![Page 1: Session II: Methodological requirements for projects activities ......UNFCCC secretariat, programme Firstname Lastname, Job Title Session II: Methodological requirements for projects](https://reader033.vdocuments.mx/reader033/viewer/2022060101/60b25b929bdb7e27757859de/html5/thumbnails/1.jpg)
UNFCCC secretariat, programmeFirstname Lastname, Job Title
Session II: Methodological requirements for projects activities in the renewable energy sector
Methodology ACM0002�Consolidated baseline methodology for grid-connected electricity generation
from renewable sources�DNA TRAINING Venue:
Gaj Hegde, Team Lead, Small Scale CDM Methodologies
Standards Setting Unit, Sustainable Development Mechanism Programme
![Page 2: Session II: Methodological requirements for projects activities ......UNFCCC secretariat, programme Firstname Lastname, Job Title Session II: Methodological requirements for projects](https://reader033.vdocuments.mx/reader033/viewer/2022060101/60b25b929bdb7e27757859de/html5/thumbnails/2.jpg)
OUTLINE
Overview
Applicability
Baseline identification
Additionality demonstration
Emissions Calculation
Monitoring requirements
Other energy methodologies
![Page 3: Session II: Methodological requirements for projects activities ......UNFCCC secretariat, programme Firstname Lastname, Job Title Session II: Methodological requirements for projects](https://reader033.vdocuments.mx/reader033/viewer/2022060101/60b25b929bdb7e27757859de/html5/thumbnails/3.jpg)
Overview
![Page 4: Session II: Methodological requirements for projects activities ......UNFCCC secretariat, programme Firstname Lastname, Job Title Session II: Methodological requirements for projects](https://reader033.vdocuments.mx/reader033/viewer/2022060101/60b25b929bdb7e27757859de/html5/thumbnails/4.jpg)
APPLICABILITY
Conditions (p3) and Technology types
(c) Retrofit of an existing plant
(d) Replacement of an existing plant
For hydro and geothermal: Historical operational reference, min 5 years data, prior the PAOnly first capacity addition/retrofit during the historical reference.
(b) Capacity addition
Hydro, wind, geothermal, solar, wave/tidal
(a) Greenfield sites, new power plant located where no renewable power plant was operated before;
Applicability (p2)
![Page 5: Session II: Methodological requirements for projects activities ......UNFCCC secretariat, programme Firstname Lastname, Job Title Session II: Methodological requirements for projects](https://reader033.vdocuments.mx/reader033/viewer/2022060101/60b25b929bdb7e27757859de/html5/thumbnails/5.jpg)
ACM0002 (p3) does not apply to:
1. PAs that involve switching from fossil fuels to renewable sources at the site of the PA;
2. Biomass fired power plants; and3. Hydro plants that increased existing reservoirs with power density less
than 4 W/m2.
APPLICABILITY
![Page 6: Session II: Methodological requirements for projects activities ......UNFCCC secretariat, programme Firstname Lastname, Job Title Session II: Methodological requirements for projects](https://reader033.vdocuments.mx/reader033/viewer/2022060101/60b25b929bdb7e27757859de/html5/thumbnails/6.jpg)
Baseline identification
New plants� The methodology prescribes that the baseline is the operation of grid-connected power
plants and by the addition of new generation sources, as reflected in the combined margin (CM) calculations described in the �Tool to calculate the emission factor for an electricity system�.�
Capacity addition� For the added capacity: similarly to new plants;� For existing capacity: the methodology establishes that the existing facility would
continue to supply electricity to the grid at historical levels, until the time at which the generation facility would likely be replaced or retrofitted. From that point of time onwards, the baseline scenario is assumed to correspond to the project activity, and no emission reductions are assumed to occur.
![Page 7: Session II: Methodological requirements for projects activities ......UNFCCC secretariat, programme Firstname Lastname, Job Title Session II: Methodological requirements for projects](https://reader033.vdocuments.mx/reader033/viewer/2022060101/60b25b929bdb7e27757859de/html5/thumbnails/7.jpg)
Retrofit or replacement� The methodology provides a stepwise procedure based on the �Combined
tool to identify the baseline scenario and demonstrate additionality�.! Step 1: Identify realistic and credible alternative baseline scenarios for power
generation;! Step 2: Barrier analysis; and! Step 3: Investment analysis.
Baseline identification
![Page 8: Session II: Methodological requirements for projects activities ......UNFCCC secretariat, programme Firstname Lastname, Job Title Session II: Methodological requirements for projects](https://reader033.vdocuments.mx/reader033/viewer/2022060101/60b25b929bdb7e27757859de/html5/thumbnails/8.jpg)
Additionality demonstration
Additionality Tool
![Page 9: Session II: Methodological requirements for projects activities ......UNFCCC secretariat, programme Firstname Lastname, Job Title Session II: Methodological requirements for projects](https://reader033.vdocuments.mx/reader033/viewer/2022060101/60b25b929bdb7e27757859de/html5/thumbnails/9.jpg)
Emissions calculation
Baseline emissions� CO2 emissions from electricity generation in fossil fuel fired power plants
connected to the grid that are displaced due to the project activity,! Results from the multiplication of the electricity generated by the project activity
and the emission factor from the electric power grid
Project emissions� Project emissions from fossil fuel consumption; � Project emissions from the operation of geothermal power plants due to the
release of non-condensable gases;� Project emissions from water reservoirs of hydro power plants.
Emission reductions� Baseline emissions � Project emissions.
