Separating Industry Issues From Safety IssuesManaging Inter–Organisational Collaboration when Implementing a Fatigue Risk Management System (FRMS)
Captain Robert D Holliday FRAeS
2nd September 2011
![Page 2: Separating Industry Issues From Safety Issues Managing Inter–Organisational Collaboration when Implementing a Fatigue Risk Management System (FRMS) Captain](https://reader036.vdocuments.mx/reader036/viewer/2022062619/5515493555034673228b617d/html5/thumbnails/2.jpg)
Contents
― Collaboration― Aims― Culture― Trust― Politics and Power― Conclusion
![Page 3: Separating Industry Issues From Safety Issues Managing Inter–Organisational Collaboration when Implementing a Fatigue Risk Management System (FRMS) Captain](https://reader036.vdocuments.mx/reader036/viewer/2022062619/5515493555034673228b617d/html5/thumbnails/3.jpg)
Collaboration
An oil company manager once said of collaboration:
You may have to jump into bed with someone you don’t like…’
![Page 4: Separating Industry Issues From Safety Issues Managing Inter–Organisational Collaboration when Implementing a Fatigue Risk Management System (FRMS) Captain](https://reader036.vdocuments.mx/reader036/viewer/2022062619/5515493555034673228b617d/html5/thumbnails/4.jpg)
‘Sleeping with the enemy’
![Page 5: Separating Industry Issues From Safety Issues Managing Inter–Organisational Collaboration when Implementing a Fatigue Risk Management System (FRMS) Captain](https://reader036.vdocuments.mx/reader036/viewer/2022062619/5515493555034673228b617d/html5/thumbnails/5.jpg)
Safety Perspective
Fit to FlyFit to Fly
CommuteCommute
LifestyleLifestyle
MedicationMedication
SleepSleep
FamilyFamily
ExerciseExercise
HealthHealth
DietDiet
![Page 6: Separating Industry Issues From Safety Issues Managing Inter–Organisational Collaboration when Implementing a Fatigue Risk Management System (FRMS) Captain](https://reader036.vdocuments.mx/reader036/viewer/2022062619/5515493555034673228b617d/html5/thumbnails/6.jpg)
Union Representative Perspective
Union memberUnion member
SafetySafety
LifestyleLifestyle
NegotiationNegotiation
PayPay
HoursHours
HolidayHoliday
SuspicionSuspicion
AgreementsAgreements
![Page 7: Separating Industry Issues From Safety Issues Managing Inter–Organisational Collaboration when Implementing a Fatigue Risk Management System (FRMS) Captain](https://reader036.vdocuments.mx/reader036/viewer/2022062619/5515493555034673228b617d/html5/thumbnails/7.jpg)
Management Representative Perspective
EmployeeEmployee
ComplianceCompliance
Operational Integrity
Operational Integrity
PowerPower
ProductivityProductivity
SafetySafety
EfficiencyEfficiency
Industrial RelationsIndustrial Relations
PoliticsPolitics
![Page 8: Separating Industry Issues From Safety Issues Managing Inter–Organisational Collaboration when Implementing a Fatigue Risk Management System (FRMS) Captain](https://reader036.vdocuments.mx/reader036/viewer/2022062619/5515493555034673228b617d/html5/thumbnails/8.jpg)
Crew Scheduling Perspective
Crewed AeroplaneCrewed
Aeroplane
Bid Satisfaction
Bid Satisfaction
Standby cover
Standby cover
Operational continuity
Operational continuity
SoftwareSoftware
SafetySafety
Flight Time LimitationsFlight Time Limitations
Disruption management
Disruption management
Crew Establishment
Crew Establishment
![Page 9: Separating Industry Issues From Safety Issues Managing Inter–Organisational Collaboration when Implementing a Fatigue Risk Management System (FRMS) Captain](https://reader036.vdocuments.mx/reader036/viewer/2022062619/5515493555034673228b617d/html5/thumbnails/9.jpg)
Collaboration
common aims
working processes
resources
commitment and
determination
communication and language
culture
power
trust
compromise
Risk
democracy and equality
accountability
Practitioner-generated themes
Types of themes in collaboration practiceManaging to Collaborate – Huxham & Vangen, 2005
![Page 10: Separating Industry Issues From Safety Issues Managing Inter–Organisational Collaboration when Implementing a Fatigue Risk Management System (FRMS) Captain](https://reader036.vdocuments.mx/reader036/viewer/2022062619/5515493555034673228b617d/html5/thumbnails/10.jpg)
Crew Scheduling Perspective
CollaborationCollaboration
AimsAims
CultureCulture
TrustTrust
PowerPower
PoliticsPolitics
![Page 11: Separating Industry Issues From Safety Issues Managing Inter–Organisational Collaboration when Implementing a Fatigue Risk Management System (FRMS) Captain](https://reader036.vdocuments.mx/reader036/viewer/2022062619/5515493555034673228b617d/html5/thumbnails/11.jpg)
