Page 1: SINAMICS PERFECT HARMONY GH150 · Tests carried out on drives This documentation pertains to GH150 F03 F72 F76 F79 L45 U11. 18.05.2020 12:33 ... 3.2.11 Overvoltage monitoring in the

www.siemens.com/drives

Medium-Voltage Drive

SINAMICS PERFECT HARMONY GH150Type 6SL3825

Reference Manual

Edition 05/2020

Tests carried out on drivesThis documentation pertains to

GH150F03 F72 F76 F79 L45 U11

Page 2: SINAMICS PERFECT HARMONY GH150 · Tests carried out on drives This documentation pertains to GH150 F03 F72 F76 F79 L45 U11. 18.05.2020 12:33 ... 3.2.11 Overvoltage monitoring in the

18.05.2020 12:33V9.00

Page 3: SINAMICS PERFECT HARMONY GH150 · Tests carried out on drives This documentation pertains to GH150 F03 F72 F76 F79 L45 U11. 18.05.2020 12:33 ... 3.2.11 Overvoltage monitoring in the

Medium-Voltage Drive

SINAMICS PERFECT HARMONY GH150Type 6SL3825

Reference Manual

This documentation pertains toGH150

F03 F72 F76 F79 L45 U11

Edition 05/2020

Introduction 1

General scope of services 2

Tests 3

Page 4: SINAMICS PERFECT HARMONY GH150 · Tests carried out on drives This documentation pertains to GH150 F03 F72 F76 F79 L45 U11. 18.05.2020 12:33 ... 3.2.11 Overvoltage monitoring in the

Legal informationWarning notice system

This manual contains notices you have to observe in order to ensure your personal safety, as well as to prevent damage to property. The notices referring to your personal safety are highlighted in the manual by a safety alert symbol, notices referring only to property damage have no safety alert symbol. These notices shown below are graded according to the degree of danger.

DANGERindicates that death or severe personal injury will result if proper precautions are not taken.

WARNINGindicates that death or severe personal injury may result if proper precautions are not taken.

CAUTIONindicates that minor personal injury can result if proper precautions are not taken.

NOTICEindicates that property damage can result if proper precautions are not taken.If more than one degree of danger is present, the warning notice representing the highest degree of danger will be used. A notice warning of injury to persons with a safety alert symbol may also include a warning relating to property damage.

Qualified PersonnelThe product/system described in this documentation may be operated only by personnel qualified for the specific task in accordance with the relevant documentation, in particular its warning notices and safety instructions. Qualified personnel are those who, based on their training and experience, are capable of identifying risks and avoiding potential hazards when working with these products/systems.

Proper use of Siemens productsNote the following:

WARNINGSiemens products may only be used for the applications described in the catalog and in the relevant technical documentation. If products and components from other manufacturers are used, these must be recommended or approved by Siemens. Proper transport, storage, installation, assembly, commissioning, operation and maintenance are required to ensure that the products operate safely and without any problems. The permissible ambient conditions must be complied with. The information in the relevant documentation must be observed.

TrademarksAll names identified by ® are registered trademarks of Siemens AG. The remaining trademarks in this publication may be trademarks whose use by third parties for their own purposes could violate the rights of the owner.

Disclaimer of LiabilityWe have reviewed the contents of this publication to ensure consistency with the hardware and software described. Since variance cannot be precluded entirely, we cannot guarantee full consistency. However, the information in this publication is reviewed regularly and any necessary corrections are included in subsequent editions.

Siemens AGLarge Drives ApplicationsVogelweiherstr. 1-1590441 NÜRNBERGGERMANY

Document order number: 8888888888-000088Ⓟ 05/2020 Subject to change

Copyright © Siemens AG 2020.All rights reserved

Page 5: SINAMICS PERFECT HARMONY GH150 · Tests carried out on drives This documentation pertains to GH150 F03 F72 F76 F79 L45 U11. 18.05.2020 12:33 ... 3.2.11 Overvoltage monitoring in the

Table of contents

1 Introduction...................................................................................................................................................7

2 General scope of services ............................................................................................................................9

2.1 Routine test ............................................................................................................................11

2.2 Visual inspection ....................................................................................................................12

2.3 Function tests.........................................................................................................................13

2.4 Insulation test .........................................................................................................................14

2.5 Interface test ..........................................................................................................................15

3 Tests...........................................................................................................................................................17

3.1 Visual inspection ....................................................................................................................183.1.1 Rating plate ............................................................................................................................183.1.2 Housing degree of protection .................................................................................................183.1.3 Electrical cabinet components ...............................................................................................193.1.4 Cable installation....................................................................................................................193.1.5 Cable markings ......................................................................................................................203.1.6 Setting values of circuit breakers, if used...............................................................................203.1.7 Dimensions ............................................................................................................................20

3.2 Function test...........................................................................................................................223.2.1 Auxiliary voltages ...................................................................................................................223.2.2 Interrupted cable to the operator panel ..................................................................................223.2.3 Temperature monitoring.........................................................................................................233.2.4 Door limit switches .................................................................................................................233.2.5 Door interlocking system........................................................................................................233.2.6 Ground fault monitoring..........................................................................................................243.2.7 DC link precharging................................................................................................................253.2.8 Actual value sensing of the DC link voltage ...........................................................................253.2.9 Undervoltage monitoring in the DC link..................................................................................263.2.10 Output current measurement .................................................................................................263.2.11 Overvoltage monitoring in the DC link....................................................................................273.2.12 Bypass function of the power semiconductor module............................................................273.2.13 Failure of a power semiconductor module .............................................................................283.2.14 Safety shutdown.....................................................................................................................28

3.3 Cooling system test................................................................................................................293.3.1 Static pressure test ................................................................................................................293.3.2 Differential pressure measurement ........................................................................................303.3.3 Measuring the coolant conductivity and coolant temperature ................................................303.3.4 Coolant conductivity monitoring .............................................................................................313.3.5 Coolant overtemperature monitoring......................................................................................313.3.6 Differential pressure monitoring .............................................................................................323.3.7 Fault messages from the cooling unit ....................................................................................32

3.4 Insulation test .........................................................................................................................343.4.1 High-voltage test ....................................................................................................................34

