shi3- defect list of one year inspection
TRANSCRIPT
-
8/9/2019 SHI3- Defect List of One Year Inspection
1/41
Form:
Valid date:
Inspected by:
Date of inspection: Jul 23th 2010
Time of inspection: 9h30-11h30
Picture Afer repairing
Aluminum door & accessories
Location: Office Area
Comment: Wooden skirting broken
Method Reinstall
Start:
Item: One year Inspection
Detail
Sumitomo Mitsui Construction Co., Ltd
Project: SHI3 FACTORY
Location: M2-M3 Thang Long Industrial Park
DEFECT LIST
or&accessories
Finish:
Done by: Sumitomo Mitsui Construction Co.,ltd
Result:
Location: All Door Stoppers
Comment: Wrong location, screw loosen
Method Reinstall
Start:
Finish:
Done by: Sumitomo Mitsui Construction Co.,ltd
Result:
Alu
minumdo
-
8/9/2019 SHI3- Defect List of One Year Inspection
2/41
Date of inspection: Jul 23th 2010
Time of inspection: 9h30-11h30
Picture Afer repairing
Item: One year Inspection
Detail
DEFECT LIST
Location: All aluminum doors
Comment: Door closer, alu frame broken
Method Reinforcement alu frame and closer
Start:
Finish:
Done by: Sumitomo Mitsui Construction Co.,ltd
Result:
Location: Meeting room - door
Comment: Unnecessary stopper
Method Take out
Start:
Finish:
Done by: Sumitomo Mitsui Construction Co.,ltd
Result:
Location: Tool room 2- Door stopper
Comment: Wrong location, screw loosen
Method Reinstall
Start:
Finish:
Done by:
Result:
-
8/9/2019 SHI3- Defect List of One Year Inspection
3/41
Date of inspection: Jul 23th 2010
Time of inspection: 9h30-11h30
Picture Afer repairing
Item: One year Inspection
Detail
DEFECT LIST
Location: Aluminum doors
Comment: Door closer, alu frame broken
Method Chang new one
Start:
Finish:
Done by:
Result:
Location: 3D measuring room
Comment: Door lock loosen
Method Reinstall
Start:
Finish:
Done by:
Result:
Steel door, shutter, gate& accessories
- Check and repair all shutter door switch. Install
additional steel pillar for protectiing from strongwind.
- Check & repair and paint the steel doors.
- Gate : Cutting concrete, change stronger motor
(bigger capacity), change switchs.
-
8/9/2019 SHI3- Defect List of One Year Inspection
4/41
Date of inspection: Jul 23th 2010
Time of inspection: 9h30-11h30
Picture Afer repairing
Item: One year Inspection
Detail
DEFECT LIST
Location: Shutter doors
Comment: Switch box broken
Method Repair
Start:
Finish:
Done by:
Result:
Location: Shutter doors
Comment: Paint broken
Method Repaint ing
Start:
Finish:
Done by:
Result:
Location: Heat treatment-shutter door 8m
Comment: Guide rail broken
Method Repair
Start:
Finish:
Done by:
Result:
-
8/9/2019 SHI3- Defect List of One Year Inspection
5/41
Date of inspection: Jul 23th 2010
Time of inspection: 9h30-11h30
Picture Afer repairing
Item: One year Inspection
Detail
DEFECT LIST
Location: Die cast area
Comment: Paint broken
Method Repaint ing
Start:
Finish:
Done by:
Result:
Location: Compressor room
no picture
Comment: Paint broken
Method Repaint ing
Start:
Finish:
Done by:
Result:
Location: Compressor room
Comment: Paint broken
Method Repaint ing
Start:
Finish:
Done by:
Result:
no picture
-
8/9/2019 SHI3- Defect List of One Year Inspection
6/41
Date of inspection: Jul 23th 2010
Time of inspection: 9h30-11h30
Picture Afer repairing
Item: One year Inspection
Detail
DEFECT LIST
Location: Main gate
Comment: Dangerous switch and small motor
Method Chang new one
Start:
Finish:
Done by:
Result:
Location: Main gate frame
Comment: Rust
Method Repaint ing
Start:
Finish:
Done by:
Result:
-
8/9/2019 SHI3- Defect List of One Year Inspection
7/41
Date of inspection: Jul 23th 2010
