service without compromise - total protection · project location london completion date october...

9
service without compromise

Upload: others

Post on 19-Jul-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: service without compromise - Total Protection · Project Location London Completion Date October 2016 Project Area 2 1085m Project Type Resin Bound Gravel Kensington Palace Project

service without compromise

Page 2: service without compromise - Total Protection · Project Location London Completion Date October 2016 Project Area 2 1085m Project Type Resin Bound Gravel Kensington Palace Project

Since 1986 Total Protection has expanded and diversified its service offering to provide our clients with integrated solutions and exceptional service.Each of our specialist divisions has been created in response to client demand, forming one service

provider capable of cohesively managing multiple project phases.

Our versatile and scalable services include resin surfaces, landscaping, painting, fire protection,

sealing solutions and specialist coating services. We work in partnership with our clients to develop

bespoke solutions that support and enhance their requirements.

We operate across the whole of the UK bringing a wealth of experience and efficient service

delivery to each and every project. We work with a wide range of clients, from large contractors,

builders and local authorities to estate management companies and homeowners, offering a tailor-

made service to suit individual requirements.

CONTENTS

LANDSCAPING

PAINTING SOLUTIONS

SPECIAL PROJECTS

FIRE & SEALING SOLUTIONS

TESTIMONIALS

RESIN

101214

64

8Total Protection

(Holdings) Ltd

Total Protection

(Management Services) Ltd

Total Protection

(Great Britain) Ltd

Total Protection

(Fire & Sealing Solutions) Ltd

Total Protection

(Landscaping) Ltd

Total Protection

(Special Projects) Ltd

Total Protection

(Painting Solutions) Ltd

3

Page 3: service without compromise - Total Protection · Project Location London Completion Date October 2016 Project Area 2 1085m Project Type Resin Bound Gravel Kensington Palace Project

RE

SIN

Leading specialists in the resin surfaces and coatings sector since 1986.

The Total Protection Resin team has a wealth of experience in

the design and installation of hundreds of Resin Bound and Resin

Bonded Gravel projects across the UK. We work with a wide range

of clients, from large contractors, builders and local authorities to

estate management companies and homeowners, offering a tailor-

made service to suit individual requirements.

Due to our success with projects both large and small, we have built

a prestigious client portfolio that includes the Crown Estate.

The Total Protection team has many years’ experience in the

design and installation of Resin based finishes. Our knowledge and

understanding led to the development of a range of supporting

services that offer an integrated and more efficient means of

delivering projects to the highest standards, from concept to

completion.

The Resin Surfacing industry continues to advance, offering a wider

range of products and surfacing solutions. Our Resin Surfaces

division ensures that our clients have access to the latest and most

suitable solutions for their project.

Projects

Magic Garden

Project Location Hampton Court, Surrey

Completion Date April 2015

Project Area 850m2

Project Type Resin Bound Gravel

Walthamstow Stadium Dev. Project Location London

Completion Date October 2016

Project Area 1085m2

Project Type Resin Bound Gravel

Kensington Palace

Project Location Kensington Gardens, London

Completion Date March 2013

Project Area In excess of 3000m²

Project Type Resin Bonded Gravel

R E S I N

Services

Tarmacadam Surfaces

SprayTar + Chippings

Self-Binding Gravel

Tree Pit Surfacing

Rubber Safety Surfacing

Installation of Resin Bound and

Resin Bonded Surfaces

Site Preparation, incl. Groundworks

Soft Landscape Construction

Specialist Flooring Screeds & Finishes

Specialist Pre-Project Consultation

Full Design Service incl. Hard &

Soft Landscaping

Bespoke Finishes

Line Marking

Hard Landscape Construction

Aftercare & Maintenance, incl. Power

Washing & Pressure Cleaning

5W W W.TOTA L P R OT EC T I O N .CO.U K E I N F O @ TOTA L P R OT EC T I O N .CO.U K T 0 1 2 7 7 8 41 41 5

Page 4: service without compromise - Total Protection · Project Location London Completion Date October 2016 Project Area 2 1085m Project Type Resin Bound Gravel Kensington Palace Project

PA

INT

ING

S

OL

UT

ION

SOur Painting and Coatings team are focused on delivering exceptional quality of work alongside a great personal service.

Our specialist Painting and Coatings Division carries out a wide

range of contracts, servicing many different sectors of the industry.

Our work includes refurbishments, new housing, social housing,

stripping of lead based paints and many specialist coatings.

Our team of specialist staff are fully conversant with all aspects of

the industry, offering many years of experience. We provide a full

survey/feasibility study as well as a measuring service to assist our

clients.

