shipperless & unregistered workgroup
DESCRIPTION
Shipperless & Unregistered Workgroup. Friday 1 st November 2013. Agenda. Introduction Previous actions Statistical Information Overall industry volumes Proposed new layout End User Letter Trial Update - PowerPoint PPT PresentationTRANSCRIPT
Shipperless & Unregistered Workgroup
Friday 1st November 2013
Agenda
Introduction Previous actions Statistical Information
Overall industry volumes Proposed new layout
End User Letter Trial Update Responses to Ofgem's Open Letter to Gas Distribution
Networks on Tackling Unregistered Sites MPRNs Set to DE in Error GDN Update A.O.B.
Previous Actions
Ref. Date Raised Description Action Status
147 01/07/13Continued from Action 143. Xoserve to provide the shippers with the respective updates on the MPRNs reportedly set to DE in error.
Xoserve Complete
148 01/07/13Xoserve to issue the communication templates to be used in the End User Letter trial, to the group members.
Xoserve Complete
149 01/07/13 Xoserve to publish a timeline for the EU Letter trial Xoserve Closed
150 01/07/13All Shippers to provide contact details for Networks to use to provide pre-notifications of GSR site visits or end user letters.
All Shippers Ongoing
151 01/07/13All Networks to provide contact details for Shippers to use to obtain further information on GSR site visits.
All Networks Ongoing
Outstanding Actions
Outstanding ActionsRef. Date Raised Description Action Status
152 01/07/13Xoserve to provide the updates from the Networks on MPRNs set to DE in error, to the relevant shippers.
Xoserve Ongoing
153 01/07/13Shippers to provide examples to Xoserve, of MPRNs that have not been set to DE following service removal by the Network.
All Shippers Ongoing
154 01/07/13Xoserve to forward examples to the relevant Networks, of MPRNs that have not been set to DE following service removal by the Network.
Xoserve Ongoing
155 01/07/13Networks to investigate examples of MPRNs that have not been set to DE following service removal by the Network.
All Networks Ongoing
156 01/07/13
Xoserve to ensure the following administrative actions are conducted: provide the agenda ahead of future meetingspublish dates of future meetings on the Joint Office websiteinclude the date that Actions were raised in the meeting minutes
Xoserve Complete
Statistical Information
Statistical Information September 2013
Proposed New Format for Presenting S&U Figures
End User Letter Trial
End User Letter Trial
Scope
• Investigation of 1000 MPRNs (with meters) from the Orphaned population, using Xoserve systems and other available information sources.
Objectives
• To test the effectiveness of an End User Letter Process
• To promote the confirmation of MPRNs as necessary
• To ensure that MPRNs are set to EX or DE as necessary
End User Letter Trial Timeline
23
/07
/20
13
Com
ms
1 D
ispa
tche
d
21
/08
/20
13
Com
mun
icat
ion
2 D
ispa
tche
d
06
/08
/20
13
Dea
dlin
e fo
r Com
ms
1 R
espo
nses
07
/08
/20
13
Det
ails
for C
omm
s 2
sent
for D
ispa
tch
04
/09
/20
13
Dea
dlin
e fo
r Com
ms
2 R
espo
nses
01
/11
/20
13
Find
ings
repo
rted
to
S&U
Wor
kgro
up
25
/10
/20
13
Xose
rve
Anal
ysis
com
plet
ed
15
/03
/20
13
Xose
rve
Pres
ent P
ropo
sal f
or E
U T
rial
27
/03
/20
13
Xose
rve
Issu
es d
atas
et to
Shi
pper
s
and
Net
wor
ks fo
r ana
lysi
s
27
/06
//2
01
3Xo
serv
e Is
sues
dat
aset
for p
repa
ratio
n
of C
omm
unic
atio
n 1
12
/08
//2
01
3Xo
serv
e Is
sues
dat
aset
for p
repa
ratio
n
of C
omm
s 2
04
/10
/20
13
Xose
rve
Issu
es E
U re
spon
ses
to re
leva
nt
Ship
pers
and
Net
wor
ks fo
r ana
lysi
s
From start (proposal) to finish (presentation of results), the trial took 7 ½ months.
