siemens.com/answers © Siemens AG 2013 All rights reserved. Modern rail vehicles for mass transit systems Siemens at the UITP World Congress 2013 Sandra Gott-Karlbauer, CEO Urban Transport

Upload: others

Post on 19-Apr-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Siemens at the UITP World Congress 2013 Modern rail ... · Example Workshop Services Metro São Paulo – Linha 1 Azul Our task: • 150 metros had to be refurbished between 2009

siemens.com/answers© Siemens AG 2013 All rights reserved.

Modern rail vehicles for mass transit systems

Siemens at the UITP World Congress 2013

Sandra Gott-Karlbauer, CEO Urban Transport

Page 2: Siemens at the UITP World Congress 2013 Modern rail ... · Example Workshop Services Metro São Paulo – Linha 1 Azul Our task: • 150 metros had to be refurbished between 2009

März 2013 Sektor Infrastructure & Cities, Rail Systems Division

© Siemens AG 2013 All rights reserved.Page 2

siemens.com/answers

Urban Transport answers the mobility demands of cities - today and tomorrow

Airport

City

Station

Light rail and street car, APM feeder systems, eBus/eBRT

Metros are the core transportation systems

APM airport shuttle and link feeder systems

Megacity

Passenger Coaches for intercity traffic

Brownfield Modernization and replacement of

installed base Enlargement of fleet and network

Greenfield ~200 cities worldwide with almost 1 Mio.

inhabitants w/o rail-bound public transport system

Demand Portfolio

Page 3: Siemens at the UITP World Congress 2013 Modern rail ... · Example Workshop Services Metro São Paulo – Linha 1 Azul Our task: • 150 metros had to be refurbished between 2009

März 2013 Sektor Infrastructure & Cities, Rail Systems Division

© Siemens AG 2013 All rights reserved.Page 3

siemens.com/answers

Our portfolio aims to meet the increasing challenges of urban mass transit transportation

Average distance between stops0,2 km 0,4 km 0,6 km 0,8 km 1,0 km 1,2 km

10.00010.000

20.000

30.000

40.000

50.000

60.000

70.000

80.000

Typi

cal t

rans

port

cap

acity

(Pas

seng

er/h

our/p

er d

irect

ion)

Commuter Rail

eBus/eBRTTrams

Light Rail(Pre-metro)

Automat. People Mover(Cityval)

Metro(medium and high-capacity)

Parameter:Commuter Rail: 750-3000m x 30.000-70.000 Light Rail: 500-800m x 5.000-20.000Metro: 550-1000m x 25.000-80.000 Trams: 300-600m x 3.000-9.000Cityval: 500-900m x 15.000-30.000 Bus: 200-400m x 1.200-6.000

Page 4: Siemens at the UITP World Congress 2013 Modern rail ... · Example Workshop Services Metro São Paulo – Linha 1 Azul Our task: • 150 metros had to be refurbished between 2009

März 2013 Sektor Infrastructure & Cities, Rail Systems Division

© Siemens AG 2013 All rights reserved.Page 4

siemens.com/answers

eBus / eBRT – electric equipment of buses for a better environment and cost reduction in service

• No local emissions

• Reduction of energy costs

• Advantages at LCC particularly because of decreased amount of maintenance compared to combustion engines

• Optimized ride comfort due to modern control systems

• Excellent energy yield through high efficiency and optimized energy regeneration

• Approved components for electric motor

• Range > 100km

Page 5: Siemens at the UITP World Congress 2013 Modern rail ... · Example Workshop Services Metro São Paulo – Linha 1 Azul Our task: • 150 metros had to be refurbished between 2009

März 2013 Sektor Infrastructure & Cities, Rail Systems Division

© Siemens AG 2013 All rights reserved.Page 5

siemens.com/answers

Wiener Linien: Vienna operates first series all-electric bus in Europe from Siemens and Rampini

Page 6: Siemens at the UITP World Congress 2013 Modern rail ... · Example Workshop Services Metro São Paulo – Linha 1 Azul Our task: • 150 metros had to be refurbished between 2009

März 2013 Sektor Infrastructure & Cities, Rail Systems Division

© Siemens AG 2013 All rights reserved.Page 6

siemens.com/answers

Warsaw Inspiro

Page 7: Siemens at the UITP World Congress 2013 Modern rail ... · Example Workshop Services Metro São Paulo – Linha 1 Azul Our task: • 150 metros had to be refurbished between 2009

März 2013 Sektor Infrastructure & Cities, Rail Systems Division

© Siemens AG 2013 All rights reserved.Page 7

siemens.com/answers

Avenio Education CityDoha - TK project

• Contract volumeOver 100 million Euros

• Scope of delivery: 19 trams

• CommissioningScheduled for the autumn of 2015

Avenio The Hague

• First order• Contract volume

Over 100 million Euros

• Scope of delivery 40 trams

• Delivery of first vehicles beginning in 2014

Avenio Munich

• Contract volumeAbout 29 million Euros

• Scope of delivery: 8 trams

• Commissioning of six tramsat the end of 2013

Copyright: Stadtwerke München / ergon3

2012: The year of the Avenio platformThe Hague, Doha, Munich

Page 8: Siemens at the UITP World Congress 2013 Modern rail ... · Example Workshop Services Metro São Paulo – Linha 1 Azul Our task: • 150 metros had to be refurbished between 2009

März 2013 Sektor Infrastructure & Cities, Rail Systems Division

© Siemens AG 2013 All rights reserved.Page 8

siemens.com/answers

Customer Services – Refurbishment Example Workshop Services

Metro São Paulo – Linha 1 Azul

Our task:• 150 metros had to be refurbished between 2009 and 2014• Replacement of original DC by new AC traction system

(DC chopper exchanged with IGBT inverter and DC drives replaced with AC drives)

• Installation of a new “fail-safe“ braking system• New train control system• Bogie revision including adaptations• Carried out in a consortium with Alstom

Highlights of our solution:• New on-board electrical system with battery charger• Modification of the driver’s cab; air conditioning system;

new interior• Door system revision• New air compressor and revision of the pneumatic system• Fire alarm system; Audio and video system

Page 9: Siemens at the UITP World Congress 2013 Modern rail ... · Example Workshop Services Metro São Paulo – Linha 1 Azul Our task: • 150 metros had to be refurbished between 2009

März 2013 Sektor Infrastructure & Cities, Rail Systems Division

© Siemens AG 2013 All rights reserved.Page 9

siemens.com/answers

Welcome to Siemens at the 60th UITP World Congress in Geneva!

Siemens Stand: Hall 2, Stand 2A325Palexpo, GenevaMay 26-30, 2013

Page 10: Siemens at the UITP World Congress 2013 Modern rail ... · Example Workshop Services Metro São Paulo – Linha 1 Azul Our task: • 150 metros had to be refurbished between 2009

siemens.com/answers© Siemens AG 2013 All rights reserved.

Thanks for your kind attention!

Sector Infrastructure & Cities - Rail Systems Division