SINAMICS PERFECT HARMONY GH150 6SL3825 F03 F72 F76 F79 L45 U11Reference Manual Rev.202005181233 GH150 5

Page 6: SINAMICS PERFECT HARMONY GH150 · Tests carried out on drives This documentation pertains to GH150 F03 F72 F76 F79 L45 U11. 18.05.2020 12:33 ... 3.2.11 Overvoltage monitoring in the

3.4.2 Measuring the insulation resistance.......................................................................................35

3.5 Interface test ..........................................................................................................................363.5.1 Ethernet communication ........................................................................................................363.5.2 Signals between the drive and cooling unit............................................................................36

Index...........................................................................................................................................................39

Figures

Figure 3-1 Procedure for the pressure test...................................................................................................29

Table of contents

SINAMICS PERFECT HARMONY GH150 6SL3825 F03 F72 F76 F79 L45 U116 Reference Manual Rev.202005181233 GH150

Page 7: SINAMICS PERFECT HARMONY GH150 · Tests carried out on drives This documentation pertains to GH150 F03 F72 F76 F79 L45 U11. 18.05.2020 12:33 ... 3.2.11 Overvoltage monitoring in the

Introduction 1This document describes the preconditions when testing drives. The fulfillment of these preconditions is the basis for achieving the smoothest possible testing process and maximum possible customer satisfaction.

The following drive tests are described:

● Routine tests

● Tests that are offered as standard

Note

If the scope of testing and inspection cannot fulfill all customer requirements, please consult your Siemens sales advisor at head office.

SINAMICS PERFECT HARMONY GH150 6SL3825 F03 F72 F76 F79 L45 U11Reference Manual Rev.202005181233 GH150 7

Page 8: SINAMICS PERFECT HARMONY GH150 · Tests carried out on drives This documentation pertains to GH150 F03 F72 F76 F79 L45 U11. 18.05.2020 12:33 ... 3.2.11 Overvoltage monitoring in the

Introduction

SINAMICS PERFECT HARMONY GH150 6SL3825 F03 F72 F76 F79 L45 U118 Reference Manual Rev.202005181233 GH150

Page 9: SINAMICS PERFECT HARMONY GH150 · Tests carried out on drives This documentation pertains to GH150 F03 F72 F76 F79 L45 U11. 18.05.2020 12:33 ... 3.2.11 Overvoltage monitoring in the

General scope of services 2A variable-speed drive can include the following components:

● Induction motor, synchronous motor or PEM motor with or without speed encoder

● SINAMICS drives

● Drive transformer

● Cooling unit for water-cooled drives

● Small PLCs with drive functionality.

The factory offers adapted test systems adapted to address such systems.

Note

Contact your sales person if additional components must be taken into account for your particular project.

Scope of services offeredUnless otherwise stated in the quotation, the scope of tests ordered includes all activities, equipment, materials and expendables required.

Additional activities, services and provisions - for example, the use of third-party converters - must be coordinated well in advance.

The deadline and testing period stated, and the quoted cost, can be met only if all the test and inspection procedures are clarified in detail in advance. Due to the high capacity utilization of the associated equipment, it might not be possible to carry out individual inspections and tests that are requested late if the planned test is already in progress.

If you have received specific requirements from your customer, please send these as soon as possible – with the necessary key data – to the system test facility.

Test equipmentSiemens ensures the availability of the equipment required for the agreed tests and inspections, including test couplings for load runs.

Customer couplings, coupling dummies and coupling jigs for non-cylindrical shaft extensions are excluded.

SINAMICS PERFECT HARMONY GH150 6SL3825 F03 F72 F76 F79 L45 U11Reference Manual Rev.202005181233 GH150 9

Page 10: SINAMICS PERFECT HARMONY GH150 · Tests carried out on drives This documentation pertains to GH150 F03 F72 F76 F79 L45 U11. 18.05.2020 12:33 ... 3.2.11 Overvoltage monitoring in the

Sequence of a customer acceptanceA customer acceptance test is generally executed in the sequence:

1. Installation and commissioning of the components before the customer arrives.

2. Kickoff with presentation of the test schedule and discussion of individual steps in the acceptance test workflow.

3. Execution of the tests according to the test schedule

4. Discussion of the test results

5. Preparation of test documentation for the customer. The test documentation is created before or after the customer leaves depending on the scope of testing and the time schedule.

Components provided by customerComponents provided by the customer must be available in plenty of time so that tests can be carried out on time. The factory has no access to components, which are not part of the scope of supply of PD LD. This also applies to components ordered from other Siemens' Groups. The technical data for these components is required at the latest eight weeks before the start of the acceptance test, e.g.:

● Dimensions

● Weights

● Energy Requirement

● Interfaces

Location of the customer acceptanceAll customer acceptance tests in the test fields for drives are performed as part of the manufacturing process.

NoteLimited number of persons in the test field

For safety reasons, the number of persons in the test field is limited. In addition to the regional sales partner, only two persons from the customer are permitted in the test field at the same time.

NoteTest without load motors or multipulse infeeds via transformers in the test field

Some tests are simulated or performed in test mode with limited rated data.

NoteTests with the customer's own cooling units or excitation equipment

If the customer's own cooling units or excitation equipment are to be tested, a system test can be ordered with option F97.

General scope of services

SINAMICS PERFECT HARMONY GH150 6SL3825 F03 F72 F76 F79 L45 U1110 Reference Manual Rev.202005181233 GH150

Page 11: SINAMICS PERFECT HARMONY GH150 · Tests carried out on drives This documentation pertains to GH150 F03 F72 F76 F79 L45 U11. 18.05.2020 12:33 ... 3.2.11 Overvoltage monitoring in the

2.1 Routine testDuring production, the drive is subject to an internal routine test.

General scope of services2.1 Routine test

SINAMICS PERFECT HARMONY GH150 6SL3825 F03 F72 F76 F79 L45 U11Reference Manual Rev.202005181233 GH150 11

Page 12: SINAMICS PERFECT HARMONY GH150 · Tests carried out on drives This documentation pertains to GH150 F03 F72 F76 F79 L45 U11. 18.05.2020 12:33 ... 3.2.11 Overvoltage monitoring in the

2.2 Visual inspectionThe visual inspection is performed to ensure that the equipment complies with the order specifications. The tests are carried out with the drive in a no-voltage condition.

