shatin to central link · ccp sy ml imw. nex2201_c_lom_atk_c10_303.dgn. b preliminary design (sheet...
TRANSCRIPT
12
:25
:42
PM
10/0
8/2
009
wesle
yc
PR
INT
ED
BY
:
m:\
dra
win
gs\a
tkin
s\r
ep
\fin
al
rep
ort
\lo
m\N
EX
22
01
_C
_L
OM
_A
TK
_C
10
_3
02
.dg
nF
ILE
NA
ME
:
PL
OT
DR
V:
SCALE
TITLE
REV.
DESCRIPTIONREV BY DATE
DRAWN
DESIGNED
CHECKED
APPROVED
DATE
DO NOT SCALE DRAWINGS. ALL DIMENSIONS SHALL BE
VERIFIED ON SITE.
MTR CORPORATION LIMITED 2008 COPYRIGHT IN
RESPECT OF THIS DRAWING / DOCUMENT IS OWNED BY THE
MTR CORPORATION LIMITED OF HONG KONG. NO
REPRODUCTION OF THE DRAWING / DOCUMENT OR ANY PART
BY WHATEVER MEANS IS PERMITTED WITHOUT THE PRIOR
WRITTEN CONSENT OF THE MTR CORPORATION LIMITED.DESCRIPTIONREV BY DATEAPPROVED APPROVED
ORIGINATOR
CADD REF.
Defa
ult
MO
DE
LN
AM
E:
M:\
CA
D_
AD
MIN
\PL
OT
DR
IVE
R\W
IND
OW
S\P
DF
CO
LO
UR
.plt
Maps r
epro
duced w
ith p
erm
issio
n o
f th
e D
irecto
r of
Lands, c H
ong K
ong G
overn
ment
SHATIN TO CENTRAL LINK
FIGURE NO.
STAGE 0
-20
-15
-10
-5
0
+5
+10
+15
+20
mP
D
STAGE 2
STAGE 1 STAGE 3
NEX/2201 - TAW TO HUH SECTION
1 : 400 (A3)
14/AUG/2009
CCP
SY
ML
IMW
NEX2201_C_LOM_ATK_C10_302.dgn B
PRELIMINARY DESIGN
(SHEET 1 OF 3)
MA TAU WAI ROAD+9.200mPD
EXISTING BUILDING
22155 (KERB TO KERB)
23895 MIN.
-30
-20
-15
-10
-5
0
+5
+10
+15
+20
mP
D
COMPLETED DIAPHRAGM
WALL IN STAGE 2
-22.100
2nd
1st
3rd
4th
5th
6th
8th
-30
EXISTING BUILDING
9th
10th
7th
-20
-10
-5
0
+5
+10
+15
+20
mP
D
COMPLETED DIAPHRAGM
WALL IN STAGE 1CONSTRUCT DIAPHRAGM
WALL
TRAFFIC DECKING &
TOP PROP
EXISTING BUILDING
22155 (KERB TO KERB)
-30
EXISTING
BUILDING
EXISTING
BUILDING
EXISTING
BUILDING
KING POST
KING POST
CONSTRUCTION SEQUENCE FOR LOK MAN STATION (SECTION A)
23895 MIN.
EXISTING BUILDINGEXISTING
BUILDING
6600
MIN.
600
3300
MIN.
600
HOARDING
MA TAU WAI
ROAD
HOARDING
22155 (KERB TO KERB)
23895 MIN.
-10
-5
0
+5
+10
+15
+20
mP
D
-30
CONSTRUCT DIAPHRAGM
WALL
TRAFFIC DECKING &
TOP PROP
HOARDING
HOARDING
MA TAU WAI
ROAD
3300
MIN.
600
6600
MIN.
600
-25
-9.100
-23.500
-28.500
23895 MIN.
22155 (KERB TO KERB)
3300
MIN.
600
6600
MIN.
600
HOARDING
MA TAU WAI
ROAD
HOARDING
1. CARRY OUT CONDITION SURVEY BEFORE CONSTRUCTION
COMMENCE.
2. INSTALL MONITORING INSTRUMENTS AND CARRY OUT
PROTECTION WORKS TO EXISTING BUILDINGS AS
NECESSARY.
