sirris manufacturing day 2013 hansen - eric goos
DESCRIPTION
Doorlooptijdverkorting bij Hansen Transmissions met Quick Response ManufacturingTRANSCRIPT
1
QRM Journey Quick Response
Manufacturing @ Hansen
5 -11- 2013 Eric Goos
W E L C O M E
HANSEN INDUSTRIAL GEARBOXES
Driven by gear technology, Hansen Industrial Transmissions fulfils the needs of its global
customer base by offering them reliable mechanical power transmission solutions for
demanding industrial applications.
INDUSTRY APPLICATIONS APPLICATIONS AND CUSTOMERS
ORGANISATION
¬ Edegem Belgium
HIT – Industrial Gearbox Factory
Employees: +300 Surface: Total: 50,000 m² - Factory: 30,000 m² Functions: R & D, Engineering, Production, Assembly, Sales & Service , Finance , HR Quality assurance: ISO 9001 - since 02.01.1991
6
What is QRM? Quick Response ¬ Think different about LT: Highlight the power of time Create the right Organisational structure Understand the system dynamics Apply it to the whole organisation
Total lead time: 30 days
7
Who is Rajan Suri? An inspiration
Meet the expert
8
Functioneel Cellulair
Top down Control
Team Ownership
Specialisten Cross trained
Efficiëntie Tijdreductie
1. Organisatie
2. Management
3. Personeel
4. Mindset
Traditioneel QRM
The Organisation structure changes…
9
How did we start? ¬ Get training in to QRM:Spread the word & get Guidance ¬ In early beginning send several people to masterclasses ¬ appoint someone to coordinate the QRM journey. ¬ Today about 180 people have had personal training ¬ Read and understand your company. ¬ Try out some (new) things / do a pilot / experiment ¬ Build a plan and be willing to adjust if needed.
10
Investigate the whole process?
11
Define a FTMS and try it out.
¬ 3 december 2012 we started a pilot in the CT -> Q-ROC CT ¬ Ending Januari 2013 this was evaluated and LT in order
handing was between 25% to 50% with only two people. ¬ Building the new organisation started around self steering
teams with following focus: ¬ Bringing people from Sales, Engineering &
Workpreparation together in one team. ¬ Talk and communicatie to eachother, organize yourself /
shorten com. channels ¬ Change management
FTMS = FOCUS TARGET MARKET SEGMENT
Q-ROC = QUICK RESPONCE OFFICE CELLS
12
ACE PROCESSEN
MCT visibility ORI008748QVRD2-CUN-11.2 ORI008748QVRD2-CUN-11.2 ORI008748QVRD2-CUN-11.2 ORI008748QVRD2-CUN-11.2
U60-NJ228EQ 1 132.12 U60-NJ228EQ 1 132.12 U60-NJ228EQ 1 132.12 U60-NJ228EQ 1 132.12 U60-NJ228EQ 1 132.12 U60-NJ228EQ 1 132.12 U60-NJ228EQ 1 132.12 U60-NJ228EQ 1 132.12 U60-NJ228EQ 1 132.12 U60-NJ228EQ 1 132.12 U60-NJ228EQ 1 132.12
ORI008675E17-V230B004ORI008822E17-V230B004ORI008822E17-V230B004ORI009055C17-V230B002ORI009055C17-V230B002ORI008357E17-V230B507ORI008357E17-V230B507ORI008866E17-V230B004ORI008822E17-V230B004ORI008357E17-V230B507ORI008524C17-V230B002ORI008524C17-V230B002ORI008845E17-V230B004ORI008524C17-V230B002ORI008524C17-V230B002ORI008819E17-V230B575ORI008819E17-V230B575ORI008524C17-V230B002ORI008524C17-V230B002ORI008524C17-V230B002ORI008524C17-V230B002
JE17-V203B001 JE17-V203B001 JE17-V203B001 JC17-V203B001 JC17-V202B001 JE17-V203B001 JE17-V203B001 JE17-V203B001 JE17-V203B001 JE17-V203B001 JC17-V202B001 JC17-V203B001 JE17-V203B001 JC17-V202B001 JC17-V203B001 JE17-V203B001 JE17-V203B001 JC17-V202B001 JC17-V203B001 JC17-V203B001 JC17-V202B001
Manufacturing Critical Path Time
13
ACE PROCESSEN
Q-ROC teams order gerelateerd… FTMS = Focus Target Market Segment - Offertes & Orders , claims - Per applicatie? Per Regio? Per categorie? Of een combinatie?
