![Page 1: SH5K+ Hybrid Inverter Overview & Installation · PDF fileBattery Type Li-ion LG 1 /3 Lead-acid Narada L i- onPyl Ba t er yT p 2/3 9 (1) Tab.6-2 for grid parameter details Z e ro- xp](https://reader031.vdocuments.mx/reader031/viewer/2022030417/5aa313847f8b9a1f6d8e1601/html5/thumbnails/1.jpg)
www.sungrowpower.com �
SH5K+ Hybrid Inverter Overview & Installation
�
�
![Page 2: SH5K+ Hybrid Inverter Overview & Installation · PDF fileBattery Type Li-ion LG 1 /3 Lead-acid Narada L i- onPyl Ba t er yT p 2/3 9 (1) Tab.6-2 for grid parameter details Z e ro- xp](https://reader031.vdocuments.mx/reader031/viewer/2022030417/5aa313847f8b9a1f6d8e1601/html5/thumbnails/2.jpg)
www.sungrowpower.com 2 2
01 SH5K+
![Page 3: SH5K+ Hybrid Inverter Overview & Installation · PDF fileBattery Type Li-ion LG 1 /3 Lead-acid Narada L i- onPyl Ba t er yT p 2/3 9 (1) Tab.6-2 for grid parameter details Z e ro- xp](https://reader031.vdocuments.mx/reader031/viewer/2022030417/5aa313847f8b9a1f6d8e1601/html5/thumbnails/3.jpg)
www.sungrowpower.com 3 3
Router
SolarInfo Server
SolarInfo Moni SolarInfo Bank
ü Sungrow Samsungü LG Chemü GCLü ZTE Pylon
![Page 4: SH5K+ Hybrid Inverter Overview & Installation · PDF fileBattery Type Li-ion LG 1 /3 Lead-acid Narada L i- onPyl Ba t er yT p 2/3 9 (1) Tab.6-2 for grid parameter details Z e ro- xp](https://reader031.vdocuments.mx/reader031/viewer/2022030417/5aa313847f8b9a1f6d8e1601/html5/thumbnails/4.jpg)
www.sungrowpower.com 4 4
New features:
ü Compact CT energy meter (100 A) -> easy to workaround a cramped meter box;
ü Up to 5 kW of off-grid Emergency Power System (EPS) via EPS control box;
ü Four buttons which are intuitive, easy and efficient to operate;
ü Charge a battery from the grid (e.g. during off-peak periods);
ü Customisable battery usage time (two time periods each on weekdays and weekends);
ü Integrated earth fault alarm buzzer; and
ü Night-time import power measurement. Features
ü Smart Energy Management System (EMS)
ü Zero or partial export
ü WiFi monitoring
![Page 5: SH5K+ Hybrid Inverter Overview & Installation · PDF fileBattery Type Li-ion LG 1 /3 Lead-acid Narada L i- onPyl Ba t er yT p 2/3 9 (1) Tab.6-2 for grid parameter details Z e ro- xp](https://reader031.vdocuments.mx/reader031/viewer/2022030417/5aa313847f8b9a1f6d8e1601/html5/thumbnails/5.jpg)
www.sungrowpower.com 5 5
During the day: ü the solar power generates
power to supply loads;ü the extra power can charge a
battery;ü loads unmet by PV/ the battery
draw power from the grid.
Day
Loads consumption
PV power generation
No currentWith current
ChargingDischarging
No currentWith currentNight
Loads consumption
Discharging
No currentWith currentNight (empty battery)
Loads consumption
At night:ü the battery will discharge to
supply the loads;ü it does not draw the power
from the grid, if the battery can supply enough power to the loads;
At night with empty battery, ü it will draw the power from the
grid.ü the grid can also charge the
battery from the grid.
![Page 6: SH5K+ Hybrid Inverter Overview & Installation · PDF fileBattery Type Li-ion LG 1 /3 Lead-acid Narada L i- onPyl Ba t er yT p 2/3 9 (1) Tab.6-2 for grid parameter details Z e ro- xp](https://reader031.vdocuments.mx/reader031/viewer/2022030417/5aa313847f8b9a1f6d8e1601/html5/thumbnails/6.jpg)
www.sungrowpower.com 6 6
With an STB5K backup box connected, the system is capable of operating as an off-grid system to ensure an Emergency Power System (EPS) for emergency loads in the event of a grid interruption or blackout.
