sheetno. sheetdesc. 20/06/19 xx/xx/xx xx/xx/xx two-way

18
DOCUMENT CONTROL SHEET No. SHEET DESC. 20/06/19 xx/xx/xx xx/xx/xx DRAFT TENDER CONSTRUCTION ISSUE ISSUE ISSUE 1 COVER SHEET A 2 STANDARD DETAILS & NOTES A 3 SAYER STREET PLAN VIEW A 4 SAYER - NEALE PLAN VIEW A 5 NEALE STREET ROUNDABOUT PLAN VIEW A 6 THEODORE STREET PLAN VIEW A 7 CURTIN STREET PLAN VIEW A 8 CURTIN - BSEC PLAN VIEW A 9 SCHOOL CROSSING PLAN VIEW A 10 BSEC - SHARON STREET PLAN VIEW A 11 SHARON STREET PLAN VIEW A 12 NEALE STREET LONG SECTIONS A 13 CURTIN STREET LONG SECTIONS A 14 CURTIN STREET LONG SECTIONS A 15 KERB & CHANNEL LONG SECTIONS A 16 SHARON STREET LONG SECTIONS A 17 GENERAL NOTES A 18 RESEAL REGION A CITY OF GREATER BENDIGO Survey Scale: Approved by Design Checked GB4356 ELLIS STREET FLORA HILL BI-DIRECTIONAL BIKE LANE H. WHYTOCK B. JANSSEN A. SMITH N. SARTORI 16/08/18 20/06/19 - 1 COVER SHEET Revision : File : Original sheet size: AMENDMENTS Approved by Date Revision Description DRAFT 3 PRELIMINARY DESIG Plot Date: BAYLEY JANSSEN Plotted By: 11/07/2019 Sheet: Reference: OF 18 20/06/19 20/06/19 A GB4356.dwg A3 - - - - LOCALITY MAP ELLIS STREET, FLORA HILL GB4356 TWO-WAY BIKE PATH OCTOBER 2018 ELLIS STEET PROJECT EXTENTS Bendigo South East College La Trobe University Somerville Street Neale Street Curtin Street Theodore Street Sayer Street Sharon Street

Upload: others

Post on 08-Jan-2022

19 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SHEETNo. SHEETDESC. 20/06/19 xx/xx/xx xx/xx/xx TWO-WAY

DOCUMENT CONTROL

SH

EE

T

No.

SH

EE

T

DE

SC

.

20/06/19

xx/xx/xx

xx/xx/xx

DRAFT TENDER CONSTRUCTION

ISSUE ISSUE ISSUE

1 COVER SHEET A

2 STANDARD DETAILS & NOTES A

3 SAYER STREET PLAN VIEW A

4 SAYER - NEALE PLAN VIEW A

5

NEALE STREET ROUNDABOUT PLAN

VIEW

A

6 THEODORE STREET PLAN VIEW A

7 CURTIN STREET PLAN VIEW A

8 CURTIN - BSEC PLAN VIEW A

9 SCHOOL CROSSING PLAN VIEW A

10 BSEC - SHARON STREET PLAN VIEW A

11 SHARON STREET PLAN VIEW A

12 NEALE STREET LONG SECTIONS A

13 CURTIN STREET LONG SECTIONS A

14 CURTIN STREET LONG SECTIONS A

15 KERB & CHANNEL LONG SECTIONS A

16 SHARON STREET LONG SECTIONS A

17 GENERAL NOTES A

18 RESEAL REGION A

CITY OF GREATER BENDIGO

Survey

Scale:

Approved by

Design

Checked

GB4356

ELLIS STREET

FLORA HILL

BI-DIRECTIONAL BIKE LANE

H. WHYTOCK

B. JANSSEN

A. SMITH

N. SARTORI

16/08/18

20/06/19

-

1

COVER SHEET

Revision :

File :

Original sheet size:

AMENDMENTS

Approved by DateRevision Description

DRAFT 3PRELIMINARY DESIGN

Plot Date:

BAYLEY JANSSENPlotted By:

11/07/2019

Sheet: Reference:

OF 18

20/06/19

20/06/19

A

GB4356.dwg

A3

- - - -

LOCALITY MAP

ELLIS STREET, FLORA HILL

GB4356

TWO-WAY BIKE PATH

OCTOBER 2018

E

L

L

IS

S

T

E

E

T

PROJECT EXTENTS

Bendigo South East College

La Trobe University

Som

erville S

treet

Neale S

treet

Curtin S

treet

Theodore S

treet

Sayer S

treet

S

h

a

r

o

n

S

t

r

e

e

t

AutoCAD SHX Text
Albion
AutoCAD SHX Text
Allison
AutoCAD SHX Text
Beaumont
AutoCAD SHX Text
Beebe
AutoCAD SHX Text
Bendigo
AutoCAD SHX Text
Boat
AutoCAD SHX Text
Bolton
AutoCAD SHX Text
Brodie
AutoCAD SHX Text
Brougham
AutoCAD SHX Text
Bryden
AutoCAD SHX Text
Burrell
AutoCAD SHX Text
Cambrian
AutoCAD SHX Text
Carolin
AutoCAD SHX Text
Carter
AutoCAD SHX Text
Churchill
AutoCAD SHX Text
Clarence
AutoCAD SHX Text
Condon
AutoCAD SHX Text
Curtin
AutoCAD SHX Text
Davies
AutoCAD SHX Text
Drechsler
AutoCAD SHX Text
Dungey
AutoCAD SHX Text
Echuca
AutoCAD SHX Text
Edwards
AutoCAD SHX Text
Ewing
AutoCAD SHX Text
Ewing
AutoCAD SHX Text
Flora
AutoCAD SHX Text
Hakea
AutoCAD SHX Text
Hallam
AutoCAD SHX Text
Hammer
AutoCAD SHX Text
Havlin
AutoCAD SHX Text
Havlin
AutoCAD SHX Text
Heartbreak
AutoCAD SHX Text
Hewitt
AutoCAD SHX Text
Highcrest
AutoCAD SHX Text
Hillview
AutoCAD SHX Text
Houlahan
AutoCAD SHX Text
Jeffrey
AutoCAD SHX Text
Kara
AutoCAD SHX Text
McKenna
AutoCAD SHX Text
Kilwinning
AutoCAD SHX Text
Leigh
AutoCAD SHX Text
Leonard
AutoCAD SHX Text
Lowndes
AutoCAD SHX Text
Mahon
AutoCAD SHX Text
Margaret
AutoCAD SHX Text
Marks
AutoCAD SHX Text
Marsh
AutoCAD SHX Text
Mary
AutoCAD SHX Text
Minto
AutoCAD SHX Text
Monreith
AutoCAD SHX Text
Murray
AutoCAD SHX Text
Myall
AutoCAD SHX Text
Nish
AutoCAD SHX Text
Palmerston
AutoCAD SHX Text
Percival
AutoCAD SHX Text
Pine
AutoCAD SHX Text
rose
AutoCAD SHX Text
Ra
AutoCAD SHX Text
Race
AutoCAD SHX Text
mond
AutoCAD SHX Text
Reginald
AutoCAD SHX Text
Ridgeway
AutoCAD SHX Text
Rowcliffe
AutoCAD SHX Text
Sayer
AutoCAD SHX Text
Sharon
AutoCAD SHX Text
Shipp
AutoCAD SHX Text
Somerville
AutoCAD SHX Text
Summit
AutoCAD SHX Text
Swa
AutoCAD SHX Text
Theodore
AutoCAD SHX Text
Timber
AutoCAD SHX Text
Towers
AutoCAD SHX Text
Hoskins
AutoCAD SHX Text
Banksia
AutoCAD SHX Text
Moomba
AutoCAD SHX Text
McDonald
AutoCAD SHX Text
Willow
AutoCAD SHX Text
Wirth
AutoCAD SHX Text
Wolstencroft
AutoCAD SHX Text
Woods
AutoCAD SHX Text
York
AutoCAD SHX Text
Street
AutoCAD SHX Text
Court
AutoCAD SHX Text
St
AutoCAD SHX Text
Cr
AutoCAD SHX Text
St
AutoCAD SHX Text
Drive
AutoCAD SHX Text
St
AutoCAD SHX Text
Ct
AutoCAD SHX Text
Street
AutoCAD SHX Text
Court
AutoCAD SHX Text
Street
AutoCAD SHX Text
St
AutoCAD SHX Text
Av
AutoCAD SHX Text
Avenue
AutoCAD SHX Text
Street
AutoCAD SHX Text
Court
AutoCAD SHX Text
Street
AutoCAD SHX Text
Av
AutoCAD SHX Text
Street
AutoCAD SHX Text
Street
AutoCAD SHX Text
Ct
AutoCAD SHX Text
Av
AutoCAD SHX Text
Lane
AutoCAD SHX Text
Cr
AutoCAD SHX Text
Street
AutoCAD SHX Text
Street
AutoCAD SHX Text
Street
AutoCAD SHX Text
Street East
AutoCAD SHX Text
Street West
AutoCAD SHX Text
Lane
AutoCAD SHX Text
Court
AutoCAD SHX Text
Street
AutoCAD SHX Text
Street
AutoCAD SHX Text
Street
AutoCAD SHX Text
Street
AutoCAD SHX Text
Avenue
AutoCAD SHX Text
St
AutoCAD SHX Text
Street
AutoCAD SHX Text
Street
AutoCAD SHX Text
Avenue
AutoCAD SHX Text
Av
AutoCAD SHX Text
Avenue
AutoCAD SHX Text
Street
AutoCAD SHX Text
Cr
AutoCAD SHX Text
St
AutoCAD SHX Text
Crescent
AutoCAD SHX Text
St
AutoCAD SHX Text
Street
AutoCAD SHX Text
Av
AutoCAD SHX Text
St
AutoCAD SHX Text
Street
AutoCAD SHX Text
Street
AutoCAD SHX Text
Street
AutoCAD SHX Text
Street
AutoCAD SHX Text
Street
AutoCAD SHX Text
Street
AutoCAD SHX Text
Ct
AutoCAD SHX Text
Street
AutoCAD SHX Text
Av
AutoCAD SHX Text
Street
AutoCAD SHX Text
Crescent
AutoCAD SHX Text
Street
AutoCAD SHX Text
Street
AutoCAD SHX Text
Street
AutoCAD SHX Text
Street
AutoCAD SHX Text
St
AutoCAD SHX Text
Street
AutoCAD SHX Text
Drive
AutoCAD SHX Text
Crescent
AutoCAD SHX Text
Street
AutoCAD SHX Text
Drive
AutoCAD SHX Text
Drive
AutoCAD SHX Text
St
AutoCAD SHX Text
St
AutoCAD SHX Text
Carpenter
AutoCAD SHX Text
Capper
AutoCAD SHX Text
Ct
AutoCAD SHX Text
Court
AutoCAD SHX Text
Clarke
AutoCAD SHX Text
Spring
AutoCAD SHX Text
Inorom
AutoCAD SHX Text
Pl
AutoCAD SHX Text
The
AutoCAD SHX Text
Terr
AutoCAD SHX Text
Osborne
AutoCAD SHX Text
Cardogen
AutoCAD SHX Text
Pl
AutoCAD SHX Text
Winterborne
AutoCAD SHX Text
Rise
AutoCAD SHX Text
Pl
AutoCAD SHX Text
David
AutoCAD SHX Text
Ct
AutoCAD SHX Text
Kaye
AutoCAD SHX Text
Cr
AutoCAD SHX Text
Wallace
AutoCAD SHX Text
Av
AutoCAD SHX Text
Iron
AutoCAD SHX Text
St
AutoCAD SHX Text
Rodney
AutoCAD SHX Text
Street
AutoCAD SHX Text
St
AutoCAD SHX Text
Street
AutoCAD SHX Text
Cr
AutoCAD SHX Text
Court
AutoCAD SHX Text
Irkara
AutoCAD SHX Text
Ella
AutoCAD SHX Text
Ct
AutoCAD SHX Text
Cl
AutoCAD SHX Text
Currawong
AutoCAD SHX Text
Sallys
AutoCAD SHX Text
La
AutoCAD SHX Text
Neale
AutoCAD SHX Text
Street
AutoCAD SHX Text
Road
AutoCAD SHX Text
Street
AutoCAD SHX Text
Rodney
AutoCAD SHX Text
Street
AutoCAD SHX Text
Race
AutoCAD SHX Text
St
AutoCAD SHX Text
view
AutoCAD SHX Text
all
AutoCAD SHX Text
Road
AutoCAD SHX Text
Edwards
AutoCAD SHX Text
Edwards
AutoCAD SHX Text
Road
AutoCAD SHX Text
ace
AutoCAD SHX Text
lling
AutoCAD SHX Text
Houston
AutoCAD SHX Text
Street
AutoCAD SHX Text
Ray
AutoCAD SHX Text
ce
AutoCAD SHX Text
Gully
AutoCAD SHX Text
Prim
AutoCAD SHX Text
Street
AutoCAD SHX Text
Street
AutoCAD SHX Text
STREET
AutoCAD SHX Text
STREET
AutoCAD SHX Text
STREET
AutoCAD SHX Text
CONDON
AutoCAD SHX Text
MILLER ST
AutoCAD SHX Text
TOWNSEND STREET
AutoCAD SHX Text
FLORA HILL
AutoCAD SHX Text
SECONDARY
AutoCAD SHX Text
COLLEGE
AutoCAD SHX Text
BRENNAN
AutoCAD SHX Text
PARK
AutoCAD SHX Text
POOL
AutoCAD SHX Text
LATROBE UNIVERSITY
AutoCAD SHX Text
BENDIGO CAMPUS
AutoCAD SHX Text
BENDIGO
AutoCAD SHX Text
CEMETERY
AutoCAD SHX Text
Ct
AutoCAD SHX Text
The Crest
AutoCAD SHX Text
FLORA HILL
AutoCAD SHX Text
SPORTS CENTRE
AutoCAD SHX Text
INDOOR
AutoCAD SHX Text
STRATH
AutoCAD SHX Text
VILLAGE
AutoCAD SHX Text
Keck
AutoCAD SHX Text
top
AutoCAD SHX Text
Innovation
AutoCAD SHX Text
Court
Page 2: SHEETNo. SHEETDESC. 20/06/19 xx/xx/xx xx/xx/xx TWO-WAY