Time of inspection: 9h30-11h30
Picture Afer repairing
Item: One year Inspection
Detail
DEFECT LIST
Location: Toillet 2
Gypsum board ceiling and gypsum wall
- To repair area broken
- All gypsum board and wall must be repainted
- Toillet door broken must be repaired
Comment: Ceiling paint broken
Method Repaint ing
Start:
Finish:
Done by:
Result:
Location: Grid Y1
Comment: Gypsum wall broken
Method Repair
Start:
Finish:
Done by:
Result:
-
8/9/2019 SHI3- Defect List of One Year Inspection
8/41
Date of inspection: Jul 23th 2010
Time of inspection: 9h30-11h30
Picture Afer repairing
Item: One year Inspection
Detail
DEFECT LIST
Location: Tool room
Comment: Crack
Method Repair
Start:
Finish:
Done by:
Result:
Location: shutter door X6
Comment: Gypsum wall broken
Method Repair
Start:
Finish:
Done by:
Result:
Location: shutter door
Comment: Gypsum wall broken
Method Repair
Start:
Finish: 14th May 2009
Done by: Sumitomo Mitsui Construction Co.,ltd
Result:
-
8/9/2019 SHI3- Defect List of One Year Inspection
9/41
Date of inspection: Jul 23th 2010
Time of inspection: 9h30-11h30
Picture Afer repairing
Item: One year Inspection
Detail
DEFECT LIST
Location: Heat treatment area
Comment: Gypsum wall broken
Method Repair
Start:
Finish:
Done by:
Result:
Location: 3D measuring room
Comment: Gypsum wall broken
Method Repair
Start:
Finish:
Done by:
Result:
Location: Heat treatment area
Comment: Gypsum wall broken
Method Repair
Start:
Finish:
Done by:
Result:
-
8/9/2019 SHI3- Defect List of One Year Inspection
10/41
Date of inspection: Jul 23th 2010
Time of inspection: 9h30-11h30
Picture Afer repairing
Item: One year Inspection
Detail
DEFECT LIST
Location: Shipment room
Comment: Gypsum wall broken
Method Repair
Start:
Finish:
Done by:
Result:
Location: Shipment room
Comment: Gypsum wall broken
Method Repair
Start:
Finish:
Done by:
Result:
Location: Shipment room
Comment: Gypsum wall broken
Method Repair
Start:
Finish:
Done by:
Result:
-
8/9/2019 SHI3- Defect List of One Year Inspection
11/41
Date of inspection: Jul 23th 2010
Time of inspection: 9h30-11h30
Picture Afer repairing
Item: One year Inspection
Detail
DEFECT LIST
Location: Guard house -Ceiling
Comment: Paint broken
Method Repaint ing
Start:
Finish:
Done by:
Result:
Location: Grid Y21
Comment: Groove broken
Method Repair
Start: .
Finish: .
Done by:
Result:
Location: Toilet 1
Comment: Door broken
Method Repair
Start:
Finish:
Done by:
Result:
-
8/9/2019 SHI3- Defect List of One Year Inspection
12/41
Date of inspection: Jul 23th 2010
Time of inspection: 9h30-11h30
Picture Afer repairing
Item: One year Inspection
Detail
DEFECT LIST
Location: Toilet 2
Comment: Door broken
Method Repair
Start:
Finish:
Done by:
Result:
Masonary work and tiling work
Location: Canteen- Washing basin
Comment: Tiling broken
Method Repair
Start:
Finish:
Done by:
Result:
- rea ro en must e repa re
-
8/9/2019 SHI3- Defect List of One Year Inspection
13/41
Date of inspection: Jul 23th 2010
Time of inspection: 9h30-11h30
Picture Afer repairing
Item: One year Inspection
Detail
DEFECT LIST
Location: Entrance area
Comment: Skirting tile broken
Method Repair
Start:
Finish:
Done by:
Result:
Location: Heat treament area
Comment: Unnecessary steel
Method Taking out
Start:
Finish:
Done by:
Result:
Location: Factory- Washing basin
Comment: Tiling broken
Method Repair
Start:
Finish:
Done by:
Result:
-
8/9/2019 SHI3- Defect List of One Year Inspection
14/41
Date of inspection: Jul 23th 2010
Time of inspection: 9h30-11h30
Picture Afer repairing
Item: One year Inspection
Detail
DEFECT LIST