STB5K
Emergency appliance
Home appliance
No currentWith current
![Page 7: SH5K+ Hybrid Inverter Overview & Installation · PDF fileBattery Type Li-ion LG 1 /3 Lead-acid Narada L i- onPyl Ba t er yT p 2/3 9 (1) Tab.6-2 for grid parameter details Z e ro- xp](https://reader031.vdocuments.mx/reader031/viewer/2022030417/5aa313847f8b9a1f6d8e1601/html5/thumbnails/7.jpg)
www.sungrowpower.com 7 7
ü Max. off-grid power (PV + battery): 5 kWü Max. off-grid power (battery only): 3 kW;
and
ü Max. switch time to EPS mode: 10 s.
2/5Settings
Off-grid Setting
Bat Usage Time
Forced Charge
Off-grid Setting
Enable
DisableBackup SOC 099 %
Off-grid Setting
Menu
Run Info
ON / OFF
1/2
Settings
Password:
1 1 1
Settings
The battery will be utilized down to this
level at most when connected to the
grid. This ensures some battery
reserves in the event of a blackout.
Q: What if my battery is already
depleted from daily cycles when the
grid cuts out?
000
![Page 8: SH5K+ Hybrid Inverter Overview & Installation · PDF fileBattery Type Li-ion LG 1 /3 Lead-acid Narada L i- onPyl Ba t er yT p 2/3 9 (1) Tab.6-2 for grid parameter details Z e ro- xp](https://reader031.vdocuments.mx/reader031/viewer/2022030417/5aa313847f8b9a1f6d8e1601/html5/thumbnails/8.jpg)
www.sungrowpower.com 8 8
Ø Battery Usage Time• Match the battery usage time to periods of peak and
shoulder electricity tariff (e.g. use battery power only between 7-10am and/or 2-8pm)
• Different usage time could be set for weekday and weekend
2/5Settings
Off-grid Setting
Bat Usage Time
Forced Charge
Menu
Run Info
ON / OFF
1/2
Settings
Password:
1 1 1
Settings Start Time 1
End Time 1
00:00
24:00Weekday Usage
Weekend UsageStart Time 2
End Time 2
00:00
24:00
Weekend Usage
Disable
Enable
Bat Usage Time
Start Time
End Time
00:00
04:00
Target SOC 040%
Forced Charge
Disable
Enable
Forced Charge
Ø Battery Forced Charge • Charge the battery using off-peak grid power
during programmable periods to the target SOC (e.g. charge between 1am-6am to 50% SOC).
![Page 9: SH5K+ Hybrid Inverter Overview & Installation · PDF fileBattery Type Li-ion LG 1 /3 Lead-acid Narada L i- onPyl Ba t er yT p 2/3 9 (1) Tab.6-2 for grid parameter details Z e ro- xp](https://reader031.vdocuments.mx/reader031/viewer/2022030417/5aa313847f8b9a1f6d8e1601/html5/thumbnails/9.jpg)
www.sungrowpower.com 9 9
Export power: 0-100%Accuracy: ±1%Adjustment time: < 8 s
Step 2: Go to Settings -> Password (111) -> Zero-export
Step 1: Installing the energy meter
How to activate the zero export on the SH5K?
Partial
Export Pwr[W] 05000
Zero-export
OFFON
Partial
1/2 2/2
Sungrow meter
Solar switch
Home Appliance
PV system
A
Meter link
Network meter
Main switch
Utility grid
![Page 10: SH5K+ Hybrid Inverter Overview & Installation · PDF fileBattery Type Li-ion LG 1 /3 Lead-acid Narada L i- onPyl Ba t er yT p 2/3 9 (1) Tab.6-2 for grid parameter details Z e ro- xp](https://reader031.vdocuments.mx/reader031/viewer/2022030417/5aa313847f8b9a1f6d8e1601/html5/thumbnails/10.jpg)
www.sungrowpower.com 10 10
The inverter now has an integrated earth fault
buzzer, in addition to the options available to
activate the earth fault alarms.