Typical Raised Crossing Detail

CITY OF GREATER BENDIGO

Survey

Scale:

Approved by

Design

Checked

GB4356

ELLIS STREET

FLORA HILL

BI-DIRECTIONAL BIKE LANE

H. WHYTOCK

B. JANSSEN

A. SMITH

N. SARTORI

16/08/18

20/06/19

1:300

2

STANDARD DETAILS & NOTES

Revision :

File :

Original sheet size:

AMENDMENTS

Approved by DateRevision Description

DRAFT 3PRELIMINARY DESIGN

Plot Date:

BAYLEY JANSSENPlotted By:

11/07/2019

Sheet: Reference:

OF 18

20/06/19

20/06/19

A

GB4356.dwg

A3

- - - -

3.0m Bike Lane

0.6m

Road Surface

continues as traffic

lanes or car parking

0.6m seperation between bike

lane and traffic lane/car parking.

Flexible bollards to be installed

at 12m centres or 2m offset from

edges of residential driveways

(Locations shown pg 3 - 11)

Existing Kerb or

reconstructed kerb

where shown.

Typical Bike Lane Detail

Bike Lane + Footpath Behind Kerb at

3.0m 4.5m

Varying Length

Landscape between bike lane

and back of existing kerb (remove

existing footpath and fencing)

4.5m wide concrete path. 3m

designated to bike lane (green),

1.5m footpath.

3.0m wide batter to existing

surface with fill

Sharon/Ellis Intersection Detail

6m wide raised crossing

(3m zebra crossing and

3m bike lane crossing)

Ramp black concrete for 1.3m from

road surface to top of kerb level.

6.60m 1.30m1.30m 0.60m

0.75m

Adjacent pavement reinstatement:

- 0.75m width 40mm depth Type N (10mm) asphalt

- Prime FCR before sealing

- 300mm depth CL1 FCR layed in two 150mm

deep layers, each compacted to 98%MMDD

- Note 150mm seal overlap over pavement join

Concrete Roadway ramp:

- 200mm thick, 32Mpa Black concrete, 2 layers SL82 with 50 cover top and bottom

- 150mm depth CL1 FCR (98%MMDD)

- North Bike path area to be painted with green long life paint (3.0m wide).

- South Footpath area to be painted with Zebra Crossing Line markings (3.0m wide).

- Concrete surface to be consistent with top of kerb (approx. 100mm high)

Remove Footpaths

and laybacks, replace

with naturestrip

treatment or other

surface as shown.

White Piano key and

Zebra linemarking as

per AS1742.10 Figure 2

Partially excavate

traffic island and

construct SM1 kerb at

base of ramp

Construct modified layback

as per Bike Lane Layback

Detail extending over

driveway, bike lane and

footpath as shown.

Remove existing Driveway

layback.

Excavate existing concrete

footpath. Reconstruct footpath

after bike lane construction

and match in.

Paint Bike Lane with

Green long life paint

where shown

Roundabout Crossing Details

Road to Behind Kerb Transition Detail

R2 - V111

R3 - 1A

R1 - 2A

Sign List

Island Construction Detail

Varying widths

Pull strin

g b

etw

een ke

rbs fo

r gra

de

Bedding, 100mm thick layer

compacted CL3 FCR

Dowel into kerb

with 200mm long

N10s at 500mm

cts. Pre-drill and

place dowels

100mm below top

of kerb

- 150mm thick 32MPa concrete slab

- 1 layer SL82 placed 50mm from bottom

- Flagstone stencil pattern, Charcoal

color, clear seal

Construct SM1 Kerb as shown

on plans. Top of kerb to be

100mm above existing road

surface.

SEAL: Type N Asphalt (10mm)

BASE: Class 2 FCR (20mm)

Place and compact in 2 even layers

Compact to a min. of 98% MMDD

(min CBR 80)

Existing material:

- See notes page 17 for all compaction and testing

requirements

Pavement Reinstatement Details

40

250

290

R8 - 2A

R7 - 4A

W6-V2-2A

W6 - 2A

(Arrow direction

denoted by L or R)

0.15

0.02

0.45 1.05

0.05

0.152.10

0.08

Invert to match

existing kerb invert.

0.5m radius curve.

Bike Lane layback Detail

0.60

Sawcut and reinstate

0.6m of road pavement

as per IDM SD130. Match

to existing surface.

Transition existing

barrier kerb to concrete

plinth kerb as shown.

Reconstruct pavement

adjacent design kerb and

ramp as per IDM SD130

150mm wide plain

concrete plinth kerb

150mm wide plain color

concrete plinth kerb

(similar to CoGB SD197)

Kykuyu roll out turf

on 50mm loamy sand

Reconstruct 600mm width

pavement with 150mm seal

overlap. 40mm type N (10mm)

asphalt on 300mm depth CL3

FCR compacted to 98%MMDD

0.60 0.15

0.30

150mm wide plain color

concrete plinth kerb

(similar to CoGB SD197)

Kykuyu roll out turf

on 50mm loamy sand

Construct 200mm thick 32MPa

black concrete slab with 2 layers

SL82 (50 cover top and bottom)

Construct slab on 150mm depth

CL1 FCR compacted to 98%MMDD

0.20

Varies

Height varies from

100mm depth to

0mm depth as ramp

approaches path

Kerb section adjacent Rd pavement

Kerb section adjacent Rd conc. ramp

Match kerb inverts and transition

over 750mm into modified layback.

