shapp pond dam removal project, culverts, & local water regulations

43
SHAPP POND DAM REMOVAL PROJECT CULVERTS LOCAL WATER REGULATIONS

Upload: smc427

Post on 08-Feb-2017

119 views

Category:

Environment


1 download

TRANSCRIPT

Page 1: Shapp Pond Dam Removal Project, Culverts, & Local Water Regulations

SHAPP POND DAM REMOVAL PROJECT

CULVERTS

LOCAL WATER REGULATIONS

Page 2: Shapp Pond Dam Removal Project, Culverts, & Local Water Regulations

WHAT IS A CONSERVATION DISTRICT??

• A CONSERVATION DISTRICT FOCUSES ON NATURAL RESOURCE PROBLEMS AND SOLUTIONS.  THE DISTRICT PROVIDES TECHNICAL ASSISTANCE AS WELL AS EDUCATION ON SOIL, WATER AND RELATED NATURAL RESOURCES.  MUNICIPALITIES, FARMERS AND LANDOWNERS USE THIS INFORMATION IN MAKING PROPER LAND USE DECISIONS.  IN ADDITION, THE DISTRICT ASSISTS OTHER ENVIRONMENTAL ORGANIZATIONS IN THE EXPANSION OF PUBLIC SERVICE.

Page 3: Shapp Pond Dam Removal Project, Culverts, & Local Water Regulations

SHAPP POND DAMIN THE BEGINNING…

Page 4: Shapp Pond Dam Removal Project, Culverts, & Local Water Regulations
Page 5: Shapp Pond Dam Removal Project, Culverts, & Local Water Regulations

SHAPP POND DAM CONSTRUCTION BEGINS

Page 6: Shapp Pond Dam Removal Project, Culverts, & Local Water Regulations

ACCESSING THE SITE

Page 7: Shapp Pond Dam Removal Project, Culverts, & Local Water Regulations

DEWATERING

Page 8: Shapp Pond Dam Removal Project, Culverts, & Local Water Regulations

Demolition and Removal

Page 9: Shapp Pond Dam Removal Project, Culverts, & Local Water Regulations

Restoration

Page 10: Shapp Pond Dam Removal Project, Culverts, & Local Water Regulations
Page 11: Shapp Pond Dam Removal Project, Culverts, & Local Water Regulations

CULVERT INVENTORY, ASSESSMENT AND PRIORITIZATION PROJECT

• INVENTORY ROAD-STREAM CULVERT CROSSINGS• ASSESS CULVERT

• CONDITION• INLET & OUTLET• BANK

• PRIORITIZE• LOCAL HIGHWAY NEEDS• AQUATIC CONNECTIVITY• RESILIENCY/FLOODING

Page 12: Shapp Pond Dam Removal Project, Culverts, & Local Water Regulations
Page 13: Shapp Pond Dam Removal Project, Culverts, & Local Water Regulations
Page 14: Shapp Pond Dam Removal Project, Culverts, & Local Water Regulations
Page 15: Shapp Pond Dam Removal Project, Culverts, & Local Water Regulations

WATER REGULATIONS FEDERAL AND STATE LEVEL

• US EPA• CLEAN WATER ACT

• ESTABLISHED THE BASIC STRUCTURE FOR REGULATING POLLUTANT DISCHARGES INTO THE WATERS OF THE UNITED STATES.• GAVE EPA THE AUTHORITY TO IMPLEMENT POLLUTION CONTROL PROGRAMS SUCH AS SETTING WASTEWATER STANDARDS FOR

INDUSTRY.• MAINTAINED EXISTING REQUIREMENTS TO SET WATER QUALITY STANDARDS FOR ALL CONTAMINANTS IN SURFACE WATERS.• MADE IT UNLAWFUL FOR ANY PERSON TO DISCHARGE ANY POLLUTANT FROM A POINT SOURCE INTO NAVIGABLE WATERS,

UNLESS A PERMIT WAS OBTAINED UNDER ITS PROVISIONS.• RECOGNIZED THE NEED FOR PLANNING TO ADDRESS THE CRITICAL PROBLEMS POSED BY NONPOINT SOURCE POLLUTION.