Collaboration
(One participant’s perspective)
Explicit Assumed Hidden
Collaboration aims The purpose of the collaborationby definition these are perception of joint aims
and so cannot be hidden
Organisation aims What each organisation hopes to gain for itself via the collaboration
Individual aims What each individual hopes to gain for him/herself via the collaboration
A framework for understanding aims in collaborationManaging to Collaborate – Huxham & Vangen, 2005
![Page 12: Separating Industry Issues From Safety Issues Managing Inter–Organisational Collaboration when Implementing a Fatigue Risk Management System (FRMS) Captain](https://reader036.vdocuments.mx/reader036/viewer/2022062619/5515493555034673228b617d/html5/thumbnails/12.jpg)
‘Collaborative Thuggery’
![Page 13: Separating Industry Issues From Safety Issues Managing Inter–Organisational Collaboration when Implementing a Fatigue Risk Management System (FRMS) Captain](https://reader036.vdocuments.mx/reader036/viewer/2022062619/5515493555034673228b617d/html5/thumbnails/13.jpg)
Managing Aims
― Superordinate Goals
‘Improve Safety’
‘Big Society’
― SMART goals
Specific, Measurable, Agreed, Realistic, Time bound
― Goal Commitment/Rejection
![Page 14: Separating Industry Issues From Safety Issues Managing Inter–Organisational Collaboration when Implementing a Fatigue Risk Management System (FRMS) Captain](https://reader036.vdocuments.mx/reader036/viewer/2022062619/5515493555034673228b617d/html5/thumbnails/14.jpg)
Managing Aims
Empathy Box
Positive Outcomes
Negative Outcomes
Goal Commitment ? ?
Goal Rejection ?
![Page 15: Separating Industry Issues From Safety Issues Managing Inter–Organisational Collaboration when Implementing a Fatigue Risk Management System (FRMS) Captain](https://reader036.vdocuments.mx/reader036/viewer/2022062619/5515493555034673228b617d/html5/thumbnails/15.jpg)
Managing Aims
― Integrity and Accessibility
― Beware of ‘Goals Gone Wild’
― Unintended consequences
― E.g. Ford Pinto
Goals Gone Wild (Ordenez et al 2009)
![Page 16: Separating Industry Issues From Safety Issues Managing Inter–Organisational Collaboration when Implementing a Fatigue Risk Management System (FRMS) Captain](https://reader036.vdocuments.mx/reader036/viewer/2022062619/5515493555034673228b617d/html5/thumbnails/16.jpg)
Levels of Culture
Levels of CultureOrganizational Collaboration – E.H. Schein, 2011
ArtifactsArtifacts
Espoused Beliefs and
Values
Espoused Beliefs and
Values
Underlying AssumptionsUnderlying
Assumptions
Visible organisational structures and process (hard to decipher)
Strategies, goals, philosophies (espoused justifications
Unconscious taken-for-granted beliefs, perceptions, thoughts, and feelings...(ultimate source of values and action
![Page 17: Separating Industry Issues From Safety Issues Managing Inter–Organisational Collaboration when Implementing a Fatigue Risk Management System (FRMS) Captain](https://reader036.vdocuments.mx/reader036/viewer/2022062619/5515493555034673228b617d/html5/thumbnails/17.jpg)
Managing Culture
― Underlying Assumptions
‘Prescriptive rules have worked till now’
‘Crew will use this to work less’
‘Management will use this to increase productivity’
‘It’s legal’
![Page 18: Separating Industry Issues From Safety Issues Managing Inter–Organisational Collaboration when Implementing a Fatigue Risk Management System (FRMS) Captain](https://reader036.vdocuments.mx/reader036/viewer/2022062619/5515493555034673228b617d/html5/thumbnails/18.jpg)
Managing Trust
The trust Building Loop
![Page 19: Separating Industry Issues From Safety Issues Managing Inter–Organisational Collaboration when Implementing a Fatigue Risk Management System (FRMS) Captain](https://reader036.vdocuments.mx/reader036/viewer/2022062619/5515493555034673228b617d/html5/thumbnails/19.jpg)
‘‘It is unnecessary for a prince to have all the good qualities I have enumerated, but it is very necessary to appear to have them’’ Niccolo Machiavelli, 1532
![Page 20: Separating Industry Issues From Safety Issues Managing Inter–Organisational Collaboration when Implementing a Fatigue Risk Management System (FRMS) Captain](https://reader036.vdocuments.mx/reader036/viewer/2022062619/5515493555034673228b617d/html5/thumbnails/20.jpg)
Managing Politics and Power
― ‘As organisations are manifestly social entities, power and politics are ubiquitous elements in their make up. Often used synonymously, they are also inherently interwoven and as such are treated in many ways as inseparable issues.’