Match kerb inverts and

transition over 750mm

into modified layback.

If connecting to

driveway match to

existing surface.

Bike lane continues at 1:20 grade

to a height of surface behind kerb.

IMPORTANT!

The location of underground services have been derived from

available information, however accuracy cannot be guaranteed.

All existing service information should therefore be treated as

indicative only, and service locations must be arranged prior to

commencement of any excavation. The contractor will be held

responsible for any damage caused to underground services.

W6 - 7A

W8 - 3A [L]

W6 - 3A

W8 - 22A

0.3m 3.0m

AutoCAD SHX Text
450%%C RCP
AutoCAD SHX Text
300%%C RCP
AutoCAD SHX Text
300%%C RCP
AutoCAD SHX Text
375%%C RCP
AutoCAD SHX Text
SEWER 150%%CVC
AutoCAD SHX Text
BITUMEN
AutoCAD SHX Text
DWY
AutoCAD SHX Text
EXIST.
Page 3: SHEETNo. SHEETDESC. 20/06/19 xx/xx/xx xx/xx/xx TWO-WAY

PSM 243

RL 230.495

CITY OF GREATER BENDIGO

Survey

Scale:

Approved by

Design

Checked

GB4356

ELLIS STREET

FLORA HILL

BI-DIRECTIONAL BIKE LANE

H. WHYTOCK

B. JANSSEN

A. SMITH

N. SARTORI

16/08/18

20/06/19

1:300

3

SAYER STREET PLAN VIEW

Revision :

File :

Original sheet size:

AMENDMENTS

Approved by DateRevision Description

DRAFT 3PRELIMINARY DESIGN

Plot Date:

BAYLEY JANSSENPlotted By:

11/07/2019

Sheet: Reference:

OF 18

20/06/19

20/06/19

A

GB4356.dwg

A3

- - - -

TREES TO BE REMOVED

LEGEND

BIKE LANE MARKING

Solid Green Painted Areas

CONCRETE KERB

B2 kerb to IDM SD100

CROSSING LINE MARKING

ROAD LINE MARKING

RAISED PAVEMENT

- Black Concrete

CONCRETE FOOTPATH/DWY

IDM SD205

FLEXIBLE BOLLARD

S

A

Y

E

R

S

T

R

E

E

T

E

L

L

IS

S

T

R

E

E

T

Existing Concrete ramp

Diagonal Linemarking at 12m

centres. (AS1742.2)

Bollards at 12m centres or 1

bollard halfway between

driveways which are less

than 24m apart.

Giveway to bikes

sign before bike lane

(R2 - V111)

Diagonal Linemarking as per

AS1742.2.

4 ELLIS STREET

6 ELLIS STREET

8 ELLIS STREET

10 ELLIS STREET

31 SOMERVILLE STREET

1 ELLIS STREET

3 ELLIS STREET

5A & 5B ELLIS STREET

7 ELLIS STREET

12 ELLIS STREET

14 ELLIS STREET

NATURESTRIP

PEDESTRIAN ISLAND INFILL

2

.1

0

3

.1

0

3

.1

0

0

.6

0 2

.1

0

3

.4

5

PAVEMENT REINSTATEMENT

See Page 2 for details

Road to be Resealed from kerb to kerb before linemarking

2 ELLIS STREET

Install bike lane on side road

Sign W6-7A & W8-3A [L]

Bollards to start 15m from

edge of Sayer Street.

ASPHALT DRIVEWAY

IDM SD206

Construct Concrete

footpath (IDM SD205)

to continue bike path to

intersection.

Three Bollards at 2m

spacing.

AutoCAD SHX Text
FOOTPATH
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
GAS 200%%CSTEEL
AutoCAD SHX Text
GAS 50%%CPE
AutoCAD SHX Text
ELECTRICITY 63%%C
AutoCAD SHX Text
750%%C RCP
AutoCAD SHX Text
525%%C RCP
AutoCAD SHX Text
450%%C RCP
AutoCAD SHX Text
600%%C RCP
AutoCAD SHX Text
600%%C RCP
AutoCAD SHX Text
TELSTRA 100%%CPVC
AutoCAD SHX Text
TELSTRA 50%%CPVC
AutoCAD SHX Text
WATER 100%%CAC
AutoCAD SHX Text
SEWER 150%%CVC
AutoCAD SHX Text
SEWER 150%%CVC
AutoCAD SHX Text
SEWER 150%%CVC
Page 4: SHEETNo. SHEETDESC. 20/06/19 xx/xx/xx xx/xx/xx TWO-WAY

C

H

0

.0

0

C

H

1

0

.

0

0

C

H

2

0

.

0

0

C

H

3

0

.

0

0

CITY OF GREATER BENDIGO

Survey

Scale:

Approved by

Design

Checked

GB4356

ELLIS STREET

FLORA HILL

BI-DIRECTIONAL BIKE LANE

H. WHYTOCK

B. JANSSEN

A. SMITH

N. SARTORI

16/08/18

20/06/19

1:300

4

SAYER - NEALE PLAN VIEW

Revision :

File :

Original sheet size:

AMENDMENTS

Approved by DateRevision Description

DRAFT 3PRELIMINARY DESIGN

Plot Date:

BAYLEY JANSSENPlotted By:

11/07/2019

Sheet: Reference:

OF 18

20/06/19

20/06/19

A

GB4356.dwg

A3

- - - -

TREES TO BE REMOVED

LEGEND

BIKE LANE MARKING

Solid Green Painted Areas

CONCRETE KERB

B2 kerb to IDM SD100

CROSSING LINE MARKING

ROAD LINE MARKING

RAISED PAVEMENT

Black Concrete

CONCRETE FOOTPATH/DWY

IDM SD205

FLEXIBLE BOLLARD

NATURESTRIP

PEDESTRIAN ISLAND INFILL

2

.1

0

3

.1

0

3

.1

0

0

.6

0 2

.1

0

3

.4

5

E

L

L

IS

S

T

R

E

E

T

7 ELLIS STREET

12 ELLIS STREET

14 ELLIS STREET

16 ELLIS STREET

9 ELLIS STREET

11 ELLIS STREET

13 ELLIS STREET

15 ELLIS STREET

17 ELLIS STREET

136 NEALE STREET

18 ELLIS STREET

20 ELLIS STREET

22 ELLIS STREET

PAVEMENT REINSTATEMENT

See Page 2 for details

Road to be Resealed from kerb to kerb before linemarking

ASPHALT DRIVEWAY

IDM SD206

AutoCAD SHX Text
BITUMEN
AutoCAD SHX Text
DWY
AutoCAD SHX Text
EXIST.
AutoCAD SHX Text
GAS 200%%CSTEEL
AutoCAD SHX Text
GAS 50%%CPE
AutoCAD SHX Text
ELECTRICITY 63%%C
AutoCAD SHX Text
525%%C RCP
AutoCAD SHX Text
525%%C RCP
AutoCAD SHX Text
150%%C RCP
AutoCAD SHX Text
150%%C RCP
AutoCAD SHX Text
TELSTRA 50%%CPVC
AutoCAD SHX Text
TELSTRA 100%%CPVC
AutoCAD SHX Text
TELSTRA 50%%CPVC
AutoCAD SHX Text
WATER 100%%CPVC
AutoCAD SHX Text
WATER 100%%CAC
AutoCAD SHX Text
SEWER 150%%CVC
AutoCAD SHX Text
GAS 200%%CSTEEL
AutoCAD SHX Text
GAS 50%%CPE
Page 5: SHEETNo. SHEETDESC. 20/06/19 xx/xx/xx xx/xx/xx TWO-WAY

PSM 246

RL 236.391

C

H

0

.0

0

C

H

1

0

.

0

0

C

H

2

0

.

0

0

C

H

3

0

.

0

0

C

H

4

0

.0

0

C

H

5

0

.

0

0

C

H

6

0

.

0

0

C

H

7

0

.0

0

C

H

8

0

.0

0

C

H

8

2

.4

0

C

H

0

.0

0

C

H

1

0

.0

0

C

H

2

0

.0

0

C

H

0

.0

0

C

H

3

0

.2

6

C

H

3

0

.2

6

CITY OF GREATER BENDIGO

Survey

Scale:

Approved by

Design

Checked

GB4356

ELLIS STREET

FLORA HILL

BI-DIRECTIONAL BIKE LANE

H. WHYTOCK

B. JANSSEN

A. SMITH

N. SARTORI

16/08/18

20/06/19

1:300

5

NEALE STREET ROUNDABOUT PLAN VIEW

Revision :

File :

Original sheet size:

AMENDMENTS

Approved by DateRevision Description

DRAFT 3PRELIMINARY DESIGN

Plot Date:

BAYLEY JANSSENPlotted By:

11/07/2019

Sheet: Reference:

OF 18

20/06/19

20/06/19

A

GB4356.dwg

A3

- - - -

TREES TO BE REMOVED

LEGEND

BIKE LANE MARKING

Solid Green Painted Areas

CONCRETE KERB

B2 kerb to IDM SD100

CROSSING LINE MARKING

ROAD LINE MARKING

RAISED PAVEMENT

-Black Concrete

CONCRETE FOOTPATH/DWY

IDM SD205

FLEXIBLE BOLLARD

N

E

A

L

E

S

T

R

E

E

T

N

E

A

L

E

S

T

R

E

E

T

E

L

L

IS

S

T

R

E

E

T

E

L

L

IS

S

T

R

E

E

T

Raised Shared Crossing

Details on Page 2

Pedestrian Crossing

Sign R3-1A

Install Solar Light Pole. 80W Solar

Light at 8.0m high with 0.5m arm.

Attach Zebra Crossing sign.

Remove Concrete

footpath where bike path

crosses

Match Grated pit lid to

new concrete level.

Change grating to bike

safe weave grate.