25
/09
/20
13
Inte
rim M
eetin
g –
Pre
sent
ed F
indi
ngs
from
Com
ms
1
Actions Undertaken
• Xoserve selected a random sample of 1000 Orphaned Sites with meters and provided the whole sample to Shippers and Networks
• Shippers and Networks reviewed the sample and advised if appropriate and some requested sites to be removed as already under investigation
• Xoserve conducted desktop checks on the remaining sample• Xoserve issued the results of desktop analysis to Networks• Networks conducted additional investigations and responded to
Xoserve• First letters were issued to remaining sites in the sample
Actions Undertaken
• Xoserve fielded the responses from End Users• Xoserve collated and analyzed response to first letters and passed
information to Shippers and Networks as appropriate.• Xoserve issued second letter to sites where deemed necessary• Xoserve continued to field responses from End Users• Xoserve analyzed responses to second letters and passed
information to Shippers and Networks as appropriate.• Xoserve checked Confirmation and Meter Point Status of entire
sample
Analysis
Removal Reason Number of SitesPercentage of Total Sample
Duplicate Records 27 2.70%
DE, EX, CA 6 0.60%
Confirmed (No Action Taken) 17 1.70%
Plot Addresses 34 3.40%
Removed at the request of Shippers 158 15.80%
Removed at the request of Networks 3 0.30%
Total 245 24.50%
Removals from Original Sample
These removals meant that 755 sites were issued with the first letter.
Analysis
Requested Removals from Original Sample
Removal RequestsNumber of Sites
Confirmed%
ConfirmedSet to
DE / EX% Set to
DE
Removed at the request of Shippers 158 73 46.20% 9 5.70%
Removed at the request of Networks 3 1 33.33% 0 0.00%
Total 161 74 45.96% 9 5.59%
The records removed at the request of Shippers and Networks have been monitored for Confirmations and Meter Point Status updates.
Analysis
Response Number Percentage
Letter 1 (755 issued) 146* 19.34%
Letter 2 (618 issued) 135* 21.84%
No Response (755) 474 62.78%
Total 755
End User Response Rates
* Include replies from EU and returns from Royal Mail
Analysis
End User Response Methods
Letter 2 evoked response where letter 1 had failed.
Response MethodNumber of Responses to Letter 1
Percentage
Percentage of Sum of
EU Responses
Number of Responses to Letter 2
Percentage
Percentage of Sum of
EU Responses
End User Response
Card 23 3.05%
5.70%
0 0.00%
14.56%
Email 4 0.53% 44 7.12%
Telephone Call
16 2.12% 45 7.28%
Letter 0 0.00% 1 0.16%
Royal Mail 103 13.64% 13.64% 45 7.28% 7.28%
No Response 609 80.66% 80.66% 483 78.16% 78.16%
Total 755 618
Analysis
Total Sites issued with Letters
Number of Sites
Confirmed%
ConfirmedSet to DE/EX
% Set to DE/EX
755 102 13.51% 12 1.59%
Records Included in EU Letter Dataset
13.51% of sites that were lettered were confirmed during the trial period. (not necessarily as a result of the letters)
Analysis
Xoserve made an assessment of the information obtained through the responses received.
Outcomes
Potential Outcomes Resolved? Number of Records Percentage Totals Total Percentages
Confirmed Yes 102 13.51%
207 27.42%
Set to DE Yes 3 0.40%
Set to EX Yes 9 1.19%
To Be Set to EX Yes 31 4.11%
Legitimately Unregistered Yes 62 8.21%
Passed to Shipper No 32 4.24%
548 72.58%
No Conclusion – Further Investigation Required
No 516 68.34%
Total 755 755
Age Analysis of Orphaned Sites with Meter
All Orphaned with
MetersSample of 1000 755 Lettered Sites
Pre 2000 5.00% 8.40% 9.14%
2000 - 2004 23.64% 13.50% 15.23%
2005 - 2009 46.73% 51.80% 50.07%
2010 - 2012 24.63% 26.30% 25.56%
Analysis
Comparison of Records Included in EU Letter Dataset to All Orphaned with Meter Pot
Number of
SitesConfirmed % Confirmed Set to DE/EX % Set to DE/EX
Requested Removed Sites 161 74 45.96% 9 (* +5) 5.59%
Sites issued with Letters 755 102 13.51% 12 1.59%
Total Sample 1000 176 17.60% 26 2.60%
Total Orphaned with Meter Pot 6526 431 6.60% 77 1.18%
Total Orphaned with Meter Pot minus 1000 Sample
5526 255 4.61% 51 0.92%
* 5 were removed as they had been set to DE in BAU before the letters were issued.
A Case Study
Dave Ackers
Findings from the End User Letter Trial
• Active participation of Networks and Shippers is crucial• 27.42% of the sample were resolved• End Users can not be relied upon to respond to communications.
