sheet 11 cul-de-sac details...1:25 (a4) 25mm mix 10 asphaltic concrete on 150mm compacted gap 40...

9
Page 158 of 248 Sheet 11 Cul-de-sac Details

Upload: others

Post on 18-Feb-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

  • Page 158 of 248

    Sheet 11 Cul-de-sac Details

  • Page 159 of 248

    Sheet 12 Footpath and Stormwater Kerb Connection Details

  • Page 160 of 248

    Sheet 13 Kerb and Channel Details

  • Page 161 of 248

    Sheet 14 Typical Subsoil Drainage Details

  • Page 162 of 248

    Sheet 15 Standard Road Swale Details

  • Page 163 of 248

    Sheet 16 Standard Road Swale Details (Cont)

  • Page 164 of 248

    Sheet 17 Accessible Crossing Details

  • Page 165 of 248

    Sheet 18 Vehicle Crossing - Residential

    2% 2%

  • Page 166 of 248

    Sheet 19 Vehicle Crossing – Commercial/Industrial

    Sheet 11: Cul-de-sac detailsSheet 12: Footpath and stormwater kerb connection detailsSheet 13: Kerb and channel detailsSheet 14: Typical subsoil and drainage detailsSheet 15: Standard road swale detailsSheet 16: Standard road details (cont'd)Sheet 17: Accessible crossing detailsSheet 18: Vehicle crossing - residentialSheet 19: Vehicle crossing - commercial/ industrial