15 ELLIS STREET

17 ELLIS STREET

20 ELLIS STREET

22 ELLIS STREET

24 ELLIS STREET

26 ELLIS STREET

138 NEALE STREET

149 NEALE STREET

145 NEALE STREET

NATURESTRIP

PEDESTRAIN ISLAND INFILL

Remove existing footpath.

Construct bike path then

match footpath into bike

path levels.

Remove existing

footpath. Construct bike

path then match

footpath into bike path

levels.

Remove existing

concrete footpath

Remove existing

concrete footpath

Sawcut Kerb invert and construct

concrete ramp (max 1:10 grade)

up to footpath level (Approx.

100mm above road surface)

Alignment: Neale Street Crossing

Alignment: Neale Street Footpath

Sawcut Kerb invert and construct

concrete ramp (max 1:10 grade)

up to footpath level (Approx.

100mm above road surface)

Construct Driveway layback. Extend

to pedestrian Layback as shown.

Raise and Match

Sewer Pit lids to bike

lane surface.

Replace Telstra pit

to Bike Lane level.

Replace Telstra

pit to bike lane

levels.

Trim Tree branches

PAVEMENT REINSTATEMENT

See Page 2 for details

Road to be Resealed from kerb to kerb before linemarking

Install Sign W6-V2-2A [L]

Install Sign W6-V2-2A [R]

Install Sign W6-2A

Convert SEP to JP and

incorporate into layback.

Install heavy duty lid.

ASPHALT DRIVEWAY

IDM SD206

Reconstruct concrete driveway.

If tree roots are found, COGB

Arborist are to be notified before

continuing.

Construct bike path over tree roots.

When working near tree roots, COGB

Arborist to be notified and present

during hydro excavation.

Concrete path to be 50mm thick over

exposed root. Fill using crushed rock.

When working near tree roots, COGB

Arborist to be notified and present during

hydro excavation.

Remove Traffic Island

Reinstate Linemarking

Install Light on existing pole. 70W LED

Light at 10.0m high with 3.0m arm.

AutoCAD SHX Text
CONC.
AutoCAD SHX Text
DWY
AutoCAD SHX Text
EXIST.
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
DWY
AutoCAD SHX Text
EXIST.
AutoCAD SHX Text
BITUMEN
AutoCAD SHX Text
DWY
AutoCAD SHX Text
EXIST.
AutoCAD SHX Text
GAS 200%%CSTEEL
AutoCAD SHX Text
GAS 50%%CPE
AutoCAD SHX Text
GAS 50%%CPE
AutoCAD SHX Text
ELECTRICITY 63%%C
AutoCAD SHX Text
525%%C RCP
AutoCAD SHX Text
150%%C RCP
AutoCAD SHX Text
525%%C RCP
AutoCAD SHX Text
2x450%%C RCP
AutoCAD SHX Text
450%%C RCP
AutoCAD SHX Text
150%%C RCP
AutoCAD SHX Text
300%%C RCP
AutoCAD SHX Text
300%%C RCP
AutoCAD SHX Text
375%%C RCP
AutoCAD SHX Text
300%%C RCP
AutoCAD SHX Text
300%%C RCP
AutoCAD SHX Text
375%%C RCP
AutoCAD SHX Text
375%%C RCP
AutoCAD SHX Text
300%%C RCP
AutoCAD SHX Text
300%%C RCP
AutoCAD SHX Text
TELSTRA 100%%CPVC
AutoCAD SHX Text
TELSTRA 50%%CPVC
AutoCAD SHX Text
TELSTRA 100%%CPVC
AutoCAD SHX Text
WATER 100%%CPVC
AutoCAD SHX Text
WATER 150%%CPVC
AutoCAD SHX Text
WATER 100%%CVC
AutoCAD SHX Text
WATER 100%%CAC
AutoCAD SHX Text
SEWER 150%%CVC
AutoCAD SHX Text
SEWER 150%%CVC
AutoCAD SHX Text
GAS 200%%CSTEEL
AutoCAD SHX Text
GAS 50%%CPE
Page 6: SHEETNo. SHEETDESC. 20/06/19 xx/xx/xx xx/xx/xx TWO-WAY

PSM 1860

RL 239.931

S

L

O

W

D

O

W

N

T

H

R

O

U

G

H

B

U

S

S

T

O

P

S

L

O

W

D

O

W

N

T

H

R

O

U

G

H

B

U

S

S

T

O

P

CITY OF GREATER BENDIGO

Survey

Scale:

Approved by

Design

Checked

GB4356

ELLIS STREET

FLORA HILL

BI-DIRECTIONAL BIKE LANE

H. WHYTOCK

B. JANSSEN

A. SMITH

N. SARTORI

16/08/18

20/06/19

1:300

6

THEODORE STREET PLAN VIEW

Revision :

File :

Original sheet size:

AMENDMENTS

Approved by DateRevision Description

DRAFT 3PRELIMINARY DESIGN

Plot Date:

BAYLEY JANSSENPlotted By:

11/07/2019

Sheet: Reference:

OF 18

20/06/19

20/06/19

A

GB4356.dwg

A3

- - - -

TREES TO BE REMOVED

LEGEND

BIKE LANE MARKING

Solid Green Painted Areas

CONCRETE KERB

B2 kerb to IDM SD100

CROSSING LINE MARKING

ROAD LINE MARKING

RAISED PAVEMENT

-Black Concrete

CONCRETE FOOTPATH/DWY

IDM SD205

FLEXIBLE BOLLARD

T

H

E

O

D

O

R

E

S

T

R

E

E

T

E

L

L

IS

S

T

R

E

E

T

Diagonal Linemarking at

12m centres.

19 ELLIS STREET

21 ELLIS STREET

23 ELLIS STREET

25 ELLIS STREET

27 ELLIS STREET

29 ELLIS STREET

26 ELLIS STREET

28 ELLIS STREET

30 ELLIS STREET

32 ELLIS STREET

34 ELLIS STREET

36 ELLIS STREET

38 ELLIS STREET

40 ELLIS STREET

42 ELLIS STREET

NATURESTRIP

Install Give way to cyclist

sign R2-V111

Construct concrete landing for bus stop.

Bus to stop in lane. B1 Kerb (IDM

SD100) with concrete infill (IDM SD205).

Landing to be 150mm higher than

existing road surface.

PEDESTRIAN ISLAND INFILL

Remove existing bus

stop

2

.1

0

3

.1

0

3

.1

0

0

.6

0 2

.1

0

3

.4

5

PAVEMENT REINSTATEMENT

See Page 2 for details

Road to be Resealed from kerb to kerb before linemarking

ASPHALT DRIVEWAY

IDM SD206

2

.7

0

7

.5

0

Install Bus Stop flag

Linemark existing Bus

Stop

1.20

1.50

7.50

Paint "SLOW DOWN THROUGH

BUS STOP" in bike lane

Paint "SLOW DOWN THROUGH

BUS STOP" in bike lane

Paint Bike Lane Green

through bus stop

Bus Stop Detail

Scale 1:75

Install 70W LED light on

existing power pole.

AutoCAD SHX Text
GAS 200%%CSTEEL
AutoCAD SHX Text
GAS 50%%CPE
AutoCAD SHX Text
GAS 40%%CPE
AutoCAD SHX Text
TELSTRA 100%%CPVC
AutoCAD SHX Text
TELSTRA 50%%CPVC
AutoCAD SHX Text
TELSTRA 100%%CPVC
AutoCAD SHX Text
TELSTRA 50%%CPVC
AutoCAD SHX Text
WATER 150%%CPVC
AutoCAD SHX Text
SEWER 150%%CVC
Page 7: SHEETNo. SHEETDESC. 20/06/19 xx/xx/xx xx/xx/xx TWO-WAY

PSM 244

RL 247.015

STN 3

RL 248.131

STN 2

RL 248.671

C

H

0

.0

0

C

H

1

0

.0

0

C

H

2

0

.0

0

C

H

3

0

.0

0

C

H

0

.0

0

C

H

1

0

.

0

0

C

H

2

0

.

0

0

C

H

2

0

.

8

5

C

H

0

.0

0

C

H

10.00

C

H

19.18

C

H

0

.0

0

C

H

1

0

.

0

0

C

H

2

0

.

0

0

C

H

3

0

.

0

0

C

H

4

0

.0

0

C

H

5

0

.

0

0

C

H

6

0

.

0

0

C

H 70.00

C

H

8

0

.0

0

C

H

8

5

.9

0

3

0

0

Ø

R

C

P

3

0

0

Ø

R

C

P

C

H

18.00

C

H

2

0

.0

0

C

H

4

0

.0

0

C

H

0

.0

0

C

H

5

8

.2

2

C

H

6

5

.9

4

CITY OF GREATER BENDIGO

Survey

Scale:

Approved by

Design

Checked

GB4356

ELLIS STREET

FLORA HILL

BI-DIRECTIONAL BIKE LANE

H. WHYTOCK

B. JANSSEN

A. SMITH

N. SARTORI

16/08/18

20/06/19

1:300

7

CURTIN STREET PLAN VIEW

Revision :

File :

Original sheet size:

AMENDMENTS

Approved by DateRevision Description

DRAFT 3PRELIMINARY DESIGN

Plot Date:

BAYLEY JANSSENPlotted By:

11/07/2019

Sheet: Reference:

OF 18

20/06/19

20/06/19

A

GB4356.dwg

A3

- - - -

TREES TO BE REMOVED

LEGEND

BIKE LANE MARKING

Solid Green Painted Areas

CONCRETE KERB

B2 kerb to IDM SD100

CROSSING LINE MARKING

ROAD LINE MARKING

RAISED PAVEMENT

-Black Concrete

CONCRETE FOOTPATH/DWY

IDM SD205

FLEXIBLE BOLLARD

C

U

R

T

IN

S

T

R

E

E

T

C

U

R

T

IN

S

T

R

E

E

T

E

L

L

IS

S

T

R

E

E

T

E

L

L

IS

S

T

R

E

E

T

Remove existing concrete

kerb and construct concrete

kerb in new locations. Kerb

to transition from barrier kerb

to plinth kerb over 2m.

