sils atlas meeting 18-9 october 2003 mechanics for the barrel sct
TRANSCRIPT
Sils ATLAS Meeting 18-9 October 2003
Mechanics for the Barrel SCT
Sils ATLAS Meeting 28-9 October 2003
Barrel SCT Mechanics - Specifications
Four stable cylindrical mechanical in carbon fibre - honeycomb sandwich (external dimensions are 568 / 710 / 854 / 996 mm diameter by 1530 mm length).
Stable to <1 ppm/°C CTE in longitudinal and circumferential directions, o –20°C < T < +30°C.
0% < RH < 50% RH at constant temperature, dimensional change in all directions, < 30 m/m.
Under stable conditions (- 10±1°C and 20±1°C in dry N2) changes in all directions, except through sandwich thickness, < 10 m/m/yr (2 point support in middle plane at both ends and 100 N/m2 uniformly distributed)
B3
Sils ATLAS Meeting 38-9 October 2003
Barrel SCT Mechanics - small parts
• Brackets and small components production.
• >40000 small pieces,
some the same for the 4 barrels, some specific to each barrel type
• The bracket shells are time consuming to produce and are on the critical path.
• Laminate by Composite Design, Machining by UNI-GE
• All components by end October
Sils ATLAS Meeting 48-9 October 2003
Barrel SCT Mechanics - barrel 6
Dirty work on Barrels before shipmentto RAL
Barrel 6 still in Geneva because of B3 delays at RAL
Counterdrilling of outer facing underneath pads Done for B6, B5 and B4, two pads to
be re-bonded on B4
Check/adjust mountability of brackets on pads, Done for B6, B5, B4
Surface preparation for bonding FSI system, Done for B6, B5, B4
Sils ATLAS Meeting 58-9 October 2003
Barrel SCT Mechanics - barrel 6
Clean Work to be done for B6,B5 and B4
• Cleaning cylinder
• Electrical continuity tests
• Mount brackets • all screws tightened with torque
controlled screwdrivers • brackets have to be electrically
isolated from cylinder
• Rough geometrical check.
• Visual inspection
B3
- penetrations through thermal enclosure designed
- support designed- tooling for support
manufacture to do- interlink design to do
Sils ATLAS Meeting 68-9 October 2003
Barrel SCT Mechanics - dry assembly
B3 + B6 B4 + B5 + B6
Sils ATLAS Meeting 78-9 October 2003
Barrel SCT Mechanics - assembly at RAL -delays!
Opto-harnesses are in production Barrel LM tape production complete Barrel-3 harnesses being evaluated ESD damage to DORIC ASIC & other production issues
(cracked lines etc)
B3 harness assembly at RAL
Sils ATLAS Meeting 88-9 October 2003
Barrel SCT Mechanics - assembly at RAL -delays!
B3 cooling assembly at RAL
Thermal enclosure a major problem
Sils ATLAS Meeting 98-9 October 2003
SCT Mechanics - integration of barrels at CERN
A possible assembly sequence developed by the group for the 4 equipped barrels.
Sils ATLAS Meeting 108-9 October 2003
Barrel SCT Mechanics - preparing SR1 reception
Temporary enclosure
DAQ system & readout
DCS & power supplies
Facility control & monitor (CIC)
Cooling system
Environmental Control & Interlock
Detector services
Environmental Gas
From H. Pernegger