Page 1: Shipperless & Unregistered Workgroup Tuesday 6 th May 2014

Shipperless & Unregistered Workgroup

Tuesday 6th May 2014

Page 2: Shipperless & Unregistered Workgroup Tuesday 6 th May 2014

Agenda

Introduction Previous Actions Statistical Information

Overall Industry Volumes Shipperless and Unregistered Sites Project Update Withdrawn Sites with Live MPRNs with No Meter Attached DN New Supply Leaflet GDNs Updates A.O.B.

Page 3: Shipperless & Unregistered Workgroup Tuesday 6 th May 2014

Previous Actions

Page 4: Shipperless & Unregistered Workgroup Tuesday 6 th May 2014

Outstanding Actions

Ref. Date Raised Description Action Status

150 01/07/13

All Shippers to provide contact details for Networks to use to provide pre-notifications of GSR site visits or end user letters.Update – 01/11/13 Some Shippers have provided contact details as requested but many are yet to respond.Update – 29/01/14 Some Shippers are still yet to respond. Reminders will be issued via Xoserve’s Customer Engagement Team.

All Shippers Ongoing

157 29/01/14Xoserve to provide Networks with statistics on the number of MPRN Creation Requests Submitted by Shippers in 2013.Update – 01/05/14 – high level figures provided to Networks.

Xoserve Open

158 29/01/14Networks to consider the request from DW to engage with Shippers and to create MPRNs at their request.

Networks Open

159 29/01/14Networks, Shippers and OFGEM to consider the issue of the 350,000 Withdrawn Sites with no Asset Attached. Report back at next S&U WG Meeting.

Networks, Shippers

and OFGEMOpen

160 29/01/14

Xoserve to clarify which Shipper would be pursued if a meter was found on a withdrawn site which purportedly had been removed by a previous Shipper and the site had subsequently been confirmed and withdrawn by other Shipper (s).

Xoserve Open

Page 5: Shipperless & Unregistered Workgroup Tuesday 6 th May 2014

Statistical Information

Page 6: Shipperless & Unregistered Workgroup Tuesday 6 th May 2014

Statistical Information February 2014Unregistered Sites Jan-14 Feb-14

    Total With Shippers Remaining Total With Shippers Remaining

Shipper Activity 233 3 230 103 0 103

Orphaned

TOTAL 14,684 1,673 13,011 14,308 0 14,308

With Meter 5,908 - - 5,581 0 5,581

Shipperless Sites - Shipper

(PTS)

GSR 1,192 524 668 1,184 0 1,184

GSS 402 - - 94 0 94

Shipperless Sites - Industry (SSP) 4,891 2,228 2,663 4,709 0 4,709

No Activity 815 0 815 897 0 897

Legitimately Unregistered

38,759 - - 38,764 0 38,764

Meter Point created less than 12 months

32,040 - - 36,292 0 36,292

TOTAL 21,815 4,428 17,387 21,201 0 21,201

Page 7: Shipperless & Unregistered Workgroup Tuesday 6 th May 2014

Shipperless and Unregistered Sites Clearance Project

Update

Page 8: Shipperless & Unregistered Workgroup Tuesday 6 th May 2014

S&U Site Clearance Project - The Story So Far

• Xoserve produced a “Base-line” Dataset in November

• This was issued to the industry for portfolio comparisons

• Xoserve issued the first batch of End User Letters in March

• Xoserve have so far, issued letters to Shipperless Sites and are currently in the middle of issuing letters to Unregistered Sites.

• Xoserve has issued records to Shippers and Networks where appropriate.

• Xoserve continues to complete desktop investigations

Page 9: Shipperless & Unregistered Workgroup Tuesday 6 th May 2014

Update on Shipperless Sites

OutcomeNumber of

Records%

Site Confirmed 75 2.25%

Set to DE 11 0.33%

Passed to Network 572 17.19%

Passed to Shipper 49 1.47%

Possible Duplicate 140 4.21%

To be set to EX 6 0.18%

Further Investigation by Xoserve Required 168 5.05%

No Response 2306 69.31%

Total 3327 100.00%

15 duplicate records were found in the original dataset.

Page 10: Shipperless & Unregistered Workgroup Tuesday 6 th May 2014

Update on Unregistered Batch 1

OutcomeNumber of

Records%

Site Confirmed 4 0.08%

Set to DE 0 0.00%

Passed to Network 319 6.60%

Passed to Shipper 27 0.56%

Possible Duplicate 35 0.72%

To be set to EX 3 0.06%

Further Investigation by Xoserve Required 211 4.37%

No Response 4234 87.61%

Total 4833 100.00%

Page 11: Shipperless & Unregistered Workgroup Tuesday 6 th May 2014

Lettering Schedule

Shipperless Sites Letters Both Letters Have Been Issued

   

Unregistered Sites Letters Dispatch Week Commencing

Batch 1 Both Letters Have Been Issued

Batch 2 Letter 1 Letter 1 Has Been Issued

Batch 2 Letter 2 12/05/2014

Batch 3 Letter 1 02/06/2014

Batch 3 Letter 2 16/06/2014

Page 12: Shipperless & Unregistered Workgroup Tuesday 6 th May 2014

Going Forward

• Xoserve will continue to process responses.

• Xoserve will continue to issue records to Shippers and Networks to investigate and process accordingly

• Xoserve will investigate and process records as appropriate.

• It is hoped that the majority of returns will have been received from End Users by the end of June 2014.

• Activity by Xoserve, Shippers and Networks will continue beyond this date.

• The Project is scheduled to be completed by the end of October 2014.

Page 13: Shipperless & Unregistered Workgroup Tuesday 6 th May 2014

Withdrawn Sites with Live MPRNs with no

Meter Attached

Page 14: Shipperless & Unregistered Workgroup Tuesday 6 th May 2014

Background

• In January, Xoserve made the S&U Workgroup aware of the existence of a number of Shipperless Sites on UK-Link that are not necessarily included in the S&U process.

• The group discussed the issue and agreed to contemplate what, if any action was required to address these records which fall outside the definition of a “Shipperless Site”:

“Shipperless Meter Point – A Supply Point that has no current registered Shipper but previously had one, and for which it has been established that gas is being consumed through a meter.”

Page 15: Shipperless & Unregistered Workgroup Tuesday 6 th May 2014

DN

Unregistered Sites Leaflet

Page 16: Shipperless & Unregistered Workgroup Tuesday 6 th May 2014
Page 17: Shipperless & Unregistered Workgroup Tuesday 6 th May 2014

DN Unregistered Sites Leaflet

Page 18: Shipperless & Unregistered Workgroup Tuesday 6 th May 2014

GDN Updates

Page 19: Shipperless & Unregistered Workgroup Tuesday 6 th May 2014

AOB

Any other business?

Thanks for your attendance your contribution & support

Have a safe journey home!