Location: Factory- Washing basin
Comment: Tiling broken - Granite stone
Method Repair
Start:
Finish:
Done by:
Result:
Location: Factory- Washing basin
Comment: Tiling broken
Method Repair
Start:
Finish:
Done by:
Result:
Location: Corridor to bikeshed
Comment: Brick around column base broken
Method Repair
Start:
Finish:
Done by:
Result:
-
8/9/2019 SHI3- Defect List of One Year Inspection
15/41
Date of inspection: Jul 23th 2010
Time of inspection: 9h30-11h30
Picture Afer repairing
Item: One year Inspection
Detail
DEFECT LIST
Location: Waste water treatment room
Comment: Tank cover broken
Method New concrete
Start:
Finish:
Done by:
Result:
Location: Main gate
Comment: Concrete surface broken
Method Taking out and new concrete
Start:
Finish:
Done by:
Result:
Location: X1 wall
Comment: Crack
Method Make groove
Start:
Finish:
Done by:
Result:
-
8/9/2019 SHI3- Defect List of One Year Inspection
16/41
Date of inspection: Jul 23th 2010
Time of inspection: 9h30-11h30
Picture Afer repairing
Item: One year Inspection
Detail
DEFECT LIST
Location: X1 wall
Comment: Crack
Method Make groove
Start:
Finish:
Done by:
Result:
Location: PC columns and wall
Comment: Crack happened
MethodCutting and caulking,
installation angle bar
Start:
Finish:
Done by:
Result:
Emulsion paint and epoxy paint work
- All brick wall must be repaired and repainted
(Outside and outsite)- Broken epoxy area must be repaird and repainted
-
8/9/2019 SHI3- Defect List of One Year Inspection
17/41
Date of inspection: Jul 23th 2010
Time of inspection: 9h30-11h30
Picture Afer repairing
Item: One year Inspection
Detail
DEFECT LIST
Location: Guard house
Comment: Paint broekn on wall
Method Repaint ing
Start:
Finish:
Done by:
Result:
Location: Main gate area
Comment: Paint broken on brick wall
Method Apply party and paint
Start:
Finish:
Done by:
Result:
Location: Locker room
Comment: External paint broken
Method Repaint ing
Start:
Finish:
Done by:
Result:
-
8/9/2019 SHI3- Defect List of One Year Inspection
18/41
Date of inspection: Jul 23th 2010
Time of inspection: 9h30-11h30
Picture Afer repairing
Item: One year Inspection
Detail
DEFECT LIST
Location: 3D measuring room
Comment: Dirty wall
Method Repaint ing
Start:
Finish:
Done by:
Result:
Location: Canteen area
Comment: Paint on electric panel
Method Cleaning
Start:
Finish:
Done by:
Result:
Location: Grid X1-X2,Y16-Y17
Comment: Epoxy paint broken
Method Repair
Start:
Finish:
Done by:
Result:
-
8/9/2019 SHI3- Defect List of One Year Inspection
19/41
Date of inspection: Jul 23th 2010
Time of inspection: 9h30-11h30
Picture Afer repairing
Item: One year Inspection
Detail
DEFECT LIST
Location: Grid X1-X2,Y16-Y17
Comment: Concrete surface broken
Method Repair
Start:
Finish:
Done by:
Result:
Road work, drainage system and landscape work
Location: Guard house walkway
Comment: Tiling broken
Method Repairing
Start:
Finish:
Done by:
Result:
- ro en asp a t roa area an water stagnate area
must be repaired
- Manhole cover broken must be replaced
- Big manhole cover must be divided to several
small ones
- Broken walkway paving block must be repaired
-
8/9/2019 SHI3- Defect List of One Year Inspection
20/41
Date of inspection: Jul 23th 2010
Time of inspection: 9h30-11h30
Picture Afer repairing
Item: One year Inspection
Detail
DEFECT LIST
Location: Guard house walkway
Comment: Paving block broken
Method Repairing
Start:
Finish:
Done by:
Result:
Location: Walkway
Comment: Motar broken
Method Repair
Start:
Finish:
Done by:
Result:
Location: Corridor to bikeshed
Comment: Stagnate water on asphalt road
Method Repairing