If an earth fault occurs,• the buzzer inside the inverter will beep;
• the DO2 dry-contact will switch on automatically to signal an external alarm (which is not provided); and
• the WiFi and/or Ethernet communication port can be
used to trigger a remote alarm.Relay
Buzzer220Vac
Light
ON1
COM1
Inverter DO port
DO1COM1 NO1
DO2COM2 NO2
![Page 11: SH5K+ Hybrid Inverter Overview & Installation · PDF fileBattery Type Li-ion LG 1 /3 Lead-acid Narada L i- onPyl Ba t er yT p 2/3 9 (1) Tab.6-2 for grid parameter details Z e ro- xp](https://reader031.vdocuments.mx/reader031/viewer/2022030417/5aa313847f8b9a1f6d8e1601/html5/thumbnails/11.jpg)
www.sungrowpower.com 11 11
Menu
Run Info
ON / OFF
1/2
Settings
Password:
1 1 1
Settings
4/5Settings
Earth Fault
Prot. ParamExisting Sys
Existing Sys
EnableDisable
Rate Power
Power[W] 00000
Any single-phase PV grid-connected inverters
can be retrofitted to SH5K to charge the battery.
![Page 12: SH5K+ Hybrid Inverter Overview & Installation · PDF fileBattery Type Li-ion LG 1 /3 Lead-acid Narada L i- onPyl Ba t er yT p 2/3 9 (1) Tab.6-2 for grid parameter details Z e ro- xp](https://reader031.vdocuments.mx/reader031/viewer/2022030417/5aa313847f8b9a1f6d8e1601/html5/thumbnails/12.jpg)
www.sungrowpower.com 12 12
ü Compliant to AS/NZS 4777.2:2015
DRM
DRED
• The SH5K+ supports all DRM0-DRM8 modes,
reactive power and power quality response.
• DRM modes and the resulting import and
export limits can be viewed on the LCD.
Menu
Run Info
ON / OFF
1/2
Settings
DRM State No
Import Limit 100.0%
Export Limit 100.0%
![Page 13: SH5K+ Hybrid Inverter Overview & Installation · PDF fileBattery Type Li-ion LG 1 /3 Lead-acid Narada L i- onPyl Ba t er yT p 2/3 9 (1) Tab.6-2 for grid parameter details Z e ro- xp](https://reader031.vdocuments.mx/reader031/viewer/2022030417/5aa313847f8b9a1f6d8e1601/html5/thumbnails/13.jpg)
www.sungrowpower.com 13 13
02 Installation &Monitoring
![Page 14: SH5K+ Hybrid Inverter Overview & Installation · PDF fileBattery Type Li-ion LG 1 /3 Lead-acid Narada L i- onPyl Ba t er yT p 2/3 9 (1) Tab.6-2 for grid parameter details Z e ro- xp](https://reader031.vdocuments.mx/reader031/viewer/2022030417/5aa313847f8b9a1f6d8e1601/html5/thumbnails/14.jpg)
www.sungrowpower.com 14 14
300mm150mm30
0mm
300m
m300mm
150
150
SH5K+ Installation STB5K Installation
Back view Side view
18 65
117
35 45.3
Rail
Slot
Back view
Meter Installation
Battery Installation
![Page 15: SH5K+ Hybrid Inverter Overview & Installation · PDF fileBattery Type Li-ion LG 1 /3 Lead-acid Narada L i- onPyl Ba t er yT p 2/3 9 (1) Tab.6-2 for grid parameter details Z e ro- xp](https://reader031.vdocuments.mx/reader031/viewer/2022030417/5aa313847f8b9a1f6d8e1601/html5/thumbnails/15.jpg)
www.sungrowpower.com 15 15
1 2
3
Push
PE
L
N
11 mm-19 mm
150 mm-160 mm
Torque: 1.2 N m
4
Open the enclosure lid Unscrew the nut
Lead the cable
5
![Page 16: SH5K+ Hybrid Inverter Overview & Installation · PDF fileBattery Type Li-ion LG 1 /3 Lead-acid Narada L i- onPyl Ba t er yT p 2/3 9 (1) Tab.6-2 for grid parameter details Z e ro- xp](https://reader031.vdocuments.mx/reader031/viewer/2022030417/5aa313847f8b9a1f6d8e1601/html5/thumbnails/16.jpg)
