signature: date: bexleyheath bellway homes south ......case study bexleyheath albion road,...
TRANSCRIPT
CASE STUDY
BEXLEYHEATHALBION ROAD, BEXLEYHEATH, LONDON DA6 7LB
New brownfield development of 518 apartments, 9 commercial units and under croft parking in a six no reinforced concrete frames up to 12 stories. Work commenced November 2018
> Pile caps ground beam and lift shafts.
> Storm and foul water drainage installation
> Formation of under croft parking
> Construction of 6 no reinforced concrete frames up to 12 stories in height
CLIENT:Bellway Homes South East
CONTRACT VALUE:£11,600,000
SCOPE OF WORKS
GROUNDWORK AND CONCRETE FRAME SPECIALISTS www.coinford.co.uk
Images
p1diqb32gsk3ud0c1n2b11en7g47.doc Page 2 of 2
Paul confirmed yes
Paul confirmed yes
Images
p1diqb32gsk3ud0c1n2b11en7g47.doc Page 2 of 2
Paul confirmed yes
Paul confirmed yes
CASE STUDY
p1diqb32gsk3ud0c1n2b11en7g47.doc Page 1 of 2
Site Name: Bexleyheath Job No: 724
Site Address: Albion Road, Bexleyheath, London DA6 7LB
Description: (Max 50 Words)
New brownfield development of 518 apartments, 9 commercial units and under croft parking in a six no reinforced concrete frames up to 12 stories. Work commenced November 2018
Client: Bellway Homes South East
Contract Value: £11,600,000
Scope of works:(Max 16 lines) Pile caps ground beam and lift shafts.
Storm and foul water drainage installationFormation of under croft parking.Construction of 6 no reinforced concrete frames up to 12 stories in height
Approved By: Position:
Signature: Date:
IMAGES: Paul confirmed yes