Page 1: SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018Development... · SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018 Background •The Ship Point master planning process was

SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018

Page 2: SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018Development... · SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018 Background •The Ship Point master planning process was

SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018

Background

• The Ship Point master planning process was initiated in March of 2017 to advance policy direction from Harbour Vitality Principles (2014)

• Ship Point design and initial implementation a key action in the 2015-2018 Strategic Plan

Page 3: SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018Development... · SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018 Background •The Ship Point master planning process was

SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018

The Process

• Phase 1: Detailed Assessment, Design Framework

• Phase 2: Conceptual Design

• 2 open houses with over 300 people in attendance

• Online survey with 147 responses

• Council approved design concept as basis for Phase 3

• Phase 3: Master Plan Document

• Detailed (schematic) design

• Implementation & Phasing Strategy

• Cost estimate and Funding Strategy

Page 4: SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018Development... · SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018 Background •The Ship Point master planning process was

SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018

Draft Design Concept - what we heard

Page 5: SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018Development... · SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018 Background •The Ship Point master planning process was

SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018

Vitality through high quality design

Year-round activation and programming

Strong connectivity and access

Site design that supports a range of active uses

Design Themes

Guiding Principles

Page 6: SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018Development... · SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018 Background •The Ship Point master planning process was

SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018

Site Design and Program – Overview

Page 7: SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018Development... · SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018 Background •The Ship Point master planning process was

SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018

Site Design and Program

The Terraces

Page 8: SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018Development... · SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018 Background •The Ship Point master planning process was

SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018

Site Design and Program

Picnic Site

Page 9: SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018Development... · SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018 Background •The Ship Point master planning process was

SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018

Site Design and Program Harbour Air Plaza

Page 10: SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018Development... · SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018 Background •The Ship Point master planning process was

SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018

Site Design and Program Festival Pier

Page 11: SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018Development... · SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018 Background •The Ship Point master planning process was

SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018

Site Design and Program Wharf Street Promenade

Page 12: SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018Development... · SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018 Background •The Ship Point master planning process was

SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018

Site Design and Program

Ship Point Promenade

Page 13: SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018Development... · SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018 Background •The Ship Point master planning process was

SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018

Site Design and Program

Conceptual Built Form

Page 14: SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018Development... · SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018 Background •The Ship Point master planning process was

SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018

Site Design and Program

Conceptual Built Form

Page 15: SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018Development... · SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018 Background •The Ship Point master planning process was

SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018

Success Stories from Elsewhere

Page 16: SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018Development... · SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018 Background •The Ship Point master planning process was

SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018

Success Stories from Elsewhere

Page 17: SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018Development... · SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018 Background •The Ship Point master planning process was

SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018

Ship Point will require a combination of repair, replacement and structural stabilization of the sea wall and portions of the site

Shoreline and Structural Approach

Page 18: SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018Development... · SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018 Background •The Ship Point master planning process was

SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018

Retreat: Remove existing damaged sea wall and replace with rip-rap bank

Unload: Removing approx. 1 metre of material approx. 3 metres back from the shoreline to reduce load bearing on existing wall

Support: reinforcing existing wall with vertical strapping in some areas with upfront and ongoing repair and maintenance

Reinforce: A series of interlocking jet grouted columns adjacent to the existing sea wall to contain the unconsolidated fill and materials

Phased Replacement of pier: Full Emergency Repairs in 2018 with Steel Piles and Replace Restricted Portion by 2023

Settlement management: use of geo -grid and resin bound materials to improve site stability and long term maintenance

Shoreline and Structural Approach

Shoreline Strategies

Page 19: SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018Development... · SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018 Background •The Ship Point master planning process was

SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018

Conceptual Phasing, Funding

Page 20: SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018Development... · SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018 Background •The Ship Point master planning process was

SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018

Thank You!

Page 21: SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018Development... · SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018 Background •The Ship Point master planning process was

SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018

The Master Plan

• Design framework

• Schematic design and layout

• Materials and furnishings

• Shoreline and structural approach

• Conceptual built form

• Programming and operations

• Sustainability and resilience strategy

• Implementation and phasing

• Class ‘C’ cost

Page 22: SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018Development... · SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018 Background •The Ship Point master planning process was

SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018

Site Design and Program

• Character

Page 23: SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018Development... · SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018 Background •The Ship Point master planning process was

SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018

Jet grouting is a soil improvement technique that involves injection of water-cement grout and mixing into the existing soil.

Shoreline and Structural Approach

Shoreline Strategies

Site and shoreline structural restoration does not include mitigation for seismic events

Approach premised on management of seawall settlement through on-going operations and maintenance

Page 24: SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018Development... · SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018 Background •The Ship Point master planning process was

SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018

Shoreline Treatment

Rip Rap bank + blocks:• Modular for settling support• Informal gathering at various scales

Benched Seawall:• Softer edge• Habitat and filtering contaminated

surface runoff

Stepped Seawall:• Access to water’s edge• Seating• Views

Page 25: SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018Development... · SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018 Background •The Ship Point master planning process was

SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018

Site Design and Program

Site resilience and storm water ecology

Page 26: SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018Development... · SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018 Background •The Ship Point master planning process was

SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018

Site Design and Program

• Materials

Page 27: SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018Development... · SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018 Background •The Ship Point master planning process was

SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018

Site Design and Program

• Program and Activities

Page 28: SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018Development... · SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018 Background •The Ship Point master planning process was

SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018

Site Design and Program - Overview

Constructed foreshore and marine habitat

Terraced landscape and amphitheatreGrand stair case and ramps

Festival Pier

Playable features

Access to water

Pavilion

Restaurant

Harbour Air Plaza

Improved Circulation

Improved Circulation