www.sungrowpower.com 16 16
1. Assemble the DC connector. 2. Rotate the DC switch to “OFF” position.
Positive Crimp Contact
Negative Crimp Contact
Crimp Contact
Positive Insulator
Cable Gland
Negative Insulator
Crimp ContactCable Gland
1 2
480.0+
-
3. Ensure that the open circuit voltage does not exceed the inverter input limit of 600 V, even under the lowest operating temperature.
optional
Backup Ctrl
![Page 17: SH5K+ Hybrid Inverter Overview & Installation · PDF fileBattery Type Li-ion LG 1 /3 Lead-acid Narada L i- onPyl Ba t er yT p 2/3 9 (1) Tab.6-2 for grid parameter details Z e ro- xp](https://reader031.vdocuments.mx/reader031/viewer/2022030417/5aa313847f8b9a1f6d8e1601/html5/thumbnails/17.jpg)
www.sungrowpower.com 17 17
4. Install the copper between SPV1+ and SPV2+ when the inverter works in parallel mode.
5. Plug the positive and negative DC connectors into the corresponding terminals until there is an audible click.
optional
![Page 18: SH5K+ Hybrid Inverter Overview & Installation · PDF fileBattery Type Li-ion LG 1 /3 Lead-acid Narada L i- onPyl Ba t er yT p 2/3 9 (1) Tab.6-2 for grid parameter details Z e ro- xp](https://reader031.vdocuments.mx/reader031/viewer/2022030417/5aa313847f8b9a1f6d8e1601/html5/thumbnails/18.jpg)
www.sungrowpower.com 18 18
Item � Description � Specification �
A � Screw � M5×12 mm � (3.0 N m) �
B � Spring washer � - � C � Washer � - � D � Cable socket � - �
E � Yellow-green cable � 6-10 mm2 copper wire or � 10-16 mm2 aluminum wire �
In no case shall the second PE connection substitute for the PE connection in the AC terminal block. Be sure to connect both PE terminals for reliable grounding. The loss of any or all warranty rights may follow if otherwise. �
![Page 19: SH5K+ Hybrid Inverter Overview & Installation · PDF fileBattery Type Li-ion LG 1 /3 Lead-acid Narada L i- onPyl Ba t er yT p 2/3 9 (1) Tab.6-2 for grid parameter details Z e ro- xp](https://reader031.vdocuments.mx/reader031/viewer/2022030417/5aa313847f8b9a1f6d8e1601/html5/thumbnails/19.jpg)
www.sungrowpower.com 19 19
LN
1. Mount the meter and hang the spilt core CT to the L line of the mains switch.
The arrow on the spilt core CT must point from the grid to the load. �
A2 B2
485
Tighten the wires to terminals A2 and B2 on the inverter.
2. Install the communication cable.
* All cables for the meter are included in the package
![Page 20: SH5K+ Hybrid Inverter Overview & Installation · PDF fileBattery Type Li-ion LG 1 /3 Lead-acid Narada L i- onPyl Ba t er yT p 2/3 9 (1) Tab.6-2 for grid parameter details Z e ro- xp](https://reader031.vdocuments.mx/reader031/viewer/2022030417/5aa313847f8b9a1f6d8e1601/html5/thumbnails/20.jpg)
www.sungrowpower.com 20 20
CANH CANL
CANL
* Communication cable included in the package
2. Install the communication cable. 1. Install electrical cables.
![Page 21: SH5K+ Hybrid Inverter Overview & Installation · PDF fileBattery Type Li-ion LG 1 /3 Lead-acid Narada L i- onPyl Ba t er yT p 2/3 9 (1) Tab.6-2 for grid parameter details Z e ro- xp](https://reader031.vdocuments.mx/reader031/viewer/2022030417/5aa313847f8b9a1f6d8e1601/html5/thumbnails/21.jpg)
www.sungrowpower.com 21 21
The digital output cable and digital input cable are included with the STB5K.