![Page 10: Session II: Methodological requirements for projects activities ......UNFCCC secretariat, programme Firstname Lastname, Job Title Session II: Methodological requirements for projects](https://reader033.vdocuments.mx/reader033/viewer/2022060101/60b25b929bdb7e27757859de/html5/thumbnails/10.jpg)
Monitoring requirements
Key parameters� At validation
" Grid emission factor (can also be monitored ex post)� Monitored
" Electricity supplied to the grid by the project" If applicable:
� Fossil fuels combusted attributable to the project activity� Methane emissions of the project
![Page 11: Session II: Methodological requirements for projects activities ......UNFCCC secretariat, programme Firstname Lastname, Job Title Session II: Methodological requirements for projects](https://reader033.vdocuments.mx/reader033/viewer/2022060101/60b25b929bdb7e27757859de/html5/thumbnails/11.jpg)
AMS- I.D � Grid connected renewable electricity generation
� Counter part ACM0002, but covers biomass PAs� Involves renewable electricity generation units, such as photovoltaic,
hydro, tidal/wave, wind, geothermal and renewable biomass: a) Supplying electricity to a national or a regional grid; orb) Supplying electricity to an identified consumer facility via
national/regional grid through a contractual arrangement such aswheeling.
![Page 12: Session II: Methodological requirements for projects activities ......UNFCCC secretariat, programme Firstname Lastname, Job Title Session II: Methodological requirements for projects](https://reader033.vdocuments.mx/reader033/viewer/2022060101/60b25b929bdb7e27757859de/html5/thumbnails/12.jpg)
AMS- I.F - Renewable electricity generation for captive use and mini-grid
� Involves renewable electricity generation units, such as photovoltaic, hydro, tidal/wave, wind, geothermal and renewable biomass that supply electricity to user(s).
� The project activity will displace electricity that is or would have been supplied by on one or more sources : a) national/regional grid; b) fossil fuel fired captive power plant; and c) a carbon intensive mini-grid.
![Page 13: Session II: Methodological requirements for projects activities ......UNFCCC secretariat, programme Firstname Lastname, Job Title Session II: Methodological requirements for projects](https://reader033.vdocuments.mx/reader033/viewer/2022060101/60b25b929bdb7e27757859de/html5/thumbnails/13.jpg)
Features of AMS- I.D and AMS-I.F
Case1: exclusively diesel electricity, default EF depending on load factor
Case 2: mix of energy sources including grid, weighted average EF ( captive electricity EF as per the �Tool to calculate baseline, project and/or leakage emissions from electricity consumption�)
Case 3: EF of grid as per AMS-I.D
Combined margin or weighted average of current generation for Emission Factor (EF)
RE substitutes fossil fuel intensive grid/mini-grid and/or captive electricity
RE supply to a national or regional grid
AMS-I.FAMS-I.D
![Page 14: Session II: Methodological requirements for projects activities ......UNFCCC secretariat, programme Firstname Lastname, Job Title Session II: Methodological requirements for projects](https://reader033.vdocuments.mx/reader033/viewer/2022060101/60b25b929bdb7e27757859de/html5/thumbnails/14.jpg)
AMS-I.A Electricity generation by the users
� Project: Electricity is produced by users using renewable energy technologies (e.g. solar home systems for lighting, wind-battery chargers for powering domestic appliances)
� Baseline: Services (e.g. lighting and electric appliances) are provided using fossil-fuel-based technologies (e.g., kerosene lamps and diesel generators).
![Page 15: Session II: Methodological requirements for projects activities ......UNFCCC secretariat, programme Firstname Lastname, Job Title Session II: Methodological requirements for projects](https://reader033.vdocuments.mx/reader033/viewer/2022060101/60b25b929bdb7e27757859de/html5/thumbnails/15.jpg)
AMS-I.C �Thermal energy production with or without electricity�
Involves renewable energy technologies that supply users with thermal energy to displace fossil fuel use. Examples include solar thermal water heaters and dryers, solar cookers, steam/heat generatorsCogeneration technology that simultaneously produces heat and electricity is also covered
![Page 16: Session II: Methodological requirements for projects activities ......UNFCCC secretariat, programme Firstname Lastname, Job Title Session II: Methodological requirements for projects](https://reader033.vdocuments.mx/reader033/viewer/2022060101/60b25b929bdb7e27757859de/html5/thumbnails/16.jpg)
AMS-I.C �Thermal energy production with or without electricity�
Cogeneration technology displaces inefficient and carbon intensive way of producing heat and electricity in a separate process ( example heat is produced using boiler and electricity is produced in captive plant and/or in a grid.
Cogeneration
Heat
Electricity
![Page 17: Session II: Methodological requirements for projects activities ......UNFCCC secretariat, programme Firstname Lastname, Job Title Session II: Methodological requirements for projects](https://reader033.vdocuments.mx/reader033/viewer/2022060101/60b25b929bdb7e27757859de/html5/thumbnails/17.jpg)
Key Approaches: AMS-I.D, I.F and I.A
XProject supplies electricity to household users (included in the project boundary) located in off grid areas.
5
XProject supplies electricity to a mini grid system where in the baseline all generators use exclusively fuel oil and/or diesel fuel
4
XProject supplies electricity to an identified consumer facility via national/regional grid (through a contractual arrangement such as wheeling)
3
XProject displaces grid electricity consumption (e.g. grid import) and/or captive fossil fuel electricity generation at the user end (excess electricity may be supplied to a grid)
2
XProject supplies electricity to a national/regional grid1
AMS-I.FAMS-I.DAMS-I.AProject type