Sequoia Park Pond (0705DP) Retrofit Project

TRANSCRIPT

Page 1: Sequoia Park Pond Retrofit Project

A Fairfax County, VA, publication

Department of Public Works and Environmental Services

Working for You!

Sequoia Park Pond (0705DP) Retrofit Project

Contract Number CN13125095Project Number SD-000031-123 ATask Order No. 21Mason District

August 2014

Page 2: Sequoia Park Pond Retrofit Project

Sequoia Park Pond (0705DP) Retrofit Project

Stormwater Planning, Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch

Page 3: Sequoia Park Pond Retrofit Project

Project Details Sequoia Park Pond (0705DP) Retrofit Project

Stormwater Planning, Capital Facilities/Utilities Design and Construction Division/Transportation Stormwater Construction Branch

Description:

The Sequoia Park Pond (0705DP) Retrofit Project was substantially completed on June 23, 2014. Sequoia Park Pond is an existing stormwater management pond located on the north side of the intersection at Edsall Road and Dublin Avenue. The existing pond was retrofitted to provide improved down stream water quality benefits and detention. The proposed water quality benefits realized by this project will be the removal of 9 lbs/year of total phosphorus, 41 lbs/year of total nitrogen and 1750 lbs/year of total suspended solids.

Project Overview:

• Removed the existing trickle ditch.• Excavated and constructed four micro-pools at a maximum depth of 18” below the pond bottom.• Extended the existing 18” RCP and installed a new EW-1 along with 2’ depth of river jack bedding • Constructed two rock weir structures• Replaced the existing 4’ trail by 12’ wide asphalt access road.• Installed a proposed driveway CG-9D entrance for maintenance road (under construction)• Restored the site with selected seed mix, planting plugs (trees will be planted in end of Sept. 2014).

• Project Team:• Stormwater and Planning Division – Joseph P. Riley-Ryan• Utilities Design and Construction Division - Yousef Rayyan• Utilities Design and Construction Division - Kenneth Atkins• Surveyor - Gregory Harper

Page 4: Sequoia Park Pond Retrofit Project

Sequoia Park Pond (0705DP) Retrofit Project

Stormwater Planning, Capital Facilities/Utilities Design and Construction Division/Transportation Stormwater Construction Branch

Springfield, VA Tax-Map 0714-((30))-B

Project Site

Page 5: Sequoia Park Pond Retrofit Project

Stormwater Planning, Capital Facilities/Utilities Design and Construction Division/Transportation Stormwater Construction Branch

Sequoia Park Pond (0705DP) Retrofit Project Pre-Existing/New Conditions of the Inflow Locations

Concrete inflow trickle ditch

Before After

Inflow locations were stabilized with coir matt and reinforced bedding

material

Page 6: Sequoia Park Pond Retrofit Project

Stormwater Planning, Capital Facilities/Utilities Design and Construction Division/Transportation Stormwater Construction Branch

Sequoia Park Pond (0705DP) Retrofit Project

Pre-Existing/New Condition of the Pond Site

micro pool No. 4

micro pool No. 3

micro pool No. 2 micro pool No. 1

existing outlet structure

Edsall Road

12’ wide asphalt access road

rock weir 1 and 2

Page 7: Sequoia Park Pond Retrofit Project

Stormwater Planning, Capital Facilities/Utilities Design and Construction Division/Transportation Stormwater Construction Branch

Sequoia Park Pond (0705DP) Retrofit Project

4’ wide pre-existing trail

12’ wide new access road

Pre-Existing Condition and New Condition of the Asphalt Trail

Before After

Page 8: Sequoia Park Pond Retrofit Project

Sequoia Park Pond (0705DP) Retrofit Project

Stormwater Planning, Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch

Before After

Page 9: Sequoia Park Pond Retrofit Project

Additional Information

For additional Information, please call

www.fairfaxcounty.gov/dpwes

Stormwater Planning, Capital Facilities/Utilities Design and Construction Division/Transportation Stormwater Construction Branch

Sequoia Park Pond (0705DP) Retrofit Project

Irene Haske, Public Information Officer703-324-5821, TTY 711