The visual inspection together with the customer – or with the company accepting the equipment – is carried out with the drive installed and labeled. Each test step is documented in the acceptance report with the specific results of the step.

The visual inspection is part of the function test (F72, F73).

Visual inspection Order codesWithout the customer present

With the cus‐tomer present

● Rating plate● Housing degree of protection● Electrical cabinet components● Cable installation● Cable markings● Setting values of circuit breakers, if used● Dimensions

-

F03

See alsoVisual inspection (Page 18)

General scope of services2.2 Visual inspection

SINAMICS PERFECT HARMONY GH150 6SL3825 F03 F72 F76 F79 L45 U1112 Reference Manual Rev.202005181233 GH150

Page 13: SINAMICS PERFECT HARMONY GH150 · Tests carried out on drives This documentation pertains to GH150 F03 F72 F76 F79 L45 U11. 18.05.2020 12:33 ... 3.2.11 Overvoltage monitoring in the

2.3 Function testsThe drive functions are tested according to IEC 61800-5-1. In addition, excerpts from additional standards apply, which are listed in the relevant chapters as well as internal Siemens directives within the scope of quality assurance.

The function tests are performed and documented in the Siemens test field by internal test field personnel. For the function test, the drive is in the test mode with restricted monitoring functions.

The successful test is confirmed in a 3.1 certificate – or in the case that the customer has ordered the acceptance test, in a 3.2 certificate.

See alsoFunction test (Page 22)

Functional acceptance of the drive with inductive load Order codesWithout the customer present

With the cus‐tomer present

● Visual acceptance test *● Auxiliary voltages● Cooling system● Protection and monitoring functions● DC link precharging, if available● Actual value sensing of the DC link voltage

F72

F73

* The visual acceptance is part of the function acceptance. It can also be separately ordered with F03.

General scope of services2.3 Function tests

SINAMICS PERFECT HARMONY GH150 6SL3825 F03 F72 F76 F79 L45 U11Reference Manual Rev.202005181233 GH150 13

Page 14: SINAMICS PERFECT HARMONY GH150 · Tests carried out on drives This documentation pertains to GH150 F03 F72 F76 F79 L45 U11. 18.05.2020 12:33 ... 3.2.11 Overvoltage monitoring in the

2.4 Insulation testThe insulation resistance is measured before and after the high-voltage test. The insulation test can only be ordered and carried out together with the function test (F72, F73).

Insulation test Order codesWithout the customer present

With the cus‐tomer present

● High-voltage test● Measuring the insulation resistance

F76

F77

The successful test is confirmed in a 3.1 certificate – or in the case that the customer has ordered the acceptance test, in a 3.2 certificate.

See alsoInsulation test (Page 34)

The insulation test is performed on a separate acceptance day prior to the function test.

General scope of services2.4 Insulation test

SINAMICS PERFECT HARMONY GH150 6SL3825 F03 F72 F76 F79 L45 U1114 Reference Manual Rev.202005181233 GH150

Page 15: SINAMICS PERFECT HARMONY GH150 · Tests carried out on drives This documentation pertains to GH150 F03 F72 F76 F79 L45 U11. 18.05.2020 12:33 ... 3.2.11 Overvoltage monitoring in the

2.5 Interface testThe analog, digital and serial interfaces between the drive and higher-level control on the customer side are checked. The interface test can only be ordered and performed together with the function acceptance.

During the tests, the drive is only supplied with auxiliary voltage.

Interface test Order codesWithout the customer present

With the cus‐tomer present

● Ethernet communication● Signals to the customer's system● Signals between the drive and cooling unit, if available● Additional interfaces

-

F79

The test is confirmed in a 3.1 certificate – or in the case that the customer has ordered the acceptance test, in a 3.2 certificate.

General scope of services2.5 Interface test

SINAMICS PERFECT HARMONY GH150 6SL3825 F03 F72 F76 F79 L45 U11Reference Manual Rev.202005181233 GH150 15

Page 16: SINAMICS PERFECT HARMONY GH150 · Tests carried out on drives This documentation pertains to GH150 F03 F72 F76 F79 L45 U11. 18.05.2020 12:33 ... 3.2.11 Overvoltage monitoring in the

General scope of services2.5 Interface test

SINAMICS PERFECT HARMONY GH150 6SL3825 F03 F72 F76 F79 L45 U1116 Reference Manual Rev.202005181233 GH150

Page 17: SINAMICS PERFECT HARMONY GH150 · Tests carried out on drives This documentation pertains to GH150 F03 F72 F76 F79 L45 U11. 18.05.2020 12:33 ... 3.2.11 Overvoltage monitoring in the

Tests 3The tests that have been expressly ordered for the drive with serial number 12345670001001 are listed in the following.

SINAMICS PERFECT HARMONY GH150 6SL3825 F03 F72 F76 F79 L45 U11Reference Manual Rev.202005181233 GH150 17

Page 18: SINAMICS PERFECT HARMONY GH150 · Tests carried out on drives This documentation pertains to GH150 F03 F72 F76 F79 L45 U11. 18.05.2020 12:33 ... 3.2.11 Overvoltage monitoring in the

3.1 Visual inspection

The visual inspection is performed to ensure that the drive complies with the requirements of the order. The individual test steps are performed with the drive in a no-voltage condition.

The test together with the customer – or his representative – is carried out with the drive installed and labeled. The results of all of the tests are documented in the acceptance report.

3.1.1 Rating plate

FundamentalsThe technical data and ordered options on the rating plate and the routine test certificate are checked to ensure that they match up.

Test procedure1. The data on the rating plate and the routine test certificate are visually compared.

ResultThe test is passed if the data match up.

3.1.2 Housing degree of protection

FundamentalsA check is made as to whether the housing degree of protection ordered complies with what is described in the catalog.

Test procedure1. The housing degree of protection is identified based on what is stamped on the rating plate.