3. CARRY OUT PRE-CONSTRUCTION TRENCHING WORKS.
4. CARRY OUT DIVERSION OF UTILITIES.
1. EXCAVATE UNDER DECKING, SUPPORTING
UTILITIES. EXCAVATE TO 0.5m BELOW STRUT
LEVEL.
2. DEWATERING TO 0.5m BELOW EXCAVATION LEVEL.
3. INSTALL TEMPORARY STEEL STRUT.
4. REPEAT STEP 1 TO 3 UNTIL FINAL
EXCAVATION LEVEL REACHED. REMOVE THE 1.2m
JET GROUT SLAB AT -9.1mPD.
5. INSTALL AND TEST EARTH MAT.
STRUT @ 3m c/c TO BE
REVIEW BY GEO. TEAM
1. REMOVE OVERHEAD SIGNS. RE-LOCATE BUS STOP.
2. SET UP TRAFFIC MANAGEMENT ARRANGEMENT.
AND TEMPORARY STREET LIGHTING. MODIFY
EXISTING FOOTPATH.
3. CARRY OUT UNDERPINNING WORK IF NECESSARY.
4. CONSTRUCT GUIDE WALLS.
5. ERECT PORTABLE BARRIER AND CONSTRUCT
DIAPHRAGM WALL. RE-LOCATE CROSSINGS AND
EVA LAY-BYES AS REQUIRED.
6. INSTALL SHEAR PINS, IF SHALLOW ROCKHEAD
ENCOUNTERED.
7. CONSTRUCT 610 DIA. SOCKET H-PILE AT 6m c/c.
IT WILL USE AS KING POST DURING CONSTRUCTION
STAGE.
8. BETWEEN GRID LINE 1 TO 4, INSTALL 1.2m
THICK JET GROUT SLAB AT -9.1mPD AND 2m
THICK JET GROUT SLAB AT -23.5mPD AND
-28.5mPD.
9. EXCAVATE AND SUPPORT FIRST HALF OF TOP PROP
AND TEMPORARY TRAFFIC DECKING.
1. SWITCH TRAFFIC MANAGEMENT ARRANGEMENT.
2. CARRY OUT UNDERPINNING WORK IF
NECESSARY.
3. CONSTRUCT GUIDE WALLS.
4. CONSTRUCT DIAPHRAGM WALL WITH SHEAR PINS.
5. CONSTRUCT 610 DIA. SOCKET H-PILE AT 6m c/c,
IF APPLICABLE.
6. BETWEEN GRID LINE 1 TO 4, INSTALL 1.2m
THICK JET GROUT SLAB AT -9.1mPD AND 2m
THICK JET GROUT SLAB AT -23.5mPD AND
-28.5mPD.
7. EXCAVATE AND SUPPORT SECOND HALF OF
TOP PROP AND TRAFFIC DECKING.
8. CARRY OUT PUMPING TEST (WATER TABLE
LOWERED INSIDE BOX TO UNDERSIDE OF BASE
SLAB -22.100 mPD).
9. ON SUCCESSFUL COMPLETION OF PUMPING
TEST ALLOW WATER TABLE RECOVERY.
KING POST
-9.100
-23.500
-28.500
-20
-25
7.302
12
:25
:44
PM
10/0
8/2
009
wesle
yc
PR
INT
ED
BY
:
m:\
dra
win
gs\a
tkin
s\r
ep
\fin
al
rep
ort
\lo
m\N
EX
22
01
_C
_L
OM
_A
TK
_C
10
_3
03
.dg
nF
ILE
NA
ME
:
PL
OT
DR
V:
SCALE
TITLE
REV.
DESCRIPTIONREV BY DATE
DRAWN
DESIGNED
CHECKED
APPROVED
DATE
DO NOT SCALE DRAWINGS. ALL DIMENSIONS SHALL BE
VERIFIED ON SITE.