Pedestrian Crossing

Sign R2-1A

Pedestrian Crossing

Sign R2-1A

33 ELLIS STREET

35 ELLIS STREET

37 ELLIS STREET

39 ELLIS STREET

44 ELLIS STREET

49 CURTIN STREET

48 ELLIS STREET

36 CURTIN STREET

50 ELLIS STREET

NATURESTRIP

Replace sewer lid to

gatic sewer lid at

bike path level

Raise Telstra Pit to bike

path level.

PEDESTRIAN ISLAND INFILL

Remove existing

footpath. Construct bike

path then match

footpath into bike path

levels.

Remove existing

footpath. Construct bike

path then match

footpath into bike path

levels.

Alignment: Curtin Street Crossing

Alignment: Curtin Street Footpath

Alignment: Curtin Street Kerb West

Alignment: Curtin Street Kerb East

Sawcut Kerb invert and construct

concrete ramp (max 1:10 grade)

up to footpath level (Approx.

100mm above road surface)

Sawcut Kerb invert and construct

concrete ramp (max 1:10 grade)

up to footpath level (Approx.

100mm above road surface)

PAVEMENT REINSTATEMENT

See Page 2 for details

Road to be Resealed from kerb to kerb before linemarking

Install Sign W6-V2-2A [L]

Install Sign W6-V2-2A [R]

Install Sign W6-2A

See page 2 for

Crossing Details

ASPHALT DRIVEWAY

IDM SD206

Construct Tray

Grate pit (COGB

SD590-A-D-L-U)

Construct Tray

Grate pit (COGB

SD590-A-D-L-U)

Install 300Ø RCP

to connect grating

pits at 1% grade.

Install 300Ø RCP

to connect grating

pits at 1% grade.

Construct SEP and shift

behind new kerb. Extend

existing 300Ø and

Connect new 300Ø RCP.

Install Solar Light Pole.

80W Solar Light at 8.0m

high with 0.5m arm.

Install Light on existing Pole.

70W Light at 8.5m high with

3.0m arm.

Construct bike path over tree roots.

When working near tree roots, COGB

Arborist to be notified and present

during hydro excavation.

Move fence back to title and

construct concrete footpath.

Reconstruct Kerb as shown.

See page 16 for long section.

Alignment: Ellis Street Kerb 3

AutoCAD SHX Text
CONC FOOTPATH
AutoCAD SHX Text
CONC FOOTPATH
AutoCAD SHX Text
GAS 200%%CSTEEL
AutoCAD SHX Text
GAS 50%%CPE
AutoCAD SHX Text
GAS 150%%CSTEEL
AutoCAD SHX Text
GAS 150%%CSTEEL
AutoCAD SHX Text
GAS 50%%CSTEEL
AutoCAD SHX Text
ELECTRICITY 32%%C
AutoCAD SHX Text
300%%C RCP
AutoCAD SHX Text
300%%C RCP
AutoCAD SHX Text
300%%C RCP
AutoCAD SHX Text
300%%C RCP
AutoCAD SHX Text
150%%C RCP
AutoCAD SHX Text
450%%C RCP
AutoCAD SHX Text
225%%C RCP
AutoCAD SHX Text
TELSTRA 100%%CPVC
AutoCAD SHX Text
TELSTRA 50%%CPVC
AutoCAD SHX Text
WATER 150%%CPVC
AutoCAD SHX Text
WATER 150%%CPVC
AutoCAD SHX Text
WATER 100%%CPVC
AutoCAD SHX Text
SEWER 150%%CVC
AutoCAD SHX Text
SEWER 150%%CVC
Page 8: SHEETNo. SHEETDESC. 20/06/19 xx/xx/xx xx/xx/xx TWO-WAY

STN 3

RL 248.131

C

H

8

0

.0

0

C

H

8

5

.9

0

C

H

4

0

.0

0

C

H

5

8

.2

2

C

H

6

5

.9

4

CITY OF GREATER BENDIGO

Survey

Scale:

Approved by

Design

Checked

GB4356

ELLIS STREET

FLORA HILL

BI-DIRECTIONAL BIKE LANE

H. WHYTOCK

B. JANSSEN

A. SMITH

N. SARTORI

16/08/18

20/06/19

1:300

8

CURTIN - BSEC PLAN VIEW

Revision :

File :

Original sheet size:

AMENDMENTS

Approved by DateRevision Description

DRAFT 3PRELIMINARY DESIGN

Plot Date:

BAYLEY JANSSENPlotted By:

11/07/2019

Sheet: Reference:

OF 18

20/06/19

20/06/19

A

GB4356.dwg

A3

- - - -

TREES TO BE REMOVED

LEGEND

BIKE LANE MARKING

Solid Green Painted Areas

CONCRETE KERB

B2 kerb to IDM SD100

CROSSING LINE MARKING

ROAD LINE MARKING

RAISED PAVEMENT

-Black Concrete

CONCRETE FOOTPATH/DWY

IDM SD205

FLEXIBLE BOLLARD

37 ELLIS STREET

39 ELLIS STREET

41 ELLIS STREET

2/43 ELLIS STREET

45 ELLIS STREET

47 ELLIS STREET

49 ELLIS STREET

48 ELLIS STREET

50 ELLIS STREET

52 ELLIS STREET

54 ELLIS STREET

BENDIGO SOUTH EAST COLLEGE

NATURESTRIP

PEDESTRIAN ISLAND INFILL

2

.6

0

3

.1

0

3

.1

0

0

.6

0 2

.1

0

3

.4

5

E

L

L

IS

S

T

R

E

E

T

PAVEMENT REINSTATEMENT

See Page 2 for details

Road to be Resealed from kerb to kerb before linemarking

ASPHALT DRIVEWAY

IDM SD206

AutoCAD SHX Text
GAS 50%%CSTEEL
AutoCAD SHX Text
300%%C RCP
AutoCAD SHX Text
300%%C RCP
AutoCAD SHX Text
300%%C RCP
AutoCAD SHX Text
150%%C RCP
AutoCAD SHX Text
450%%C RCP
AutoCAD SHX Text
300%%C RCP
AutoCAD SHX Text
300%%C RCP
AutoCAD SHX Text
225%%C RCP
AutoCAD SHX Text
TELSTRA 100%%CPVC
AutoCAD SHX Text
TELSTRA 50%%CPVC
AutoCAD SHX Text
WATER 150%%CPVC
AutoCAD SHX Text
SEWER 150%%CVC
Page 9: SHEETNo. SHEETDESC. 20/06/19 xx/xx/xx xx/xx/xx TWO-WAY

STN 4

RL 252.745

PSM 560

RL 255.605

STN 1

RL 256.554

STN 5

RL 252.527

C

h

0

.

0

0

CITY OF GREATER BENDIGO

Survey

Scale:

Approved by

Design

Checked

GB4356

ELLIS STREET

FLORA HILL

BI-DIRECTIONAL BIKE LANE

H. WHYTOCK

B. JANSSEN

A. SMITH

N. SARTORI

16/08/18

20/06/19

1:300

9

SCHOOL CROSSING PLAN VIEW

Revision :

File :

Original sheet size:

AMENDMENTS

Approved by DateRevision Description

DRAFT 3PRELIMINARY DESIGN

Plot Date:

BAYLEY JANSSENPlotted By:

11/07/2019

Sheet: Reference:

OF 18

20/06/19

20/06/19

A

GB4356.dwg

A3

- - - -

TREES TO BE REMOVED

LEGEND

BIKE LANE MARKING

Solid Green Painted Areas

CONCRETE KERB

B2 kerb to IDM SD100

CROSSING LINE MARKING

ROAD LINE MARKING

RAISED PAVEMENT

-Black Concrete

CONCRETE FOOTPATH/DWY

IDM SD205

FLEXIBLE BOLLARD

49 ELLIS STREET

49A ELLIS STREET

51 ELLIS STREET

53 ELLIS STREET

BENDIGO SOUTH EAST COLLEGE

Traffic Islands either side of

school crossing with stenciled

concrete infill

Include new School Crossing

posts as per AS1742.10

School Crossing Linemarking

in accordance with AS1742.10

NATURESTRIP

Sawcut 300mm from lip of island

kerb and remove traffic island.

Replace sawcut region with

typical pavement.

PEDESTRIAN ISLAND INFILL

Move Parking sign to new

location

Sawcut 300mm from lip of island

kerb and remove traffic island.

Replace sawcut region with

typical pavement.

Install "Giveway to Cyclist"

Signs at school driveway

2

.1

0

3

.1

0

3

.1

0

0

.6

0 2

.1

0

3

.4

5

V

a

ry

in

g

PAVEMENT REINSTATEMENT

See Page 2 for details

Road to be Resealed from kerb to kerb before linemarking

ASPHALT DRIVEWAY

IDM SD206

Paint "Wait Here"

Install School Crossing ahead

signs. W6-3A & W8-22A

Install School Crossing ahead

signs. W6-3A & W8-22A

Include new School Crossing

posts as per AS1742.10

AutoCAD SHX Text
GAS 50%%CSTEEL
AutoCAD SHX Text
ELECTRICITY MULTIPLE
AutoCAD SHX Text
300%%C RCP
AutoCAD SHX Text
300%%C RCP
AutoCAD SHX Text
TELSTRA 50%%CPVC
AutoCAD SHX Text
TELSTRA 50%%CPVC
AutoCAD SHX Text
TELSTRA 100%%CPVC
AutoCAD SHX Text
WATER 150%%CPVC
Page 10: SHEETNo. SHEETDESC. 20/06/19 xx/xx/xx xx/xx/xx TWO-WAY

C

h

0

.

0

0

C

h

1

0

.

0

0

C

h

2

0

.

0

0

C

h

3

0

.

0

0

C

h

3

4

.

6

4

C

h

0

.

0

0

C

h

1

0

.