2. Depending on the version, the following components are visually checked, e.g.:

– Canopies

– Cooling slots

– Fittings and rubber seals in the doors and between the cabinet units

– Cable entries

– Openings for water pipes, if available

– Additional components, if available

Tests3.1 Visual inspection

SINAMICS PERFECT HARMONY GH150 6SL3825 F03 F72 F76 F79 L45 U1118 Reference Manual Rev.202005181233 GH150

Page 19: SINAMICS PERFECT HARMONY GH150 · Tests carried out on drives This documentation pertains to GH150 F03 F72 F76 F79 L45 U11. 18.05.2020 12:33 ... 3.2.11 Overvoltage monitoring in the

ResultThe test is passed if the components required for the specified housing degree of protection are available.

3.1.3 Electrical cabinet components

FundamentalsA visual inspection is made to see whether the electrical cabinet components are installed as defined in the layout diagram and/or circuit diagram.

Test procedure1. The customer selects electrical cabinet components by random sampling.

2. The selected electrical cabinet components are visually checked to ensure that they are correctly installed and marked.

ResultThe test is passed if the selected electrical cabinet components are installed as specified in the layout diagram and/or circuit diagram.

3.1.4 Cable installation

FundamentalsVisual and mechanical checks are made to ensure that cables and conductors have been installed correctly and are connected correctly according to the circuit diagram.

Test procedure1. The customer selects cables or conductors by random sampling.

2. The following is inspected:

– Are the cables firmly connected?

– Have edge protectors been attached to sharp edges?

– Are the cables routed according to the circuit diagram?

ResultThe inspection is passed if the cable installation does not exhibit any deficiencies and matches the information in the circuit diagram.

Tests3.1 Visual inspection

SINAMICS PERFECT HARMONY GH150 6SL3825 F03 F72 F76 F79 L45 U11Reference Manual Rev.202005181233 GH150 19

Page 20: SINAMICS PERFECT HARMONY GH150 · Tests carried out on drives This documentation pertains to GH150 F03 F72 F76 F79 L45 U11. 18.05.2020 12:33 ... 3.2.11 Overvoltage monitoring in the

3.1.5 Cable markings

FundamentalsA visual inspection is made to see whether cables and conductors are marked as defined in the circuit diagram.

Test procedure1. The customer selects cables or conductors by random sampling.

– Are the cable end tags and conductor colors of cables and conductors marked as defined in the circuit diagram?

ResultThe test is passed if the cable and conductor markings match what is specified in the circuit diagram.

3.1.6 Setting values of circuit breakers, if used

FundamentalsThe circuit breaker settings are visually checked against what is specified in the circuit diagram.

Test procedure1. The customer selects circuit breakers by random sampling.

2. The circuit breaker settings are visually checked against what is specified in the circuit diagram.

ResultThe test is passed if the circuit breaker settings match what is specified in the circuit diagram.

3.1.7 Dimensions

FundamentalsThe drive dimensions are measured. The basis for the visual inspection is the order-specific dimension drawing.

Test procedure1. The external dimensions, length, width and height of the drive are measured.

Tests3.1 Visual inspection

SINAMICS PERFECT HARMONY GH150 6SL3825 F03 F72 F76 F79 L45 U1120 Reference Manual Rev.202005181233 GH150

Page 21: SINAMICS PERFECT HARMONY GH150 · Tests carried out on drives This documentation pertains to GH150 F03 F72 F76 F79 L45 U11. 18.05.2020 12:33 ... 3.2.11 Overvoltage monitoring in the

ResultThe test is passed if the dimensions match with what is specified in the dimension drawing.

Tests3.1 Visual inspection

SINAMICS PERFECT HARMONY GH150 6SL3825 F03 F72 F76 F79 L45 U11Reference Manual Rev.202005181233 GH150 21

Page 22: SINAMICS PERFECT HARMONY GH150 · Tests carried out on drives This documentation pertains to GH150 F03 F72 F76 F79 L45 U11. 18.05.2020 12:33 ... 3.2.11 Overvoltage monitoring in the

3.2 Function test

Medium voltage is stored in the DC link

3.2.1 Auxiliary voltages

FundamentalsTests are performed according to DIN EN 60146-1. The auxiliary voltages are visually checked using indicator lights or using a voltmeter.

Test procedure1. The drive power section is switched off.

2. The auxiliary voltages are switched on.

3. The auxiliary voltages are checked.

ResultThe test is passed if all of the auxiliary voltages are available.

3.2.2 Interrupted cable to the operator panel

FundamentalsAn interrupted cable to the operator panel is simulated.

Test procedure1. The drive power section is switched off.

2. The auxiliary voltage is present.

3. The interface cable between the operator panel and Control Unit is withdrawn at the operator panel.

ResultThe test is passed if the appropriate fault message is displayed on the operator panel.

Tests3.2 Function test

SINAMICS PERFECT HARMONY GH150 6SL3825 F03 F72 F76 F79 L45 U1122 Reference Manual Rev.202005181233 GH150

Page 23: SINAMICS PERFECT HARMONY GH150 · Tests carried out on drives This documentation pertains to GH150 F03 F72 F76 F79 L45 U11. 18.05.2020 12:33 ... 3.2.11 Overvoltage monitoring in the

3.2.3 Temperature monitoring

FundamentalsAll power sections are equipped with temperature sensors to monitor the internal cabinet temperature. The switching thresholds of the temperature monitoring function are checked. The selected switching thresholds are specified in the circuit diagram. The temperatures are monitored on the test station computer.

Test procedure1. The auxiliary voltage is present.

2. The temperature sensor is warmed up to the appropriate switching thresholds:

– Tfan: The auxiliary fans switch on.

– Talarm: An alarm message is displayed on the test station computer.

– Tfault: A fault message is displayed on the test station computer.

ResultThe test is passed if the drive manifests the described responses at the various switching thresholds. The tolerance range at the switching thresholds is ±5 K.

3.2.4 Door limit switches

FundamentalsTests are performed in accordance with IEC 61800-5-1

The doors of the drive power section are monitored using limit switches. This monitoring function ensures that when the doors are open, the drive cannot be switched on.

Test procedure1. The auxiliary voltage is present. All drive doors are closed.

2. One door of the drive power section is opened.

ResultThe test is passed if the appropriate message is displayed on the test station computer.