• NYS DEPARTMENT OF ENVIRONMENTAL CONSERVATION (DEC)• WASTEWATER TREATMENT• PESTICIDES, PETROLEUM, CHEMICALS STORAGE AND HANDLING• SOLID WASTE, HAZARDOUS WASTE

Page 16: Shapp Pond Dam Removal Project, Culverts, & Local Water Regulations

STORMWATER MANAGEMENT IS MANDATED BY THE US ENVIRONMENTAL PROTECTION AGENCY (EPA)

• REQUIRED BY THE 1987 AMENDMENTS TO CLEAN WATER ACT

• Implemented in NYS by the DEC and regulated municipalities

• NYS DEC issued “General Permits” to regulate stormwater discharges from construction sites and municipalities

WATER REGULATIONS THE LOCAL LEVEL

Page 17: Shapp Pond Dam Removal Project, Culverts, & Local Water Regulations

New York State Pollutant Discharge Elimination System (SPDES) Stormwater General Permits

SPDES General Permit for Stormwater Discharges from Construction Activity Regulates Construction Activities that disturb 1 acre or more of land

SPDES General Permit for Stormwater Discharges from Municipal Separate Storm Sewer Systems (MS4s)Regulates MS4s located in “urbanized areas”

Page 18: Shapp Pond Dam Removal Project, Culverts, & Local Water Regulations

SPDES General Permit for Stormwater Discharges from Municipal Separate Storm Sewer Systems (MS4s)Regulates MS4s located in “urbanized areas”

MS4: A CONVEYANCE OR SYSTEM OF CONVEYANCES OWNED BY A STATE, CITY, TOWN, VILLAGE, OR OTHER PUBLIC ENTITY THAT DISCHARGES TO THE WATERS OF THE UNITED STATES

Page 19: Shapp Pond Dam Removal Project, Culverts, & Local Water Regulations

Regulated MS4s in NYS• Minimum population of 50,000 and• Minimum average population density of 1000 persons per sq. mile (based on the 2010 Census data)

Page 20: Shapp Pond Dam Removal Project, Culverts, & Local Water Regulations

REGULATED MS4 STORMWATER MANAGEMENT PROGRAM

1. Public education and outreach2. Public participation &

involvement3. Illicit discharge detection and

elimination4. Construction site runoff

control5. Post-construction site runoff

control 6. Pollution prevention &

good housekeeping of municipal operations

Page 21: Shapp Pond Dam Removal Project, Culverts, & Local Water Regulations

SPDES General Permit for Stormwater Discharges from Construction Activity Regulates Construction Activities that disturb 1 acre or more of land

Page 22: Shapp Pond Dam Removal Project, Culverts, & Local Water Regulations

WHO NEEDS A PERMIT?• ANYONE DISTURBING 1 ACRE OR MORE

OF SOIL (ABOUT 208' X 208')• EVEN IF THE SOIL IS NOT ALL EXPOSED AT

THE SAME TIME• INCLUDING SINGLE-FAMILY HOMES IN

SUBDIVISIONS• SOMETIMES SMALLER PROJECTS, IN

PROTECTED WATERSHEDS OR SENSITIVE AREAS

Page 23: Shapp Pond Dam Removal Project, Culverts, & Local Water Regulations

ACTIVITIES REQUIRING PERMIT COVERAGE

• GRADING • EXCAVATING • FILLING• STOCKPILING• DEMOLITION• CLEAR-CUTTING • CLEARING AND

GRUBBING • TREE CUTTING AND

SKIDDING• BRUSH ROOT

REMOVAL• STUMP REMOVAL

Page 24: Shapp Pond Dam Removal Project, Culverts, & Local Water Regulations

CONSTRUCTING STORMWATER MANAGEMENT PRACTICES

RETENTION GREEN INFRASTRUCTURE

Page 25: Shapp Pond Dam Removal Project, Culverts, & Local Water Regulations

PONDS: WATER QUANTITY CONTROL

• OLD TECHNOLOGY: DETENTION BASINS (DRY BASINS) – THEY PROVIDE ONLY FLOOD CONTROL

New standards: Retention Basins (Wet Ponds) – they provide water quality treatment and flood protection

outlet

Page 26: Shapp Pond Dam Removal Project, Culverts, & Local Water Regulations

FOREBAY: WATER QUALITY CONTROL

• POND WITH A FOREBAY (A SMALL POND CELL AT THE INLET) AND A ROCK-LINED SPILLWAY TO THE PERMANENT POOL PROVIDE SEDIMENT SETTLING AND WATER QUALITY TREATMENT

Forebay that has not been cleaned – forebays must be dredged when the sediment accumulates to 50% of the capacity

flow direction

flow direction

Page 27: Shapp Pond Dam Removal Project, Culverts, & Local Water Regulations

POND CONSTRUCTIONForebay• Small pond “cell”

at inlet • Berm between

forebay and main pond

• Spillway in berm

Page 28: Shapp Pond Dam Removal Project, Culverts, & Local Water Regulations

POND CONSTRUCTIONForebay• Small pond “cell”

at inlet • Berm between

forebay and main pond

• Spillway in berm

Page 29: Shapp Pond Dam Removal Project, Culverts, & Local Water Regulations

POND CONSTRUCTIONForebay• Small pond “cell”

at inlet • Berm between

forebay and main pond

• Spillway in berm

Page 30: Shapp Pond Dam Removal Project, Culverts, & Local Water Regulations

AQUATIC BENCH: WATER QUALITY TREATMENT

• POND CONSTRUCTED WITHOUT AQUATIC BENCH – NOT IN COMPLIANCE WITH DEC TECHNICAL STANDARDS, POOR SLOPE STABILITY AND HABITAT

