Sewage Sludge Incineration in BURSA, Turkey IGIP, Darmstadt, KfW, Frankfurt AWIPLAN-PPD GMBH Porschestraße 15 Phone: +49 7158 98502-32 E-mail: [email protected] PLANUNGSSOZIETÄT 70794 Filderstadt Fax: +49 7158 98502-31 Internet: www.awiplan-ppd.de Germany Project characteristics Financed by the German governmental bank, KfW, Kreditanstalt für Wiederaufbau, the implementation of sewage sludge treatment facilities at the waste water treatment plant in the city of Bursa is in reali- zation. The waste water treatment association of BURSA is processing the waste water of 2.6 million people. The total project comprises the reconstruction of 4 existing plants and the new construction of 6 plants. Technical concept: Drying of the dewatered sludge Fluidized bed incineration Generation of electricity with steam turbine Waste heat recovery Tasks carried out by AWIPLAN-PPD Key data at a glance Decision of realisation ................ 2012 Completion ................................. 2015 Capacity ...................................... 29.5 t sludge/h Capacity (24 % DM) .................... 236,000 t/a sludge Financial budget ......................... 80,000,000 € Fluidised bed incineration ........... 2 x 13,0 MW Mineral residues ......................... 20,000 t/a

Upload: others

Post on 04-Nov-2019

22 views

Category:

Documents


0 download

TRANSCRIPT

Sewage Sludge Incineration in BURSA, Turkey

IGIP, Darmstadt, KfW, Frankfurt

AWIPLAN-PPD GMBH Porschestraße 15 Phone: +49 7158 98502-32 E-mail: [email protected]

PLANUNGSSOZIETÄT 70794 Filderstadt Fax: +49 7158 98502-31 Internet: www.awiplan-ppd.de

Germany

Project characteristics

Financed by the German governmental bank, KfW,

Kreditanstalt für Wiederaufbau, the implementation

of sewage sludge treatment facilities at the waste

water treatment plant in the city of Bursa is in reali-

zation.

The waste water treatment association of BURSA

is processing the waste water of 2.6 million people.

The total project comprises the reconstruction of 4

existing plants and the new construction of 6

plants.

Technical concept:

• Drying of the dewatered sludge

• Fluidized bed incineration

• Generation of electricity with steam turbine

• Waste heat recovery

Tasks carried out by AWIPLAN-PPD

Key data at a glance Decision of realisation ................ 2012

Completion ................................. 2015

Capacity ...................................... 29.5 t sludge/h

Capacity (24 % DM) .................... 236,000 t/a sludge

Financial budget ......................... 80,000,000 €

Fluidised bed incineration ........... 2 x 13,0 MW

Mineral residues ......................... 20,000 t/a