3.2.5 Door interlocking system

FundamentalsTests are performed in accordance with IEC 61800-5-1

Tests3.2 Function test

SINAMICS PERFECT HARMONY GH150 6SL3825 F03 F72 F76 F79 L45 U11Reference Manual Rev.202005181233 GH150 23

Page 24: SINAMICS PERFECT HARMONY GH150 · Tests carried out on drives This documentation pertains to GH150 F03 F72 F76 F79 L45 U11. 18.05.2020 12:33 ... 3.2.11 Overvoltage monitoring in the

To avoid accidents, the drive doors must be closed during operation. This is guaranteed by the electromagnetic door interlocking system. The doors of the power section remain interlocked until the DC link has been completely discharged and a safety wait time has elapsed.

Test procedure1. The auxiliary voltage is present.

2. All drive doors have been closed.

3. The DC link voltage is set to a specified value.The electromagnetic door interlocking system locks the power section doors.

4. The power section doors cannot be opened.

5. The power section power supply is switched off. The DC link completely discharges itself. The safety wait time elapses.

6. If a grounding switch is installed, it is closed manually.

7. The power section doors can be opened.

ResultThe test is passed if the door interlocking system functions as described.

3.2.6 Ground fault monitoring

FundamentalsThe ground fault monitoring is tested according to EN 60204-1.

Test procedure1. The auxiliary voltage is present.

2. The DC link is discharged and grounded. The ground fault message is displayed at the test station computer.

3. The grounding is withdrawn.

ResultThe test is passed if the appropriate message is no longer displayed at the test station computer.

Tests3.2 Function test

SINAMICS PERFECT HARMONY GH150 6SL3825 F03 F72 F76 F79 L45 U1124 Reference Manual Rev.202005181233 GH150

Page 25: SINAMICS PERFECT HARMONY GH150 · Tests carried out on drives This documentation pertains to GH150 F03 F72 F76 F79 L45 U11. 18.05.2020 12:33 ... 3.2.11 Overvoltage monitoring in the

3.2.7 DC link precharging

FundamentalsWhen switching on the drive, the DC link is charged. After this, the circuit breaker is closed. The DC link must be charged in a specified time to 85 % of the DC link voltage.

Test procedure1. The auxiliary voltage is present.

2. The drive is switched on. The time measurement starts.The DC link is charged.

3. When 85 % of the DC link voltage is reached, the charge time is measured.

4. The signal to close the circuit breaker is active.

ResultThe test is passed if the DC link was charged within the specified time.

3.2.8 Actual value sensing of the DC link voltage

FundamentalsThe actual value sensing of the DC link voltage UDC+ and UDC- is checked. The calibrated measuring equipment is used as reference.

Test procedure1. The DC link is charged up to the rated voltage.

2. The actual value sensing devices in the drive measure the voltage. The values UDC+ and UDC- are measured and displayed at the test station computer in the appropriate parameters.

3. The measured values of the calibrated measuring equipment are compared with the values provided by the actual value sensing of the drive.

ResultThe test is passed if the displayed values at the test station computer match the reference values with a tolerance of ±10 %.

Tests3.2 Function test

SINAMICS PERFECT HARMONY GH150 6SL3825 F03 F72 F76 F79 L45 U11Reference Manual Rev.202005181233 GH150 25

Page 26: SINAMICS PERFECT HARMONY GH150 · Tests carried out on drives This documentation pertains to GH150 F03 F72 F76 F79 L45 U11. 18.05.2020 12:33 ... 3.2.11 Overvoltage monitoring in the

3.2.9 Undervoltage monitoring in the DC link

FundamentalsFluctuations in the power supply can result in short-term changes to the DC link voltage.

The undervoltage monitoring senses the actual value of the DC link voltage, and switches off the drive at a defined rated voltage.

Test procedure1. The auxiliary voltage is present.

2. The DC link is charged up to 100 %.

3. By controlling the DC voltage supply, the DC link voltage is slowly reduced.A message is displayed on the test station computer when the undervoltage limit is reached. The drive is switched off.

4. The voltage value at the time of the message is calculated on the test station computer.

ResultThe test is passed if the value calculated is 95 % of the rated DC link voltage.

3.2.10 Output current measurement

FundamentalsThe internal current measurement of the drive is checked for an inductive load. Three reactors connected in a star connection are used as load. The calibrated measuring equipment is used as reference.

● For SINAMICS GM150, the inverter is tested.

● For SINAMICS SM150, either the line-side or the motor-side drive is tested in inverter mode.

● For SINAMICS GH150, the Motor Module is tested in inverter mode.

● For SINAMICS SM120, the Active Line Module and the Motor Module are tested in the inverter mode.

Test procedure1. The drive is switched on.

2. The DC link is charged up to the rated voltage.

3. The inverter is enabled.

4. The rms values of output currents IL1, IL2, IL3 are measured for max. 10 minutes at the specified frequency and communicated to the test station computer.

Tests3.2 Function test

SINAMICS PERFECT HARMONY GH150 6SL3825 F03 F72 F76 F79 L45 U1126 Reference Manual Rev.202005181233 GH150

Page 27: SINAMICS PERFECT HARMONY GH150 · Tests carried out on drives This documentation pertains to GH150 F03 F72 F76 F79 L45 U11. 18.05.2020 12:33 ... 3.2.11 Overvoltage monitoring in the

ResultThe test is passed if the values displayed on the test station computer match the reference values with a tolerance of ±5 %.

3.2.11 Overvoltage monitoring in the DC link

FundamentalsFluctuations in the power supply can result in short-term changes to the DC link voltage.

The overvoltage monitoring senses the actual value of the DC link voltage, and switches off the drive at a defined rated voltage.

Test procedure1. The auxiliary voltage is present.

2. The DC link is charged up to 100 %.

3. The drive is operated with a load current ILoad = 50 ±5 A.

4. By controlling the DC voltage supply, the DC link voltage is slowly increased. A message is displayed on the test station computer when the overvoltage limit is reached. The drive is switched off.

5. The voltage value at the time of the message is calculated on the test station computer.

ResultThe test is passed if the determined value is 113 % of the DC link voltage.

3.2.12 Bypass function of the power semiconductor module

FundamentalsThe bypass function is checked by triggering a virtual driver fault.

Test procedure1. The DC link is charged.

