    Sickness Industry / Sick firm

  • 7/30/2019 Sickness Industry

    2/31

    Sick industry

    Sick industry refers to the Sick units in a

    particular industry as a whole.

    Example

    Sickness in Textile industry ( say the factories /

    units in the industry as a whole are Sick ) .

    Refers to the general phenomena and does not

    refer to any particular unit in the industry.

  • 7/30/2019 Sickness Industry

    3/31

  • 7/30/2019 Sickness Industry

    4/31

    Remedies The Industrial units can do nothing of the

    happenings for which it has no control but canequip themselves prepared to protect to face

    such unfavorable happenings.

    In the example given, the people of thatcommunity can use Mosquito nets to protect

    themselves from Mosquitoes.

    In the example given , the Industrial units can

    consider constructing the sheds well above thefloor level at the time of construction to avoid

    water entering the shed during rainy season.

  • 7/30/2019 Sickness Industry

    5/31

    Unit Protecting from the influences

    of external environment Normally entrepreneurs conduct

    environmental scanning to know and to

    implement suitable strategies for managing

    macro environment which influences theoperations of the business in all the following

    stages of business to avoid unit becoming Sick,

    Project Identification

    Project planning

    Project implementation

    Project management

    Project development

  • 7/30/2019 Sickness Industry

    6/31

    Sick firm

    Sick firm refers to the Sick unit in a particularindustry .

    Reserve Bank of India ( RBI ) defines Sick firm as

    the firm incurring cash loss for two consecutivefinancial years and erosion of net worth of theassets of the firm to the extent of 50%.

    Example

    Sickness happening in a Textile firm ( say Binny Mills) .

    Refers to sickness happening in a firm and thus referto a particular unit in the industry.

  • 7/30/2019 Sickness Industry

    7/31

    Causes for Sickness

    Causes for Sickness in Industry could be termed asIndustry Sickness and the Causes for Sickness of theFirm could be termed as Sick Firm.

    The Sickness in Industry may result in Firm Sickness but

    Sickness in any one firm may not make the IndustrySick.

    The Industry Sickness is viewed from the Macro anglebut the Firm Sickness is viewed from the Micro angle.

    Nothing could be done by the Firms to change theMacro environment. They can do something to someextent adjust themselves and find ways to survive inthe environment.

  • 7/30/2019 Sickness Industry

    8/31

    Causes for Industry Sickness

    The causes for Sickness in the industry may bebecause of external reasons.

    EXTERNAL REASONS Political and legal ( LPG )

    Socio cultural preferences ( using Computers)

    Natural calamities ( tsunami )

    Competition ( Substitute, Industry, Form )

    Technology ( State of the Technology )

    Economy ( boom, recession, depression )

    The industrial sickness may lead to sickness of the unitsof the industry.

  • 7/30/2019 Sickness Industry

    9/31

    Remedial measure for Industry

    Sickness

    If the Industry as a whole is Sick and there

    exists a need to revive the Industry by taking

    appropriate steps at the Macro level.

    In the example given earlier , burning a

    Mosquito coil to kill all the Mosquitoes to

    avoid malaria. Association of the Industry

    asking for Tax relief from Govt throughLobbying.

  • 7/30/2019 Sickness Industry

    10/31

    contd

    When there is no Industry Sickness and if

    some units are Sick in the industry then we

    can come to a conclusion that there are some

    problems in the management of those units

    which need to be attended to avoid the units

    becoming Sick further and also to revive the

    Sick unit if feasible.

  • 7/30/2019 Sickness Industry

    11/31

    Causes for Firm Sickness

    The causes for Sickness in the industry may alsohappen due internal reasons of the firm also.

    The reasons for Sickness of the firms can happen at anyone or more of the following stages while performingthe business functions viz Marketing, Production,Finance and Human Resource Management

    1) Project Identification

    2) Project Planning stage

    3) Project implementation stage

    4) Project Maintenance stage

  • 7/30/2019 Sickness Industry

    12/31

    Factors causing Sickness during Project

    Identification Stage - 1

    Not performing the activity of Scanning theenvironment properly to know the Opportunitiesand Threats that exist in the environment,

    Not performing the activity of matching theStrengths and Weakness of the Promoters withthe required Strengths to manage the Projectefficiently and effectively ( in terms of

    Management personnel, Government formalities,Marketing , Production, Finance and HumanResource Management )

  • 7/30/2019 Sickness Industry

    13/31

    Factors causing Sickness during Project

    Planning Stage 2 ( at Planning stage )

    Marketing not estimating the quantity of

    Sales properly and the Product mix

    In Planning the Branding strategy wrongly

    Not Understanding the competitors strengths

    and weakness properly

    Not Understanding consumer preferences in

    deciding the Product mix

    Assuming the price of the Product at a very

    high rate without obtaining the feedback from

    the Pros ective Customers of the Product.