Per Regio, en met focus op categorieën ABC => “Fast track”
Team 1: DACH – RU – IN – SCA
Team 2: BNL – JP – UK - ME (eng)
Team 3: LAT – IT – SCAN (LAT = Latijns EU: Fr/Sp/P)
Team 4: CT (koeltorens)
Team 5: GROUP
Vertical Design Team
Spa
re C
apac
ity W
ith
D -
asig
nmen
ts
NO
NO
RD
ERR
ELAT
ED
OR
DER
REL
ATED
14
ACE PROCESSEN Q-ROC teams order gerelateerd… Team 1: DACH – RU – IN – SCA
Team 2: BNL – JP – UK - ME (eng) Team 3: LAT – IT – SCAN
Team 4: CT
Team 5: GROUP
15
ACE PROCESSEN
TEAM Targets & KPI’s
-Focus on Leadtime (LT) reduction (-50%) for a better OTD.
-Focus ON .. First time right (FTR)
-Focus on Crosstraining en Knowledge sharing (cross departmental)
Introduction of QRM number in every team QRM Number = Baseline measurement X 100 Current measurement
ORDERRELATED teams
16
ACE PROCESSEN
Orderrelated Q-ROC teams
consolidated results
CAT A
CAT A
CAT B
CAT B
Overview YTD
CAT A
23
ACE PROCESSEN
QRM journey today and next steps
Planning: projecten + trainingen najaar 2013.
1. Projecten
Naam OnderwerpAfgevaardigdeQROC - CT
AfgevaardigdeQROC - BNL
AfgevaardigdeQROC - DACH
AfgevaardigdeQROC - LAT
AfgevaardigdeQROC - Group
AfgevaardigdeQROC - DEV
deelnemersQROC - Group
deelnemers QROC-
SPARES
deelnemers QROC-
REPAIRS
deelnemers QROC-ONSITE
deelnemers QROC-
DEVELOPMENT SERVICES
1 Customer intimacy
Standardisatie van een geselecteerde klant binnen uw team.
Dit zowel op het vlak van offerte als orderverwerking
EDC
2 Workflow document
Finaliseren en integreren van het workflow document.
Dit is een nieuwe manier van werken over het hele bedrijf
en zal gedeeltelijk de PCF vervangen.
DNI (MSC) VDRHK (backup)
DVH WVD (SD) VMA DV SSM (VOK)
3 HPP support
Trachten om de behandeling van HPP dossiers te
vereenvoudigen en indien mogelijk zoveel als mogelijk te automatiseren.
KRO (LDE)HK
KPE (backup) LM WVD (GIK) JVG SCD SSM IAD PCA
4 Long LT BOM
Trachten om de werkvoorbereiding (status 2R) eenvoudiger
te maken en een aantal zaken indien mogelijk te automatiseren.
DNI (KRO) HKELR (backup)
PAD WVD (CM) EDC/DV
5 MaattekeningenStandardisatie en regels ivm 97
tekeningen + eventuele vereenvoudigingen.
KRO (LDE)KPE
SVE (backup) LM JVR (CM) NA
6 FTR - 1300 lijn
Afspraken maken ivm behandelen en ingeven AR's.
Vebeteringsacties definiëren om FTR omhoog te brengen.
LDE (KRO) SVEKPE (backup)
PAD JVR (WVD) WMA DMT
7 FTR - checklistHoe gaan we om met nazicht en
zelfcontrole om onze FTR omhoog te brengen.
MSC (DNI)ELR
BR (backup) WL CM (GIK) DMT GAL/SSM GJ MDI
8 Process + procedures
Hoe borgen we alle gemaakte afspraken op
een gestructureerde manier en hoe zorgen we dat weetjes universeel ter
beschkking worden gesteld.
MSC (LDE)ELR
VDR (backup) LOB GIK (CM) NA VOK GJ CAS
9 Resource planning
Een beeld creeëren van de workload binnen de teams om steeds het
overzicht te kunnen houden en soms prioriteiten te bepalen.
DNI (MSC)KPE
VDR (backup) VES WVD (CM) NA DMT SSM/VOK
Heel het teamBR(BNL) - WL(DACH) - LDE(CT) - GIK(LIS) - NA(AC)
¬ Crosstraining from the teams / over the teams ¬ Time slicing with several other departments ¬ Top 9 most urgent trainings with eye on flexibility ¬ Not only office but also Shop floor
24
THANK YOU