

resource• Our objective is to contribute to the well-being of the people and the

nation

OVERVIEW OF COMPANY

VISION AND MISSION

BUSINESS, PRODUCTS & SERVICES

Upstream & Downstream OperationOil / PetchemGas / PowerLogistics / MaritimeTechnology / EngineeringPropertiesEducation

OVERVIEW OF COMPANY

PETRONAS CORE BUSINESS

OVERVIEW OF COMPANY

Founded on 11th May 1978

OVERVIEW OF COMPANYPETRONAS CARI GALI SDN BHD

Domestic

International

PCSBExploration &

Production Operation

OVERVIEW OF COMPANY

PCSB International Operation

OVERVIEW OF COMPANYPCSB Domestic Operation

Sarawak Operation

(SKO)

Peninsular Malaysia

Operation(PMO)

Sabah Operation

(SBO)

INSTRUMENTED CONTROL PANEL

DOCUMENT SEARCH

ANALYZEP & ID

INSTRUMENT INDEX UPDATE

DULANG INSTRUMENT UPGRADE FOR IO

PROJECT

DISCUSSION WITH VENDOR

FACTORY ACCEPTANCE TEST

FOR COMPACT ORIFICE

FACTORY ACCEPTANCE TEST

FOR FLOW CONTROL VALVE

FACILITIES IMPROVEMENT

PROJECT AT TINGGI-A

DOCUMENT SEARCH

PREPARE DATASHEET

FIRE AND GAS

DISCUSSION WITH VENDOR

DOCUMENT SEARCH

LCV 2024 UPGRADE AT PULAI A

DOCUMENT SEARCH

PREPARE DATASHEET

PROJECTS INVOLVEMENT

ONSHORE GAS TERMINAL

SITE VISIT WITH INSTRUMENT

ENGINEER

ACTIVITIES

ACTIVITIES

Factory Acceptance Test (FAT) for Compact Orifice

Hand pump HART communicator

Multimeter Calipers

Tools used during FAT

Orifice – A plate that is used to create differential pressure to get the reading of flow.Compact orifice – Transmitter consist of orifice plate, strainer & temperature sensor

ACTIVITIES

1. Test for differential pressure

Compact orificeHand pump

ACTIVITIES

2. Test for temperature sensor

RTD - 3 wires

Connection to test temperature sensor

ACTIVITIES

3. Checking the bore size and diameter of the orifice

Diameter of the orifice

Bore size

• The valve (LCV 120) is leaking due to sand erosion

• A new valve need to be replaced thus a new datasheet is needed

ACTIVITIES

•Piping and instrument diagram of the LCV 120 at Tinggi A

•P & ID is important in completing a datasheet

Prepare datasheet for LCV 120 for Facilities Improvement Project at Tinggi - A

Valve that need to be replaced

Preparing Datasheet

The completed datasheet will be send to vendor for sizing and quotation

Service – Data will be given from Process Department

General – Data from P&ID

Body – Data will be given from Mechanical Department

Actuator, Positioner, Transducer – Data will be given from Instrument Department

KNOWLEDGE GAINED

Prepare datasheet

Fire and gas de-tection system

Flow, Temper-ature, Pressure,

Level

Understand basic P&ID

KNOWLEDGE GAINED

• Exposed to industrial real-life working experience• Gained new skills and knowledge related to the line of study• Opportunity to strengthen communication and management skills

CONCLUSION

THANK YOU