(Di Domenico, 2011)
![Page 21: Separating Industry Issues From Safety Issues Managing Inter–Organisational Collaboration when Implementing a Fatigue Risk Management System (FRMS) Captain](https://reader036.vdocuments.mx/reader036/viewer/2022062619/5515493555034673228b617d/html5/thumbnails/21.jpg)
Managing Politics and Power
― Power – Making people do things they otherwise wouldn’t
― Buy in is more sustainable
― Power associated with the purse
― Power is distributed in various forms
![Page 22: Separating Industry Issues From Safety Issues Managing Inter–Organisational Collaboration when Implementing a Fatigue Risk Management System (FRMS) Captain](https://reader036.vdocuments.mx/reader036/viewer/2022062619/5515493555034673228b617d/html5/thumbnails/22.jpg)
Collaboration
articulate clear, common agreed aims as a first step
get on with joint task without agreeing aims first
articulate clear compatible aims
Seek common ground
Seek enough agreement INTERMEDIATE
POSITIONS
EXTREMEEXTREMEEXTREMEEXTREME
EXTREME
EXTREME
REFORMULATED EXTREME
REFORMULATED EXTREME
Tensions in managing aims in collaborative settingsManaging to Collaborate – Huxham & Vangen, 2005
+ provides direction to guide joint action– difficult to reach agreement so action may never happen
+ immediate joint action– lack of direction
![Page 23: Separating Industry Issues From Safety Issues Managing Inter–Organisational Collaboration when Implementing a Fatigue Risk Management System (FRMS) Captain](https://reader036.vdocuments.mx/reader036/viewer/2022062619/5515493555034673228b617d/html5/thumbnails/23.jpg)
Top Ten tips for Collaborating
― 1. See the collaborative advantage― 2. Budget more time than you think― 3. Remember there will be different
agendas round the table― 4. Set small achievable goals to start
with to build trust― 5. Communicate― 6. Remember each member will have
different constraints that may cause tensions
(Huxham and Vangen, 2005)
![Page 24: Separating Industry Issues From Safety Issues Managing Inter–Organisational Collaboration when Implementing a Fatigue Risk Management System (FRMS) Captain](https://reader036.vdocuments.mx/reader036/viewer/2022062619/5515493555034673228b617d/html5/thumbnails/24.jpg)
Top Ten tips for Collaborating
― 7. Try to establish that members are able to participate autonomously
― 8. Recognise that power is important and that each member has power from a different source
― 9. Sometime you will facilitate and sometimes direct
― 10. Be persistent, apply high energy levels, total commitment and nurturing and the collaboration will be successful
(Huxham and Vangen, 2005)
![Page 25: Separating Industry Issues From Safety Issues Managing Inter–Organisational Collaboration when Implementing a Fatigue Risk Management System (FRMS) Captain](https://reader036.vdocuments.mx/reader036/viewer/2022062619/5515493555034673228b617d/html5/thumbnails/25.jpg)
Conclusion
― Perseverance― Energy ― Commitment― Time― All required for a successful collaboration
![Page 26: Separating Industry Issues From Safety Issues Managing Inter–Organisational Collaboration when Implementing a Fatigue Risk Management System (FRMS) Captain](https://reader036.vdocuments.mx/reader036/viewer/2022062619/5515493555034673228b617d/html5/thumbnails/26.jpg)
Thank You
![Page 27: Separating Industry Issues From Safety Issues Managing Inter–Organisational Collaboration when Implementing a Fatigue Risk Management System (FRMS) Captain](https://reader036.vdocuments.mx/reader036/viewer/2022062619/5515493555034673228b617d/html5/thumbnails/27.jpg)
References
― References― Huxham, C., Vangen, S. (2010) “Managing to collaborate”, Oxon,
Routledge.― Schein, Edgar. The Levels of Culture. Source: Organisational Culture
and Leadership. 2004. Jossey-Bass.― Di Domenico, M, Vangen, S, Winchester, N, Kumar Boojihawon, D and
Mordaunt, J (2011) ORGANIZATIONAL COLLABORATION Themes and issues. Oxon, Routledge,
― Goal setting: A five-step approach to behaviour change Gary Latham― Goals gone wild: The systematic side effects of overprescribing goal setting
Lisa Ordóñez, Maurice Schweitzer, Adam Galinsky and Max Bazerman― The Prince Niccolò Machiavelli (translated and edited by W.K. Marriott)― Understanding power in organizations Jeffrey Pfeffer― The levels of culture Edgar Schein
― Lukes, S., (2005), Power:A Radical View, B325 Managing across organisational and cultural boundaries (2011), The Open University, Milton Keynes
― Pinney, R., (2008), Building trusted relationships, Les50ons, B325 Managing across organisational and cultural boundaries (2011), The Open University, Milton Keynes