Aquatic bench – provides vegetation for pollutant filtering and habitat for fish and frogs that feed on mosquitoes

Page 31: Shapp Pond Dam Removal Project, Culverts, & Local Water Regulations

AQUATIC BENCH: WATER QUALITY TREATMENT

• NO AQUATIC BENCH – LIMITED SPACE FOR PLANTS FOR FILTERING AND HABITAT

The Aquatic Bench is a flat shelf below the permanent water level – use a survey level to make sure it is 12-18″ below the low flow orifice

Page 32: Shapp Pond Dam Removal Project, Culverts, & Local Water Regulations

Aquatic Bench• Flat shelf 12-18″

below water surface

• Extends up to 15 feet into pond

• Irregular shape• Pond slopes 3:1

(h:v) or less – otherwise a fence is required

POND CONSTRUCTION

Page 33: Shapp Pond Dam Removal Project, Culverts, & Local Water Regulations

Aquatic Bench• Flat shelf 12-18″

below water surface

• Extends up to 15 feet into pond

• Irregular shape• Pond slopes 3:1

(h:v) or less – otherwise a fence is required

POND CONSTRUCTION

Page 34: Shapp Pond Dam Removal Project, Culverts, & Local Water Regulations

Aquatic Bench• Flat shelf 12-18″

below water surface

• Extends up to 15 feet into pond

• Irregular shape• Pond slopes 3:1

(h:v) or less – otherwise a fence is required

POND CONSTRUCTION

Page 35: Shapp Pond Dam Removal Project, Culverts, & Local Water Regulations

Aquatic Bench• Flat shelf 12-18″

below water surface

• Extends up to 15 feet into pond

• Irregular shape• Pond slopes 3:1

(h:v) or less – otherwise a fence is required

POND CONSTRUCTION

Page 36: Shapp Pond Dam Removal Project, Culverts, & Local Water Regulations

Establish proper depth in ponds to preserve water qualityProtect existing vegetation during and after construction to reduce runoff

too shallow!

Page 37: Shapp Pond Dam Removal Project, Culverts, & Local Water Regulations

GREEN INFRASTRUCTUREOBJECTIVE:• REDUCE RUNOFF AND IMPROVE WATER QUALITY• BIORETENTION• RAIN GARDEN• INFILTRATION BASIN• DRY SWALEINSTALLATION:• USE LIGHT EQUIPMENT TO MINIMIZE SOIL COMPACTION• USE TOPSOIL TO ACHIEVE BEST INFILTRATION• PERFORM SOIL RESTORATION BEFORE PLANTING

Page 38: Shapp Pond Dam Removal Project, Culverts, & Local Water Regulations

BIORETENTION / RAIN GARDEN

• STONE/GRAVEL BASE• OPTIONAL

UNDERDRAIN• OVERFLOW INLET

• Observation port• Topsoil for planting

Page 39: Shapp Pond Dam Removal Project, Culverts, & Local Water Regulations

BIORETENTION / RAIN GARDEN

Page 40: Shapp Pond Dam Removal Project, Culverts, & Local Water Regulations

Bioretention / Rain Garden

Page 41: Shapp Pond Dam Removal Project, Culverts, & Local Water Regulations

INFILTRATION AND DRY SWALE• GRADUAL SIDE SLOPES• MOWABLE SURFACE• UNDERDRAIN • NO WOODY PLANTS

• Observation port (infiltration basin)

• Forebay (infiltration basin)

Page 42: Shapp Pond Dam Removal Project, Culverts, & Local Water Regulations

GREEN INFRASTRUCTURE CONCERNS

• SOILS ARE A KEY COMPONENT:• HEAVY EQUIPMENT COMPACTS SOIL• DE-COMPACTION MAY BE REQUIRED• USING HEAVY NATIVE SOILS INHIBITS INFILTRATION

Page 43: Shapp Pond Dam Removal Project, Culverts, & Local Water Regulations

THANK YOU!

BRIAN F. SCORALICKEXECUTIVE DIRECTOR

DUTCHESS COUNTY SOIL & WATER CONSERVATION DISTRICT