0

0

C

h

2

0

.

0

0

C

h

2

8

.

6

4

CITY OF GREATER BENDIGO

Survey

Scale:

Approved by

Design

Checked

GB4356

ELLIS STREET

FLORA HILL

BI-DIRECTIONAL BIKE LANE

H. WHYTOCK

B. JANSSEN

A. SMITH

N. SARTORI

16/08/18

20/06/19

1:300

10

BSEC - SHARON STREET PLAN VIEW

Revision :

File :

Original sheet size:

AMENDMENTS

Approved by DateRevision Description

DRAFT 3PRELIMINARY DESIGN

Plot Date:

BAYLEY JANSSENPlotted By:

11/07/2019

Sheet: Reference:

OF 18

20/06/19

20/06/19

A

GB4356.dwg

A3

- - - -

TREES TO BE REMOVED

LEGEND

BIKE LANE MARKING

Solid Green Painted Areas

CONCRETE KERB

B2 kerb to IDM SD100

CROSSING LINE MARKING

ROAD LINE MARKING

RAISED PAVEMENT

-Black Concrete

CONCRETE FOOTPATH/DWY

IDM SD205

FLEXIBLE BOLLARD

57 ELLIS STREET

61 ELLIS STREET

63 ELLIS STREET

65 ELLIS STREET

67 ELLIS STREET

BENDIGO SOUTH EAST COLLEGE

NATURESTRIP

Remove existing kerb and replace on

new alignment. Back of kerb to match

existing footpath level. Reinstate 3m

width of road pavement as per IDM130.

Remove Grated pit and extend

300Ø RCP. Construct SEP (COGB

SD590-A-D-G-S) at new kerb

location and connect 300Ø RCP.

Remove kerb and layback. Replace with

kerb on new alignment. Construct

footpath and driveway area as shown

Remove traffic island

and replace road

surface (300mm offset)

PEDESTRIAN ISLAND INFILL

Alignment: Ellis Street Kerb 1

Alignment: Ellis Street Kerb 2

3

.

1

0

3

.

1

0

0

.

9

5

2

.

5

0

3

.

4

5

PAVEMENT REINSTATEMENT

See Page 2 for details

Road to be Resealed from kerb to kerb before linemarking

ASPHALT DRIVEWAY

IDM SD206

AutoCAD SHX Text
300%%C RCP
AutoCAD SHX Text
300%%C RCP
AutoCAD SHX Text
300%%C RCP
AutoCAD SHX Text
TELSTRA 100%%CPVC
Page 11: SHEETNo. SHEETDESC. 20/06/19 xx/xx/xx xx/xx/xx TWO-WAY

S

H

A

R

O

N

S

T

R

E

E

T

C

h

2

0

.

0

0

C

h

3

0

.

0

0

C

h

3

4

.

6

4

C

H

0

.

0

0

C

H

1

0

.

0

0

C

H

2

0

.

0

0

C

H

3

0

.

0

0

C

H

4

0

.

0

0

C

H

4

4

.

8

0

CITY OF GREATER BENDIGO

Survey

Scale:

Approved by

Design

Checked

GB4356

ELLIS STREET

FLORA HILL

BI-DIRECTIONAL BIKE LANE

H. WHYTOCK

B. JANSSEN

A. SMITH

N. SARTORI

16/08/18

20/06/19

1:300

11

SHARON STREET PLAN VIEW

Revision :

File :

Original sheet size:

AMENDMENTS

Approved by DateRevision Description

DRAFT 3PRELIMINARY DESIGN

Plot Date:

BAYLEY JANSSENPlotted By:

11/07/2019

Sheet: Reference:

OF 18

20/06/19

20/06/19

A

GB4356.dwg

A3

- - - -

TREES TO BE REMOVED

LEGEND

BIKE LANE MARKING

Solid Green Painted Areas

CONCRETE KERB

B2 kerb to IDM SD100

CROSSING LINE MARKING

ROAD LINE MARKING

RAISED PAVEMENT

-Black Concrete

CONCRETE FOOTPATH/DWY

IDM SD205

FLEXIBLE BOLLARD

BENDIGO SOUTH EAST COLLEGE

LA TROBE UNIVERSITY

69 ELLIS STREET

71 ELLIS STREET

73 ELLIS STREET

75 ELLIS STREET

77 ELLIS STREET

NATURESTRIP

Construct Concrete Bike path (3m

width) and Footpath (1.5m width).

PEDESTRIAN ISLAND INFILL

Remove existing kerb.

Linemark a right turning

lane into Sharon street.

Alignment: Sharon Street Footpath

Sawcut kerb invert and construct concrete

ramp (max. grade 1:10) to footpath level

(approx. 100mm above road surface)

Remove footpath and fencing between

back of kerb and design bike path.

Landscape area with Mulch and small

plants.

Install Pedestrian

fence 100mm inside

edge of footpath.

Connect to existing

fence at both ends.

Install R8 - 2A and R7 - 4A facing path.

Install R8-2A facing Sharon Street.

Batter from edge of

footpath 3m and turf.

PAVEMENT REINSTATEMENT

See Page 2 for details

Road to be Resealed from kerb to kerb before linemarking

1

.

7

0

ASPHALT DRIVEWAY

IDM SD206

3

.

0

0

Remove Shrubs

Remove Shrubs

Remove SEP and extend 300Ø

RCP. Construct SEP (COGB

SD590-A-D-G-S) and connect

300Ø RCP.

Remove First carpark and move parking

sign.

AutoCAD SHX Text
GAS 50%%CSTEEL
AutoCAD SHX Text
GAS 150%%CSTEEL
AutoCAD SHX Text
WATER 100%%CPVC
AutoCAD SHX Text
WATER 225%%CPVC
Page 12: SHEETNo. SHEETDESC. 20/06/19 xx/xx/xx xx/xx/xx TWO-WAY

CITY OF GREATER BENDIGO

Survey

Scale:

Approved by

Design

Checked

GB4356

ELLIS STREET

FLORA HILL

BI-DIRECTIONAL BIKE LANE

H. WHYTOCK

B. JANSSEN

A. SMITH

N. SARTORI

16/08/18

20/06/19

-

12

NEALE STREET LONG SECTIONS

Revision :

File :

Original sheet size:

AMENDMENTS

Approved by DateRevision Description

DRAFT 3PRELIMINARY DESIGN

Plot Date:

BAYLEY JANSSENPlotted By:

11/07/2019

Sheet: Reference:

OF 18

20/06/19

20/06/19

A

GB4356.dwg

A3

- - - -

0.00

1.55

5.00

9.04

9.83

10.00

14.83

15.00

15.74

19.83

20.00

20.92

25.00

28.66

30.26

CHAINAGE

236.56

236.56

236.53

236.61

236.80

236.71

236.73

236.98

236.98

236.99

236.84

236.83

236.92

237.17

237.46

237.46

237.54

237.54

237.54

NS CL

236.53

236.65

236.80

236.86

236.87

237.08

237.08

237.09

236.98

236.97

236.92

237.21

237.46

DESIGN

Crest C

h 15.745 R

L 237.087

Sag C

h 20.922 R

L 236.919

R.L. 231.50

I.P

. 236.534

3.50%

I.P

. 236.796

7.75%

I.P

. 237.245

-5.36%

10.00

I.P

. 236.919

7.03%

Neale Street Footpath LONGITUDINAL SECTION CH 0.000 To 30.261

SCALES: H 1:200 V 1:100 (A3)

CHAINAGE

NS CL

R.L. 230.00

Neale Street Crossing LONGITUDINAL SECTION CH 0.000 To 82.399

SCALES: H 1:300 V 1:100 (A3)

0.00

7.94

10.00

20.00

23.99

30.00

33.36

34.86

36.36

37.02

40.00

40.52

41.02

44.02

44.76

46.26

46.45

47.76

49.90

50.00

54.90

59.90

60.00

66.45

67.45

68.45

69.90

70.00

70.87

70.90

71.90

75.35

82.40

235.32

235.32

235.88

235.96

236.32

236.47

236.60

236.73

236.80

236.80

236.78

236.82

236.97

237.04

236.97

236.90

236.86

236.91

236.91

236.92

236.98

237.07

237.07

237.29

237.33

237.33

237.35

237.35

237.40

237.50

237.50

237.55

237.55

237.52

237.23

237.40

237.40

237.40

235.88

235.96

236.32

236.47

236.65

236.76

236.82

236.92

236.97

237.12

237.13

237.13

237.04

237.00

236.95

236.95

236.98

237.07

237.08

237.25

237.33

237.33

237.36

237.39

237.47

237.62

237.63

237.67

237.67

237.62

237.23

Crest C

h 41.021 R

L 237.129

Sag C

h 46.453 R

L 236.947

Crest C

h 70.874 R

L 237.674

I.P

. 235.881

3.65%

I.P

. 236.466

3.10%

I.P

. 236.803

7.84%

3.00

I.P

. 237.246

-5.87%

7.00

I.P

. 236.909

4.55%

3.00

I.P

. 237.302

0.47%

10.00

I.P

. 237.361

10.66%

2.00

I.P

. 237.729

-11.24%

2.00

BACK OF FOOTPATH

DESIGN

BACK OF BIKEPATH

Page 13: SHEETNo. SHEETDESC. 20/06/19 xx/xx/xx xx/xx/xx TWO-WAY

CITY OF GREATER BENDIGO

Survey

Scale:

Approved by

Design

Checked

GB4356

ELLIS STREET

FLORA HILL

BI-DIRECTIONAL BIKE LANE

H. WHYTOCK

B. JANSSEN

A. SMITH

N. SARTORI

16/08/18

20/06/19

-

13

CURTIN STREET LONG SECTIONS

Revision :

File :

Original sheet size:

AMENDMENTS

Approved by DateRevision Description

DRAFT 3PRELIMINARY DESIGN

Plot Date:

BAYLEY JANSSENPlotted By:

11/07/2019

Sheet: Reference:

OF 18

20/06/19

20/06/19

A

GB4356.dwg

A3

- - - -

CHAINAGE

NS CL

R.L. 242.00

Curtin Street Crossing LONGITUDINAL SECTION CH 0.000 To 84.612

SCALES: H 1:300 V 1:100 (A3)

0.00

1.45

5.00

9.22

10.00

15.00

17.05

20.00

20.60

25.00

28.55

30.00

CHAINAGE

248.96

248.96

248.91

249.18

249.19

249.23

249.40

249.39

249.33

249.30

249.37

249.46

249.48

249.48

249.48

NS CL

248.96

248.91

249.10

249.33

249.36

249.50

249.51

249.49

249.48

249.47

249.46

249.47

Sag C

h 1.453 R

L 248.913

Crest C

h 17.048 R

L 249.513

Sag C

h 28.546 R

L 249.458

R.L. 243.50

I.P

. 248.959

-3.17%

I.P

. 248.913

5.38%

I.P

. 249.331

4.22%

I.P

. 249.575

-1.77%

10.00

I.P

. 249.476

-0.23%

I.P

. 249.458

1.17%

Curtin Street Footpath LONGITUDINAL SECTION CH 0.000 To 29.998

SCALES: H 1:200 V 1:100 (A3)

DESIGN

BACK OF FOOTPATH

DESIGN

BACK OF BIKEPATH

0.00

6.59

7.02

10.00

13.50

20.00

20.64

28.68

30.00

33.30

33.34

35.14

38.34

40.00

40.25

43.34

44.16

45.40

50.00

50.68

57.70

60.00

65.41

70.00

71.55

72.74

78.89

80.00

84.61

85.00

85.90

247.16

247.16

247.37

247.37

247.37

247.41

247.66

247.91

247.91

247.91

248.33

248.38

248.38

248.38

248.90

248.90

248.90

249.01

249.01

249.01

249.12

249.12

249.12

249.22

249.25

249.24

249.21

249.19

249.19

249.19

249.13

249.09

249.07

249.07

249.07

248.73

248.73

248.73

248.68

248.52

248.52

248.52

248.41

248.34

248.29

248.29

248.29

248.13

248.13

248.13

248.13

248.13

248.13

248.12

248.12

248.12

247.42

247.62

247.85

248.28

248.32

248.85

248.94

249.16

249.16

249.25

249.35

249.36

249.36

249.32

249.30

249.27

249.08

249.05

248.75

248.66

248.43

248.24

248.17

Crest C

h 40.252 R

L 249.365

I.P

. 247.422

6.60%

I.P

. 249.157

5.95%

I.P

. 249.456

-2.65%

10.00

I.P

. 249.269

-4.20%

Page 14: SHEETNo. SHEETDESC. 20/06/19 xx/xx/xx xx/xx/xx TWO-WAY

CITY OF GREATER BENDIGO

Survey

Scale:

Approved by

Design

Checked

GB4356

ELLIS STREET

FLORA HILL

BI-DIRECTIONAL BIKE LANE

H. WHYTOCK

B. JANSSEN

A. SMITH

N. SARTORI

16/08/18

20/06/19

-

14

CURTIN STREET LONG SECTIONS

Revision :

File :

Original sheet size:

AMENDMENTS

Approved by DateRevision Description

DRAFT 3PRELIMINARY DESIGN

Plot Date:

BAYLEY JANSSENPlotted By:

11/07/2019

Sheet: Reference:

OF 18

20/06/19

20/06/19

A

GB4356.dwg

A3

- - - -

0.00

0.25

1.25

2.25

3.00

3.59

4.59

5.00

5.59

6.34

10.00

12.77

14.27

15.00

15.77

16.38

17.88

19.38

19.46

CHAINAGE

249.35

249.35

249.34

249.32

249.31

249.31

249.30

249.28

249.27

249.25

249.21

249.21

249.21

249.02

248.87

248.78

248.73

248.67

248.62

248.51

248.41

248.41

248.41

248.41

NS CL

249.35

249.34

249.32

249.31

249.31

249.30

249.28

249.27

249.25

249.21

249.02

248.87

248.78

248.73

248.67

248.62

248.51

248.41

248.41

R.L. 245.50

I.P

. 249.349

-3.27%

I.P

. 249.308

-0.07%

2.00

I.P

. 249.307

-0.88%

I.P

. 249.293

-4.58%

2.00

I.P

. 249.213

-5.30%

I.P

. 248.793

-8.17%

3.00

I.P

. 248.498

-5.86%

3.00

Curtin Street Kerb West LONGITUDINAL SECTION CH 0.000 To 19.462

SCALES: H 1:100 V 1:50 (A3)

0.00

0.30

1.55

2.80

3.65

4.90

5.00

6.15

10.00

12.06

12.81

13.56

14.07

14.82

15.57

15.66

CHAINAGE

249.48

249.48

249.46

249.41

249.39

249.39

249.37

249.36

249.32

249.11

248.99

248.95

248.89

248.84

248.78

248.73

248.72

248.72

248.72

NS CL

249.48

249.46

249.41

249.39

249.39

249.37

249.36

249.31

249.10

248.99

248.95

248.89

248.84

248.78

248.73

248.72

R.L. 246.00

I.P

. 249.476

-5.00%

I.P

. 249.399

-0.55%

2.50

I.P

. 249.380

-5.42%

2.50

I.P

. 248.952

-8.55%

1.50

I.P

. 248.780

-6.90%

1.50

Curtin Street Kerb East LONGITUDINAL SECTION CH 0.000 To 15.658

SCALES: H 1:100 V 1:50 (A3)

DESIGN

BACK OF KERB

DESIGN

BACK OF KERB

Page 15: SHEETNo. SHEETDESC. 20/06/19 xx/xx/xx xx/xx/xx TWO-WAY

CITY OF GREATER BENDIGO

Survey

Scale:

Approved by

Design

Checked

GB4356

ELLIS STREET

FLORA HILL

BI-DIRECTIONAL BIKE LANE

H. WHYTOCK

B. JANSSEN

A. SMITH

N. SARTORI

16/08/18

20/06/19

-

15

KERB & CHANNEL LONG SECTIONS

Revision :

File :

Original sheet size:

AMENDMENTS

Approved by DateRevision Description

DRAFT 3PRELIMINARY DESIGN

Plot Date:

BAYLEY JANSSENPlotted By:

11/07/2019

Sheet: Reference:

OF 18

20/06/19

20/06/19

A

GB4356.dwg

A3

- - - -

0.00

5.00

10.00

15.00

20.00

23.64

25.00

28.64

CHAINAGE

257.19

257.19

257.30

257.33

257.54

257.44

257.55

257.58

257.64

257.64

257.64

NS CL

257.30

257.37

257.44

257.50

257.55

R.L. 254.50

I.P

. 257.300

1.35%

Ellis Street Kerb 1 LONGITUDINAL SECTION CH 0.000 To 28.644

SCALES: H 1:200 V 1:50 (A3)

0.00

5.00

10.00

15.00

20.00

25.00

29.64

34.64

CHAINAGE

259.91

259.91

260.12

260.12

260.12

260.47

260.75

260.98

261.31

261.40

261.40

261.40

261.63

261.63

261.63

NS CL

260.12

260.38

260.64

260.90

261.16

261.40

R.L. 257.00

I.P

. 260.118

5.19%

Ellis Street Kerb 2 LONGITUDINAL SECTION CH 0.000 To 34.639

SCALES: H 1:200 V 1:50 (A3)

DESIGN

BACK OF KERB

DESIGN

BACK OF KERB

Page 16: SHEETNo. SHEETDESC. 20/06/19 xx/xx/xx xx/xx/xx TWO-WAY

CITY OF GREATER BENDIGO

Survey

Scale:

Approved by

Design

Checked

GB4356

ELLIS STREET

FLORA HILL

BI-DIRECTIONAL BIKE LANE

H. WHYTOCK

B. JANSSEN

A. SMITH

N. SARTORI

16/08/18

20/06/19

-

16

SHARON STREET LONG SECTION

Revision :

File :

Original sheet size:

AMENDMENTS

Approved by DateRevision Description

DRAFT 3PRELIMINARY DESIGN

Plot Date:

BAYLEY JANSSENPlotted By:

11/07/2019

Sheet: Reference:

OF 18

20/06/19

20/06/19

A

GB4356.dwg

A3

- - - -

CHAINAGE

NS CL

R.L. 257.50

Sharon Street Footpath LONGITUDINAL SECTION CH 0.000 To 51.528

SCALES: H 1:300 V 1:100 (A3)

DESIGN

BACK OF FOOTPATH

0.00

4.15

10.00

13.50

15.00

16.00

17.73

18.50

20.00

25.00

30.00

35.00

36.22

40.00

42.03

44.69

44.80

262.86

262.86

263.08

263.08

263.08

263.41

263.64

263.73

263.76

263.77

263.77

263.77

263.77

263.76

263.69

263.64

263.63

263.66

263.66

263.66

263.99

264.60

264.61

264.61

264.61

264.62

264.62

264.62

263.42

263.63

263.72

263.77

263.84

263.86

263.91

264.07

264.23

264.38

264.42

264.54

264.60

I.P

. 263.415

6.18%

I.P

. 263.786

3.14%

5.00

18.20

19.04

20.00

25.00

30.00

35.00

40.00

45.00

50.00

55.00

58.22

CHAINAGE

248.23

248.23

248.21

248.16

248.14

248.12

248.13

248.11

248.10

248.11

248.11

NS CL

248.23

248.22

248.21

248.19

248.18

248.16

248.15

248.13

248.12

248.11

DES CL

R.L. 247.00

I.P

. 248.227

-0.31%

Ellis Street Kerb 3 LONGITUDINAL SECTION CH 18.200 To 58.224

SCALES: H 1:300 V 1:20 (A3)

Page 17: SHEETNo. SHEETDESC. 20/06/19 xx/xx/xx xx/xx/xx TWO-WAY

CITY OF GREATER BENDIGO

Survey

Scale:

Approved by

Design

Checked

GB4356

ELLIS STREET

FLORA HILL

BI-DIRECTIONAL BIKE LANE

H. WHYTOCK

B. JANSSEN

A. SMITH

N. SARTORI

16/08/18

20/06/19

-

17

GENERAL NOTES

Revision :

File :

Original sheet size:

AMENDMENTS

Approved by DateRevision Description

DRAFT 3PRELIMINARY DESIGN

Plot Date:

BAYLEY JANSSENPlotted By:

11/07/2019

Sheet: Reference:

OF 18

20/06/19

20/06/19

A

GB4356.dwg

A3

- - - -

FILL NOTES

1. All earthworks and compaction are to be in accordance with VicRoad's Specification

Section 204.