(62.8% non-response rate) and can take up to 3 months to reply!• A second communication to End Users yielded higher end-user
response rates than the first letter• We experienced issues with the postal aspect of the trial which
meant:– Deliveries were not as prompt as expected
– There were some unexpected delivery failures
– We failed to receive the non-deliveries as quickly as expected
– Non-deliveries were sometimes returned with conflicting reasons.
Active participation of Networks and Shippers is crucial!!!
Gas Distribution Networks’ Response to Ofgem's Open
Letter on Tackling Unregistered Sites
EnergyNetworksAssociationRoot cause solution for unregistered sites / MPRN creationDavid Mitchell1st November 2013
Root Cause Solutions – MPRN Batches
26
Energy Networks Association
•Xoserve are now issuing smaller batches of MRPNs in an effort to influence the behaviour of parties who allocate new MPRNs to sites.
•Batches are relevant to the number of new connections that the requester makes.
•A maximum of 5000 MPRNs will be issued at any one time.
•New batches are only issued once 85% of the previous batch have been used.
Root Cause Solutions – MAMCoP Change
27
Energy Networks Association
•It was identified that an amendment to MAMCoP was needed to facilitate with the process of preventing unregistered sites.
•Change order MAM/13/002 has been raised titled “Ensuring appropriate Supply Contracts Are In Place Before installing a gas meter.”
•The change has been discussed at length at the MAMCoP board during the course of 2013 due to the change having a material effect on the operations of MAMs. The proposed change would appear to have universal support.
•A vote on the change is planned this month
Root Cause Solutions – Customer Communication Leaflet
28
Energy Networks Association
•GDNs have agreed on the format of a customer communications leaflet to be left following the installation of a new service.
•The leaflet provides details on how to establish if a supplier is in place for a property:
• Explains what an MPRN is and where is can be found
• Where names of suppliers can be found
• Provides useful contact numbers
•The leaflet clearly states that the use of gas without a supply contract is illegal.
Root Cause Solutions – MPRN Allocation Document
29
Energy Networks Association
•A new MPRN Allocation document is being produced.
•The document will outline the MPRN creation process and will cover areas such a requesting MPRNs.
•It will explain what to do with MPRNs if the project does not go ahead and the action needed to prevent duplicate MPRN’s and MPRN remaining at a status of Live.
•The document will outline when and where a new MPRN is required.
•The document is due to be released in early January 2014.
MPRNs Set to DE in Error
Deborah WatsonGazprom Energy
MPRN Issues
• MPR creation scenarios
• “Network” not setting MPRs to dead
• “Network” using 9999999999 on isolation correspondence
• Unregistered “found meter” reported by “Network” – wrong mpr noted
• Found supplies and MPR creations
• Networks to contact registered shippers when a request to isolate is received
MPR creation scenarios
Scenario A
• Existing MPRN should be used
House
Gas Main
ECV
RemovedService Altered
ECV
Service
Service laid at same point on the main (Alteration of service, Service replacement & Capacity increase)
Scenario B
Old service disconnected and new service fitted at a different location in the gas main
House
Gas Main
ECV
RemovedService
ECV
NewService
• Existing MPRN should be used and old service isolated
Scenario C
Old service disconnected and new service fitted at different main.
• Existing MPRN should be used and old service isolated
ECV
ECV
Removed Service
New ServiceHouse
Gas Main 1
Gas
Mai
n 2
Scenario D
House
Swimming Pool
ECV
ServiceNewExisting
ECV
Service
Gas Main
Additional service fitted at different points in same gas main.
• New MPRN should be created
Scenario E
Converted Flats (originally House No 22)
NewService
New
ECV ECV
Flat 1No 22
Orginally
RemovedService
Flat 2 Flat 3
ServiceNew
Service
Gas Main
ECV ECV
•3 New MPRNs should be created•Further discussion needed regarding isolation of old service
House converted to flats old service removed and additional services fitted at different points in the same gas main
Scenario F
Converted Flats (originally House No 22)
No 22
ECV
Gas Main
ECV ECV ECV
Orginally
Now Flat 1 Flat 2 Flat 3 Flat 4
•3 new MPRNs should be created•Address amendment would be required for original MPRN to reflect ‘flat 1’. How should this be actioned?
House converted to flats and existing service changed to flat 1 and additional services fitted at different points in the same gas main.
Scenrio G
House
Gas Main
ECV
NewService
• New MPRN should be created
New service laid at any point on the main (New Development – Could be a plot address)
GDN Updates
AOB
Any other business?
Thanks for your attendance your contribution & support