Senior Design
1University of Portland School of Engineering
Project PBoT Zone Surveillance
• Team– Steve Beyer– Emily McKaig– Carolyn Farris
AdvisorDr. Hoffbeck
Industry RepresentativeMr. John Turner
Affiliation: Siltronic
Senior Design
2University of Portland School of Engineering
Introduction
• The truck zone surveillance system will be designed to record activity at truck zones and transmit camera feedback wirelessly to a remote computer (base unit).
Senior Design
3University of Portland School of Engineering
Accomplishments
• Received some components from Client• Completed version 0.9 of the functional
specification
GSM Module
Solar Panel
BatteryAntenna
Senior Design
4University of Portland School of Engineering
Project Goals
• Improve the current system– Wireless– Weigh less– Solar powered– Longer battery life
• Successfully transmit live
feed over the AT&T wireless
network and store
Senior Design
5University of Portland School of Engineering
Plans
• Complete version 1.0 of functional specification
• Choose all components• Write all sections of design document• Complete budget• Send command from processor to GSM
module to test connectivity
Senior Design
6University of Portland School of Engineering
MilestonesStatus Description Original
TargetPreviousTarget
PresentTarget
completed Func Spec v.0.9 24 Sep 10 24 Sep 10 24 Sep 10
Choose components 6 Oct 10 6 Oct 10 6 Oct 10
Func Spec v.0.95 8 Oct 10 8 Oct 10 8 Oct 10
Obtain final GSM module 15 Oct 10 15 Oct 10 15 Oct 10
Func Spec v.1.0 15 Oct 10 15 Oct 10 15 Oct 10
Send command from processor to GSM module
31 Oct 10 31 Oct 10 31 Oct 10
Design Doc v.0.9 5 Nov 10 5 Nov 10 5 Nov 10
Final Budget 12 Nov 10 12 Nov 10 12 Nov 10
Design Doc v.0.95 19 Nov 10 19 Nov 10 19 Nov 10
Design Doc v.1.0 24 Nov 10 24 Nov 10 24 Nov 10
Senior Design
7University of Portland School of Engineering
Concerns/Issues• Difficulty integrating processor and GSM module
– Solution: attempt to connect to the GSM module and send test commands
• May not get complete solar panel components from client– Solution: work with client to expedite receipt of
parts• Budget out of control
– Solution: get funding from Portland Bureau of Transportation or borrow parts