MTR CORPORATION LIMITED 2008 COPYRIGHT IN
RESPECT OF THIS DRAWING / DOCUMENT IS OWNED BY THE
MTR CORPORATION LIMITED OF HONG KONG. NO
REPRODUCTION OF THE DRAWING / DOCUMENT OR ANY PART
BY WHATEVER MEANS IS PERMITTED WITHOUT THE PRIOR
WRITTEN CONSENT OF THE MTR CORPORATION LIMITED.DESCRIPTIONREV BY DATEAPPROVED APPROVED
ORIGINATOR
CADD REF.
Defa
ult
MO
DE
LN
AM
E:
M:\
CA
D_
AD
MIN
\PL
OT
DR
IVE
R\W
IND
OW
S\P
DF
CO
LO
UR
.plt
Maps r
epro
duced w
ith p
erm
issio
n o
f th
e D
irecto
r of
Lands, c H
ong K
ong G
overn
ment
SHATIN TO CENTRAL LINK
FIGURE NO.
NEX/2201 - TAW TO HUH SECTION
1 : 400 (A3)
14/AUG/2009
CCP
SY
ML
IMW
NEX2201_C_LOM_ATK_C10_303.dgn B
PRELIMINARY DESIGN
(SHEET 2 OF 3)
STAGE 6
STAGE 7
CONSTRUCTION SEQUENCE FOR LOK MAN STATION (SECTION A)
1. CAST ROOF SLAB.
2. COMPLETE WATERPROOFING TO STATION ROOF.
3. COMPLETE STATION FIT OUT WORK.
4. REMOVE KING POST ABOVE BASE SLAB. LEFT-IN
KING POST BELOW BASE SLAB AS TENSION PILE.
STAGE 4
1. CAST BASE SLAB.
2. REMOVE TEMPORARY PROP LAYER 9th AND 10th.
STAGE 5
1. CAST UPPER TRACK SLAB.
2. REMOVE TEMPORARY PROP LAYER 4th, 5th, 6th
7th AND 8th.
3. CAST CONCOURSE SLAB.
4. REMOVE TEMPORARY PROP LAYER 2nd AND 3rd.
-30
-20
-15
-10
-5
0
+5
+10
+15
+20
mP
D
EXISTING BUILDING
-22.100
BACKFILL THIS STAGE
-20
-15
-10
-5
0
+5
+10
+15
+20
mP
D
STRUT @ 3m c/c
2nd
1st
3rd
5th
6th
7th
EXISTING BUILDING
-22.100
8th
-30
-20
-15
-10
-5
0
+5
+10
+15
+20
mP
D
STRUT @ 3m c/c
2nd
1st
3rd
4th
5th
6th
7th
EXISTING BUILDING
-22.100
8th
CAST IN BASE SLAB
TEMPORARY PROP LAYER 9th AND 10th
REMOVED AFTER BASE SLAB CAST
-30
-20
-15
-10
-5
0
+5
+10
+15
+20
mP
D
EXISTING BUILDING
-22.100
1st
-30
EXISTING
BUILDING
EXISTING
BUILDING
EXISTING
BUILDING
EXISTING
BUILDING
KING POST
KING POST
9th
10th
4th
REMOVED KING POST
3300
MIN.
600
6600
MIN.
600
22155 (KERB TO KERB)
23895 MIN.
HOARDING
MA TAU WAI
ROAD
HOARDING
22155 (KERB TO KERB)
23895 MIN.
3300
MIN.
600
6600
MIN.
600
HOARDING
MA TAU WAI
ROAD
HOARDING
22155 (KERB TO KERB)
23895 MIN.
3300
MIN.
600
6600
MIN.
600
HOARDING
MA TAU WAI
ROAD
HOARDING
22155 (KERB TO KERB)
23895 MIN.
3300
MIN.
600
6600
MIN.
600
HOARDING
MA TAU WAI
ROAD
HOARDING
1. CAST PLATFORM SLAB.
2. BACKFILL OVER UPPER ROOF SLAB TO UNDERSIDE
OF TRAFFIC DECKING
3. RECHARGE WATER TO RESTORE ORIGINAL
GROUND WATER LEVEL.
4. REINSTATE UTILITIES
7.303
12
:25
:45
PM
10/0
8/2
009
wesle
yc
PR
INT
ED
BY
:
m:\
dra
win
gs\a
tkin
s\r
ep
\fin
al
rep
ort
\lo
m\N
EX
22
01
_C
_L
OM
_A
TK
_C
10
_3
04
.dg
nF
ILE
NA
ME
:
PL
OT
DR
V:
SCALE
TITLE
REV.
