sgsy

25
SGSY

Upload: thor

Post on 13-Jan-2016

47 views

Category:

Documents


4 download

DESCRIPTION

SGSY. SGSY. Objective Strengthening income generation- Livelihood of poor Strategy Community mobilisation Formation of Sustainable SHGs Capacity Building of SHGs Focus Cluster approach Key Activity Technology input Skill Development. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: SGSY

SGSY

Page 2: SGSY

Objective

Strengthening income generation- Livelihood of poor

Strategy Community mobilisation

Formation of Sustainable SHGs Capacity Building of SHGs

Focus Cluster approach

Key Activity Technology input Skill Development

SGSY

Page 3: SGSY

Achievement 2010-11District Physical Target Loan Applications % age of

AchievementSponsored Sanctioned Disbursed

Angul 3800 2967 3 3 0

Balangir 6500 1990 59 12 0

Bargarh 5700 2100 185 78 1

Deogarh 1400 312 56 0 0

Dhenkanal 4400 1641 0 0 0

Jajpur 5500 2645 683 196 4

Jharsuguda 1000 737 0 0 0

Kendrapada 4000 1028 0 0 0

Keonjhar 6900 3886 481 212 3

Khurda 4200 1218 344 81 2

Mayurbhanj 12000 2639 103 18 0

Nayagarh 3800 2328 379 167 4

Puri 5400 809 0 0 0

Sambalpur 2900 633 21 21 1

Subarnapur 2500 245 0 0 0

Sundergarh 6000 2248 160 136 2

Total 76000 27426 2474 924

Page 4: SGSY

VILLAGE HAAT

Page 5: SGSY

Sanctioned - 90 @ 3per dist.

First Installment Released - 30

Second Installment Submitted - 24

Second Installment Released - 15

Progress

Page 6: SGSY

• Creation of better marketing facility

• Existing market in villages

• Where weekly Village Haat

• One-stop Shopping platform

• Land must be owned by the Gram Panchayat

Village Haat

Page 7: SGSY

Name of the District

2nd Installment Proposal

Submitted

2nd Installment released

Selected Block Progress

Angul √ Released

Chendipada Completed

Pallahada Do

Athamallik Under Progress

Bargarh √ Released

Bargarh Foundation Level

Sohela Roof Level

Paikmal Plinth Level

Bolangir√

Released

Saitala Roof Casted

Khaprakhol Roof Casted

Agalpur Plinth Level

Deogarh √ Released

Reamal Plinth Level

Barkote Do

Tilaibani Lintel Level

Dhenkanal √ Released

Sadar Lintel Level

Hindol Do

Kankadahada Do

Page 8: SGSY

Name of the District

2nd Installment Proposal

Submitted

2nd

Installment released

Selected Block Progress

Jajpur √ Released 

Koksora No information

Junagarh Do

Narla Do

Jharsuguda√

-

Dharmasala Roof Casted

Rasulpur Roof Level

Binjharpur Lintel level

Kendrapada Not submitted -

Derabish Plinth Level

Marshaghai Lintel Level

Rajkanika Do

Keonjhar Not submitted

Ghatgaon Lintel Level

Anandpur Roof Level

Champua Plinth Level

Khurda Not submitted Site not yet selected

Mayurbhanj √ Released

Rairangpur Lintel Level

Udala Lintel Level

Karanjia Roof Casting

Page 9: SGSY

Name of the District

2nd Installment Proposal

Submitted

2nd

Installment released

Selected Block Progress

Nayagarh √ Released

Gania Roof Casting

Dasapalla Roof Casting

Odagaon Completed

PuriNot

submitted-

Sadar Plinth Level

Delanga Do

Astaranga Do

Sambalpur √ Released

Naktideul Completed

Kuchinda Roof Casting

Rengali Plinth Level

Sonepur √ -

Dunguripali Lintel Level

Biramaharajpur Lintel Level

Ullunda Plinth Level

Sundergarh √ -

Tangarpali Completed

Lahunipada Plinth Level

Nuagaon Roof Level

Page 10: SGSY

RSETI

Page 11: SGSY

• GoI provides Rs.1.00 crore one time aid for infrastructure.

• State Government to provide land free of cost

• Each RSETI to train atleast 70% BPL youth

• Hired building for 3 years - maximum of Rs.10.00 lakhs

• Training cost @ Rs. 200/-

(Candidate/day for 4 weeks-max Rs. 4, 000/-)