Backup control Digital input
B1 B2
SBB5K
SH5K
B1B2
3
PELN
10-15mm
40-50mm
1 2
Grid SH5K ACLoad
STB5K
![Page 22: SH5K+ Hybrid Inverter Overview & Installation · PDF fileBattery Type Li-ion LG 1 /3 Lead-acid Narada L i- onPyl Ba t er yT p 2/3 9 (1) Tab.6-2 for grid parameter details Z e ro- xp](https://reader031.vdocuments.mx/reader031/viewer/2022030417/5aa313847f8b9a1f6d8e1601/html5/thumbnails/22.jpg)
www.sungrowpower.com 22 22
Set the grid standard
Set the time
Set battery type and parameters
1
2
4
3
5
6
7
8
Set zero-export
Test earth fault alarm
Grid Standard
AG EE EG
PN PC WP
Manual Default
Date
T ime
22 / 02 / 15
07 : 38 : 08
hh : mm : ss
DD / MM / Y Y
Testing earth faultrelay and buzzer inside alarm . . .
End
Start
Li-ion Samsung
No Battery
Battery Type
Li-ion LG
1/3
Lead-acid Narada
Li-ion Pylon
Battery Type 2/3
9
(1) Tab.6-2 for grid parameter details
Zero-export
ON
OFF
Partial
1/2 Off-grid Setting
Enable
Disable
Confirm Exit?Incorrect configura-tion may cause fault!
Complete initial settings and exit
Set the reactive power
Set off-grid parameters
Set battery usage time
Weekend Usage
Weekday Usage
Bat Usage Time Start Time1
End Time1
00:00
24:00
Start Time2
End Time2
00:00
24:00
(1) The time setting is very important, which directly affects data logging.
(2) Set the protection parameters manually for “Manual”.
(2) DD, MM, and YY stand for day, mon th , and year respec t i ve ly .(3) hh, mm, and ss stand for hour, minute, and second respectively.
ON: no power will be exported to grid.
OFF: all output power will be exported to grid.
Partial: you can set the export power.
* Set backup SOC and max. discharge current if enabled.
* Automatically return to main menu after 3s.
Initializing...
Reactive Power
PFOFF
Q(u)
Q(p)Qt
OFF: Disable the reactive power regulation.
PF: power factor regulation modeQ(t): reactive power limit modeQ(p): power regulation modeQ(u): voltage regulation mode
Battery Type
Other Lead-acid
3/3
Li-ion GCL
![Page 23: SH5K+ Hybrid Inverter Overview & Installation · PDF fileBattery Type Li-ion LG 1 /3 Lead-acid Narada L i- onPyl Ba t er yT p 2/3 9 (1) Tab.6-2 for grid parameter details Z e ro- xp](https://reader031.vdocuments.mx/reader031/viewer/2022030417/5aa313847f8b9a1f6d8e1601/html5/thumbnails/23.jpg)
www.sungrowpower.com 23 23
Step 1: After installing the inverter: Green LED indicator è RunningRed LED indicator è Fault
Step 2: Find the fault code and read the relevant section of the user manual
Step 3: If unable to resolve the issue, please contact Sungrow on 1800 SUNGROW (786 476) or email [email protected] for advice.
![Page 24: SH5K+ Hybrid Inverter Overview & Installation · PDF fileBattery Type Li-ion LG 1 /3 Lead-acid Narada L i- onPyl Ba t er yT p 2/3 9 (1) Tab.6-2 for grid parameter details Z e ro- xp](https://reader031.vdocuments.mx/reader031/viewer/2022030417/5aa313847f8b9a1f6d8e1601/html5/thumbnails/24.jpg)
www.sungrowpower.com 24 24
Ethernet Connection Wi-Fi Module Connection
5000
Running
=~1000
1000
3000
16:37
(W)
+ -
Solarinfo Moni app
Conneted
With DHCP [ON] the router will allocate the IP address automatically.