DESCRIPTIONREV BY DATE
DRAWN
DESIGNED
CHECKED
APPROVED
DATE
DO NOT SCALE DRAWINGS. ALL DIMENSIONS SHALL BE
VERIFIED ON SITE.
MTR CORPORATION LIMITED 2008 COPYRIGHT IN
RESPECT OF THIS DRAWING / DOCUMENT IS OWNED BY THE
MTR CORPORATION LIMITED OF HONG KONG. NO
REPRODUCTION OF THE DRAWING / DOCUMENT OR ANY PART
BY WHATEVER MEANS IS PERMITTED WITHOUT THE PRIOR
WRITTEN CONSENT OF THE MTR CORPORATION LIMITED.DESCRIPTIONREV BY DATEAPPROVED APPROVED
ORIGINATOR
CADD REF.
Defa
ult
MO
DE
LN
AM
E:
M:\
CA
D_
AD
MIN
\PL
OT
DR
IVE
R\W
IND
OW
S\P
DF
CO
LO
UR
.plt
Maps r
epro
duced w
ith p
erm
issio
n o
f th
e D
irecto
r of
Lands, c H
ong K
ong G
overn
ment
SHATIN TO CENTRAL LINK
FIGURE NO.
NEX/2201 - TAW TO HUH SECTION
1 : 400 (A3)
14/AUG/2009
CCP
SY
ML
IMW
NEX2201_C_LOM_ATK_C10_304.dgn B
PRELIMINARY DESIGN
STAGE 8
STAGE 9
STAGE 10
(SHEET 3 OF 3)
TAXI
EXISTING BUILDING
-22.100
-20
-15
-10
-5
0
mP
D
+20
+5
+10
+15
23895 MIN.
22155 (KERB TO KERB)
-30
EXISTING
BUILDING
CONSTRUCTION SEQUENCE FOR LOK MAN STATION (SECTION A)
MA TAU WAI
3500
MIN.
600
6500
MIN.
600
ROAD
UPPER PART OF DIAPHRAGM
WALL REMOVED
EXISTING BUILDING
-22.100
-20
-15
-10
-5
0
mP
D
+20
+5
+10
+15
HOARDING
23895 MIN.
22155 (KERB TO KERB)
-30
MA TAU WAI
HOARDING
6500
MIN.
600
600
3500
MIN.
600
+20
ROAD
UPPER PART OF DIAPHRAGM
WALL REMOVED
EXISTING BUILDING
-22.100
-20
-15
-10
-5
0
+5
+10
+15
mP
D
23895 MIN.
22155 (KERB TO KERB)
-30
EXISTING
BUILDING
EXISTING
BUILDING1. RE-ARRANGE TRAFFIC MANAGEMENT.