We carry out a diverse range of decorating and specialist coatings

services for many clients across the UK. These include new housing,

social housing planned maintenance, high-end refurbishments,

commercial work, education and bespoke painting solutions.

We operate an extensive workforce of skilled tradesmen/women all

of whom are CSCS qualified. All of our managers are either SSSTS

or SMSTS and first aid qualified.

Projects

Aveley Village Extension

Project Location Aveley, Essex

Completion Date December 2015

Scope 178 Dwellings

The Bridge

Project Location Dartford, Kent

Completion Date 2016

Scope Approx 1000 Dwellings

Chobham Manor

Project Location Stratford Inter. Olympic Village

Completion Date 2020

Scope Phases 1 & 2 - 849 Properties

PA I N T I N G S O LU T I O N S

Services

New Housing

Social Housing Planned Maintenance

High-end Refurbishments

Commercial Work

Schools

Class O Coatings

Anti-Graffiti Coatings

Intumescent Coatings

Lead Paint Removal

Hygiene Coatings

Residential Decorating

Surveys, Specifications

& Product Advice

7W W W.TOTA L P R OT EC T I O N .CO.U K E I N F O @ TOTA L P R OT EC T I O N .CO.U K T 0 1 2 7 7 8 41 41 5

Page 5: service without compromise - Total Protection · Project Location London Completion Date October 2016 Project Area 2 1085m Project Type Resin Bound Gravel Kensington Palace Project

LA

ND

SC

AP

ING

We are an established, experienced and award winning landscape contractor and are proud to work with some of the world’s biggest and best suppliers.

Total Protection specialises in high-end, bespoke landscaping

projects, but we can also assist with large multi-phase landscape

installations and smaller specialised requirements too. Our links to

some of the world’s major suppliers and specialist sub-contractors

enforce our credentials and our passion to deliver exceptional

service.

Our extensive experience enables us to effectively deliver smaller

projects focusing on value for money, right the way up to large

commercial multi-phase installations. We remain focused on quality

without compromise thanks to our exceptional landscaping team.

Our senior management team are involved right from the beginning;

in the detailed design, specification and construction stages. Their

valuable input has led to Total Protection successfully delivering

some of the premier public realm schemes in the UK in recent years.

Total Protection is passionate about delivering beautiful gardens and

landscapes for our clients to enjoy, which will look great today but

even better tomorrow. This requires great design followed by quality

construction, delivered by an outstanding maintenance team.

Projects

The International Quarter (TIQ)

Project Location Stratford, East London

Completion Date August 2017

Project Size £3.8m

St John Bosco College

Project Location Battersea, London

Completion Date September 2015

Project Size £850,000

199 Westminster Bridge Road

Project Location London SE1

Completion Date November 2015

Project Size £1.3m

L A N D S C A P I N G

Services

Hard and Soft Landscaping Services

Ground Works

Specialist Stone Fixers

Water Features

Irrigation Design and Build

Green Roofs and Walls

Sports Pitch Design and Construction

Specialist Wetland Works

Lifting Existing Trees

Landscape Design

External Lighting

Garden Maintenance

9W W W.TOTA L P R OT EC T I O N .CO.U K E I N F O @ TOTA L P R OT EC T I O N .CO.U K T 0 1 2 7 7 8 41 41 5

Page 6: service without compromise - Total Protection · Project Location London Completion Date October 2016 Project Area 2 1085m Project Type Resin Bound Gravel Kensington Palace Project

SP

EC

IAL

PR

OJE

CT

SModern materials allow us to develop and offer unique solutions.

Our Special Projects team are often called upon to solve highly

specific problems where our unparalleled experience with modern

materials allows us to develop and offer unique solutions. Our

experience in the industry and knowledge of specialist materials

is unrivalled, along with the ability to think laterally with specialist

applications.

By working with suppliers and manufacturers we deal with each

project identifying its individual issues and opportunities, enabling

us to tailor the most suitable solution to every situation. Sometimes

we even develop new products along the way!

Working in sectors as diverse as social housing, transport, industrial

and medical, the team often design, develop and deliver bespoke

solutions with long-term sustainability through a single turnkey

process, which make us the first port of call for many clients across

the UK time and time again.