2. The drive is operated with a load current ILoad = 50 ±5 A.

3. A virtual driver fault is triggered via an optical interface. The bypass function is activated and the appropriate signal is displayed on the test station computer.

Tests3.2 Function test

SINAMICS PERFECT HARMONY GH150 6SL3825 F03 F72 F76 F79 L45 U11Reference Manual Rev.202005181233 GH150 27

Page 28: SINAMICS PERFECT HARMONY GH150 · Tests carried out on drives This documentation pertains to GH150 F03 F72 F76 F79 L45 U11. 18.05.2020 12:33 ... 3.2.11 Overvoltage monitoring in the

ResultThe test is passed if the following events occur:

● The drive activates the bypass function.

● The appropriate message is displayed on the test station computer.

● The drive shuts down after 30 seconds.

3.2.13 Failure of a power semiconductor module

FundamentalsThe power section must shut down if a power semiconductor module fails. The failure is simulated by withdrawing the fiber-optic cable connector from the gating module of a power semiconductor module. This interrupts the control.

Test procedure1. The auxiliary voltage is present.

2. The fiber-optic cable connector of a gating module is withdrawn.A message is displayed on the test station computer.

ResultThe test is passed if the appropriate message is displayed on the test station computer and the inverter is inhibited.

3.2.14 Safety shutdown

FundamentalsThe tests are performed in accordance with IEC 60146-1-1 and IEC 60204-11.

The safety shutdown of the power section shuts down the inverter if the button is pressed.

Test procedure1. The auxiliary voltage is present.

2. The drive is operated with a load current ILoad = 50 ±5 A.

3. The button is pressed.

ResultThe test is passed if the inverter is shut down and the appropriate message is displayed on the test station computer.

Tests3.2 Function test

SINAMICS PERFECT HARMONY GH150 6SL3825 F03 F72 F76 F79 L45 U1128 Reference Manual Rev.202005181233 GH150

Page 29: SINAMICS PERFECT HARMONY GH150 · Tests carried out on drives This documentation pertains to GH150 F03 F72 F76 F79 L45 U11. 18.05.2020 12:33 ... 3.2.11 Overvoltage monitoring in the

3.3 Cooling system test

The test is performed with a calibrated cooling unit of the test station.

3.3.1 Static pressure test

FundamentalsTests are performed according to IEC 61800-5-1 and DIN EN 805.

The drive cooling system is checked for leaks and pressure drop for one hour.

Test procedure1. The cooling system is filled with coolant and the valves in the supply and return lines are

closed.

2. With the valves closed, pressure is increased to a test pressure of pt and is controlled for the next 10 min.

3. After a total of 30 min, pressure p1 is measured.

4. After a total of 60 min, pressure p2 is measured.

Figure 3-1 Procedure for the pressure test

5. The pressure drop is calculated from measured values: Δp = p1 - p2

Tests3.3 Cooling system test

SINAMICS PERFECT HARMONY GH150 6SL3825 F03 F72 F76 F79 L45 U11Reference Manual Rev.202005181233 GH150 29

Page 30: SINAMICS PERFECT HARMONY GH150 · Tests carried out on drives This documentation pertains to GH150 F03 F72 F76 F79 L45 U11. 18.05.2020 12:33 ... 3.2.11 Overvoltage monitoring in the

ResultThe test is passed if the differential pressure is ≤ 0.4 bar and no leaks have occurred in the cooling system.

3.3.2 Differential pressure measurement

FundamentalsDifferential pressure Δp expresses the pressure drop of the coolant between supply pressure pV and return pressure pR of the drive. The coolant flow is set at the cooling unit to the calculated flow.

Test procedure1. The calculated flow is checked. It is permissible that the flow deviates by ±5 % from the

calculated value.

2. The differential pressure is read from the appropriate parameter on the test station computer.

CalculationsThe reference differential pressure is calculated from the measured values of the cooling unit: Δp = pV - pR

ResultThe test is passed if the differential pressure Δp = 3.5 ±0.2 bar.

3.3.3 Measuring the coolant conductivity and coolant temperature

FundamentalsTests are performed in accordance with IEC 60146-1-1.

Sensors in the drive coolant circuit acquire the coolant temperature in the supply line and the coolant conductivity. The measured values from these sensors are compared with the measured values of the calibrated cooling unit.

The coolant flow is set at the cooling unit to the calculated flow.

Test procedure1. The cooling unit is switched on. The auxiliary voltage is present.

2. The calculated flow is checked. It is permissible that the flow deviates by ±5 % from the calculated value.

Tests3.3 Cooling system test

SINAMICS PERFECT HARMONY GH150 6SL3825 F03 F72 F76 F79 L45 U1130 Reference Manual Rev.202005181233 GH150

Page 31: SINAMICS PERFECT HARMONY GH150 · Tests carried out on drives This documentation pertains to GH150 F03 F72 F76 F79 L45 U11. 18.05.2020 12:33 ... 3.2.11 Overvoltage monitoring in the

3. The values sensed by the sensors are displayed on the test station computer:

– Temperature in the supply line

– Conductivity

4. The measured values from the sensors are compared with the reference values of the cooling unit.

ResultThe test is passed if the measured values lie within the tolerances.

● Temperature in the supply line ±5 K

● Conductivity ±0.2 µS/cm

3.3.4 Coolant conductivity monitoring

FundamentalsTests are performed in accordance with IEC 60146-1-1. Sensors in the drive coolant circuit acquire the coolant conductivity. The coolant conductivity monitoring is checked.

Test procedure1. The cooling unit is switched on. The auxiliary voltage is present.

2. The calculated flow is checked. It is permissible that the flow deviates by ±5 % from the calculated value.

3. The parameter value of the conductivity limit is reduced below the actual coolant value on the test station computer.

ResultThe test is passed if the appropriate message is displayed on the test station computer.

3.3.5 Coolant overtemperature monitoring

FundamentalsTests are performed in accordance with IEC 60146-1-1.

Sensors in the drive coolant circuit acquire the coolant temperature. The overtemperature shutdown is checked: An interrupted cable is simulated by withdrawing the temperature sensor connected. This simulates a very high temperature.