2. REMOVE DECKING ON ONE HALF OF ROAD.
3. REMOVE UPPER 2m OF DIAPHRAGM WALL.
4. REINSTATE MA TAU WAI ROAD.
1. STATION STRUCTURE COMPLETED.
1. RE-ARRANGE TRAFFIC MANAGEMENT.
2. REMOVE REMAINDER OF TRAFFIC DECKING.
3. REMOVE UPPER 2m OF DIAPHRAGM WALL.
4. REINSTATE REMAINING OF MA TAU WAI ROAD.
7.304
STAGE 0 STAGE 2
STAGE 3STAGE 1
NEX/2201 - TAW TO HUH SECTION
1 : 400 (A3)
14/AUG/2009
CCP
SY
ML
IMW
NEX2201_C_LOM_ATK_C10_305.dgn B
PRELIMINARY DESIGN
LOK SHAN
ROAD EAST
FOOT
PATH
FOOT
PATHEXISTING
BUILDING
EXISTING
BUILDING
7800
-15
-10
-5
0
+5
+10
+15
+20
mPD
+15
mPD
-15
-10
-5
0
+5
+10
+15
+20
+15
LOM STATION
TYPICAL ADIT CONSTRUCTION SEQUENCE
(SHEET 1 OF 2)
EXISTING
BUILDING
EXISTING
BUILDING
7800
+11.500
-15
-10
-5
0
+5
+10
+15
+20
mPD
+15
mPD
-15
-10
-5
0
+5
+10
+15
+20
+15
PIPE PILES
HOARDING
EXISTING
BUILDING
EXISTING
BUILDING
7800
+11.500
-15
-10
-5
0
+5
+10
+15
+20
mPD
+15
mPD
-15
-10
-5
0
+5
+10
+15
+20
+15
HOARDING
EXISTING
BUILDING
EXISTING
BUILDING
-15
-10
-5
0
+5
+10
+15
+20
mPD
+15
mPD
-15
-10
-5
0
+5
+10
+15
+20
+15
PIPE PILES COMPLETED PIPE PILES
IN STAGE 1
COMPLETED TRAFFIC
DECKING IN STAGE 1
HOARDING
0.4
HH
0.6
H
+10.500
-0.450
+4.000
+8.000
-1.95 BASE SLAB
STRUT @ 4m C/C
0.000
7800
3500
3500
3500
1900
1. CARRY OUT CONDITION SURVEY BEFORE CONSTRUCTION
COMMENCE.
2. CARRY OUT PRE-CONSTRUCTION TRENCHING WORKS.
3. CARRY OUT UTILITY DIVERSION.
1. EXCAVATE UNDER DECKING, SUPPORTING
UTILITIES.
2. DEWATERING TO 0.5m BELOW EXCAVATION LEVEL.
3. EXCAVATE TO 0.5m BELOW STRUT LEVEL.
4. INSTALL TEMPORARY STRUT.
5. REPEAT STEP 2 TO 4 UNTIL FINAL EXCAVATION
LEVEL REACHED.
6. CAST BASE SLAB OF ENTRANCE STRUCTURE.
7.305
1. REMOVE OVERHEAD SIGNS.
2. SET UP TRAFFIC MANAGEMENT ARRANGEMENT.
3. INSTALL PIPE PILES (DEPTH REFER TO STAGE 4).
4. INSTALL GROUT CURTAIN.
5. EXCAVATE AND INSTALL FIRST PORTION OF
TEMPORARY TRAFFIC DECKING.
1. SWITCH TRAFFIC MANAGEMENT ARRANGEMENT.
2. INSTALL PIPE PILES (DEPTH REFER TO STAGE 4).
3. INSTALL GROUT CURTAIN.
4. EXCAVATE AND SUPPORT SECOND PORTION OF
TRAFFIC DECKING AND CONNECT THE TRAFFIC
DECKING BETWEEN SATGE 1 & STAGE 2.
5. CARRY OUT PUMPING TEST, WATER TABLE
LOWERED INSIDE EXCAVATION AREA TO
UNDERSIDE OF BASE SLAB.
6. ON SUCCESSFUL COMPLETION OF PUMPING
TEST ALLOW WATER TABLE RECOVERY.
+11.50
TRAFFIC DECKING
5:1
5:2
8 P
M10/0
8/2
009
dic
kyw
PR
INT
ED
BY
:
m:\
dra
win
gs\a
tkin
s\r
ep\f
inal
report
\LO
M\N
EX
2201_C
_L
OM
_A
TK
_C
10_305.d
gn
FIL
EN
AM
E:
PL
OT
DR
V:
SCALE
TITLE
REV.
DESCRIPTIONREV BY DATE
DRAWN
DESIGNED
CHECKED
APPROVED
DATE
DO NOT SCALE DRAWINGS. ALL DIMENSIONS SHALL BE
VERIFIED ON SITE.
MTR CORPORATION LIMITED 2008 COPYRIGHT IN
RESPECT OF THIS DRAWING / DOCUMENT IS OWNED BY THE
MTR CORPORATION LIMITED OF HONG KONG. NO
REPRODUCTION OF THE DRAWING / DOCUMENT OR ANY PART
BY WHATEVER MEANS IS PERMITTED WITHOUT THE PRIOR
WRITTEN CONSENT OF THE MTR CORPORATION LIMITED.DESCRIPTIONREV BY DATEAPPROVED APPROVED
ORIGINATOR
CADD REF.
