Download SHRP 2 - R04 ABC Demonstration Bridge Design and Construction AASHTO Committee on Construction San Francisco, CA August 16, 2012

If you can't read please download the document

Upload: adrienne-hardin

Post on 16-Dec-2015

219 views

Category:

Documents


1 download

TRANSCRIPT

  • Slide 1
  • SHRP 2 - R04 ABC Demonstration Bridge Design and Construction AASHTO Committee on Construction San Francisco, CA August 16, 2012
  • Slide 2
  • Iowa ABC Demonstration Project Two Week Closure US Highway 6 Bridge over Keg Creek 6 miles east of Council Bluffs, IA Normal construction duration 14-16 weeks ABC construction duration 14 days
  • Slide 3
  • Project Innovations Precast modular bridge system (including precast approach pavement) Superstructure units create a semi- integral abutment for rapid construction Durable, moment-resisting UHPC joint between deck panels First bridge in US with full, moment- resisting UHPC joint at the piers
  • Slide 4
  • UHPC UHPC Particle Packing UHPC Constituents: Portland cement silica fume fine, uniformly graded sand crushed quartz steel fibers water superplasticizers
  • Slide 5
  • 14-Day ABC Timeline 123 4 56789 10 111213 14
  • Slide 6
  • Bridge Farm Concept
  • Slide 7
  • Precast Abutments and Piers
  • Slide 8
  • Superstructure Modules
  • Slide 9
  • Deck Joint Forming
  • Slide 10
  • Deck Concrete Placement
  • Slide 11
  • Drilled Shaft Construction
  • Slide 12
  • Abutment Details Precast Abutment Construction Single piece barrel section SCC to fill pile pockets Temporary support of backwall until SCC reaches 3500 psi
  • Slide 13
  • Semi- Integral Abutment
  • Slide 14
  • Abutment Construction
  • Slide 15
  • SCC Concrete for Abutments
  • Slide 16
  • Precast Piers
  • Slide 17
  • Precast Pier Connections
  • Slide 18
  • Column Assembly and Bracing
  • Slide 19
  • Capbeam Assembly
  • Slide 20
  • Modular Superstructure
  • Slide 21
  • Pier Joint Detail C Pier 1 L C Pier 2 L
  • Slide 22
  • PT Retrofit for Modules
  • Slide 23
  • Module Transport
  • Slide 24
  • Module Assembly
  • Slide 25
  • Slide 26
  • Deck Joint Reinforcing
  • Slide 27
  • UHPC Mixing
  • Slide 28
  • UHPC Placement
  • Slide 29
  • FHWA/HFL Workshop
  • Slide 30
  • Slide 31