Tests3.3 Cooling system test

SINAMICS PERFECT HARMONY GH150 6SL3825 F03 F72 F76 F79 L45 U11Reference Manual Rev.202005181233 GH150 31

Page 32: SINAMICS PERFECT HARMONY GH150 · Tests carried out on drives This documentation pertains to GH150 F03 F72 F76 F79 L45 U11. 18.05.2020 12:33 ... 3.2.11 Overvoltage monitoring in the

Test procedure1. The cooling unit is switched on. The auxiliary voltage is present.

2. The temperature sensor connector is withdrawn.

ResultThe test is passed if the appropriate message is displayed on the test station computer.

3.3.6 Differential pressure monitoring

FundamentalsDifferential pressure Δp expresses the pressure drop of the coolant between supply pressure pV and return pressure pR of the drive. The coolant flow is set at the cooling unit to the calculated flow. The differential pressure decreases when the flow is reduced.

The drive cooling circuit is equipped with a differential pressure monitoring function. The parameterized switching threshold is checked.

Test procedure1. The cooling system is switched on. The auxiliary voltage is present.

2. The coolant flow is reduced.

3. A message is displayed on the test station computer when the switching threshold is reached. The inverter is shut down.

4. The differential pressure and the switching threshold are read from the appropriate parameters on the test station computer.

ResultThe test is passed if the drive manifests the described responses at the switching threshold.

3.3.7 Fault messages from the cooling unit

FundamentalsWhen a fault occurs, the cooling unit outputs an alarm or fault at the drive. These signals are simulated at the drive interface.

Tests3.3 Cooling system test

SINAMICS PERFECT HARMONY GH150 6SL3825 F03 F72 F76 F79 L45 U1132 Reference Manual Rev.202005181233 GH150

Page 33: SINAMICS PERFECT HARMONY GH150 · Tests carried out on drives This documentation pertains to GH150 F03 F72 F76 F79 L45 U11. 18.05.2020 12:33 ... 3.2.11 Overvoltage monitoring in the

Test procedure1. The auxiliary voltage is present.

2. A simulation device is connected to the drive interface.

3. The appropriate digital inputs are activated. In accordance with the activated digital input, an alarm or fault is displayed on the test station computer.

ResultThe test is passed if the appropriate messages are displayed on the test station computer.

Tests3.3 Cooling system test

SINAMICS PERFECT HARMONY GH150 6SL3825 F03 F72 F76 F79 L45 U11Reference Manual Rev.202005181233 GH150 33

Page 34: SINAMICS PERFECT HARMONY GH150 · Tests carried out on drives This documentation pertains to GH150 F03 F72 F76 F79 L45 U11. 18.05.2020 12:33 ... 3.2.11 Overvoltage monitoring in the

3.4 Insulation test

3.4.1 High-voltage test

FundamentalsThe test is carried out according to the following standards:

● IEC 61800-5-1

● EN 50178

● For marine applications, additional requirements from the marine classification societies may apply.

The high-voltage test verifies the voltage strength (test voltage) for overvoltage conditions specified in the standard.

Test equipmentA calibrated test instrument is used for the test.

Test procedure1. The circuits to be tested are separately short-circuited corresponding to the individual

voltage levels.

– Power circuit/circuits

– Various auxiliary circuits

2. The circuits that are presently not connected to the test instrument are connected to ground potential.

3. The test voltage is adjusted for each circuit corresponding to the insulation test report.

4. The circuits are tested with respect to one another and with respect to the PE protective conductor at the electrical cabinet.The test duration is 1 s, for marine applications, 60 s.

5. The test is repeated with 80% test voltage.

ResultThe test is passed if the test instrument is not switched off (tripped) during the test as a result of flashover.

Tests3.4 Insulation test

SINAMICS PERFECT HARMONY GH150 6SL3825 F03 F72 F76 F79 L45 U1134 Reference Manual Rev.202005181233 GH150

Page 35: SINAMICS PERFECT HARMONY GH150 · Tests carried out on drives This documentation pertains to GH150 F03 F72 F76 F79 L45 U11. 18.05.2020 12:33 ... 3.2.11 Overvoltage monitoring in the

3.4.2 Measuring the insulation resistance

FundamentalsThe test is conducted according to EN 50178, EN 60204-1 and IEC 60146-1-1.

The insulation resistance of the individual circuits is measured before and after the high-voltage test, and the following value must be obtained:

Rated operating voltage Insulation resistanceBelow 1000 V At least 1 MΩ Above 1000 V At least 10 MΩ

Test equipmentA calibrated test instrument is used for the test.

Test procedure1. The circuits to be tested are separately short-circuited corresponding to the individual

voltage levels.

– Power circuit/circuits

– Various auxiliary circuits

2. The circuits that are presently not connected to the test instrument are connected to ground potential.

3. The test voltage is adjusted for each circuit corresponding to the insulation test report.

4. The circuits are tested with respect to one another and with respect to the PE protective conductor at the electrical cabinet.

ResultThe test is passed if the insulation resistances lie within the tolerance specified by the standard.

Tests3.4 Insulation test

SINAMICS PERFECT HARMONY GH150 6SL3825 F03 F72 F76 F79 L45 U11Reference Manual Rev.202005181233 GH150 35

Page 36: SINAMICS PERFECT HARMONY GH150 · Tests carried out on drives This documentation pertains to GH150 F03 F72 F76 F79 L45 U11. 18.05.2020 12:33 ... 3.2.11 Overvoltage monitoring in the

3.5 Interface test

3.5.1 Ethernet communication

FundamentalsThe communication between the test station computer and the drive is established via Ethernet and its correct functioning is checked.

Test procedure1. The connection between the drive and the test station computer is established using an

Ethernet cable.

2. The auxiliary voltage is switched on.

3. The connection is established via the test station computer. The operating software is in online mode.

4. The customer selects up to ten signals, which are read in and read out on the test station computer. This procedure checks the communication.For bus connections, it is crucial that communication is established.

ResultThe test is passed if the signals are displayed on the test station computer.

3.5.2 Signals between the drive and cooling unit

FundamentalsThe signals defined in the "Functional test plan" are simulated on the test station computer, and the signal transfer to the cooling unit checked.

Test procedure1. The connection between the drive and the test station computer is established using an

Ethernet cable.