![Page 25: SH5K+ Hybrid Inverter Overview & Installation · PDF fileBattery Type Li-ion LG 1 /3 Lead-acid Narada L i- onPyl Ba t er yT p 2/3 9 (1) Tab.6-2 for grid parameter details Z e ro- xp](https://reader031.vdocuments.mx/reader031/viewer/2022030417/5aa313847f8b9a1f6d8e1601/html5/thumbnails/25.jpg)
www.sungrowpower.com 25 25
5000
Running
=~1000
1000
3000
16:37
(W)
+ -
![Page 26: SH5K+ Hybrid Inverter Overview & Installation · PDF fileBattery Type Li-ion LG 1 /3 Lead-acid Narada L i- onPyl Ba t er yT p 2/3 9 (1) Tab.6-2 for grid parameter details Z e ro- xp](https://reader031.vdocuments.mx/reader031/viewer/2022030417/5aa313847f8b9a1f6d8e1601/html5/thumbnails/26.jpg)
www.sungrowpower.com 26 26
Monthly Info Annually Info Battery Info Solar Info Grid Info
![Page 27: SH5K+ Hybrid Inverter Overview & Installation · PDF fileBattery Type Li-ion LG 1 /3 Lead-acid Narada L i- onPyl Ba t er yT p 2/3 9 (1) Tab.6-2 for grid parameter details Z e ro- xp](https://reader031.vdocuments.mx/reader031/viewer/2022030417/5aa313847f8b9a1f6d8e1601/html5/thumbnails/27.jpg)
www.sungrowpower.com 27 27
Visit www.solarinfobank.com and click Register Register as a Business User
![Page 28: SH5K+ Hybrid Inverter Overview & Installation · PDF fileBattery Type Li-ion LG 1 /3 Lead-acid Narada L i- onPyl Ba t er yT p 2/3 9 (1) Tab.6-2 for grid parameter details Z e ro- xp](https://reader031.vdocuments.mx/reader031/viewer/2022030417/5aa313847f8b9a1f6d8e1601/html5/thumbnails/28.jpg)
www.sungrowpower.com 28 28
![Page 29: SH5K+ Hybrid Inverter Overview & Installation · PDF fileBattery Type Li-ion LG 1 /3 Lead-acid Narada L i- onPyl Ba t er yT p 2/3 9 (1) Tab.6-2 for grid parameter details Z e ro- xp](https://reader031.vdocuments.mx/reader031/viewer/2022030417/5aa313847f8b9a1f6d8e1601/html5/thumbnails/29.jpg)
www.sungrowpower.com 29 29
} View multiple parameters
} Daily and weekly reports
} Monitor power and energy consumption
} Monitor inverter status for proactive servicing
![Page 30: SH5K+ Hybrid Inverter Overview & Installation · PDF fileBattery Type Li-ion LG 1 /3 Lead-acid Narada L i- onPyl Ba t er yT p 2/3 9 (1) Tab.6-2 for grid parameter details Z e ro- xp](https://reader031.vdocuments.mx/reader031/viewer/2022030417/5aa313847f8b9a1f6d8e1601/html5/thumbnails/30.jpg)
www.sungrowpower.com 30 30
Load power
Grid voltage Battery SOC
PV Power
![Page 31: SH5K+ Hybrid Inverter Overview & Installation · PDF fileBattery Type Li-ion LG 1 /3 Lead-acid Narada L i- onPyl Ba t er yT p 2/3 9 (1) Tab.6-2 for grid parameter details Z e ro- xp](https://reader031.vdocuments.mx/reader031/viewer/2022030417/5aa313847f8b9a1f6d8e1601/html5/thumbnails/31.jpg)
www.sungrowpower.com 31 31
Ø Monitor the power imported from the grid
Ø Patented technology to record night-time import power even when the inverter is shut down
Ø Installers can recommend appropriate battery capacity based on customer’s consumption history
![Page 32: SH5K+ Hybrid Inverter Overview & Installation · PDF fileBattery Type Li-ion LG 1 /3 Lead-acid Narada L i- onPyl Ba t er yT p 2/3 9 (1) Tab.6-2 for grid parameter details Z e ro- xp](https://reader031.vdocuments.mx/reader031/viewer/2022030417/5aa313847f8b9a1f6d8e1601/html5/thumbnails/32.jpg)
© Copyright SUNGROW 201607 www.sungrowpower.com
If you have any questions arising from this presentation, please contact us: 1800 Sungrow (786 476) [email protected]