SH 16 Bandera, Texas November 14, 2017 SH 16 OPEN HOUSE PUBLIC MEETING From Old San Antonio Rd to Robindale East November 14, 2017

Upload: dangdung

Post on 14-Feb-2019

219 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SH 16 - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot/get-involved/sat/sh-16/presentation.pdf · SH 16 Bandera, Texas November 14, 2017 Environmental Statement The environmental

SH 16 Bandera, Texas November 14, 2017

SH 16 OPEN HOUSE PUBLIC MEETING

From Old San Antonio Rd to Robindale East

November 14, 2017

Page 2: SH 16 - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot/get-involved/sat/sh-16/presentation.pdf · SH 16 Bandera, Texas November 14, 2017 Environmental Statement The environmental

SH 16 Bandera, Texas November 14, 2017

SH 16 FROM: OLD SAN ANTONIO RD TO: ROBINDALE EAST

BANDERA COUNTY

OPEN HOUSE PUBLIC MEETING

November 14, 2017

5:00 pm – 7:00 pm

Bandera High School (Cafeteria)

474 Old San Antonio Rd

Bandera, Texas 78003

Page 3: SH 16 - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot/get-involved/sat/sh-16/presentation.pdf · SH 16 Bandera, Texas November 14, 2017 Environmental Statement The environmental

SH 16 Bandera, Texas November 14, 2017

Project Location

3

BEGIN PROJECT

Old San Antonio Rd

END PROJECT

Robindale East

Page 4: SH 16 - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot/get-involved/sat/sh-16/presentation.pdf · SH 16 Bandera, Texas November 14, 2017 Environmental Statement The environmental

SH 16 Bandera, Texas November 14, 2017

General Project Information

PROJECT LENGTH – Approximately 1.38 miles

SH 16 Proposed Improvements:

– Expand the existing road to four lanes with a continuous two way left turn

lane, raised median, bike accommodations, curbs, sidewalks, and

drainage improvements

– Intersection improvements at Old San Antonio Hwy East

– Reconstruct the bridge over Bandera Creek and the roadway approaches

4

Page 5: SH 16 - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot/get-involved/sat/sh-16/presentation.pdf · SH 16 Bandera, Texas November 14, 2017 Environmental Statement The environmental

SH 16 Bandera, Texas November 14, 2017

Typical Section – Existing

5

Page 6: SH 16 - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot/get-involved/sat/sh-16/presentation.pdf · SH 16 Bandera, Texas November 14, 2017 Environmental Statement The environmental

SH 16 Bandera, Texas November 14, 2017

Typical Section – Proposed

6

Page 7: SH 16 - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot/get-involved/sat/sh-16/presentation.pdf · SH 16 Bandera, Texas November 14, 2017 Environmental Statement The environmental

SH 16 Bandera, Texas November 14, 2017

Intersection Improvement at Old San Antonio Rd East

7

Existing Configuration Proposed Configuration

With Raised Median

Page 8: SH 16 - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot/get-involved/sat/sh-16/presentation.pdf · SH 16 Bandera, Texas November 14, 2017 Environmental Statement The environmental

SH 16 Bandera, Texas November 14, 2017

Crashes from 2011 to 2017

8

Type of Crash No. of Crashes Injury Accident

Intersection Related 12 7

Driveway Access 13 8

Others 37 20

Total 62 35

Page 9: SH 16 - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot/get-involved/sat/sh-16/presentation.pdf · SH 16 Bandera, Texas November 14, 2017 Environmental Statement The environmental

SH 16 Bandera, Texas November 14, 2017

YEARLY AADT COUNTS

Traffic Projection

9

0

5,000

10,000

15,000

20,000

25,000

30,000

1990 2000 2017 2020 2040 2050

AN

NU

AL A

VE

RA

GE

DA

ILY

TR

AF

FIC

(

AA

DT )

13

,10

0

21

,78

0

24

,40

0

PR

OJE

CTE

D

PR

OJE

CTE

D

4,6

00

10

,10

0

Year

14

,30

0

PR

OJE

CTE

D

Page 10: SH 16 - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot/get-involved/sat/sh-16/presentation.pdf · SH 16 Bandera, Texas November 14, 2017 Environmental Statement The environmental

SH 16 Bandera, Texas November 14, 2017

Environmental

CONSIDERATIONS

– No additional ROW needed

– Traffic Noise Analysis will be performed

– Historical and Archeological resources will be evaluated

– Portions of the proposed project are within a Federal Emergency

Management Agency (FEMA) designated 100-year floodplain

– Historical marker will be relocated

– Minimize impacts to Bandera Creek & Doe Creek

10

Page 11: SH 16 - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot/get-involved/sat/sh-16/presentation.pdf · SH 16 Bandera, Texas November 14, 2017 Environmental Statement The environmental

SH 16 Bandera, Texas November 14, 2017

Environmental Statement

The environmental review, consultation, and other actions required by

applicable Federal environmental laws for this project are being, or have been,

carried-out by TxDOT pursuant to 23 U.S.C. 327 and a Memorandum of

Understanding dated December 16, 2014, and executed by FHWA and TxDOT.

La revisión ambiental, consultas y otras acciones requeridas por las leyes

ambientales federales aplicables para este proyecto están siendo o han sido,

llevado a cabo por TxDOT ‐ en virtud de 23 USC 327 y un Memorando de

Entendimiento fechado el 16 de Diciembre del 2014, y ejecutado por la FHWA

y el TxDOT.

11

Page 12: SH 16 - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot/get-involved/sat/sh-16/presentation.pdf · SH 16 Bandera, Texas November 14, 2017 Environmental Statement The environmental

SH 16 Bandera, Texas November 14, 2017

Project Timeline

12

Years 2017 2018 2019 2020 2021 2022 2023 2024

Schematic Design/Environmental

Clearance

Detailed Design/Utility Relocation

Construction Phase*

Timescales

*Depending upon funding availability

Earliest anticipated construction date: Fall of 2022

CONSTRUCTION COST

Approx. $12 M

Page 13: SH 16 - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot/get-involved/sat/sh-16/presentation.pdf · SH 16 Bandera, Texas November 14, 2017 Environmental Statement The environmental

SH 16 Bandera, Texas November 14, 2017

Comments

13

Deadline for Comments: Wednesday, November 29, 2017

For more information visit www.txdot.gov

and search “SH 16 Bandera”

Options for Commenting

1. Complete a written comment card at the meeting tonight.

2. E-mail comments to: [email protected]

3. Provide verbal comments to the onsite court reporter.

4. Mail comments to: SH 16 Public Meeting Comment

306 1st Street N

Pflugerville, TX 78660

Page 14: SH 16 - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot/get-involved/sat/sh-16/presentation.pdf · SH 16 Bandera, Texas November 14, 2017 Environmental Statement The environmental

SH 16 Bandera, Texas November 14, 2017

Conclusion

14

THANK YOU FOR

YOUR TIME !