Shiraz Urban Railway Organization
Shiraz Metro Project
Shiraz Traffic Studies
16 corridors and 27 scenarios in basic study
6 corridors approvedPassengers in 2020 (phpd)
Lines
17500 Line 1
12500 Line 2
21481 Line 3
12845 Line 4
7564 Line 5
20223 Line 62100000 Trip generation
per day
Trip Vehicles
%50 Private
%2 Motor and bicycle
%22 Taxi
%26 Bus
Shiraz Metro Project Lines
Status of Shiraz Metro Project
Shiraz Metro LinesStatus Color Length
( Km)Line
Under Construction( Physical Progress :
%52)
---------- 24.5 Line 1
Basic Study ( EPC) (Progress : % 37 )
---------- 14 Line 2
Basic Study ---------- 10 Line 3 Basic Study ---------- 17.2 Line 4 Basic Study ---------- 9.5 Line 5 Basic Study ---------- 14.8 Line 6
90 Total Length
12
34
56
78
910
111213
1415
16
17
18
19
20
21
Nam
azi
Stat
ion
Valias
r st
atio
n
Dou
ran
Sation
Total length of line one : 24.5 KmN
TBM Tunneling
Depot
Connectio
n line
Ehsa
n
Dep
ot
Mai
n Dep
ot
Under constructionCon
trol
cent
er
Shiraz Metro Line 1
Total budget : 1.06 billion USD
Stations Of Line One
13 Island platform Stations
Stations Side platform 7
Typical profile of Shiraz metro Stations
Characteristics of line One
24.5 km Length :20 No. of stations :102 m platforms length : 3000 m min of vertical curve :250 m min of horizontal curve :
3 minutes headway :38 km traditional speed :30 sec. stop time in stations :1500 DC. V OCS type :
High floor car type :5 No. of cars in a trainset :290 person car capacity :1450 person trainset capacity :
17500 personmax. of line capacity in one direction :
9.5 km first phase length :
15 km second phase length :
Characteristics of Line One
Types of Tunneling in Shiraz metro
MAIN TUNNEL– SUPPORT SYSTEM
Tunnel center
Road center
TBM Tunneling
NATM Tunneling
Cut & Cover Tunneling
Station's
Diaphragm Walls
Control Center
Depot & Workshops