  • 7/30/2019 Sickness Industry

    14/31

    Technical ( at Planning stage )

    Technical not choosing the right technology,going wrong in the Installed capacity,

    not ensuring availability of Raw material,

    labor, accessories, packing material, etc

    Not ensuring availability of Utilities

    requirement properly

    not ensuring equipments and man power toimplement Quality control measures and

    taking steps to add in the facility proposed

    Not locating the project in the suitable area

    for the Pro ect

  • 7/30/2019 Sickness Industry

    15/31

    Government Supports ( at Planning stage ) Not verifying from the concerned Government departments

    on the objections / un favorable policies that exist to the

    business projects of the nature proposed like, whether there will be delay in obtaining licenses from the

    Govt authorities like Production license, Sales Tax

    registration, etc.

    Objection from Pollution control Board

    availability of Infra structure facilities to be provided to the

    proposed business projects from the Government

    Authorities

    availability of Term loan from the State FinancialInstitutions and Banks

    Whether there will be any delay in disbursing Investment

    subsidy given Government

  • 7/30/2019 Sickness Industry

    16/31

    Financial aspects ( at Planning

    stage )

    Not arriving at the correct requirement of thefunds for starting / establishing the business /

    project.

    Not making adequate reserve under the HeadContingency provision for cost escalation and

    un foreseen expenses in the Cost of the

    Project

    Not making adequate reserve under the Head

    Preliminary and Pre operative expenses ( start

    up expenses and initial expenses )in the Cost

    of the Pro ect

    td

  • 7/30/2019 Sickness Industry

    17/31

    contd Not making proper arrangement for initial

    Working capital funds with the commercial

    Bankers. Not maintaining the required Promoters

    capital funds in the readily available form to

    be broughtin stages towardsimplementation of the Project.

    Not foreseeing and considering alternative

    arrangements in case of any delay in therelease of the Govt financial support like

    Investment subsidy, Seed capital, etc. ( for this

    Bridge loan is provided by Banks as a stop gap

    arran ement

  • 7/30/2019 Sickness Industry

    18/31

    contd Not assuming reasonable Selling price of the

    Product in the cost of Production andProfitability statement prepared for 5 years

    Not assuming reasonable Cost of the items

    which goes into the Production in the cost of

    Production and Profitability statement.

    Not arriving at the appropriate Debt Equity

    ratio for the means of finance

    Borrowing term loan at a very high rate of

    interest.

    Not calculating Profit After Tax to know the

    F i Si k

  • 7/30/2019 Sickness Industry

    19/31

    Factors causing Sickness

    Project Implementation stage

    Delayed implementation compared to scheduledprogram

    Improper implementation compared to the designed

    program

    Cost escalation very much above the estimated cost

    of the program resulting in heavy financial strain for

    the Project at the initial stage itself.

    If the Project has not been implemented as per theset Plan it will become Born Sick Project and the

    Sickness will continue even after the project come

    into existence.

  • 7/30/2019 Sickness Industry

    20/31

    Factors causing Sickness

    Project Management stage

    Mal function of Marketing Function, Due to change in the external environment

    Marketing ,

    Political and legal ( LPG ) - Ban on the Product by Govt Socio cultural preferences ( dressing style )

    Natural calamities ( tsunami )

    Competition ( Substitute, Industry, Form )

    Technology ( State of the Technology ) land line phone tomobile

    Economy ( boom, recession, depression ) demand for

    real estate

  • 7/30/2019 Sickness Industry

    21/31

    Factors causing Sickness

    Project Management stage Mal function of Production Function, Due to change in the external environment Production ,

    Political and legal ( LPG ) Restriction on usage of

    Technology

    Socio cultural preferences ( Organic food )

    Natural calamities ( climatic conditions )

    Competition ( Substitute, Industry, Form )