2. A simulation device, which represents the cooling unit, is connected to the drive.

3. The auxiliary voltage is switched on.

4. The connection is established via the test station computer. The operating software is in online mode.

5. The signals are simulated.

Tests3.5 Interface test

SINAMICS PERFECT HARMONY GH150 6SL3825 F03 F72 F76 F79 L45 U1136 Reference Manual Rev.202005181233 GH150

Page 37: SINAMICS PERFECT HARMONY GH150 · Tests carried out on drives This documentation pertains to GH150 F03 F72 F76 F79 L45 U11. 18.05.2020 12:33 ... 3.2.11 Overvoltage monitoring in the

ResultThe test is passed if the appropriate states relating to the signals are displayed on the test station computer.

Tests3.5 Interface test

SINAMICS PERFECT HARMONY GH150 6SL3825 F03 F72 F76 F79 L45 U11Reference Manual Rev.202005181233 GH150 37

Page 38: SINAMICS PERFECT HARMONY GH150 · Tests carried out on drives This documentation pertains to GH150 F03 F72 F76 F79 L45 U11. 18.05.2020 12:33 ... 3.2.11 Overvoltage monitoring in the

Tests3.5 Interface test

SINAMICS PERFECT HARMONY GH150 6SL3825 F03 F72 F76 F79 L45 U1138 Reference Manual Rev.202005181233 GH150

Page 39: SINAMICS PERFECT HARMONY GH150 · Tests carried out on drives This documentation pertains to GH150 F03 F72 F76 F79 L45 U11. 18.05.2020 12:33 ... 3.2.11 Overvoltage monitoring in the

Index

CComponents provided by customer, 10Cooling system test

Coolant conductivity monitoring, 31Coolant overtemperature monitoring, 31Differential pressure measurement, 30Differential pressure monitoring, 32Fault messages from the cooling unit, 32Measuring the coolant conductivity and coolant temperature, 30Static pressure test, 29

Customer acceptance inspection, 10

FF03, 12F72, 13, 36F73, 13, 36F76, 14F77, 14F79, 15, 36Function tests, 13

Actual value sensing of the DC link voltage, 25Auxiliary voltages, 22Bypass function of the power semiconductor module, 27DC link precharging, 25Door interlocking system, 24Door limit switches, 23Failure of a power semiconductor module, 28Ground fault monitoring, 24Interrupted cable to the operator panel, 22Output current measurement, 26Overvoltage monitoring in the DC link, 27Safety shutdown (optional), 28Temperature monitoring, 23Undervoltage monitoring in the DC link, 26

IInsulation test, 14

High-voltage test, 34Measuring the insulation resistance, 35

Interface test, 15Ethernet communication, 36Signals between the drive and cooling unit, 36

UU11, 27

VVisual inspection, 12, 18

Cable installation, 19Cable markings, 20Dimensions, 20Electrical cabinet components, 19Housing degree of protection, 18Rating plate, 18Setting values of circuit breakers, if used, 20

SINAMICS PERFECT HARMONY GH150 6SL3825 F03 F72 F76 F79 L45 U11Reference Manual Rev.202005181233 GH150 39

Page 40: SINAMICS PERFECT HARMONY GH150 · Tests carried out on drives This documentation pertains to GH150 F03 F72 F76 F79 L45 U11. 18.05.2020 12:33 ... 3.2.11 Overvoltage monitoring in the

Index

SINAMICS PERFECT HARMONY GH150 6SL3825 F03 F72 F76 F79 L45 U1140 Reference Manual Rev.202005181233 GH150

Page 41: SINAMICS PERFECT HARMONY GH150 · Tests carried out on drives This documentation pertains to GH150 F03 F72 F76 F79 L45 U11. 18.05.2020 12:33 ... 3.2.11 Overvoltage monitoring in the
Page 42: SINAMICS PERFECT HARMONY GH150 · Tests carried out on drives This documentation pertains to GH150 F03 F72 F76 F79 L45 U11. 18.05.2020 12:33 ... 3.2.11 Overvoltage monitoring in the

8888888888 000088 01 EN 01

*888888888800008801EN01* 888888888800008801EN01

Further Informationwww.siemens.com/LDASiemens AGLarge Drives ApplicationsVogelweiherstr. 1-1590441 NÜRNBERGGERMANY

Page 43: SINAMICS PERFECT HARMONY GH150 · Tests carried out on drives This documentation pertains to GH150 F03 F72 F76 F79 L45 U11. 18.05.2020 12:33 ... 3.2.11 Overvoltage monitoring in the

Large Drives Applications

Siemens AG, DI MC CBMF MF-NMA LDA EN, Postfach 47 43, 90025 Nürnberg

Department DI MC CBMF MF-NMA LDA ENTel. +49 (911) 433-6422Fax +49 (911) 433-6921Email [email protected]

mOur ref. 8888888888000088Date 18.05.2020

Documentation for 6SL3825Your order no. - 000010

AL: N ECCN: N UL: DEStWanr (CD): 85234045, StWanr (Print): 49011000

Dear Sir / Madam,

Many thanks for your order, the documentation for which is enclosed.

Yours very truly,

*888888888800008801EN01*

Page 44: SINAMICS PERFECT HARMONY GH150 · Tests carried out on drives This documentation pertains to GH150 F03 F72 F76 F79 L45 U11. 18.05.2020 12:33 ... 3.2.11 Overvoltage monitoring in the
Page 45: SINAMICS PERFECT HARMONY GH150 · Tests carried out on drives This documentation pertains to GH150 F03 F72 F76 F79 L45 U11. 18.05.2020 12:33 ... 3.2.11 Overvoltage monitoring in the

Spine label for binder 50 mm (120 g/m2)

SINAMICS PERFECT HARMONY GH150

6SL3825

GH150

F03 F72 F76 F79 L45 U11

Tests carried out on drives

Spine label for binder 145 mm (120 g/m2)

SINAMICS PERFECT HARMONY GH150 6SL3825GH150

F03 F72 F76 F79 L45 U11

Tests carried out on drives

Page 46: SINAMICS PERFECT HARMONY GH150 · Tests carried out on drives This documentation pertains to GH150 F03 F72 F76 F79 L45 U11. 18.05.2020 12:33 ... 3.2.11 Overvoltage monitoring in the