sips eco panels: case study · sips eco panels: case study "we arrived at 07:45hrs on frame...

2
receive the SIP frame and less than two weeks after the erectors started on site, the frame and roof were fitted. Karl and Joan Peter had a clear idea of what they wanted to build and how they wanted to build it. Having visited the Home- building and Renovation Show at Peterborough, they chose Custom Homes to do their revised planning drawings and Sips Eco Panels to supply their super-efficient frame. Once they received plan- ning permission and conducted an archaeo- logical dig, they quickly prepared the site to The design was an adapta- tion of what had already been granted per- mission on the site. The adaptations included the provision of a lantern roofed conservatory to the rear and the provision to allow for PV tiles at a later date if required. The build was to incorpo- rate rainwater harvesting, MVHR and solar panels to enhance its efficiency. The Peter’s self-build Design and Self-Build The Design South Suffolk Business Centre, Sips Eco Panels 4-7 Boston Road, Glenrothes, Fife, KY62RE www.sipsecopanels.co.uk t: 01592 631636 e: [email protected] Sips Eco Panels: Case Study

Upload: others

Post on 04-Jun-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Sips Eco Panels: Case Study · Sips Eco Panels: Case Study "We arrived at 07:45hrs on frame delivery day to find the erection team already onsite and unloading the SIPs Eco Panels

receive the SIP frame and less than two weeks after the erectors started on site, the frame and roof were fitted.

Karl and Joan Peter had a clear idea of what they wanted to build and how they wanted to build it. Having visited the Home-building and Renovation Show at Peterborough, they chose Custom Homes to do their revised planning drawings and Sips Eco Panels to supply their super-efficient frame.

Once they received plan-ning permission and conducted an archaeo-logical dig, they quickly prepared the site to

The design was an adapta-tion of what had already been granted per-mission on the site.

The adaptations included the provision of a lantern roofed conservatory to the rear and the provision to allow for PV tiles at a later date if required.

The build was to incorpo-rate rainwater harvesting, MVHR and solar panels to enhance its efficiency.

The Peter’s self-build

Design and Self-Build

The Design

Sips Eco Panels: Case Study

Sips Eco Panels South Suffolk Business Centre,

Alexandra Road, SUDBURY,

Suffolk. CO10 2ZX

www.sipsecopanels.co.uk

t: 01787 377388 f: 01787 377622

e: [email protected]

Sips Eco Panels4-7 Boston Road,

Glenrothes,Fife,

KY62RE

www.sipsecopanels.co.uk

t: 01592 631636

e: [email protected]

Sips Eco Panels:Case Study

Page 2: Sips Eco Panels: Case Study · Sips Eco Panels: Case Study "We arrived at 07:45hrs on frame delivery day to find the erection team already onsite and unloading the SIPs Eco Panels

The Peter’s ended with a beautiful, effi-cient home which they had largely built themselves. They were pleased with the design work and support they received:

"Custom Homes delivered a professional ser-vice from the design stage right through to completion. We found them to be friendly and helpful throughout."

And of their speed of erection by the Sips Eco Panel team of their frame and roof?

Photos

The Experience

Sips Eco Panels: Case Study

"We arrived at 07:45hrs on frame delivery day to find the erection team already onsite and unloading the SIPs Eco Panels from the lorry. Less than two weeks later the frame, roof, internal stud walls and flooring had all been completed."

If you would like to find out more information about Sips Eco Panels, or to submit drawings for a quote today please visit our website at:

www.sips.co

Sips Eco Panels South Suffolk Business Centre,

Alexandra Road, SUDBURY,

Suffolk. CO10 2ZX

www.sipsecopanels.co.uk

t: 01787 377388 f: 01787 377622

e: [email protected]

Sips Eco Panels4-7 Boston Road,

Glenrothes,Fife,

KY62RE

www.sipsecopanels.co.uk

t: 01592 631636

e: [email protected]

Sips Eco Panels: Case Study