Defa
ult
MO
DE
LN
AM
E:
M:\
CA
D_
AD
MIN
\PL
OT
DR
IVE
R\W
IND
OW
S\A
3_
PD
F C
OL
OU
R.p
lt
Maps r
epro
duced w
ith p
erm
issio
n o
f th
e D
irecto
r of
Lands, c H
ong K
ong G
overn
ment
SHATIN TO CENTRAL LINK
FIGURE NO.
STAGE 4 STAGE 6
STAGE 7STAGE 5
NEX/2201 - TAW TO HUH SECTION
1 : 400 (A3)
14/AUG/2009
CCP
SY
ML
IMW
NEX2201_C_LOM_ATK_C10_306.dgn B
PRELIMINARY DESIGN
0 2 4 6 8 10
METRES
1 : 400
1. ENTRANCE STRUCTURE COMPLETED.
LOM STATION
TYPICAL ADIT CONSTRUCTION SEQUENCE
(SHEET 2 OF 2)
-15
-10
-5
0
+5
+10
+15
+20
mPD
+15
mPD
-15
-10
-5
0
+5
+10
+15
+20
+15
-0.450
-1.950
TEMPORARY PROP NO.1
INSTALLED THIS STAGE
CAST SIDE WALL
CAST ROOF SLAB
NEW DECKING SUPPORT
1st STRUT
2nd STRUT
3rd STRUT
4th STRUT
+5.250
7800
-15
-10
-5
0
+5
+10
+15
+20
mPD
+15
mPD
-15
-10
-5
0
+5
+10
+15
+20
+15
-0.450
-1.950
+5.250
7800
-15
-10
-5
0
+5
+10
+15
+20
mPD
+15
mPD
-15
-10
-5
0
+5
+10
+15
+20
+15
-0.450
-1.950
+5.250
7800
-15
-10
-5
0
+5
+10
+15
+20
mPD
+15
mPD
-15
-10
-5
0
+5
+10
+15
+20
+15
-0.450
-1.950
+5.250
7800
BACKFILL THIS STAGE
WATERPROOFING LAYER
REMOVE TEMPORARY
PROP NO.1 THIS
STAGE
REMOVE TRAFFIC DECKING
+11.500
EXISTING
BUILDING
EXISTING
BUILDING
HOARDING
EXISTING
BUILDING
EXISTING
BUILDING
HOARDING
EXISTING
BUILDING
EXISTING
BUILDING
HOARDING
EXISTING
BUILDING
EXISTING
BUILDING
FOOT
PATH
LOK SHAN
ROAD EAST
FOOT
PATH
3500
3500
3500
PORTION 2
PORTION 1
STRUT REMOVED
AT THIS STAGE
1. REMOVE 4th LAYER TEMPORARY STRUT.
2. CAST SMOOTHING LAYER AGAINST EXCAVATED
SURFACE FOR LOWER PORTION SIDE WALL.
3. INSTALL WATERPROOFING LAYER.
4. INFILL CONCRETE BETWEEN ENTRANCE
STRUCTURE AND EXCAVATED SURFACE
EXTEND WATERPROOFING.
5. CAST ENTRANCE SIDE WALL TO BOTTOM OF 3rd
LAYER OF TEMPORARY STRUT.
6. INSTALL TEMPORARY PROP NO.1.
7. REMOVE 3rd LAYER TEMPORARY STRUT.
8. CAST SMOOTHING LAYER AND EXTEND
WATER PROOF LAYER.
9. CAST REMAINING POSTION OF ENTRANCE
SIDE WALL AND CAST ROOF SLAB.
10. SUPPORT TRAFFIC DECKING ON ROOF SLAB.
7.306
1. REMOVE TEMPORARY PROP NO. 1.
2. COMPLETE ENTRANCE FIT OUT WORKS.
3. COMPLETE INFILL PANELS ON ROOF SLAB.
4. COMPLETE WATERPROOFING AND PROTECTION
LAYER TO ROOF SLAB.
5. REMOVE 2nd LAYER OF TEMPORARY STRUT AND
TEMPORARY PROP No.1.
