SH 16 Bandera, Texas November 14, 2017
SH 16 OPEN HOUSE PUBLIC MEETING
From Old San Antonio Rd to Robindale East
November 14, 2017
SH 16 Bandera, Texas November 14, 2017
SH 16 FROM: OLD SAN ANTONIO RD TO: ROBINDALE EAST
BANDERA COUNTY
OPEN HOUSE PUBLIC MEETING
November 14, 2017
5:00 pm – 7:00 pm
Bandera High School (Cafeteria)
474 Old San Antonio Rd
Bandera, Texas 78003
SH 16 Bandera, Texas November 14, 2017
Project Location
3
BEGIN PROJECT
Old San Antonio Rd
END PROJECT
Robindale East
SH 16 Bandera, Texas November 14, 2017
General Project Information
PROJECT LENGTH – Approximately 1.38 miles
SH 16 Proposed Improvements:
– Expand the existing road to four lanes with a continuous two way left turn
lane, raised median, bike accommodations, curbs, sidewalks, and
drainage improvements
– Intersection improvements at Old San Antonio Hwy East
– Reconstruct the bridge over Bandera Creek and the roadway approaches
4
SH 16 Bandera, Texas November 14, 2017
Typical Section – Existing
5
SH 16 Bandera, Texas November 14, 2017
Typical Section – Proposed
6
SH 16 Bandera, Texas November 14, 2017
Intersection Improvement at Old San Antonio Rd East
7
Existing Configuration Proposed Configuration
With Raised Median
SH 16 Bandera, Texas November 14, 2017
Crashes from 2011 to 2017
8
Type of Crash No. of Crashes Injury Accident
Intersection Related 12 7
Driveway Access 13 8
Others 37 20
Total 62 35
SH 16 Bandera, Texas November 14, 2017
YEARLY AADT COUNTS
Traffic Projection
9
0
5,000
10,000
15,000
20,000
25,000
30,000
1990 2000 2017 2020 2040 2050
AN
NU
AL A
VE
RA
GE
DA
ILY
TR
AF
FIC
(
AA
DT )
13
,10
0
21
,78
0
24
,40
0
PR
OJE
CTE
D
PR
OJE
CTE
D
4,6
00
10
,10
0
Year
14
,30
0
PR
OJE
CTE
D
SH 16 Bandera, Texas November 14, 2017
Environmental
CONSIDERATIONS
– No additional ROW needed
– Traffic Noise Analysis will be performed
– Historical and Archeological resources will be evaluated
– Portions of the proposed project are within a Federal Emergency
Management Agency (FEMA) designated 100-year floodplain
– Historical marker will be relocated
– Minimize impacts to Bandera Creek & Doe Creek
10
SH 16 Bandera, Texas November 14, 2017
Environmental Statement
The environmental review, consultation, and other actions required by
applicable Federal environmental laws for this project are being, or have been,
carried-out by TxDOT pursuant to 23 U.S.C. 327 and a Memorandum of
Understanding dated December 16, 2014, and executed by FHWA and TxDOT.
La revisión ambiental, consultas y otras acciones requeridas por las leyes
ambientales federales aplicables para este proyecto están siendo o han sido,
llevado a cabo por TxDOT ‐ en virtud de 23 USC 327 y un Memorando de
Entendimiento fechado el 16 de Diciembre del 2014, y ejecutado por la FHWA
y el TxDOT.
11
SH 16 Bandera, Texas November 14, 2017
Project Timeline
12
Years 2017 2018 2019 2020 2021 2022 2023 2024
Schematic Design/Environmental
Clearance
Detailed Design/Utility Relocation
Construction Phase*
Timescales
*Depending upon funding availability
Earliest anticipated construction date: Fall of 2022
CONSTRUCTION COST
Approx. $12 M
SH 16 Bandera, Texas November 14, 2017
Comments
13
Deadline for Comments: Wednesday, November 29, 2017
For more information visit www.txdot.gov
and search “SH 16 Bandera”
Options for Commenting
1. Complete a written comment card at the meeting tonight.
2. E-mail comments to: [email protected]
3. Provide verbal comments to the onsite court reporter.
4. Mail comments to: SH 16 Public Meeting Comment
306 1st Street N
Pflugerville, TX 78660
SH 16 Bandera, Texas November 14, 2017
Conclusion
14
THANK YOU FOR
YOUR TIME !