session 2- "bike/walk twin cities" by tony hull

Upload: pbriresearchlibrary

Post on 08-Apr-2018

226 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/6/2019 Session 2- "Bike/Walk Twin Cities" by Tony Hull

    1/14

    Bike/Walk Twin Cities

    Minneapolis Area, Minnesota

  • 8/6/2019 Session 2- "Bike/Walk Twin Cities" by Tony Hull

    2/14

    Bike/Walk Twin Cities

    Community Profile

    MinneapolisMinneapolis

    38 miles of on street bike lanes38 miles of on street bike lanes

    57 miles of off street trails57 miles of off street trails

    16,500 bike parking spaces16,500 bike parking spaces

    Bike racks on all buses, trainsBike racks on all buses, trains

    Sidewalk network is 80% complete.Relatively flat topographyRelatively flat topography

    Warm summer; robust winter; some spring/fallWarm summer; robust winter; some spring/fall

    IDEAL for WALKING and BIKING!IDEAL for WALKING and BIKING!

    Minneapolis mode split*

    Auto 77%

    Transit 4%Bike 4%

    Walk 13%

    NO LOW HANGING FRUIT!NO LOW HANGING FRUIT!

    *Metropolitan Council, 2000 Travel Behavior Inventory:

  • 8/6/2019 Session 2- "Bike/Walk Twin Cities" by Tony Hull

    3/14

    Bike/Walk Twin Cities

    Program Area

    Program Area: City of Minneapolis and adjacent

    communities including the Airport and Ft. Snelling

    Program Emphasis on connections to Minneapolis

    Brooklyn Center

    Columbia

    Heights

    Edina

    Falcon Heights

    Fridley

    Golden ValleyLauderdale

    Minneapolis

    Richfield

    Robbinsdale

    Roseville

    Saint Anthony

    Saint Lois Park

    Saint Paul

    Population:

    377,392 Minneapolis

    930,934 NTPProgram area

    3,208,212 MSA

  • 8/6/2019 Session 2- "Bike/Walk Twin Cities" by Tony Hull

    4/14

    Bike/Walk Twin Cities

    The Bike/Walk Program

    Transit for Livable Communities:

    TLC Mission

    Improve the quality of life in Minnesota

    communities by promoting transit, walking,

    biking and transit oriented development

    Background

    Established in 1996

    Regional non-profit, non-partisan agencyResearch

    Organizing

    Advocacy

  • 8/6/2019 Session 2- "Bike/Walk Twin Cities" by Tony Hull

    5/14

    Bike/Walk Twin Cities

    The Program

    Tenets of TLC Bike/Walk approach

    Innovation

    Strategic planningEngaged stakeholders

    Fair,Transparent process

    Quality measurement

    Institutionalized change

  • 8/6/2019 Session 2- "Bike/Walk Twin Cities" by Tony Hull

    6/14

    Bike/Walk Twin Cities

    Innovation

    Bring in experts to host workshops

    Introduce new concepts

    Expose traditional mythsGenerate excitement for new approaches

    Build capacity for institutional changes

  • 8/6/2019 Session 2- "Bike/Walk Twin Cities" by Tony Hull

    7/14

    Bike/Walk Twin Cities

    Strategic Planning

    Snapshot Minneapolis

    Awards for 8 planning studies

    Central Avenue NEHennepin Avenue

    Central Corridor Bicycle and Pedestrian Plan

    Richfield Arterials

    Xenia Ave/Park Place Blvd. Corridor

    Douglas Drive Corridor & Connection to Luce Line

    Minneapolis Pedestrian MasterPlanMetro Transit Bike/Ped Improvements Study

    Outreach ProgramBike/Walk Ambassadors

  • 8/6/2019 Session 2- "Bike/Walk Twin Cities" by Tony Hull

    8/14

    Bike Walk Twin Cities

    Engage Stakeholders

  • 8/6/2019 Session 2- "Bike/Walk Twin Cities" by Tony Hull

    9/14

    Bike Walk Twin Cities

    Engage Stakeholders

  • 8/6/2019 Session 2- "Bike/Walk Twin Cities" by Tony Hull

    10/14

    Bike Walk Twin Cities

    Process

    Round 1 Planning, Operations, Infrastructure - 2007Planning

    OperationsLivable streets

    Pedestrian districts/plazasOff-road facilities

    Round 2 Infrastructure - 2008Livable streets

    Bike/walk streets

    Final round LOI & direct awards 2009Innovative capital projectsPrevious proposals, results of planning studies

    Education and outreach

  • 8/6/2019 Session 2- "Bike/Walk Twin Cities" by Tony Hull

    11/14

    Bike Walk Twin Cities

    Measurement

    Evaluation plan

    Data collection and analysis

    Before & After surveyBike & pedestrian counts

    Community wide measurement

    Project specific measurement

    Public health component

  • 8/6/2019 Session 2- "Bike/Walk Twin Cities" by Tony Hull

    12/14

    Bike/Walk Twin Cities

    Current Status

    Funding Awarded

    Direct Awards $1.3 million

    2007 Solicitation

    63 applications received totaling$17.9 million30 projects awarded totaling $7.3 million

    2008 Solicitation

    35 applications received totaling $16.1 million

    5 projects awarded totaling $1.87 million

    2009 Strategic Investments

    16 LOIs received

    4 invited to full proposal

    Education / Enforcement / Awareness

    Working with previous applicants and planning study

    outcomes

    Project funds remaining to allocate: $6.25 millionDoes not include administrative and contracted costs

  • 8/6/2019 Session 2- "Bike/Walk Twin Cities" by Tony Hull

    13/14

    Bike/Walk Twin Cities

    Program Future

    Infrastructure improvements:

    75 miles of new bike lanes

    New bike parking over 1000 spaces

    Up to 3 miles of new off-street facilities mostly filling in existing gaps

    Dozens of improvements at major crossings for pedestrians and

    cyclists.Innovations that have never been done in the Twin Cities:

    Bike Walk Streets (aka bike boulevards)

    4-3 lane conversions and other road diets to allow for bike lanes

    Advance boxes and special bike signals

    Cycle-track (1stAvenue)

    Bike donation/bike-sharing program?Goals for institutional changes:

    Revised state aid standards

    Complete Streets Policy

    New attention to bike/ped issues

  • 8/6/2019 Session 2- "Bike/Walk Twin Cities" by Tony Hull

    14/14

    Bike/Walk Twin Cities

    THANK YOU

    Transit for Livable Communities

    Bike/Walk Program

    www.bikewalktwincities.org

    Tony Hull

    [email protected]