2. All fill materials are to be approved by the Superintendent's Representative prior to

being imported onto the site, and unless noted otherwise, shall be a clean clay based

material free of vegetation matter or contaminants.

3. All filling is to comply with AS3798-1996 Appendix B, level 1 (or 2) as specified

4. The Contractor is responsible for ensuring that all imported fill material, including

topsoil, satisfies the description for clean fill material in EPA bulletin publication No.

448 (Sep 95) and subsequent revisions. The Contractor shall provide verification

including test certificates to the Superintendent's Representative.

FOOTPATH CONSTRUCTION NOTES

1. Property storm water pipes located during works are to be plumbed to the nearest pit.

Where this is not practical, seek approval from superintendent to plumb to kerb or into

nearest storm water pipe.

2. Footpath to be constructed to SD205 unless noted otherwise.

3. Expansion joints as per SD210 to be constructed at all joins with existing footpath &

driveways.

4. SD210 Expansion joints along any new sections of footpath are to be at a maximum

separation of 14m centers as per SD205.

5. Tool joints are to be at 1.2m centers and constructed to SD210 unless noted

otherwise.

6. Batter work and associated top soiling is to be limited to 1.0m from design edge of the

footpath, unless noted otherwise. This width cannot be altered unless direct consent

from the Superintendent is sought.

GENERAL CONSTRUCTION NOTES

1. All kerb, footpath and pram crossing constructions shall have bedding/boxing

inspected by the Superintendent's Representative prior to pouring of concrete.

2. If property stormwater outlets (not already identified on plan) are located during

construction, it is the Contractors responsibility to connect them into council

underground drainage or back of kerb (As per S.D. 45 & S.D. 47) to the approval of

the Superintendent's Representative.

3. Renewal of gas and water property service conduits to be 100mmØPVC (sewer

grade).

4. All sewer man-hole covers within the footpath alignment (wholly or partly) are to be

renewed & adjusted to design finished levels unless noted otherwise or directed by

the Superintendent's Representative.

5. All redundant footpath, kerb and road seal to be saw cut and removed from site.

6. All service pits are to be renewed and matched into design surface unless noted

otherwise noted or directed by the Superintendent's Representative.

7. All TGSI's are to be Black Fibre Reinforced Resin Polymer type manufactured by ESP

Aust. Or approved equivalent. TGSI's to be cast in place on new concrete works and

installed in accordance with AS1428, unless noted otherwise or directed by the

Superintendent's Representative.

ROAD CONSTRUCTION NOTES

1. All Works to be carried out in accordance with CoGB Standard Drawings,

Specifications, approved plans and to the satisfaction of the Superintendent's

Representative.

2. These notes also refer to the latest version of the Infrastructure Design Manual (IDM)

and latest version of the IDM Standard Drawings.

3. The Project Manager is to be notified seven days prior to the commencement of

Works with a Pre-commencement meeting to be held between CoGB, the Consultant

and the Contractor. A site management plan is to be submitted prior to the

commencement of Works and prior to the onsite Pre-commencement meeting.

4. Prior to commencement of the Works, the Contractor shall provide the following:

- Source of quarry material

- N.A.T.A. approved test results for the F.C.R that is to be used

- If the source of the quarry material is changed during the course of the Works, then

new test results shall be provided.

5. Prior to commencement of Works on site, the Contractor must ensure that all matters

relating to the Occupational Health and Safety Act 2004, have been and will be

complied with.

6. On the commencement of construction, the Contractor must comply with the

recommendation of the Environment Protection Authority publication "Construction

Techniques for Sediment Pollution Control". Appropriate siltation control is to be

maintained throughout the construction and maintenance period of the Works.

7. The disposal site for spoil storage, and truck removal route, is to be submitted in

writing to, and approved by the Superintendent's Representative prior to the

commencement of Works.

8. Where Works are in the vicinity of existing services, these services are to be located

and exposed prior to commencement of the work. Relevant authorities are to be

notified 7 days prior to the Works.

9. All dimensions are in metres unless noted otherwise.

10. All levels are to Australian Height Datum (AHD) unless noted otherwise.

11. All co-ordinates are to Map Grid of Australia (MGA) unless noted otherwise.

12. The Contractor must arrange the inspection of the Works with the Superintendent's

Representative as per the hold points in the Specifications, or as directed by the

Superintendent's Representative.

13. All redundant assets are to be removed and disposed off site unless noted otherwise.

14. All service conduit trenches under road pavements, under footpaths and under

swales are to be backfilled as per IDM SD310 unless noted otherwise. Compaction

standards noted in SD310 shall be achieved.

15. Blasting is not generally accepted.

16. All existing assets affected by the Works (i.e. signs, vehicle crossings, footpaths, kerb

and line marking) shall be reinstated by the Contractor before the completion of

Works, to the satisfaction of the Superintendent's Representative.

17. At the completion of all Works, all rubbish, debris and surplus spoil shall be removed

and the site shall be cleared to the satisfaction of the Superintendent's

Representative.

18. The Contractor is to obtain a Building Permit for any structures, fences and for any

retaining walls over 1.0m in height.

19. Any infrastructure damage incurred during the Defects Liability Period noted on the

contract is the responsibility of the Contractor and is to be reinstated to the

satisfaction of the Superintendent's Representative.

20. All disturbed areas (eg. nature strips, batters, allotments and reserves) are to be

reinstated to a clean, tidy condition, top dressed with 75mm min. depth approved top

soil, and seeded with a CoGB approved blend or unless otherwise noted. Soil &

seeded treated areas must be satisfactorily established prior to the end of the

Maintenance Period otherwise further treatment is required by the Contractor.

21. Any exposed aggregate concrete works are to be achieved by sandblasting only.

Washing aggregate off with water is not permitted.

22. The Contractor shall notify the public of any impending road closures by providing

sufficient signage 2 weeks prior to construction commencing.

PAVEMENT NOTES

1. Construction of road pavements is to be in accordance with the requirements of

VicRoad's Standard Specifications for Roadworks (Section 304). Testing must be

carried out by a N.A.T.A. approved laboratory, or by calibrated nuclear densometer

test to the relevant Australian Standard.

2. Compaction tests are to be undertaken in the following locations:

- At

2

3

depth of the pavement

- At alternating sides of the road

- 1.0m in from the seal edge or lip of kerb

- At even spacings.

3. The number of compaction tests shall comply with the table below:

Location Number of Compaction tests

Court bowls 3

Intersections 2

Straights 1 per 500m2 (1/50m for 10.2m wide pvmt.)

4. Copies of the geotechnical results are to be submitted to the Superintendent's

Representative.

5. Sub-base and base materials are to be at 85% optimum moisture content (OMC)

during compaction, and maintained at 85% OMC until proof rolling.

6. Typical Compaction levels required (unless noted otherwise):

Subgrade: To be compacted to 100% standard dry density ratio.

Subbase: Flexible pavements shall be compacted in accordance with Scale C in

VicRoads table 304.082.

Compaction shall be to 98% of the maximum dry density ratio determined by the

modified compaction test.

Base: Flexible pavements shall be compacted in accordance with Scale C in VicRoads

table 304.082.

Compaction shall be to 100% of the maximum dry density ratio determined by the

modified compaction test.

7. Proof rolling of the Subgrade, Sub base and Base must be undertaken as per Section

12.7.15 of the IDM. Proof rolling will be at the expense of the contractor in accordance

with AS3798 and the requirements of section 173 and 204.12 of the VicRoad's

Specification. The Superintendent's Representative must be present during the proof

rolling. The Subgrade must not deflect more than 2mm vertically within 300mm of the

test roller in isolated locations.

8. Identification and treatment of soft areas during proof rolling shall be dealt with as per

Sections 12.7.13 and 12.7.14 of the IDM and as approved by the Superintendent's

Representative.

Page 18: SHEETNo. SHEETDESC. 20/06/19 xx/xx/xx xx/xx/xx TWO-WAY

CITY OF GREATER BENDIGO

Survey

Scale:

Approved by

Design

Checked

GB4356

ELLIS STREET

FLORA HILL

BI-DIRECTIONAL BIKE LANE

H. WHYTOCK

B. JANSSEN

A. SMITH

N. SARTORI

16/08/18

20/06/19

-

18

Reseal Region

Revision :

File :

Original sheet size:

AMENDMENTS

Approved by DateRevision Description

DRAFT 3PRELIMINARY DESIGN

Plot Date:

BAYLEY JANSSENPlotted By:

11/07/2019

Sheet: Reference:

OF 18

20/06/19

20/06/19

A

GB4356.dwg

A3

- - - -

S

o

m

e

r

v

ille

S

tr

e

e

t

S

a

y

e

r

S

tr

e

e

t

N

e

a

le

S

tr

e

e

t

T

h

e

o

d

o

r

e

S

tr

e

e

t

C

u

r

tin

S

tr

e

e

t

S

h

a

r

o

n

S

t

r

e

e

t

E

llis

S

tre

e

t

Bendigo South East College

La Trobe University

Extent of Reseal works

Reseal Kerb to Kerb