sian gold project – ghana brief summary june 2009

26
Sian Gold Project – Ghana BRIEF SUMMARY June 2009

Upload: christian-daniel

Post on 13-Dec-2015

234 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Sian Gold Project – Ghana BRIEF SUMMARY June 2009

Sian Gold Project – GhanaBRIEF SUMMARY

June 2009

Page 2: Sian Gold Project – Ghana BRIEF SUMMARY June 2009

Forward Looking Statement

Certain statements contained in the following presentation constitute forward-

looking statements. Such forward-looking statements involve a number of known

and unknown risks, uncertainties and other factors, which may cause the actual

results, performance or achievements of the company to be materially different

from actual results and achievements expressed or implied by such forward-

looking statements. Readers are cautioned not to place undue reliance on these

forward-looking statements, which speak only as of the date the statements were

made and the readers are also advised to consider such forward looking statements

while considering the risks inherent in the business of exploration.

2

Page 3: Sian Gold Project – Ghana BRIEF SUMMARY June 2009

Major Gold Deposits in Africa

Largest Gold Producer

2nd Top Gold Producer

3rd Top Gold Producer

• Focused on gold in Ghana and Tanzania – 2 stable countries

• Quality gold projects

• 400,000 oz on a fully permitted past producer in Ghana with a 30 year mining lease

3

Page 4: Sian Gold Project – Ghana BRIEF SUMMARY June 2009

Gold Projects, Tanzania

Tanzania: Gold & DiamondsLake Victoria Goldfields:

Area with over 50 million oz in gold reserves

• Itilima Project (43-101): gold and diamonds

• Lwenge/Geita Gold Project

• Kishapu

• Lalago

Other properties in Tanzania:• Vukene

• Kilindi

4

Page 5: Sian Gold Project – Ghana BRIEF SUMMARY June 2009

Priority Project: Sian, Ghana

Sian on Ashanti Gold Belt

• Sian contains two previous open pit mines and a 400,000 oz resource at 2.3 g/t

• 30 km NE of Newmont’s Akyem 8.7+ million oz deposit

• Production capital costs minimized by existing mine infrastructure

• Drill results show significant exploration upside potential

Other Ghana Projects:• Kwahu Praso (Ashanti Belt)• Kaniago (Asankrangwa Belt)

5

Page 6: Sian Gold Project – Ghana BRIEF SUMMARY June 2009

Priority Project: Sian

Presentation will focus on priority project: Sian, Ghana• Most advanced, early term ROI

• Sian: past gold producer with a 93% gold recovery rate

• Just 30 km north of Newmont Mining’s 8.7+ million oz Akyem gold deposit on the Ashanti Gold Belt

• Infrastructure, power, roads, water, and CIL (Carbon in Leach) plant

• 30 year renewable mining lease with 17 years remaining

• Sian resource has the potential to reach over 1 million oz in the next 12 months

6

Page 7: Sian Gold Project – Ghana BRIEF SUMMARY June 2009

Aiming for a Multimillion oz Deposit

Sian

• Sian: 50 sq km of prime ground in elephant country

Gold resource on the Sian project:• 400,000 oz resource

• Additional 700,000 oz in gold potential

Only 10% drilled to date

• Dixcove Granites – part of the geological structure

7

Page 8: Sian Gold Project – Ghana BRIEF SUMMARY June 2009

Sian Plant

Page 9: Sian Gold Project – Ghana BRIEF SUMMARY June 2009

Sian Plant

Page 10: Sian Gold Project – Ghana BRIEF SUMMARY June 2009

Sian Open Pit

Page 11: Sian Gold Project – Ghana BRIEF SUMMARY June 2009

Sian Open Pit

Page 12: Sian Gold Project – Ghana BRIEF SUMMARY June 2009

Sian Open Pit

Page 13: Sian Gold Project – Ghana BRIEF SUMMARY June 2009

Priority Project: Sian

Sian Gold Project

• Completely surrounded by Newmont Mining

• In open pit gold production 2000 to 2003

• 93% gold recovery rate at 2.3 g/t

• No refractory gold

• Fully permitted

• Need to increase tonnage and bring Sian back into production by the end of 2010

• Estimated timeframe to production: 12 months from date of financing

Sian Processing Plant, Ghana; April 2007

13

Page 14: Sian Gold Project – Ghana BRIEF SUMMARY June 2009

Sian Plant

Page 15: Sian Gold Project – Ghana BRIEF SUMMARY June 2009

Sian Plant

Page 16: Sian Gold Project – Ghana BRIEF SUMMARY June 2009

Sian Plant

Page 17: Sian Gold Project – Ghana BRIEF SUMMARY June 2009

Sian Plant

Page 18: Sian Gold Project – Ghana BRIEF SUMMARY June 2009

Focus on Sian

What we need to do concurrently:

1. Prove up a minimum of 1 million oz of gold on direct extensions of the Sian gold deposit and drill test new zones to:

- Increase indicated resource (infill drilling and drilling at depth)

- Upgrade to a measured category (definition drilling)

- Complete a scoping study and update the feasibility study (bankable)

1. Engineering review of CIL plant to determine costs of re-commissioning (bankable report)

2. Airborne VTEM survey over Sian to accelerate drilling

18

Page 19: Sian Gold Project – Ghana BRIEF SUMMARY June 2009

Goal: Gold Productionon Sian by the end of 2010

Targets and objectives

• Expected initial production: 12 months away

– Initially 2,000 tonnes / day x 300 days = 600,000 tonnes per year

– 93% gold recovery rate

– 600,000 tonnes at 2.3 g/t = 44,516 oz of gold in year 1

• Expected revenues

– Assume gold at $850 USD per oz

– Gross revenue at $850 per oz = $38 million USD– Production cost at $350 per oz = $16 million USD

• Revenue net of costs per oz – year 1

– $22 million USD

19

Page 20: Sian Gold Project – Ghana BRIEF SUMMARY June 2009

Technical Partnerships

• Midlands team: best in geology, best in operations

– We know Africa well

• Midlands is partnered with a strong engineering company to move the Sian project forward

• Engineering partner knows Africa well and has

– Operational experience

– Project management experience

– Technical and engineering expertise

– Knowledge of Ghana

– Track record in bringing properties to production

20

Page 21: Sian Gold Project – Ghana BRIEF SUMMARY June 2009

Financing Requirements For Sian

Up to $5 million USD required in the next 12 months

To achieve the following:

– At least 1 million oz

– A scoping study and a bankable updated feasibility study

– A bankable technical report on the existing CIL plant

– A VTEM air magnetic and radiometric survey to accelerate further drilling to grow the resource

– Take Sian to a production decision

21

Page 22: Sian Gold Project – Ghana BRIEF SUMMARY June 2009

Use of Funds: $5 million Sian

• $3 million – up to 20,000 metres of drilling

– Definition drilling: 10,000 metres

– Infill drilling: 5,000 metres

– Engineering and condemnation drilling: 3,000 metres

– Contingency: 2,000 metres

• $500,000 – engineering metallurgical testing

• $250,000 – scoping study and update of feasibility study

• $250,000 – airborne VTEM and radiometric survey

• $200,000 – resource/reserve calculation and update

• $800,000 – working capital

22

Page 23: Sian Gold Project – Ghana BRIEF SUMMARY June 2009

Investment Decision Points

Early Exploration

- Soil Surveys

- Geological Mapping

- Geological data review

- Target generation

Exploration Drilling

Exploration Drilling

- Resource Generation

- Definition Drilling

- Resource Categories

Feasibility Study Mine Development

High Risk

Decreasing Risk

Page 24: Sian Gold Project – Ghana BRIEF SUMMARY June 2009

Other Information

Page 25: Sian Gold Project – Ghana BRIEF SUMMARY June 2009

Directors

Edward A. Harris (Chair)- Vice-President and portfolio manager with McLean Budden Ltd. since 1990- 34 years of experience in the financial services industry

Kim F. Harris, MA (Vice Chair)- Founder of Midlands- Over 20 years of experience in Africa, including 12 in exploration

Pierre Lalande, PGeo- Chief Geologist for IAMGold Corp. from 1994 to 2001- Previously with Watts, Griffis and McOuat Ltd.

R. John Carruthers- Director of Industrial Business Development with Casebank Technologies Inc. from 1999 to 2004- Former Manager with Deloitte & Touche until February 1999

Mark B. Keatley, MBA, MPhil, MA- CFO of Ashanti Goldfields Ltd. from 1994 to 2000- Senior management positions in International Finance Corporation, World Bank, Ford Motor Company, UK

Karl Schmed- President, Global Colour Link & Associates

Noel Nedrick- Financial Consultant

25

Page 26: Sian Gold Project – Ghana BRIEF SUMMARY June 2009

Contact Information

Head Office1210 Sheppard Avenue East, Suite 302Toronto, OntarioCanada M2K 1E3

Tel: +1 416 492 6992Fax: +1 416 492 6993E-mail: [email protected]

Accra, Ghana

Aviation House, Suite 203PO Box 30679, KIAAccraGhana

Tel: +233 (0) 21 772 [email protected]

Shinyanga, Tanzania

PO Box 1175ShinyangaTanzania

[email protected]

Sian, Ghana; April 2007

26