simdat and ogsa–dai hans–christian hoppe intel gmbh, bruehl edinburgh, april 7, 2004 simdat

10
SIMDAT and OGSA–DAI SIMDAT and OGSA–DAI Hans Hans Christian Hoppe Christian Hoppe Intel GmbH, Bruehl Intel GmbH, Bruehl Edinburgh, April 7, 2004 Edinburgh, April 7, 2004 SIMDAT

Upload: quentin-barrett

Post on 18-Jan-2016

213 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SIMDAT and OGSA–DAI Hans–Christian Hoppe Intel GmbH, Bruehl Edinburgh, April 7, 2004 SIMDAT

SIMDAT and OGSA–DAISIMDAT and OGSA–DAI

HansHans––Christian HoppeChristian HoppeIntel GmbH, BruehlIntel GmbH, Bruehl

Edinburgh, April 7, 2004Edinburgh, April 7, 2004

SIMDAT

Page 2: SIMDAT and OGSA–DAI Hans–Christian Hoppe Intel GmbH, Bruehl Edinburgh, April 7, 2004 SIMDAT

SIMDAT

SIMDAT - IntroductionSIMDAT - IntroductionFour sectors of international economic importance:

Automotive

Pharmaceutical

Aerospace

Meteorology

Seven Grid-technology development areas:

Grid infrastructure

Distributed Data Access

VO Administration

Workflows

Ontologies

Analysis Services

Knowledge Services

The solution of industrially relevant complex problems using data-centric Grid technology.

SIMDAT is coordinated by Fraunhofer SCAI (Clemens Thole)

Page 3: SIMDAT and OGSA–DAI Hans–Christian Hoppe Intel GmbH, Bruehl Edinburgh, April 7, 2004 SIMDAT

SIMDAT

Key Grid TechnologiesKey Grid Technologies

Key technologies:Key technologies: Knowledge ServicesKnowledge Services Integration of Analysis ServicesIntegration of Analysis Services OntologiesOntologies WorkflowWorkflow Administration of Virtual OrganizationsAdministration of Virtual Organizations Access to Remote Data Repositories Integrated Grid InfrastructuresIntegrated Grid Infrastructures

Page 4: SIMDAT and OGSA–DAI Hans–Christian Hoppe Intel GmbH, Bruehl Edinburgh, April 7, 2004 SIMDAT

SIMDAT

SIMDAT - StrategySIMDAT - Strategy SIMDAT takes an ambitious route to drive Grid technology SIMDAT takes an ambitious route to drive Grid technology

to the heart of industrial process:to the heart of industrial process:

Phase 1: Connectivity Phase 2: Interoperability Phase 3: Knowledge

•Grid infrastructure operational•Distributed DB access operational•Base on WSRF or WS

•Federate data repositories•Initial virtual data repository•Pull in NextGRID results (and others)

•Operate knowledge capture, discovery&mining•Leverage NG workflow capabilities•Base on NG Grid stuff

PM 18 PM 30 PM 48

Page 5: SIMDAT and OGSA–DAI Hans–Christian Hoppe Intel GmbH, Bruehl Edinburgh, April 7, 2004 SIMDAT

SIMDAT

Project StructureProject Structure

Workflow

Ontologies

Analysis Services

Virtual Organisations

Distributed Data Access

Integrated Grid Infrastructure Prototypes

Knowledge Discovery

Gridtechno-

logyresearch

Auto-motive

Pharma Aero- space

Meteo TechnologyChampions

Intel

BAE Systems

Inforsense

Ontoprise

MSC

Fraunhofer

Page 6: SIMDAT and OGSA–DAI Hans–Christian Hoppe Intel GmbH, Bruehl Edinburgh, April 7, 2004 SIMDAT

SIMDAT

Capability Providers

Grid Technologists

End Users

SIMDAT PartnersSIMDAT Partners

Page 7: SIMDAT and OGSA–DAI Hans–Christian Hoppe Intel GmbH, Bruehl Edinburgh, April 7, 2004 SIMDAT

SIMDAT

Key Requirements – First 18 MonthsKey Requirements – First 18 Months Distributed access to (central) databasesDistributed access to (central) databases

unlimited distributed read accessunlimited distributed read access(limited) distributed upgrades/writes(limited) distributed upgrades/writesuse DB to store small–medium datasetsuse DB to store small–medium datasetsuse DB to store references to large datasetsuse DB to store references to large datasetsprovide monitoring, auditingprovide monitoring, auditing

Start integrating with upper layersStart integrating with upper layersengineering PSE, PDM systemsengineering PSE, PDM systemsbioscience middleware (Lion SRS, ...)bioscience middleware (Lion SRS, ...)meteo prediction and archival systemsmeteo prediction and archival systems

Page 8: SIMDAT and OGSA–DAI Hans–Christian Hoppe Intel GmbH, Bruehl Edinburgh, April 7, 2004 SIMDAT

SIMDAT

Key Requirements – Months 18–30Key Requirements – Months 18–30 Work towards virtualizationWork towards virtualization

federate DBs distributed across partners/sitesfederate DBs distributed across partners/sitesunlimited distributed read accessunlimited distributed read access(limited) distributed update/write(limited) distributed update/writevirtualize SQL queries and data formatsvirtualize SQL queries and data formatssupport different DB implementations (IBM Oracle, ...)support different DB implementations (IBM Oracle, ...)integrate provenance informationintegrate provenance informationaccommodate large entriesaccommodate large entriesintroduce messaging layer?introduce messaging layer?

Integrate Grid developmentsIntegrate Grid developmentsother FP6 projects (NextGRID, ...)other FP6 projects (NextGRID, ...)rest of the worldrest of the world

Page 9: SIMDAT and OGSA–DAI Hans–Christian Hoppe Intel GmbH, Bruehl Edinburgh, April 7, 2004 SIMDAT

SIMDAT

Key Requirements – Months 30–48Key Requirements – Months 30–48 Complete virtualizationComplete virtualization

unlimited distributed read, update, writeunlimited distributed read, update, writedistributed DB managementdistributed DB managementintegration of ontology–based data/query processingintegration of ontology–based data/query processingintegration of advanced workflow techniquesintegration of advanced workflow techniquesidentify and start to address performance issuesidentify and start to address performance issues

Integrate Grid developmentsIntegrate Grid developmentsresults of FP6 projects results of FP6 projects rest of the worldrest of the world

Page 10: SIMDAT and OGSA–DAI Hans–Christian Hoppe Intel GmbH, Bruehl Edinburgh, April 7, 2004 SIMDAT

SIMDAT

First SIMDAT PhaseFirst SIMDAT Phase

First three–six monthsFirst three–six monthsconsolidate requirements by application areasconsolidate requirements by application areasprovide gap analysis with OGSA–DAIprovide gap analysis with OGSA–DAIprioritize requirements and produce roadmapprioritize requirements and produce roadmapidentify risks and setup mitigation strategyidentify risks and setup mitigation strategy

Months 6–12Months 6–12integrate first Grid infrastructure&data access integrate first Grid infrastructure&data access

functionalityfunctionality