signal & telecom training center
TRANSCRIPT
Signal & Telecom Training Center/
सिगनल व दरूिंचार प्रसिक्षण कें द्र,
Kharagpur .
(Under MultiDisciplinary Zonal Training Institute/
बहु-ववषयक क्षते्रीय प्रसिक्षण िंस्थान, Kharagpur)
दक्षक्षण पूवव रेलवे South Eastern Railway
• Prior to 1963, the training of S&T Supervisiors, Technicians and Helpers
was conducted at the Signal Workshop Kharagpur.
• In 1963 the training was switched to Supervisors Training Center/KGP
combined with Mechanical dept.
• The present training centre came into existence during November 1981. It
was formally inaugurated on 23rd September 1983 by the then Honorable
Railway Minister Mr A. B. A. Gani Khan Choudhary.
• This training centre was inducted as a part of the MDZTI by amalgamating
it with STC and CETC in the year 2020 .
Brief History of
Signal and Telecom Training Centre (STTC)
Facility Quantity
Classrooms 4
Laboratories 6
E learning room 1
Video Conferencing room 1
Seminar room 1
Library 1
Outdoor yard layout 1
Hostel rooms 34
Mess 1
Playground 1
Recreation room 1
Facilities at STTC
Types of Courses Conducted by STTC/KGP
Sl
No
Courses Courses in a year
(approx.)
Duration
1 Refresher Tech (Sig & Tele) 24 04 weeks
2 Refresher Helper (Sig & Tele) 8 02 weeks
3 Equipment Tech (Sig & Tele) 40 01 week
4 Induction Sig& Tele – Helper 6 04 weeks
5 Initial Apprentice for Tech-I 2 08+17 weeks
6 Initial Apprentice for Tech-III 4 08+09 weeks
7 Foundation course (Gr D to Gr C) 6 08+09 weeks
8 Intermediate JE (Sig & Tele) 4 12 to 17 weeks
9 Disaster Management 6 1 week
10 Blacksmith 4 1 week
Courses
2015-16
(No of
Trainees)
2016-17
(No of
Trainees)
2017-18
(No of
Trainees)
2018-19 (No
of Trainees)
2019-20
(No of
Trainees)
2020-21 (No
of Trainees)
1 Refresher Tech (Sig & Tele) 489 576 524 467 414 282
2 Refresher Helper (Sig & Tele) - - - - 41 -
3 Equipment Tech (Sig & Tele) 505 401 348 192 228 191
4 Induction Sig & Tele – Helper 188 173 121 88 94 -
5 Initial Apprentice for Tech-I 71 144 145 66 78 252
6 Initial Apprentice for Tech-III
7 Appreciation Course for SM-I & SM-III 32 01 02 0 0
8 Foundation course (Gr D to C) 142 81 172 137 104 -
9 Intermediate JE (Sig & Tele) 32 50 34 32 23 33
10 Introduction Course for Appr JE & SSE 17 24 02 0 0 0
11 Disaster Management 23 37 17 21 23 -
12 Blacksmith 34 37 26 15 20 -
13 GR ’B’ Promotional Courses For SSE / JE’s 0 0 18 30 0 0
14 Vocational Courses For Engineering
Students 0 0 06 33 20 0
Total 1501 1555 1414 1083 1045 758
Course occupancy in the last 5 years
• These courses have been conducted on-line due to lock down.
Initially due to COVID-19, no training was conducted. Further from June’ 2020 onwards online training started.
The courses which can be taken up through online, have started.
Available Teaching Aids with STTC/KGP
Aid Quantity
Computers 5
Projectors 2
Monitor Display 2
White Board 7
Microphones 2
Web cam 3
Cadre
Note: Selection for Sr. Instructors and Instructors (Sig & Tele) is under process.
SL NO DESIGNATION SANCTIONED ON-ROLL VACANCY
1 CHIEF INSTRUCTOR 1 0 1
2 SR.INSTRUCTOR/SIG 1 2 -1
3 SR.INSTRUCTOR/TELE 3 3 0
4 INSTRUCTOR/SIG 6 0 6
5 INSTRUCTOR/TELE 4 0 4
6 SR.TECH/SIG 0 2 -2
7 TECH-I/SIG 3 0 3
8 TECH-II/SIG 1 0 1
9 TECH-III/SIG 0 2 -2
10 SR.TECH/TELE 0 1 -1
11 TECH-I/TELE 1 0 1
12 TECH-II/TELE 1 0 1
13 TECH-III/TELE 0 0 0
14 Painter Gr.III 1 0 1
15 Caretaker 1 1 0
16 Helper-II 7 4 3
17 Cleaner 1 0 1
18 Safaiwala 1 0 1
19 Chowkidar 4 1 3
20 Jamadar Peon 1 1 0
21 Peon 1 1 0
22 OS Gr.I 1 2 -1
23 Sr. Clerk 1 0 1
Total 40 20 20
Laboratory Training equipments available
Signalling
Single Line Block Proving Axl Counter Panel with UFSBI
Tokenless Block Instrument (Handle type)
Double Line Block Instument (SGE type)
Automatic Block Signalling (Double Line)
Single Section Digital Axle Counter (Eldyne)
Multi Section Digital Axle Counter (Eldyne)
Universal Axle Counter (CEL)
Electronic Interlocking (Warm Standby- Ansaldo)
Thick web Switch and Fan Shaped layout with Point machine
and operating Panel
Automatic Signalling layout
Integrated Power Supply
Electric Lifting Barrier (Global Make) with sliding boom.
STM 1 equipment with NMS
PD Mux equipment with NMS
Networking equipment
Train Traffic Control equipment
VHF sets
1+1 telephone setup
Integrated Passenger Information System (Software)
GPS Clock
PA system
OTDR and Splicing machine
Laboratory Training equipments available
Telecom
Modules expected in near future
Electronic Interlocking (Kyosan make) with Simulation Panel – Work
being executed by RVNL.
Multi Section Digital Axle Counter (Siemens make) - Work being
executed by RVNL.
Datalogger (Efftronics) - Work being executed by RVNL.
Double Line BPAC Panel with UFSBI - Work being executed by RVNL.
IPS (Statcon) - Work being executed by RVNL.
Already in pipeline
Under finalization
• EI, MSDAC, SSDAC, STM, IP Exchange, CC TV Network, IPIS ver.4
etc. of different make.
BACK