    Technology ( State of the Technology ) land line phone tomobile

    Economy ( boom, recession, depression ) demand for

    real estate during Boom period of the economy

    Supplier - inadequate supply of quality raw material andother materials

  • 7/30/2019 Sickness Industry

    22/31

    Factors causing Sickness

    Project Management stage Mal function of Finance Function, Due to change in the external environment Finance ,

    Political and legal ( LPG ) increase in Income Tax for the

    companies

    Socio cultural preferences - change in the attitude of the

    people towards saving from investing in business ventures

    Natural calamities ( need to carry more inventory due to

    heavy rains )

    Competition ( Substitute, Industry, Form ) cost of capital

    Technology ( State of the Technology ) Collection of Bill

    through electronic media

    economy ( boom, recession, depression ) demand for

    money in the economy

    Supplier increasing cost of raw material ,other materials

  • 7/30/2019 Sickness Industry

    23/31

    Factors causing Sickness

    Project Management stage Mal function of H.R.Function,

    Due to change in the external environment Human ResourceManagement,

    Political and legal ( LPG ) change in the Reservation policy

    in the employee rolls of the company.

    Socio cultural preferences - change in the attitude of thewomen to go for employment

    Natural calamities (absenteeism of employees may be very

    high due to continuous heavy rains affecting production)

    Competition ( Substitute, Industry, Form ) when humanresource prefers to start business of their own posing a

    challenge for the H.R department in mobilizing Man power

    resulting non availability of Man power.

    No rain situation for agriculture activity will result in laborforce shifting to building construction activity

  • 7/30/2019 Sickness Industry

    24/31

    contd

    Technology ( State of the Technology ) for the fast

    changing technology companies may find difficult to get

    Man power resulting in non availability of right work force

    economy ( boom, recession, depression ) demand for

    Man power becomes a major problem

    Supplier non availability of contracting work force may

    result in high labor cost for the company.

  • 7/30/2019 Sickness Industry

    25/31

    Factors causing Sickness

    Project Management stage

    Mal function of Marketing Function,

    Due to change in the internal environment

    Marketing ,

    Due to internal reasons

    Lack of professionalism

    Shortage of funds for Marketing activity

    Product Quality problem

    Non cooperation of Distributors / Marketing

    middlemen

    Non cooperation of Sales personnel

    F t i Si k

  • 7/30/2019 Sickness Industry

    26/31

    Factors causing Sickness

    Project Management stage Mal function of Production Function,

    Due to change in the internal environment production ,

    Due to internal reasons

    Lack of professionalism

    Shortage of funds for Production activity

    Product Quality problem

    Non cooperation of suppliers / service providers /

    middlemen

    Non cooperation of Production department

    personnel

    Machinery break down,

    Non availability of utilities, infra structure, etc

  • 7/30/2019 Sickness Industry

    27/31

    Factors causing Sickness

    Project Management stage

    Mal function of Finance Function,

    Due to change in the internal environment

    Finance ,

    Due to internal reasons

    Lack of professionalism

    Shortage of funds for Finance activity

    Product Quality problem sales revenue and

    collection of Bills

    Non cooperation of suppliers in extending credit

    facility

  • 7/30/2019 Sickness Industry

    28/31

    contd

    Non cooperation of Banks in extending credit

    facility to the company towards working capital

    Non cooperation of Finance department

    personnel

  • 7/30/2019 Sickness Industry

    29/31

    Factors causing Sickness

    Project Management stage

    Mal function of Human Resource

    Management Function,

    Due to change in the internal environment

    H.R. Management ,

    Due to internal reasons

    Lack of professionalism

    Shortage of funds for H.R.D activity

    Non cooperation of Consultancy companies, etc

  • 7/30/2019 Sickness Industry

    30/31

    Remedial measure for Sick unit

    If the Unit is Sick and there exists a need to

    revive the Industry by taking appropriate steps

    at the Micro level / studying the unit

    individually from all the angles of business, bytaking up Case study research of the unit to

    find out what exactly went wrong in the unit

    and finding ways on how to overcome fromthe problems.

  • 7/30/2019 Sickness Industry

    31/31

    contd

    In the example given earlier , to protect from

    the Mosquito bite people can use Mosquito

    net. Similarly Sick units can consider

    introducing new designs or new products tocater to the changing demand of the

    Customers when the Industry is facing the

    problem of Change in Customer preference inthe Macro environment.