simdat and ogsa–dai hans–christian hoppe intel gmbh, bruehl edinburgh, april 7, 2004 simdat
TRANSCRIPT
SIMDAT and OGSA–DAISIMDAT and OGSA–DAI
HansHans––Christian HoppeChristian HoppeIntel GmbH, BruehlIntel GmbH, Bruehl
Edinburgh, April 7, 2004Edinburgh, April 7, 2004
SIMDAT
SIMDAT
SIMDAT - IntroductionSIMDAT - IntroductionFour sectors of international economic importance:
Automotive
Pharmaceutical
Aerospace
Meteorology
Seven Grid-technology development areas:
Grid infrastructure
Distributed Data Access
VO Administration
Workflows
Ontologies
Analysis Services
Knowledge Services
The solution of industrially relevant complex problems using data-centric Grid technology.
SIMDAT is coordinated by Fraunhofer SCAI (Clemens Thole)
SIMDAT
Key Grid TechnologiesKey Grid Technologies
Key technologies:Key technologies: Knowledge ServicesKnowledge Services Integration of Analysis ServicesIntegration of Analysis Services OntologiesOntologies WorkflowWorkflow Administration of Virtual OrganizationsAdministration of Virtual Organizations Access to Remote Data Repositories Integrated Grid InfrastructuresIntegrated Grid Infrastructures
SIMDAT
SIMDAT - StrategySIMDAT - Strategy SIMDAT takes an ambitious route to drive Grid technology SIMDAT takes an ambitious route to drive Grid technology
to the heart of industrial process:to the heart of industrial process:
Phase 1: Connectivity Phase 2: Interoperability Phase 3: Knowledge
•Grid infrastructure operational•Distributed DB access operational•Base on WSRF or WS
•Federate data repositories•Initial virtual data repository•Pull in NextGRID results (and others)
•Operate knowledge capture, discovery&mining•Leverage NG workflow capabilities•Base on NG Grid stuff
PM 18 PM 30 PM 48
SIMDAT
Project StructureProject Structure
Workflow
Ontologies
Analysis Services
Virtual Organisations
Distributed Data Access
Integrated Grid Infrastructure Prototypes
Knowledge Discovery
Gridtechno-
logyresearch
Auto-motive
Pharma Aero- space
Meteo TechnologyChampions
Intel
BAE Systems
Inforsense
Ontoprise
MSC
Fraunhofer
SIMDAT
Capability Providers
Grid Technologists
End Users
SIMDAT PartnersSIMDAT Partners
SIMDAT
Key Requirements – First 18 MonthsKey Requirements – First 18 Months Distributed access to (central) databasesDistributed access to (central) databases
unlimited distributed read accessunlimited distributed read access(limited) distributed upgrades/writes(limited) distributed upgrades/writesuse DB to store small–medium datasetsuse DB to store small–medium datasetsuse DB to store references to large datasetsuse DB to store references to large datasetsprovide monitoring, auditingprovide monitoring, auditing
Start integrating with upper layersStart integrating with upper layersengineering PSE, PDM systemsengineering PSE, PDM systemsbioscience middleware (Lion SRS, ...)bioscience middleware (Lion SRS, ...)meteo prediction and archival systemsmeteo prediction and archival systems
SIMDAT
Key Requirements – Months 18–30Key Requirements – Months 18–30 Work towards virtualizationWork towards virtualization
federate DBs distributed across partners/sitesfederate DBs distributed across partners/sitesunlimited distributed read accessunlimited distributed read access(limited) distributed update/write(limited) distributed update/writevirtualize SQL queries and data formatsvirtualize SQL queries and data formatssupport different DB implementations (IBM Oracle, ...)support different DB implementations (IBM Oracle, ...)integrate provenance informationintegrate provenance informationaccommodate large entriesaccommodate large entriesintroduce messaging layer?introduce messaging layer?
Integrate Grid developmentsIntegrate Grid developmentsother FP6 projects (NextGRID, ...)other FP6 projects (NextGRID, ...)rest of the worldrest of the world
SIMDAT
Key Requirements – Months 30–48Key Requirements – Months 30–48 Complete virtualizationComplete virtualization
unlimited distributed read, update, writeunlimited distributed read, update, writedistributed DB managementdistributed DB managementintegration of ontology–based data/query processingintegration of ontology–based data/query processingintegration of advanced workflow techniquesintegration of advanced workflow techniquesidentify and start to address performance issuesidentify and start to address performance issues
Integrate Grid developmentsIntegrate Grid developmentsresults of FP6 projects results of FP6 projects rest of the worldrest of the world
SIMDAT
First SIMDAT PhaseFirst SIMDAT Phase
First three–six monthsFirst three–six monthsconsolidate requirements by application areasconsolidate requirements by application areasprovide gap analysis with OGSA–DAIprovide gap analysis with OGSA–DAIprioritize requirements and produce roadmapprioritize requirements and produce roadmapidentify risks and setup mitigation strategyidentify risks and setup mitigation strategy
Months 6–12Months 6–12integrate first Grid infrastructure&data access integrate first Grid infrastructure&data access
functionalityfunctionality