6. BACKFILL TO UNDERSIDE OF TRAFFIC DECKING
AND REMOVE 1st LAYER OF STRUT.
7. REINSTATE UTILITIES.
8. RECHARGE WATER TO RESTORE ORIGINAL
GROUND WATER LEVEL.
1. REMOVAL OF TRAFFIC DECKING AND PIPE PILES
WALL FOR PORTION 1 TO 2m BELOW GROUND LEVEL.
2. REINSTATE LOK SHAN ROAD EAST FOR PORTION 1.
3. RE-ARRANGE TRAFFIC MANAGEMENT.
4. REMOVAL OF TRAFFIC DECKING AND PIPE PILES
WALL FOR PORTION 2 TO 2m BELOW GROUND LEVEL.
5. REINSTATE REMAINING OF LOK SHAN ROAD EAST
TO PORTION 2.
5:1
5:3
2 P
M10/0
8/2
009
dic
kyw
PR
INT
ED
BY
:
m:\
dra
win
gs\a
tkin
s\r
ep
\fin
al
rep
ort
\LO
M\N
EX
22
01
_C
_L
OM
_A
TK
_C
10
_3
06
.dg
nF
ILE
NA
ME
:
PL
OT
DR
V:
SCALE
TITLE
REV.
DESCRIPTIONREV BY DATE
DRAWN
DESIGNED
CHECKED
APPROVED
DATE
DO NOT SCALE DRAWINGS. ALL DIMENSIONS SHALL BE
VERIFIED ON SITE.
MTR CORPORATION LIMITED 2008 COPYRIGHT IN
RESPECT OF THIS DRAWING / DOCUMENT IS OWNED BY THE
MTR CORPORATION LIMITED OF HONG KONG. NO
REPRODUCTION OF THE DRAWING / DOCUMENT OR ANY PART
BY WHATEVER MEANS IS PERMITTED WITHOUT THE PRIOR
WRITTEN CONSENT OF THE MTR CORPORATION LIMITED.DESCRIPTIONREV BY DATEAPPROVED APPROVED
ORIGINATOR
CADD REF.
Defa
ult
MO
DE
LN
AM
E:
M:\
CA
D_
AD
MIN
\PL
OT
DR
IVE
R\W
IND
OW
S\A
3_
PD
F C
OL
OU
R.p
lt
Maps r
epro
duced w
ith p
erm
issio
n o
f th
e D
irecto
r of
Lands, c H
ong K
ong G
overn
ment
SHATIN TO CENTRAL LINK
FIGURE NO.
SCALE
TITLE
REV.
DESCRIPTIONREV BY DATE
DRAWN
DESIGNED
CHECKED
APPROVED
DATE
DO NOT SCALE DRAWINGS. ALL DIMENSIONS SHALL BE
VERIFIED ON SITE.
MTR CORPORATION LIMITED 2008 COPYRIGHT IN
RESPECT OF THIS DRAWING / DOCUMENT IS OWNED BY THE
MTR CORPORATION LIMITED OF HONG KONG. NO
REPRODUCTION OF THE DRAWING / DOCUMENT OR ANY PART
BY WHATEVER MEANS IS PERMITTED WITHOUT THE PRIOR
WRITTEN CONSENT OF THE MTR CORPORATION LIMITED.DESCRIPTIONREV BY DATEAPPROVED APPROVED
ORIGINATOR
CADD REF.
SHATIN TO CENTRAL LINK
FIGURE NO.
HIN KENG
ESTATE
A
-
A
-
A
-
A
-
ENPF
NEX/2201 - TAW TO HUH SECTION
1 : 2000 (A3)
14/AUG/2009
KTH
IMW
NEX2201_K_HIK_MCA_C01_002A.dgn A
PRELIMINARY DESIGN
22.401
HIN KENG
ESTATE
HIN KENG
ESTATE
HIN KENG
ESTATE
PROPOSED
EXCAVATION
LEVEL
GROUTING
TO PROPOSED
EXCAVATION LEVEL
CONSTRUCTION SEQUENCE
AT-GRADE BOX SECTION AT HIN KENG
(SHEET 1 OF 2)
KYF