Projects

Royal Academy of Engineering

Project Location Central London

Completion Date March 2012

Scope Non-slip wearing surface

Farringdon Station

Project Location London

Completion Date September 2011

Scope Design & specify a durable, non-slip floor

Tilbrook Mill Kennels

Project Location Cambridgeshire

Completion Date April 2014

Scope Installing suitable slip resistant flooring

S P EC I A L P R OJ EC T S

Services

MMA Fast Curing Resin Floor System

Chemical Resistant Coatings & Screeds

Graffiti Resistant Wall Coatings

(Sacrificial/Non-sacrificial Class 0)

Resin Bound & Resin Bonded

Gravel Systems

Structural & Non-structural Concrete

Repairs and Grouting

Fireproof Coatings

Painting & Decorating

Damp-proofing & Waterproofing

External Hard & Soft Landscaping

Children’s Play Areas

Metallic and Graphic Floors

11W W W.TOTA L P R OT EC T I O N .CO.U K E I N F O @ TOTA L P R OT EC T I O N .CO.U K T 0 1 2 7 7 8 41 41 5

Page 7: service without compromise - Total Protection · Project Location London Completion Date October 2016 Project Area 2 1085m Project Type Resin Bound Gravel Kensington Palace Project

FIR

E &

SE

AL

ING

S

OL

UT

ION

SProjects

Chobham Manor

Project Location Stratford

Scope Fireproofing

Hampstead School Project Location Hampstead

Scope Fire protection to steel beams

McLaren Technology Centre

Project Location Woking

Scope Duct sealing

REV DATE DESCRIPTION DRN CHK DRAWING TITLE

SCALE A1 SHEET

STATUS

DRAWING NO REV

DO NOT SCALE THIS DRAWING ALL DIMENSIONS MUST BE CHECKED ON SITEINFORM THE ARCHITECT OF ANY DISCREPANCIES PRIOR TO CONSTRUCTION

KEY PLAN NOTES

c 2014 jestico + whiles. all rights reserved

CLIENT

PROJECT

3D VIEWAERIAL VIEW LOOKING NORTH

WATES

HAMPSTEAD SECONDARY SCHOOLPLANNING SUBMISSION

2657-JW-400 P02

P01 13.03.15 DRAFT PLANNING SUBMISSION TP BM

P02 18.03.15 ISSUED FOR PLANNING TP BM

F I R E & S E A L I N G S O LU T I O N S

Over 30 years’ experience in delivering professional fire protection packages.

Total Protection Fire and Sealing Solutions provides professionally

managed, cost effective fire compliant services to a wide range of

clients throughout the UK.

Well respected within this highly specialised field our team has over

30 years’ experience delivering a wide range of 3rd party accredited

passive fire protection installation services.

We are approved installers of some of the leading passive fire

protection manufacturers, such as Nullifire and Sherwin Williams for

intumescent paints, Firetherm for fire sealing products, Knauf, Promat

and British Gypsum for boards and CSD and Filoform for water and

gas sealing products.

Total Protection is approved by The Loss Prevention Certification

Board (LPCB). Our accreditation involves regular site and office audits

to ensure the correct standards and procedures are adhered to.

Services

Intumescent Coatings

Fire Sealing

Fire Barrier & Curtains

Fire Protection Advice & Surveys

Air & Acoustic Sealing

Water & Gas Sealing

Steel – Intumescent Coatings

Fire SealingAir & Acoustic

Water and Gas Seals

13W W W.TOTA L P R OT EC T I O N .CO.U K E I N F O @ TOTA L P R OT EC T I O N .CO.U K T 0 1 2 7 7 8 41 41 5

Page 8: service without compromise - Total Protection · Project Location London Completion Date October 2016 Project Area 2 1085m Project Type Resin Bound Gravel Kensington Palace Project

TE

ST

IMO

NIA

LS

JUST A FEW OF OUR HAPPY CLIENTS

“The guys on site were excellent, a pleasure to work with.”

Jo Kenny, Red Bull Technology

“We are extremely pleased with our driveway and as people go past our house they

often comment at how nice it looks.”

Paul Saini

“Everyone is very pleased with the resin surface at Trinity Methodist Church. The work

was carried out efficiently and the quality is of a high standard.”

Alexander Kitchin, Director

“Just a note to say how impressed I am with the works carried out at Sidney Court.

The decoration and wall coatings have transformed the appearance and feel of the

internal communal block. This combined with the flooring you laid has had a massive

impact in improving our stock. Hopefully we can work together again soon!”

Carl Oakley, Project Manager - B3Living

“All a very good service and quality job. Thanks.”

Peter Castle, CJ Oshea

T E S T I M O N I A L S

15W W W.TOTA L P R OT EC T I O N .CO.U K E I N F O @ TOTA L P R OT EC T I O N .CO.U K T 0 1 2 7 7 8 41 41 5

Page 9: service without compromise - Total Protection · Project Location London Completion Date October 2016 Project Area 2 1085m Project Type Resin Bound Gravel Kensington Palace Project

T 01277 841 415 F 01277 829 716 E [email protected]

The Coach House, Baddow Park, West Hanningfield Road, Chelmsford, Essex, CM2 7SY

www.totalprotection.co.uk

service without compromise