Start:
Finish:
Done by:
Result:
-
8/9/2019 SHI3- Defect List of One Year Inspection
21/41
Date of inspection: Jul 23th 2010
Time of inspection: 9h30-11h30
Picture Afer repairing
Item: One year Inspection
Detail
DEFECT LIST
Location: Asphalt road - Scrap room
Comment: Asphalt broken
Method Repairing
Start:
Finish:
Done by:
Result:
Location: Asphalt road - X6+
Comment: Asphalt broken
Method Repairing
Start:
Finish:
Done by:
Result:
Location: Asphalt road - Cooling tower
Comment: Asphalt level is bad
Method Repairing
Start:
Finish:
Done by:
Result:
-
8/9/2019 SHI3- Defect List of One Year Inspection
22/41
Date of inspection: Jul 23th 2010
Time of inspection: 9h30-11h30
Picture Afer repairing
Item: One year Inspection
Detail
DEFECT LIST
Location: Asphalt road - X6+
Comment: Asphalt broken
Method Repairing
Start:
Finish:
Done by:
Result:
Location: Asphalt road - Front side
Comment: Asphalt broken
Method Repairing
Start:
Finish:
Done by:
Result:
Location: Asphalt road - X6+
Comment: Asphalt broken
Method Repairing
Start:
Finish:
Done by:
Result:
-
8/9/2019 SHI3- Defect List of One Year Inspection
23/41
Date of inspection: Jul 23th 2010
Time of inspection: 9h30-11h30
Picture Afer repairing
Item: One year Inspection
Detail
DEFECT LIST
Location: Asphalt road - Backside
Comment: Stagnate water
Method Repairing asphalt road
Start:
Finish:
Done by:
Result:
Location: Asphalt road - X6+
Comment: Asphalt broken
Method Repairing
Start:
Finish:
Done by:
Result:
Location: Asphalt road - Oil storage
Comment: Stagnate water
Method Repairing asphalt road
Start:
Finish:
Done by:
Result:
-
8/9/2019 SHI3- Defect List of One Year Inspection
24/41
Date of inspection: Jul 23th 2010
Time of inspection: 9h30-11h30
Picture Afer repairing
Item: One year Inspection
Detail
DEFECT LIST
Location: Asphalt road - Diecast area
Comment: Asphalt broken
Method Repairing
Start:
Finish:
Done by:
Result:
Location: Ashalt road - Transformer room
Comment: Stagnate water
Method Repairing asphalt road
Start:
Finish:
Done by:
Result:
Location: Ashalt road - Transformer room
Comment: Stagnate water
Method Repairing asphalt road
Start:
Finish:
Done by:
Result:
-
8/9/2019 SHI3- Defect List of One Year Inspection
25/41
Date of inspection: Jul 23th 2010
Time of inspection: 9h30-11h30
Picture Afer repairing
Item: One year Inspection
Detail
DEFECT LIST
Location: Ashalt road - Compressor room
Comment: Stagnate water
Method Repairing asphalt road
Start:
Finish:
Done by:
Result:
Location: Canteen area
Comment: Stagnate water
Method Repairing and repainting wall
Start:
Finish:
Done by:
Result:
Location: Drainage system
Comment: Edge and cover broken
Method Change new one
Start:
Finish:
Done by:
Result:
-
8/9/2019 SHI3- Defect List of One Year Inspection
26/41
Date of inspection: Jul 23th 2010
Time of inspection: 9h30-11h30
Picture Afer repairing
Item: One year Inspection
Detail
DEFECT LIST
Location: Curb work
Comment: Curb broken
Method Change new one
Start:
Finish:
Done by:
Result:
Location: Drainage system
Comment: Manhole cover very heavy
Method Divide into several parts
Start:
Finish:
Done by:
Result:
Location: Drainage system
Comment:Manhole edge broken and
manhole cover very heavy
Method Repairing
Start:
Finish:
Done by:
Result:
-
8/9/2019 SHI3- Defect List of One Year Inspection
27/41
Date of inspection: Jul 23th 2010
Time of inspection: 9h30-11h30
Picture Afer repairing
Item: One year Inspection
Detail
DEFECT LIST
Location: Drainage system
Comment: Edge and cover broken
Method Change new one
Start:
Finish:
Done by:
Result:
Location: Drainage system
Comment: Cover broken
Method Change new one
Start:
Finish:
Done by:
Result:
Location: Manholes
Comment: Cover broken
Method Change new one
Start:
Finish:
Done by:
Result:
-
8/9/2019 SHI3- Defect List of One Year Inspection
28/41
Date of inspection: Jul 23th 2010
Time of inspection: 9h30-11h30
Picture Afer repairing
Item: One year Inspection
Detail
DEFECT LIST
Location: Manholes
Comment: Cover rust
Method Change new one
Start:
Finish:
Done by:
Result:
Location: Drainage system
Comment: Hole on concrete pipe
Method Plastering
Start:
Finish:
Done by:
Result:
Location: Drainage system
Comment: Manhole cover broken
Method Replace new one
Start:
Finish:
Done by:
Result:
-
8/9/2019 SHI3- Defect List of One Year Inspection
29/41
Date of inspection: Jul 23th 2010
Time of inspection: 9h30-11h30
Picture Afer repairing
Item: One year Inspection
Detail
DEFECT LIST
Location: Entrance area
Comment: stagnate water
Method Repairing asphalt road
Start:
Finish:
Done by:
Result:
Steel structure work
Location: Canopy support
Comment: Rust
Method Repaint ing
Start:
Finish:
Done by:
Result:
- e a t on c ps on t e roo must e nsta e
completely.
- The leakage location must be repaired
- The rust steel structures must be repainted
- The broken fiber glass insulation must be replaced
-
8/9/2019 SHI3- Defect List of One Year Inspection
30/41
Date of inspection: Jul 23th 2010
Time of inspection: 9h30-11h30
Picture Afer repairing
Item: One year Inspection
Detail
DEFECT LIST
Location: Grid X1
Comment: Fiber glass insulation broken
Method Replace new one
Start:
Finish:
Done by:
Result:
Location: Diecast area
Comment: Flasing broken
Method Reinstall
Start:
Finish:
Done by:
Result:
Location: Compressor room
Comment:Water lackage &
Fiber glass insulation broken
Method Repairing& replace new one
Start:
Finish:
Done by:
Result:
-
8/9/2019 SHI3- Defect List of One Year Inspection
31/41
Date of inspection: Jul 23th 2010
Time of inspection: 9h30-11h30
Picture Afer repairing
Item: One year Inspection
Detail
DEFECT LIST
Location: Compressor room
Comment: Fiber glass insulation broken
Method Replace new one
Start:
Finish:
Done by:
Result:
Location: Grid X6
Comment: Fiber glass insulation broken
Method Replace new one
Start:
Finish:
Done by:
Result:
Location: Roof monitor
Comment: Fiber glass insulation broken
Method Replace new one
Start:
Finish:
Done by:
Result:
-
8/9/2019 SHI3- Defect List of One Year Inspection
32/41
Date of inspection: Jul 23th 2010
Time of inspection: 9h30-11h30
Picture Afer repairing
Item: One year Inspection
Detail
DEFECT LIST
Location: Grid X6
Comment: Fiber glass insulation broken
Method Replace new one
Start:
Finish:
Done by:
Result:
Location: Grid X6
Comment: Fiber glass insulation broken
Method Replace new one
Start:
Finish:
Done by:
Result:
Location: Shutter door 8m
Comment: Waste piece
Method Taking out
Start:
Finish:
Done by:
Result:
-
8/9/2019 SHI3- Defect List of One Year Inspection
33/41
Date of inspection: Jul 23th 2010
Time of inspection: 9h30-11h30
Picture Afer repairing
Item: One year Inspection
Detail
DEFECT LIST
Location: Backside canopy
Comment: Bracing rod slack
Method Make it stra ight
Start:
Finish:
Done by:
Result:
Location: Main gate
Comment: Soil not plan
Method Backfilling and leveling
Start:
Finish:
Done by:
Result:
Location: Heat treatment area
Comment: Fiber glass insulation broken
Method Replace new one
Start:
Finish:
Done by:
Result:
-
8/9/2019 SHI3- Defect List of One Year Inspection
34/41
Date of inspection: Jul 23th 2010
Time of inspection: 9h30-11h30