• Cost towards Training Faculty, Salary and Logistic-BANK

STRUCTURE

Page 12: SGSY

IDENTIFICATION OF LAND

To Identified in consultation with Sponsoring Bank

Plan and Scheduled to be intimated to Department

Land to be transferred in the name of Sponsoring Bank

POSSETION OF LAND

Land Sketch to be submitted to NIRD

Land Sketch to be signed jointly by the Principal -ITI & LDM

PD DRDA to counter sign on the Land Sketch

Land in the premises of Block and DRDA can be identified

POLICY

Page 13: SGSY

• Training module to be designed by Bank

• DRDAs to Sponsor Trainees to RESTIs

• Cost of training to be met out of SGSY

FUNCTION

Page 14: SGSY

District BankFund

Sanctioned/Released

Status of operation

LocationStatus of Proposal

Remarks

AngulUCO Bank

- Not in Operation ITI Talcher

To be submitted by the Bank to

NIRD

Land Identified inside ITI, Talcher

Bargarh SBI - - Bheden

To be submitted by the Bank to

NIRD

Land Identified at Bheden

Block Office Premises

Bolangir SBI - - ITI Bolangir

To be submitted by the Bank to

NIRD

Industries Department has

agreed to provide land

inside ITI Bolangir premises

Deogarh CBI - - - - -

DhenkanalUCO Bank

- -Womens’

Poly Tech. Dhenkanal

To be submitted by the Bank to

NIRD

Already filed for alienation of

Land

Page 15: SGSY

District BankFund

Sanctioned/Released

Status of operation

LocationStatus of Proposal

Remarks

Jajpur SBI - -Akarabad, Barchana

-Already filed for

alienation of Land

Jharsuguda SBI - -TATA

Refractory, Belpahar

-

RSETI has been set up in the

infrastructure created by TATA

Kendrapada SBI - -Yet to be identified

- -

KeonjharBank of

India

Sanctioned1.00 CroreReleased50.00 lakh

In Operation (non-

residential) Rented

Accommodation

OSME, Keonjhar

NIRD is awaiting for

land allocation and SLBC approval

Director appointed by BoI.

KhurdaIndian

Overseas Bank

- -Yet to be identified

NIRD is awaiting for

land allocation and SLBC approval

Director appointed

Page 16: SGSY

District BankFund

SanctionedReleased

Status of operation

LocationStatus of Proposal

Remarks

MayurbhanjBank

of India

Sanctioned1.00 Cr.

Released50.00 lakh

In Operation

( non-residential)

ITI,Baripada

NIRD is awaiting for

land allocation and SLBC approval

Land alienation filed. Pending with Revenue Department for free of

premium

Nayagarh SBI - -Adjacent to

DRDA office

- -

PuriUCO Bank

ReleasedRs.10.00

lakh

In operation

Non residential

ITI, Puri

NIRD has recommende

d to MoRD for Sanction

Land to be located elsewhere as the

identified land comes under sweet water zone

Sambalpur SBI - - ITI, Hirakud -Land identified. DTET

has given clearance for land.

Sonepur SBI - -ITI,

Sonepur- -

Sundergarh SBI - -ITI,

Rourkela- -

Page 17: SGSY

Journey towards NRLM

Page 18: SGSY

Shift in Approach

SGSY NRLM

Guidelines Flexibility to States

No HR Structure Dedicated HR Structure

Allocation based Demand driven

Back-end subsidy Delivery subsidy

Interest subsidy

Focus on Self -employment

Self-employment

Skilled Wage-employment

Page 19: SGSY

Objectives

• Promotion of diversified and gainful self-employment of rural BPL HHs for sustainable rural livelihoods

• Tapping of emerging wage employment opportunities in the growing sectors of economy

19

Page 20: SGSY

• Process Driven

• Demand Driven

• Dedicated HR Structure» State Mission

» District Cell

» Block Cell- CRP @ 1 per GP

• Preparation of Action Plan - Concrete Work Plan

• Convergence with other Programme - All Mission Shakti Groups to be covered

- One person from 100 days wage earner Family to be tied up with Skill Training in desired trade

- All IAY beneficiaries

Approach

Page 21: SGSY

• Universal Social Mobilisation

• Formation of Activity based Group

• Market driven activity to be selected

• Prioritise Skill Development of rural Youth– Shift from unskilled labour to skilled labour with the aim of tapping local

livelihoods opportunities emerging in other programmes

• SHG management and Book Keeping.

• Product linkage of SHGs.

• Market linkage of products.

• Experience Sharing

Approach

Page 22: SGSY

STRATEGY

• Dedicated structure• Database of SHG to be developed• NRLM to work as a common platform for social

mobilization• Cadre of human resource - in the form of CRPs• Develop a pro-poor inclusion strategy• Develop a convergence policy at the State level

Page 23: SGSY

• One time start-up grant of Rs.1000/- to newly formed SHGs.

• Revolving funds @ Rs.15,000/- to SHG.

• Skill Development Training @ Rs.7500/- per family.

• Capital Subsidy to SHG on credit linkage (Rs.2.5 Lakh)

• Interest Subsidy upto Rs. 1 Lakh per SHG.

Proposed Guidelines

Page 24: SGSY

Thanks…

Page 25: SGSY

• Subsidy Driven

• Selection of Key Activities

• Selection of Appropriate SHG

• Little follow-up a the field level

• Ignorant beneficiary

• Reluctant Implementers

• Lack of cooperation by Banks

Concern Areas of SGSY