Picture Afer repairing
Item: One year Inspection
Detail
DEFECT LIST
Location: Corridor to bikeshed
Comment: Water leakage from downspout and gutter
Method Reintall
Start:
Finish:
Done by:
Result:
Location: Corridor to bikeshed
Comment: Water leakage
Method Reinstall flashings and sealant
Start:
Finish:
Done by:
Result:
Location: Bike shed
Comment: downspout broken
Method Replace new one
Start:
Finish:
Done by:
Result:
-
8/9/2019 SHI3- Defect List of One Year Inspection
35/41
Date of inspection: Jul 23th 2010
Time of inspection: 9h30-11h30
Picture Afer repairing
Item: One year Inspection
Detail
DEFECT LIST
Location: Canopy
Comment: Unneccessary wire
Method Taking out
Start:
Finish:
Done by:
Result:
Others
Location: Heat treatment area
Comment: Checker plate curved
Method
Start:
Finish:
Done by:
Result:
-
8/9/2019 SHI3- Defect List of One Year Inspection
36/41
Date of inspection: Jul 23th 2010
Time of inspection: 9h30-11h30
Picture Afer repairing
Item: One year Inspection
Detail
DEFECT LIST
Location: Shutter doors
Comment: Angle bar dust
Method Repaint ing
Start:
Finish:
Done by:
Result:
Location: Floor expansion joint
Comment: Sealant broken
Method Replace new one
Start:
Finish:
Done by:
Result:
Location: Bike shed
Comment: Handrail steel rust
Method Repaint ing
Start:
Finish:
Done by:
Result:
-
8/9/2019 SHI3- Defect List of One Year Inspection
37/41
Date of inspection: Jul 23th 2010
Time of inspection: 9h30-11h30
Picture Afer repairing
Item: One year Inspection
Detail
DEFECT LIST
Location: All PC columns
-
8/9/2019 SHI3- Defect List of One Year Inspection
38/41
Date of inspection: Jul 23th 2010
Time of inspection: 9h30-11h30
Picture Afer repairing
Item: One year Inspection
Detail
DEFECT LIST
Comment: Crack between PC columns and wall
Method Cutting, caulking, installation angle bar
Start:
Finish:
Done by:
Result:
Location: Shutter door at corridor
Comment: Gypsum board broken
Method Replace new one
Start:
Finish:
Done by:
Result:
Location: Energie area
Comment: Steel net fence rust
Method Repaint ing
Start:
Finish:
Done by:
Result:
-
8/9/2019 SHI3- Defect List of One Year Inspection
39/41
Date of inspection: Jul 23th 2010
Time of inspection: 9h30-11h30
Picture Afer repairing
Item: One year Inspection
Detail
DEFECT LIST
Location: Steel ladder up to roof
Comment: Steel rust
Method Repaint ing
Start:
Finish:
Done by:
Result:
Location: Crack on concrete floor
Comment: Wrong location of Joint
Method Repair crack and make new joint
Start:
Finish:
Done by:
Result:
Location: Crack on concrete floor
Comment: Wrong location of Joint
Method Repair crack and make new joint
Start:
Finish:
Done by:
Result:
-
8/9/2019 SHI3- Defect List of One Year Inspection
40/41
Date of inspection: Jul 23th 2010
Time of inspection: 9h30-11h30
Picture Afer repairing
Item: One year Inspection
Detail
DEFECT LIST
Location: Canteen - Kitchen area
Comment: Stainess grating broken
Method Repair and reinstal l
Start:
Finish:
Done by:
Result:
Location: Crack on concrete floor
Comment: Wrong location of Joint
Method Repair crack and make new joint
Start:
Finish:
Done by:
Result:
Location: Crack on concrete floor
Comment: Wrong location of Joint
Method Repair crack and make new joint
Start:
Finish:
Done by:
Result:
-
8/9/2019 SHI3- Defect List of One Year Inspection
41/41
Date of inspection: Jul 23th 2010
Time of inspection: 9h30-11h30
Picture Afer repairing
Item: One year Inspection
Detail
DEFECT LIST
Location: Corridor to bikeshed
Comment: Water leakage
Method Reinstall f lashings
Start:
Finish:
Done by:
Result: