senior capstone process
DESCRIPTION
A book summarizing the process of how I arrived at my final design solution.TRANSCRIPT
1
HWCProcess
1
2
1
3
The Harrison Wellness Center offers a holistic and all-natural approach
to preventing obesity and related diseases. Through a combination of
therapies, exercise, proper nutrition, community interaction, and exposure
to nature patients are given the knowledge, resources, and motivation
needed to live a healthier life.
1
4
1
5
Table of Contents
Summer Process
Summer Midterm
Summer Final
Schematic Design
Design Development
Reaching the End
Technical Drawings
07
21
27
35
47
67
73
Appendix 101
1
6
2
7
Summer Process
2
8
t
Very early sketches of first ideas, thoughts, and design ideas before a building and site were even selected. Laying out the program in the most ideal way.
Initial Concept Sketches May-June 2012
9
Initial space plans revolved around a circular plan. The entrance led to the locker rooms and behind that was the “serenity zone”. Therapy rooms and exercise studios then surrounded the serenity zone on all sides. The serenity zone was an early name for what later on became known as “the spine.” Even early on the idea of a running track through out the space was a driving force. Other early ideas included exercise studios with curved glass walls and blue painted walls. Another concept was to have the structure of the building
become sculptural tree like elements. This idea was later scratched since it was overly complicated and unnecessary, especially in an existing building. The idea of involved individual indoor roof gardens on top of exercise studios and other spaces came about very early on as well.
10
t
Originally I planned to use the beautiful Mt. Airy Medical Campus. The grounds were stunning with a lake and several trees surrounding the enitre area. However, the building itself was not conducive for the program and the site was scraped in favor for the Harrison Public Library.
Site 1 Early July 2012
11
12
Assignment A: Design the Entire Project July 2012
After completing the program the first goal was to design the entire project in a weekend. By doing this it became evident that the Mt. Airy Medical Campus was not an appropriate site as it compromised many of the more important design goals.
First Plan (right)Assignment A (next page)
13
14
Assignment B: A Beautiful Plan July 2012
Changing shells to the Harrison Public Library proved to be the right move. It was much more flexible and had the high ceilings the program needed. However, working with the curves and complex shapes of the shell proved to be a real challenge. Resolving the shell’s issues and how to input the program into the building would be the focus for the rest of the quarter.
Early Spatial Diagram (right)Beautiful Plan and Section (below)
15
Attempting to Understand the Shell July 2012
Various Sketches/Early Ideas (below)
16
Before midterm a small group pinup occurred to get feedback from our classmates and hash out any issues before our next critique. Issues were beginning to be resolved, however were no where near a final solution.
Spatial Diagram in Plan (below)Presentation (next page)
Small Group Pinup July 2012
17
18
Finding a Solution August 2012
Various Process Sketches/Ideas (below)
19
t
20
4
21
Summer Midterm
4
22
By midterm the program was fine-tuned very nicely and the design goals were clear. However, the program was still having trouble responding to the building in section and therefore was not as strong as it could be in plan.
Cooking Demonstration Station (right)Perspective of entry area (below)Midterm Presentation (next page)
Midterm August 2012
23
t
24
25
t
26
5
27
Summer Final
5
28
By final the shell and program were finally coming together. The programming was finally fitting in and actually growing in response to the shell. A balcony space was created to take advantage of the high spots and nature had finally made it’s way inside.
Section through Therapy Room (right)Section through Spine of Building (below)Final Presentation (next page)
Final August 2012
29
t
30
31
32
t
33
Model August 2012
An initial study model of the building made of black paper, acetate, and bas wood columns.
The model was placed over a print out of the plan to show the relationship of the shell to the new programmed plan.
It allowed for a better understanding of the spatial relationships throughout the building.
34
6
35
Schematic Design
6
36
t
Four weeks into the semester and the design of the project has really changed. The spine of the building has been determined to be the area of further development. However, the program of the spine needs to be rethought and given the new trends in body weight training and inactive physiology one possibility is a fitness zone. Other possibilities include a lap pool, community zone, or peaceful walking place.
Optional Plans of Spine (right)Proposed Section (next page)
Process January 2013
37
Given the length and linearity of the spine design decisions will be made to emphasize this. Tricks including lines of planters, reinforced by a row of ceiling fans create the feeling of an infinite and endless space. This idea was developed slightly past the sketching stage but was later scraped for other more important design features.
Designing Infinity January 2013
38
Spaces were laid out based on level of privacy. Therapy was given the far ends of the wings since they required the most privacy. The spine was laid out based on when the spine might hold community events.
Planning Diagram (right)
Process January 2013
39
t
Sketchy Perspective of what the spine could look like (left)
Process January 2013
40
t
Four weeks into the semester and the design of the project has further changed. The spine of the building has been determined to be the area of further development and given the new trends in body weight training and inactive physiology the main programmatic feature of the spine is activity and fitness.
Plan of Spine (right)Site Plan (next page top)Section (next page bottom)
Schematic Design January 2013
41
42
t
43
t Back of Spine (left)Entrance View (bottom left)Waiting (bottom right)
44
t
45
t Outside the Spine (left)View Outside from Balcony (below)
46
7
47
Design Development
7
48
Walking away from schematic reviews I thought I wanted to focus on fitness in the spine. I thought the planter bed could be become an integrated exercise equipment storage device and the floor pattern would carry up onto the planter design. Also, each section of the floor would hold a different type of exercise.
Planter sketch (right)
Process February 2013
49
t
My plan was to develop the experience of working out within HWC. I reworked the plan so that a client’s journey through the space would consist of a full workout with little back tracking. While some of these ideas have carried over to the program, after talking to Hank the focus shifted back towards nature and sustainability. I plan to return to these ideas, post design development review.
Planter sketch (right)
Process February 2013
50
After schematic design some programmatic changes were made. The main clients of HWC changed and no longer include young healthy individuals and is solely focused on an obese clientèle.
Also, rather than a strict focus on the spine of the building it has shifted to include a section of all major spaces. This called for a new spatial plan strategy. Now the spaces are laid out by privacy need with the most private spaces located near the front of the building, the public functions in the spine, and the semi-public spaces near the rear of the building.
From there, each major space type (public, semi-public, private) was developed to include several strategies to introduce nature into the space. A design goal was also created in this design phase: to design a space that demonstrates sustainable initiatives that both activate the space as well as expose the user to the elements of nature.
Diagram of Program in Section (below)Diagram of Program in Plan (next page)
Design Development February 2013 1 Public Space
2 Nature Features
Semi-Public
4 Private
4 Main Entrance
51N
52
Spaces with no privacy needs and blend seamlessly with the exterior
Element of Nature: Wind
Sustainable Initiative: Cross Ventilation
Axon through Spine and Window Detail (below)Diagram Plan of Public Spaces (next page)
Public Spaces
Rotating Mechanismadjusts automatically throughout the day based on wind speed and direction
Mullions
Clerestory Windows
Wind enters from the southwest and exits on the opposite side at speeds averaging 9 mph
located on either side of the spine make this area a prime space for cross ventilation
53
t
N
54
t
SWNE
NReflected Ceiling Plan and Details
55
t
Perspective of Spine
56
Spaces that require acoustic and thermal control
Visual privacy is not a concern
Element of Nature: Heat/Solar
Sustainable Initiative: Power Generation
Floor Details (other page)Diagram of Spaces (above)
Semi-Public Spaces
Rubber Athletic Flooring Finish Floor with thermo-sensitive top coat
Power Lines Power generated by the compression of the blocks is fed down to the power lines and then to a battery located on site
Springs springs fitted beneath the floor allow it to compress when movement occurs on the floor
Crystal Blocks a process called piezoelectricity occurs when springs cause the crystal blocks to be squashed, producing small amounts of electrical current
1 Energy Generated by Floor
2 Energy Stored in Batteries
3 Energy Used to Power Fans
57
t
N
58
t
NSection Through Exercise Studio
59
t
Perspective of Exercise Studio and Details
60
Spaces are those that require acoustical, visual and thermal control
Element of Nature: Water
Sustainable Initiative: Water Collection
Section of Therapy Room and Detail of Wall Construction (other page)Diagram of Private Spaces (above)
Private Spaces
Metal Pipeallows water to flow from the wall out to the site in order to water the plants
LED Panel an LED panel is located between two glass panels in order to add therapeutic and relaxing colors onto the water
Glass Panel a piece of glass on either side forms the wall, creating an air space for the water to flow down, the trickling sounds adding to the relaxing, therapeutic environment
Collection Pond grey water and storm water collects from all over the roof here before filtering down through the wall
61
t
N
62
1 Gray Water from laundry, showers, and sinks collects on roof
2 Gray water mixes with rain water and moves to collection site
4 Water collects to either collection barrel located on site
3 Water moves down therapy wall where it light changes its color
5 Water is pumped to toilets where the gray water can be reused
Water Cycle Diagram
63
t
Perspective of Therapy Room
64
t
First Floor Plan
65
t
Second Floor Plan
66
8
67
Reaching the End
8
68
69
After design development the focus shifted towards the look and feel of the space. With the space planning and major design concepts worked out it was now time to focus on not on the materiality of the space but the role that plantings and nature would play in the spine.
In order to try some designs out quick perspectives were done in colored pencil to try ideas out
Sketchy Perspective of Spine that will later be translated to final design of the space (right)
Design Aesthetic March 2013
70
t
71
Before coming to a final solution a more diagrammatic approach was taken to figuring out the look and feel. Colored planes represented general colors rather than actual materials. This sketch lead to the final solution found on the previous page.
Another major concern after design development was establishing the user journey and how could interior plantings shape this experience. Many iterations were drawn up showing how planters could be placed as well as where various activities are occurring. The final design ended up being a variation of the top sketch.
Sketchy Perspective of Spine (right)Planter Iteration 1 (top left)Planter Iteration 2 (bottom left)
Trial and Error March 2013
72
9
73
Technical Drawings
9
74
OPE
NO
FFIC
E12
02
ROO
M N
AME
ROO
M N
UMBE
R
DOO
R NU
MBE
R
A8211
2
3
4
ELEV
ATIO
N NU
MBE
R
SHEE
T NU
MBE
R O
F EL
EVAT
ION
INTE
RIO
REL
EVAT
ION
REFE
RENC
E
SCAL
E: 1
-1/2
"=1'-
0"DE
TAIL
205
A51212
SECT
ION
REFE
RENC
E
SHEE
T NU
MBE
R O
F SE
CTIO
N
SECT
ION
NUM
BER
DETA
IL R
EFER
ENCE
SHEE
T NU
MBE
R O
F DE
TAIL
DETA
IL N
UMBE
R
A A
1 1
FLO
OR
OPE
NING
COLU
MN
CENT
ERLI
NE
EXIS
TING
CO
LUM
N CE
NTER
LINE
LEAD
ER L
INE
FIRE
ASS
EMBL
Y RA
TING
/HO
URS)
OR
SMO
KE P
ARTI
TIO
N RE
QUI
REM
ENTS
2ASP b
PART
ITIO
NTY
PEPA
RTIT
ION
CONF
IGUR
ATIO
N
PART
ITIO
N W
ALL
MO
DIFI
CATI
ON
PART
ITIO
N TA
G
NORT
H AR
ROW
DRAW
ING
NOTE
2
FLUO
RESC
ENT
LIG
HT F
IXTU
RE (N
IGHT
LIG
HT)
NL
FLUO
RESC
ENT
LIG
HT F
IXTU
RE (E
MER
GEN
CY)
FLUO
RESC
ENT
LIG
HT F
IXTU
RE (I
N AC
P CE
ILIN
G)
FLUO
RESC
ENT
LIG
HT F
IXTU
RE (I
N A
HARD
CEI
LING
)
EEX
IT L
IGHT
/ EM
ERG
ENCY
EXI
T LI
GHT
SUPP
LY A
IR D
IFFU
SER
RETU
RN A
IR G
RILL
E
SLO
T DI
FFUS
ER
A8213
A8213
TITL
EMAR
K
205
204
203
THIS
IS A
NO
TE
OFF
ICE
205
OFF
ICE
204
OFF
ICE
2033A
a3A
a61A
a
A5115
OPP.
12
A
1'-6"
12'-0"
4'-0"
11'-0"
1'-6"
30'-0"
9'-6"
10'-0"
7'-6"
13'-0"
9'-0"4'-0"
1.DI
MEN
SIO
NS A
RE T
O C
OM
MO
N RE
FERE
NCE
OF
EXTE
RIO
R FA
CE, O
R TO
COLU
MNS
LIN
ES.
2.SL
ASHE
S HA
VE B
EEN
USED
IN L
IEU
OF
ARRO
WHE
ADS,
DO
TS M
AY B
E US
ED IN
VERY
TIG
HT C
OND
ITIO
NS.
3.DI
MEN
SIO
NS T
O A
CTUA
L SI
ZE (1
/8" A
CC.).
DIM
ENSI
ONS
ARE
TO
ONE
SID
E O
FW
ALL
ONL
Y, P
ARTI
TIO
N TY
PE W
ILL
INDI
CATE
WAL
L TH
ICKN
ESS.
4.W
HERE
SPA
CES
PERM
ITS,
DIM
ENSI
ONS
LIN
ES E
XTEN
DED
THRU
ENT
IRE
PLAN
.5.
CONT
RACT
OR
SHAL
L CH
ECK
AND
VERI
FY A
LL D
IMEN
SIO
NS A
ND IM
MED
IATE
LYRE
PORT
ANY
DIS
CREP
ANCI
ES T
O T
HE A
RCHI
TECT
.6.
IN C
ASE
OF
DISC
REPA
NCIE
S BE
TWEE
N SC
ALE
DIM
ENSI
ONS
AND
FIG
URES
, THE
FIG
URES
GO
VERN
.7.
LARG
E SC
ALE
DRAW
ING
S G
OVE
RN O
VER
SMAL
L SC
ALE
DRAW
ING
S.
A8213
A8111
2
CONC
RETE
CONC
RETE
MAS
ONR
Y
REIN
FORC
ING
BAR
S
EART
H
FACE
BRI
CK
FACE
BRI
CK W
/ CO
NCRE
TE M
ASO
NRY
BACK
-UP
STO
NE
STRU
CTUR
AL C
LAY
TILE
OR
RIG
ID IN
SULA
TIO
N
CONT
INUO
US W
OO
D BL
OCK
ING
NON-
CONT
INUO
US W
OO
D BL
OCK
ING
OR
SHIM
FINI
SH W
OO
D
PLYW
OO
D
GRA
NULA
R FI
LL
INSU
LATI
ON
- BLA
NKET
INSU
LATI
ON
- RIG
ID
MET
AL-T
YPE
INDI
CATE
D O
N DR
AWIN
G D
ETAI
L
GYP
SUM
BO
ARD
Scal
e
Proj
ect n
umbe
r
Dat
e
Dra
wn
by
Che
cked
byHar
rison
Wel
lnes
sC
ente
r10
398
New
Hav
en R
oad
Har
rison
, Ohi
o 45
030
Erin
Mac
Lenn
anEr
in E
lizab
eth
Des
ign
729
Edge
cliff
St.
Cov
ingt
on, K
Y 41
014
(312
) 231
-876
1w
ww
.gbb
n.co
m
3/8
" = 1
'-0"
3/28/2013 2:19:04 PM
AS
ARC
HIT
ECTU
RAL
STAN
DAR
DS 13
000.
00Is
sue
Dat
eEE
MEE
M
A ALAL
UMIN
UM
C CGL
CLEA
R G
LASS
CJCO
NTRO
L JO
INT
CCE
NTER
LIN
ECL
GCE
ILIN
GCO
NCCO
NCRE
TECO
NTCO
NTIN
UOUS
CPT
CARP
ETCT
CERA
MIC
TIL
ECT
GCL
EAR
TEM
PERE
D G
LASS
CUH
CABI
NET
UNIT
HEA
TER
D DFDR
INKI
NG F
OUN
TAIN
DNDO
WN
E EEA
STEA
EACH
E/F
EACH
FAC
EEL
ELEV
ATIO
NEL
ECEL
ECTR
ICEL
EVEL
EVAT
OR
EQEQ
UAL
EXP
EXPO
SED
EXST
EXIS
TING
F FEFI
RE E
XTIN
GUI
SHER
FEB
FIRE
EXT
ING
UISH
ER A
ND
WAL
L BR
ACKE
TFE
CFI
RE E
XTIN
GUI
SHER
CA
BINE
TFF
&E"F
URNI
TURE
, FIX
TURE
S AN
D EQ
UIPM
ENT"
FHFI
RE H
YDRA
NTFG
LFR
OST
ED G
LASS
G GL
GLA
SSG
YP B
DG
YPSU
M B
OAR
D
H HHI
GH
HBHO
SE B
IBHD
WHA
RDW
ARE
HMHO
LLO
W M
ETAL
HRHO
URHT
HEIG
HTHV
AC"H
EATI
NG, V
ENTI
LATI
NG &
AI
RCO
NDIT
IONI
NG
I IDIN
SIDE
DIA
MET
ERIN
VIN
VERT
M MAX
MAX
IMUM
MIN
"MIN
IMUM
, MIN
UTES
"
ARCH
ITEC
TURA
L AB
BREV
IATI
ONS
N NNO
RTH
NIC
NOT
IN C
ONT
RACT
NO. o
r #NU
MBE
RNO
MNO
MIN
ALNR
CNO
ISE
REDU
CTIO
N CO
EFFI
CIEN
T
O OC
ON
CENT
ERO
DO
UTSI
DE D
IAM
ETER
OFC
IO
WNE
R FU
RNIS
HED
and
CONT
RACT
OR
INST
ALLE
DO
GL
OBS
CURE
GLA
SSO
PPO
PPO
SITE
HAN
D
P %PE
RCEN
TPL
AMPL
ASTI
C LA
MIN
ATE
± or
+/-P
LUS
OR
MIN
USPT
PAIN
TPW
GPO
LISH
ED W
IRE
GLA
SS
Q QT
QUA
RRY
TILE
R RRU
BBER
FLO
ORI
NGRB
RESI
LIEN
T BA
SERC
BRE
SILI
ENT
COVE
BAS
ERD
ROO
F DR
AIN
REFR
REFR
IGER
ATO
RRE
QD
REQ
UIRE
D
S SSO
UTH
SCW
SOLI
D CO
RE W
OO
DSF
SQUA
RE F
EET
SIM
SIM
ILAR
SPSP
ACES
STC
SOUN
D TR
ANSM
ISSI
ON
COEF
FICI
ENT
T TTR
EAD
T/TO
P O
FTS
TUBE
STE
ELTY
PTY
PICA
L
U UCUN
DERC
OUN
TER
UNO
UNLE
SS N
OTE
D O
THER
WIS
E
W W"W
EST,
WID
E, W
ATER
"W
/W
ITH
WB
WO
OD
BASE
WD
WO
OD
W/O
WIT
HOUT
SYM
BOLS
MAT
ERIA
LS
DIM
ENSI
ONI
NG N
OTE
S
No.
Des
crip
tion
Dat
e
75
Scal
e
Proj
ect n
umbe
r
Dat
e
Dra
wn
by
Che
cked
byHar
rison
Wel
lnes
sC
ente
r10
398
New
Hav
en R
oad
Har
rison
, Ohi
o 45
030
Erin
Mac
Lenn
anEr
in E
lizab
eth
Des
ign
729
Edge
cliff
St.
Cov
ingt
on, K
Y 41
014
(312
) 231
-876
1w
ww
.gbb
n.co
m
3/28/2013 2:15:28 PM
TS
TITL
E SH
EET 13
000.
00Is
sue
Dat
eEE
MEE
M
DR
AWIN
G IN
DEX
Shee
tN
umbe
rSh
eet N
ame
TSTI
TLE
SHEE
TAS
ARC
HIT
ECTU
RAL
STA
ND
ARD
SD
201
FIR
ST F
LOO
R D
EMO
LITI
ON
PLA
NA2
01FI
RST
FLO
OR
AR
CH
ITEC
TUR
AL P
LAN
A202
LIFE
SAF
ETY
& EG
RES
S PL
ANA3
01EN
LAR
GED
FR
AGM
ENT
ARC
HIT
ECTU
RAL
PLA
NA4
01IN
TER
IOR
SEC
TIO
NS
A402
INTE
RIO
R S
ECTI
ON
SA5
01PA
RTI
TIO
N T
YPE
GEN
ERAL
NO
TES
/ TYP
ES 1
& 2
DET
AILS
A502
PAR
TITI
ON
TYP
E 3
GLA
SS P
ARTI
TIO
NA5
03PA
RTI
TIO
N T
YPE
4 W
OO
D W
ALL
A504
PAR
TITI
ON
TYP
E 5
WAT
ER W
ALL
A601
RO
OM
& F
IXTU
RE
SCH
EDU
LEA6
02D
OO
R S
CH
EDU
LE &
DET
AILS
A603
FIN
ISH
SC
EHD
ULE
& L
EGEN
DA7
00C
EILI
NG
DET
AILS
A701
FRAG
MEN
T R
EFLE
CTE
D C
EILI
NG
PLA
NA7
02FR
AGM
ENT
REF
LEC
TED
CEI
LIN
G P
LAN
- U
PPER
LEVE
LA7
03R
EFLE
CTE
D C
EILI
ING
PLA
N -
DES
IGN
FEA
TUR
ESA8
01IN
TER
IOR
DET
AILS
A901
FIR
ST F
LOO
R F
INIS
H F
LOO
R P
LAN
A902
FIR
ST F
LOO
R F
UR
NIT
UR
E PL
ANE2
01FI
RST
FLO
OR
ELE
CTR
ICAL
PLA
NE7
01FI
RST
FLO
OR
SW
ITC
HIN
G P
LAN
L200
PLAN
TIN
G P
LAN
HARR
ISON
WEL
LNES
S CE
NTER
123 P
ROJE
CT A
DDRE
SS R
OAD,
CIN
CINN
ATI, O
H 45
202
PROJ
ECT
SCOP
E, R
ENOV
ATIO
N AN
D NE
W C
ONST
RUCT
ION
PROJ
ECT
RELE
ASE:
BID
& C
ONST
RUCT
ION
SET
DESI
GN F
IRM
ERIN
ELI
ZABE
TH D
ESIG
N72
9 ED
GEC
LIFF
ST.
COVI
NGTO
N, K
Y 41
014
v 31
2.23
1.87
61
LAND
SCAP
E CO
NSUL
TANT
GARD
ENS
GALO
RE12
3 FL
OW
ER R
D.CI
NCIN
NATI
, OH
4520
2v
555.
555.
5555
LOCA
TION
MAP
DRAW
INGS
INDE
X
No.
Des
crip
tion
Dat
e
76
3
D
D
D
D
D
D
2
6'-8" 157.00
°
D1D1
D1
D1
D1
D1
D2
D2
D3D3
D4
D4
D4
DEM
OLI
TIO
N G
ENER
AL N
OTE
S1.
RE
MO
VE A
LL E
XISI
TNG
VIN
YL W
ALL
COVE
RING
/NA
ILS
/ WAL
L PR
OTE
CTIO
N /
MO
LLY
BOLT
S /
SIG
NAG
E RE
SIDY
/ ET
C. F
ROM
EXI
STIN
G W
ALLS
TO
REM
AIN.
PAT
CH A
ND R
EPAI
R FO
R PA
INTI
NG.
2.DE
MO
ALL
EXI
STIN
G F
LOO
R FI
NISH
ES, B
ASE,
ADHE
SIVE
, AND
ASS
OCI
ATED
.
3.DE
MO
ALL
EXI
STIN
G A
COUS
ITC
CEIL
ING
TIL
E.
DEM
O P
LAN
LEG
END
PART
ITIO
N TO
REM
AIN
REM
OVE
PAR
TITI
ON
COLU
MN
TO R
EMAI
N
DOO
R A
ND F
RAM
E TO
REM
AIN
REM
OVE
DO
OR
AND
FRA
ME
DEM
OLI
TON
KEYN
OTE
SD1
RE
MO
VE A
LL E
XIST
ING
CAS
EWO
RK.
D2RE
MO
VE A
LL E
XIST
ING
CAS
EWO
RK. R
EMO
VE S
INK
AND
CAP
PLUM
BING
BEL
OW
FLO
OR.
D3EX
ISIT
ING
MEC
HANI
CAL
ROO
M E
QUI
PMEN
T TO
REM
AIN
AS IS
AND
PRO
PER
PRO
CTEC
TIO
N SU
PPLI
EDDU
RING
CO
NSTR
UCTI
ON
D4EX
ISTI
NG W
ALLS
TO
BE
DEM
OLI
SHED
. NEW
CUR
TAIN
WAL
LS T
O B
E SP
ECIF
IED
AND
DETA
ILED
INAR
CHIT
ECT'
S SC
OPE
OF
WO
RK.
Scal
e
Proj
ect n
umbe
r
Dat
e
Dra
wn
by
Che
cked
byHar
rison
Wel
lnes
sC
ente
r10
398
New
Hav
en R
oad
Har
rison
, Ohi
o 45
030
Erin
Mac
Lenn
anEr
in E
lizab
eth
Des
ign
729
Edge
cliff
St.
Cov
ingt
on, K
Y 41
014
(312
) 231
-876
1w
ww
.gbb
n.co
m
As
indi
cate
d
3/28/2013 2:14:48 PM
D20
1
FIR
ST F
LOO
RD
EMO
LITI
ON
PLAN
1300
0.00
Issu
e D
ate
EEM
EEM
SCAL
E: 1
/16"
= 1
'-0"
D2011
FIR
ST F
LOO
R D
EMO
LITI
ON
PLA
N
No.
Des
crip
tion
Dat
e
77
UP
BREA
KRO
OM 70
MAL
ELO
CKER
ROOM 64
FEM
ALE
LOCK
ERRO
OM 62
BODY
WEI
GHT
TRAI
NING
STUD
IO61
EXER
CISE
STUD
IO51
EXER
CISE
STUD
IO53
EXER
CISE
STUD
IO55
THER
APY
ROOM 52
THER
APY
ROOM 43
THER
APY
ROOM 41
THER
APY
ROOM 31
WAI
TING
40
RECE
PTIO
N30
CLAS
SROO
M65
CORR
IDOR
50
CORR
IDOR
60
LOBB
Y10
STAI
R63
LAUN
DRY
80
MEC
HANI
CAL
/ DAT
A90
SPIN
E20
JUIC
EBA
R /
COOK
NGDE
MOS
22
15'-0
"21
.38°
20.62
°RE
SEAR
CH21
21.30
°
20.70
°10
.00°
9'-01/4"
11'-8"3'-0 3/4" 6'-0 3/4"
19'-9
"
5'-43
/8"
5'-0"
22'-1
01/2"
10'-0"
1b
1b
1b
1a
1a
1b
1b
1b
1b
3
3
33
33
33
3
33
3
3
9080
70
64
62
61B
65
61A
20
31
4143
52
51
5355
22A
22B
50
10B
10A
A3011
Sim
42'-0"
57'-35/8"21'-7
3/4"
16'-1 1/2"
ALIG
N
A1A1
A1
83'-
0"23
'-0"
15'-0"
23'-10 1/2"
24'-0
"
ALIGN
2'-8
"
8'-5 1
/2"
7'-1"
12'-0
"
3'-10
1/2"
2'-11
"
7'-7 1
/2"
EQEQ
9'-0"
6'-11 1/8"
7'-51/4
"
5'-0"
5'-0"
5'-0"
9' -6"
7' - 6
"
FLO
OR
PLAN
GEN
ERAL
NOTE
S1.
REFE
R TO
SHE
ET A
401
FOR
PART
ITIO
NTY
PES
2.
DOO
R FR
AMES
SHA
LL B
E 6"
FRO
M F
ACE
OF
WAL
L TO
BAC
KSID
E O
F FR
AME
UNLE
SS O
THER
WIS
E NO
TED.
3.CE
NTER
LINE
OF
NEW
PAR
TITI
ONS
TO
ALIG
N W
ITH
CENT
ERLI
NE O
F CO
LUM
NS
FLO
OR
PLAN
KEY
NO
TES
A1BL
OCK
ING
BEH
IND
WAL
L FO
RTE
LEVI
SIO
N. C
OO
RDIN
ATE
LOCA
TIO
NW
ITH
CONT
RACT
OR.
Scal
e
Proj
ect n
umbe
r
Dat
e
Dra
wn
by
Che
cked
byHar
rison
Wel
lnes
sC
ente
r10
398
New
Hav
en R
oad
Har
rison
, Ohi
o 45
030
Erin
Mac
Lenn
anEr
in E
lizab
eth
Des
ign
729
Edge
cliff
St.
Cov
ingt
on, K
Y 41
014
(312
) 231
-876
1w
ww
.gbb
n.co
m
As
indi
cate
d
3/28/2013 2:10:56 PM
A201
FIR
ST F
LOO
RAR
CH
ITEC
TUR
ALPL
AN
1300
0.00
Issu
e D
ate
EEM
EEM
SCAL
E: 1
/16"
= 1
'-0"
A2011
FIR
ST F
LOO
R A
RC
HIT
ECTU
RA
L PL
AN
No.
Des
crip
tion
Dat
e
78
UP
3
D
D
D
D
D
D
2
BREA
KRO
OM 70
MAL
ELO
CKER
ROOM 64
FEM
ALE
LOCK
ERRO
OM 62
BODY
WEI
GHT
TRAI
NING
STUD
IO61
EXER
CISE
STUD
IO51
EXER
CISE
STUD
IO53
EXER
CISE
STUD
IO55
THER
APY
ROOM 52
THER
APY
ROOM 43
THER
APY
ROOM 41
THER
APY
ROOM 31
WAI
TING
40
RECE
PTIO
N30
CLAS
SROO
M65
CORR
IDOR
50
CORR
IDOR
60
LOBB
Y10
STAI
R63
LAUN
DRY
80
MEC
HANI
CAL
/ DAT
A90
SPIN
E20
JUIC
EBA
R /
COOK
NGDE
MOS
22
RESE
ARCH
21
FEC
FEC
FEC
FEC
FEC
LIFE
SAF
ETY
& EG
RESS
GEN
ERAL
NO
TES
1.BU
ILDI
NG W
ILL
BE F
ITTE
D O
UT W
ITH
SPRI
NKLE
RS
2.
REFE
R TO
SHE
ET A
701
THRO
UGH
A703
FOR
SPRI
NKLE
R, E
XIT
SIG
N, A
ND F
IRE
ALAR
M/S
MO
KE D
ETEC
TOR
LOCA
TIO
NS
Scal
e
Proj
ect n
umbe
r
Dat
e
Dra
wn
by
Che
cked
byHar
rison
Wel
lnes
sC
ente
r10
398
New
Hav
en R
oad
Har
rison
, Ohi
o 45
030
Erin
Mac
Lenn
anEr
in E
lizab
eth
Des
ign
729
Edge
cliff
St.
Cov
ingt
on, K
Y 41
014
(312
) 231
-876
1w
ww
.gbb
n.co
m
As
indi
cate
d
3/28/2013 2:11:06 PM
A202
LIFE
SAF
ETY
&EG
RES
S PL
AN 1300
0.00
Issu
e D
ate
EEM
EEM
SCAL
E: 1
/16"
= 1
'-0"
A2021
FIR
ST F
LOO
R L
IFE
SAFE
TY &
EG
RES
S PL
AN
No.
Des
crip
tion
Dat
e
79
1A4
01
FEM
ALE
LOCK
ERRO
OM 62
BODY
WEI
GHT
TRAI
NING
STUD
IO61
THER
APY
ROOM 31
RECE
PTIO
N30
LOBB
Y10
SPIN
E20
JUIC
EBA
R /
COOK
NGDE
MOS
22
57'-
0"
42'-
0"
RESE
ARCH
21
2'-0"
16' - 0"
18' - 8"
32'- 6"
34' -
10"
7'-0"
38.00°
5'-10"
30'- 0"
64.20°
118.4
7°
6'-4 1
/2"
3'-5 1
/4"
20'-0"
3'-3 1/2"
21'-11/4
"
5'-01
/2"15'
-4"
7'-4 1/4"
9'-81/2
"
8'-1"
2'-1"
9'-93/4
"
7'-95/8
"
14'-3 1/2"
9'-41/2
"
19'-3"
ALIG
N
18' - 6
"
17'-1"
2'-91/2
"
17'-1"
2'-61/8
"
2'-6 1/2"
1
1
2 2
4
4
4
4
1b
4
4
4
4
61A
20
31
22A
22B
10B
10A
5
1A5
04
Sim
1A5
03
Sim
A503
2
4'-0"
4'-4"
24'-6"
2'-6"
9'-0"
6'-0"
3'-0"
1'-2"
8'-9"
2A4
01
2A5
02
Sim
A502
1
1A4
02
2A4
02
FLO
OR
PLAN
GEN
ERAL
NO
TES
1.RE
FER
TO S
HEET
A40
1 FO
R PA
RTIT
ION
TYPE
S
2.
DOO
R FR
AMES
SHA
LL B
E 6"
FRO
M F
ACE
OF
WAL
L TO
BAC
KSID
E O
F FR
AME
UNLE
SS O
THER
WIS
E NO
TED.
3.CE
NTER
LINE
OF
NEW
PAR
TITI
ONS
TO
ALI
GN
WIT
H CE
NTER
LINE
OF
COLU
MNS
Scal
e
Proj
ect n
umbe
r
Dat
e
Dra
wn
by
Che
cked
byHar
rison
Wel
lnes
sC
ente
r10
398
New
Hav
en R
oad
Har
rison
, Ohi
o 45
030
Erin
Mac
Lenn
anEr
in E
lizab
eth
Des
ign
729
Edge
cliff
St.
Cov
ingt
on, K
Y 41
014
(312
) 231
-876
1w
ww
.gbb
n.co
m
As
indi
cate
d
3/28/2013 2:11:18 PM
A301
ENLA
RG
EDFR
AGM
ENT
ARC
HIT
ECTU
RAL
PLAN
1300
0.00
Issu
e D
ate
EEM
EEM
SCAL
E: 1
/8" =
1'-0
"A3
011EN
LARG
ED F
RAG
MEN
T AR
CHIT
ECTU
RAL
PLAN
No.
Des
crip
tion
Dat
e
80
A5032
Sim
P-1
P-1
P-1
P-1
P-1
P-1
WD-
1W
D-1
WD-
1
WD-
1W
D-1
WD-
1W
D-1
WD-
1
WD-
1W
D-1
P-1
14'-0"3'-6"
AIR
SUPP
LYDI
FFUS
ERA7001
GL-2
14'-0"
3'-0"
A8011
10'-0"
WD-
1
WD-
1
WD-
1
WD-
1W
D-1
3'-6"
4A8
01
Sim
GL-
2
Scal
e
Proj
ect n
umbe
r
Dat
e
Dra
wn
by
Che
cked
byHar
rison
Wel
lnes
sC
ente
r10
398
New
Hav
en R
oad
Har
rison
, Ohi
o 45
030
Erin
Mac
Lenn
anEr
in E
lizab
eth
Des
ign
729
Edge
cliff
St.
Cov
ingt
on, K
Y 41
014
(312
) 231
-876
1w
ww
.gbb
n.co
m
As
indi
cate
d
3/28/2013 2:11:28 PM
A401
INTE
RIO
RSE
CTI
ON
S 1300
0.00
Issu
e D
ate
EEM
EEM
SCAL
E: 1
/16"
= 1
'-0"
A4011
LON
GIT
UD
INA
L SE
CTI
ON
TH
RO
UG
H F
RA
GM
ENT
SCAL
E: 1
/4" =
1'-0
"A4
012TR
ANS
VERS
E SE
CTIO
N TH
ROU
GH
FRAG
MEN
T
No.
Des
crip
tion
Dat
e
81
A8012
10'-0"
14'-0"
3'-0"2'-2"2'-2"2'-8"
2' - 8"
5'-4"
3'-6"
22'-2
"
P-3
WD-
1
P-1
WD-
1
WD-
1
P-1
GL-
1P-
3
WD-
1
WD-
1
WD-
1
A7006
PT-2
RP-1
P-3
WD-
1
3'-0"
P-3
A7005
Scal
e
Proj
ect n
umbe
r
Dat
e
Dra
wn
by
Che
cked
byHar
rison
Wel
lnes
sC
ente
r10
398
New
Hav
en R
oad
Har
rison
, Ohi
o 45
030
Erin
Mac
Lenn
anEr
in E
lizab
eth
Des
ign
729
Edge
cliff
St.
Cov
ingt
on, K
Y 41
014
(312
) 231
-876
1w
ww
.gbb
n.co
m
1/4
" = 1
'-0"
3/28/2013 2:11:39 PM
A402
INTE
RIO
RSE
CTI
ON
S 1300
0.00
Issu
e D
ate
EEM
EEM
SCAL
E: 1
/4" =
1'-0
"A4
021D
epen
dent
on
Gre
en R
oof S
ectio
n
SCAL
E: 1
/4" =
1'-0
"A4
022D
epen
dent
(2) o
n G
reen
Roo
f Sec
tion
No.
Des
crip
tion
Dat
e
82
PART
ITIO
N TY
PE -
NO M
ODI
FICA
TIO
N
THER
MAL
INSU
LATI
ON
BATT
S:PR
OVI
DE A
ND IN
STAL
L TH
ERM
ALIN
SULA
TIO
N BA
TTS
AT S
TUD
PART
ITIO
NS.
ACO
USTI
C IN
SULA
TIO
N:PR
OVI
DE A
ND IN
STAL
L AC
OUS
TIC
INSU
LATI
ON
ACO
USTI
C SE
ALAN
T AT
HEA
D AN
DSI
LL &
ACO
USTI
C SE
ALAN
T AR
OUN
DAL
L PE
NETR
ATIO
NS.
a b TYPI
CAL
END
COND
ITIO
N DE
TAIL
S:
NO F
ASTE
NERS
PART
ITIO
N TY
PEPE
R PL
AN
FLO
OR
SLAB
MET
AL D
ECK
PART
ITIO
N PE
RPEN
DICU
LAR
TO D
ECKI
NG
SCAL
E: 1
-1/2
"=1'-
0"BA
SE D
ETAI
LA4
01TY
PSC
ALE:
1-1
/2"=
1'-0"
HEAD
DET
AIL
A401
TYP
2"
UNO3/4" TYP
PART
ITIO
N TY
PEPE
R PL
ANCO
NTIN
UOUS
BRI
DGIN
G
STEE
L CL
IPAN
GLE
ATTA
CHM
ENT
FAST
ENER
S(2
) EA.
SIDE
FIRE
STO
P SE
ALAN
T @
FIR
ERA
TED
PART
ITIO
NSAC
OUS
TICA
L SE
ALAN
T @
ACO
USTI
CAL
PART
ITIO
NS
FIRE
SAFI
NG @
RAT
EDPA
RTIT
IONS
ACO
USTI
CAL
INSU
LATI
ON
@AC
OUS
TICA
L PA
RTIT
IONS
CONT
INUO
US D
EEP
LEG
DEF
LECT
ION
TOP
TRAC
K
CONT
INUO
US3
5/8"
MET
AL T
RACK
FIRE
STO
P SE
ALAN
T @
FIR
E RA
TED
PART
ITIO
NSAC
OUS
TICA
L SE
ALAN
T @
ACO
USTI
CAL
PART
ITIO
NSO
MIT
@ N
ON-
RATE
D PA
RTIT
IONS
GEN
ERAL
NO
TES:
THE
PART
ITIO
N TY
PE D
ESIG
NATI
ON
INCL
UDES
THE
PART
ITIO
N FI
RE R
ATIN
G O
R SM
OKE
PAR
TITI
ON
REQ
UIRE
MEN
T (W
HERE
APP
LICA
BLE)
, A P
ARTI
TIO
NCO
NFIG
URAT
ION,
AND
PAR
TITI
ON
WAL
L M
ODI
FIER
S(W
HERE
APP
LICA
BLE)
PART
ITIO
NTY
PE
FIRE
ASS
EMBL
Y (H
OUR
S)O
R SM
OKE
PAR
TITI
ON
REQ
UIRE
MEN
TPA
RTIT
ION
CONF
IGUR
ATIO
N
PART
ITIO
N W
ALL
MO
DIFI
CATI
ON
PART
ITIO
N TY
PE IN
DICA
TORS
ARE
NO
TED
ON
FLO
OR
PLAN
S. S
EE L
IFE
SAFE
TY P
LANS
OR
FLO
OR
PLAN
S FO
RLO
CATI
ON
AND
EXTE
NT O
R LI
MIT
S O
F FI
RE A
ND S
MO
KERA
TED
PART
ITIO
NS.
PART
ITIO
N TY
PE N
UMBE
RS A
RE N
OT
SEQ
UENT
IAL
AND
CERT
AIN
NUM
BERS
MAY
NO
T BE
USE
D.
ALL
PART
ITIO
N TY
PE D
ETAI
LS A
RE P
LAN
VIEW
, UNL
ESS
NOTE
D O
THER
WIS
E.
B. C. D.A.
2ASP b
PART
ITIO
N W
ALL
MO
DIFI
CATI
ONS
:PA
RTIT
ION
TYPE
KEY
:
STAN
DARD
4 7
/8" W
ALL
MET
AL S
TUD
CONS
TRUC
TIO
NW
ITH
GYP
BD
ON
BOTH
SID
ES1
STAN
DARD
3" W
ALL
MET
AL S
TUD
CONS
TRUC
TIO
NW
ITH
GYP
BD
ON
ONE
SID
E2
GLA
SS P
ARTI
TIO
N W
ALL,
REF
ER T
O S
HEET
A40
23
WO
OD
SLAT
WAL
L SY
STEM
, REF
ER T
O S
HEET
A40
34
WAT
ER W
ALL
SYST
EM, R
EFER
TO
SHE
ET A
405
5
PART
ITIO
N CO
NFIG
URAT
ION:
A501
TYP
A501
TYP
5/8"
GYP
BD
SCHE
DULE
D CE
ILIN
G
BRAC
ING
IF R
EQUI
RED
STRU
CTUR
E
FLO
OR
PART
ITIO
N TO
UND
ERSI
DE O
F ST
RUCT
URE
NO F
ASTE
NERS
PART
ITIO
N TY
PEPE
R PL
AN
FLO
OR
SLAB
MET
AL D
ECK
PART
ITIO
N PE
RPEN
DICU
LAR
TO D
ECKI
NG
SCAL
E: 1
-1/2
"=1'-
0"BA
SE D
ETAI
LA4
01TY
PSC
ALE:
1-1
/2"=
1'-0"
HEAD
DET
AIL
A401
TYP
2" PART
ITIO
N TY
PEPE
R PL
ANCO
NTIN
UOUS
BRI
DGIN
G
STEE
L CL
IPAN
GLE
ATTA
CHM
ENT
FAST
ENER
S(2
) EA.
SIDE
FIRE
STO
P SE
ALAN
T @
FIR
ERA
TED
PART
ITIO
NSAC
OUS
TICA
L SE
ALAN
T @
ACO
USTI
CAL
PART
ITIO
NS
FIRE
SAFI
NG @
RAT
EDPA
RTIT
IONS
ACO
USTI
CAL
INSU
LATI
ON
@AC
OUS
TICA
L PA
RTIT
IONS
CONT
INUO
US D
EEP
LEG
DEF
LECT
ION
TOP
TRAC
K
CONT
INUO
US3
5/8"
MET
AL T
RACK
FIRE
STO
P SE
ALAN
T @
FIR
E RA
TED
PART
ITIO
NSAC
OUS
TICA
L SE
ALAN
T @
ACO
USTI
CAL
PART
ITIO
NSO
MIT
@ N
ON-
RATE
D PA
RTIT
IONS
A501
TYP
A501
TYP
5/8"
GYP
BD
SCHE
DULE
D CE
ILIN
G
BRAC
ING
IF R
EQUI
RED
STRU
CTUR
E
FLO
OR
PART
ITIO
N TO
UND
ERSI
DE O
F ST
RUCT
URE
11
2PA
RTIT
ION
CONF
IGUR
ATIO
N:TY
PICA
L EN
D CO
NDIT
ION
DETA
ILS:
2
Scal
e
Proj
ect n
umbe
r
Dat
e
Dra
wn
by
Che
cked
byHar
rison
Wel
lnes
sC
ente
r10
398
New
Hav
en R
oad
Har
rison
, Ohi
o 45
030
Erin
Mac
Lenn
anEr
in E
lizab
eth
Des
ign
729
Edge
cliff
St.
Cov
ingt
on, K
Y 41
014
(312
) 231
-876
1w
ww
.gbb
n.co
m
1 1
/2" =
1'-0
"
3/28/2013 2:17:25 PM
A501
PAR
TITI
ON
TYP
EG
ENER
AL N
OTE
S /
TYPE
S 1
& 2
DET
AILS
1300
0.00
Issu
e D
ate
EEM
EEM
No.
Des
crip
tion
Dat
e
83
4'-0"
4'-0"
3" A
LUM
INUM
MUL
LIO
N,VE
NEER
ED IN
WD-
1
3/4"
CLE
AR T
EMPE
RED
GLA
SS
2A5
02
Sim
A5023
8'-0"2'-0"4'-0"
14'-0"
GYP
BD
SOFF
IT
STRU
CTUR
E
SCHE
DULE
D CE
ILIN
G
3/4"
CLE
AR T
EMPE
RED
GLA
SS
FLO
OR
3/4"
SAW
CUT
EXS
T CO
NCRE
TE F
LOO
R
A5024
Sim
3" A
LUM
INUM
MUL
LIO
N, V
ENEE
RED
IN W
D-1
A5025
Sim
GYP
BD
SOFF
IT
1/8"
3/4"
CLE
ARTE
MPE
RED
GLA
SS
SILI
CON
SEAL
ANT
3/4"
CLE
AR T
EMPE
RED
GLA
SS
SAW
CUT
EXS
TCO
NCRE
TE F
LOO
R
RUBB
ER N
EOPR
ENE
GAS
KET
SILI
CONE
SEA
LANT
3 1/4"
3 3/4"
3/4"
CLE
AR T
EMPE
RED
GLA
SS
5/8"
GYP
BD
ALUM
INUM
CHA
NEL
FLUS
HW
ITH
FINI
SH F
ACE
OF
CEIL
ING
2x4
WO
OD
STUD
Scal
e
Proj
ect n
umbe
r
Dat
e
Dra
wn
by
Che
cked
byHar
rison
Wel
lnes
sC
ente
r10
398
New
Hav
en R
oad
Har
rison
, Ohi
o 45
030
Erin
Mac
Lenn
anEr
in E
lizab
eth
Des
ign
729
Edge
cliff
St.
Cov
ingt
on, K
Y 41
014
(312
) 231
-876
1w
ww
.gbb
n.co
m
As
indi
cate
d
3/28/2013 2:11:59 PM
A502
PAR
TITI
ON
TYP
E 3
GLA
SS P
ARTI
TIO
N
1300
0.00
Issu
e D
ate
EEM
EEM
SCAL
E: 1
/4" =
1'-0
"A5
021G
LASS
WA
LL (T
YPE
3) E
LEVA
TIO
N
SCAL
E: 3
/4" =
1'-0
"A5
022G
LASS
WA
LL (T
YPE
3) S
ECTI
ON
SCAL
E: 1
1/2
" = 1
'-0"
A5023
GLA
SS P
ANEL
JO
INER
Y DE
TAIL
SCAL
E: 1
1/2
" = 1
'-0"
A5024
GLA
SS W
ALL
BASE
DET
AIL
SCAL
E: 1
1/2
" = 1
'-0"
A5025
GLA
SS W
ALL
CEL
ING
DET
AIL
No.
Des
crip
tion
Dat
e
84
STRU
CTUR
E
SCHE
DULE
D CE
ILIN
G
2X6
WO
OD
PLAN
KS, W
D-1
FIXE
D PO
SITI
ON
FLO
OR
2X6
WO
OD
PLAN
KS, W
D-1
MO
VEAB
LE
CLO
SED
POSI
TIO
NO
PEN
POSI
TIO
N
A5035
Sim
STRU
CTUR
ALCO
LUM
N
2X6
WO
OD
SLAT
S, W
D-1
1A5
03
Sim
A5033
14'-0"A5
034
COLU
MN
2" W
IDE
WO
OD
SHIM
ATTA
CHED
TO
CO
LUM
N
2x6
WO
OD
SLAT
ATTA
CHED
TO
WO
OD
SHIM
COLU
MN
2" T
HICK
MET
AL T
RACK
BOLT
ED T
O C
OLU
MN
2x6
WO
OD
SLAT
ATTA
CHED
TO
WO
OD
SHIM
ROLL
ER T
RACK
WHE
EL A
TTAC
HED
TO 2
x6W
OO
D SH
IMCO
NNEC
TS M
ETAL
TRAC
K AN
D W
OO
DSL
ATS,
ALL
OW
ING
THE
UNIT
TO
MO
VE A
S O
NE MET
AL T
RACK
SAW
CUT
EXS
TCO
NCRE
TE F
LOO
R
3 1/4"
5"
1/2"
WO
OD
SHIM
BEND
ING
MEC
HANI
SM
Scal
e
Proj
ect n
umbe
r
Dat
e
Dra
wn
by
Che
cked
byHar
rison
Wel
lnes
sC
ente
r10
398
New
Hav
en R
oad
Har
rison
, Ohi
o 45
030
Erin
Mac
Lenn
anEr
in E
lizab
eth
Des
ign
729
Edge
cliff
St.
Cov
ingt
on, K
Y 41
014
(312
) 231
-876
1w
ww
.gbb
n.co
m
As
indi
cate
d
3/28/2013 2:12:15 PM
A503
PAR
TITI
ON
TYP
E 4
WO
OD
WAL
L 1300
0.00
Issu
e D
ate
Aut
hor
EEM
SCAL
E: 3
/4" =
1'-0
"A5
031W
OO
D S
LAT
WA
LL (T
YPE
4) S
ECTI
ON
SCAL
E: 1
/4" =
1'-0
"A5
032W
ood
Slat
Wal
l (TY
PE 3
) ELE
VATI
ON
(Ope
n Po
sitio
n)
SCAL
E: 1
1/2
" = 1
'-0"
A5033
FIXE
D W
OO
D S
LAT
ATTA
CHM
ENT
DETA
IL
SCAL
E: 1
1/2
" = 1
'-0"
A5034
MO
VEAB
LE W
ALL
ATTA
CHM
ENT
DETA
IL
SCAL
E: 1
1/2
" = 1
'-0"
A5035
WO
OD
SLAT
WAL
L BA
SE D
ETAI
L
No.
Des
crip
tion
Dat
e
85
STRU
CTUR
E
SCHE
DULE
D CE
ILIN
G
FLO
OR
A5042
Sim
3" D
IA.
MET
AL P
IPE
1/2"
CLE
AR T
EMPE
RPED
GLA
SS
2-SI
DED
LED
PANE
L
A5044
Sim
A5043
Sim
WAT
ER C
ATCH
BAS
IN
FILT
ER
3" D
IA. M
ETAL
PIP
E
DRAI
N CO
VER
WAT
ER P
ROO
FSE
ALAN
T
1/2"
CLE
ARTE
MPE
RED
GLA
SS
FLO
OR
SLAB1/
2" C
LEAR
TEM
PERE
D G
LASS
5 1/2"
1/2"
1 3/4"
1 1/8"
1 3/4"
1/2"
.08
CLEA
R AC
RYLI
C PA
NEL
DOUB
LE S
IDED
LED
PANE
L
1 1
/8" D
OUB
LE S
IDED
LED
PAN
EL
1/2"
CLE
AR T
EMPE
RED
GLA
SS
CHAR
COAL
FILT
RATI
ON
SYST
EM
WAT
ERPR
OO
F SE
ALAN
TTO
CO
VER
ALL
EDG
ESAN
D SE
AMS
PLAS
TIC
CATC
H BA
SIN
Scal
e
Proj
ect n
umbe
r
Dat
e
Dra
wn
by
Che
cked
byHar
rison
Wel
lnes
sC
ente
r10
398
New
Hav
en R
oad
Har
rison
, Ohi
o 45
030
Erin
Mac
Lenn
anEr
in E
lizab
eth
Des
ign
729
Edge
cliff
St.
Cov
ingt
on, K
Y 41
014
(312
) 231
-876
1w
ww
.gbb
n.co
m
As
indi
cate
d
3/28/2013 2:12:24 PM
A504
PAR
TITI
ON
TYP
E 5
WAT
ER W
ALL 13
000.
00Is
sue
Dat
eEE
MEE
M
SCAL
E: 3
/4" =
1'-0
"A5
041W
ATE
R W
ALL
(TYP
E 5)
SEC
TIO
NSC
ALE:
1 1
/2" =
1'-0
"A5
042W
ATER
WAL
L BA
SE D
ETAI
L
SCAL
E: 1
1/2
" = 1
'-0"
A5043
WAT
ER W
ALL
CONS
TRUC
TIO
N DE
TAIL
SCAL
E: 1
1/2
" = 1
'-0"
A5044
WAT
ER W
ALL
TOP
DETA
IL
No.
Des
crip
tion
Dat
e
86
FIXT
URE
LEG
END
SYM
BOL
TYPE
MAN
UFAC
TURE
RPR
ODUC
TVO
LTAG
E
RECE
SSED
CAN
LIG
HTCO
OPT
ERLI
GHT
ING
COUN
TSI
ZE
6" D
IA.
LAM
P
120
VHA
LO 4
94P0
6LE
D23
7
WAL
LW
ASHE
RCO
OPE
RLI
GHT
ING
6" D
IA.
120
VHA
LO49
5WW
06LE
D37
LINE
ARBO
XCO
OPE
RLI
GHT
ING
1' x
4'12
0 V
FSR
CONF
INEM
ENT
LED
2
STRI
PLI
GHT
ING
COO
PER
LIG
HTIN
G3"
x 6
'12
0 V
NEO
RAY
STR
AIG
HT&
NARR
OW
LED
9
DOUB
LESI
DED
LED
LIG
HT B
OX
LED
LIG
HT P
ANEL
SIM
PLYT
HIN
51" x
157
"12
VDO
UBLE
SID
EDLE
D LI
GHT
BO
XST
ANDA
RD
LED
???
COLO
R
3000
K
RGB
COLO
RCH
ANG
ING
3000
K
3000
K
3000
K
Scal
e
Proj
ect n
umbe
r
Dat
e
Dra
wn
by
Che
cked
byHar
rison
Wel
lnes
sC
ente
r10
398
New
Hav
en R
oad
Har
rison
, Ohi
o 45
030
Erin
Mac
Lenn
anEr
in E
lizab
eth
Des
ign
729
Edge
cliff
St.
Cov
ingt
on, K
Y 41
014
(312
) 231
-876
1w
ww
.gbb
n.co
m
12"
= 1
'-0"
3/28/2013 2:12:32 PM
A601
RO
OM
& F
IXTU
RE
SCH
EDU
LE
1300
0.00
Issu
e D
ate
EEM
EEM
RO
OM
AR
EA S
CH
EDU
LELe
vel
Num
ber
Nam
eD
epar
tmen
tO
ccup
ancy
Occ
upan
tAr
ea
Leve
l 1Le
vel 1
10LO
BBY
-14
1 SF
Leve
l 120
SPIN
E-
993
SFLe
vel 1
21R
ESEA
RC
HN
UTR
ITIO
N/
EDU
CAT
ION
1051
SF
Leve
l 122
JUIC
E BA
R /
CO
OKN
GD
EMO
S
NU
TRIT
ION
/ED
UC
ATIO
N58
5 SF
Leve
l 130
REC
EPTI
ON
-15
6 SF
Leve
l 131
THER
APY
RO
OM
THER
APY
296
SF
Leve
l 140
WAI
TIN
GTH
ERAP
Y11
55 S
FLe
vel 1
41TH
ERAP
YR
OO
MTH
ERAP
Y21
2 SF
Leve
l 143
THER
APY
RO
OM
THER
APY
241
SF
Leve
l 150
CO
RR
IDO
R-
1312
SF
Leve
l 151
EXER
CIS
EST
UD
IOFI
TNES
S61
4 SF
Leve
l 152
THER
APY
RO
OM
THER
APY
214
SF
Leve
l 153
EXER
CIS
EST
UD
IOFI
TNES
S53
0 SF
Leve
l 155
EXER
CIS
EST
UD
IOFI
TNES
S54
4 SF
Leve
l 160
CO
RR
IDO
R-
1105
SF
Leve
l 161
BOD
YW
EIG
HT
TRAI
NIN
GST
UD
IO
FITN
ESS
1199
SF
Leve
l 162
FEM
ALE
LOC
KER
RO
OM
FITN
ESS
949
SF
Leve
l 163
STAI
R-
118
SFLe
vel 1
64M
ALE
LOC
KER
RO
OM
FITN
ESS
730
SF
Leve
l 165
CLA
SSR
OO
MN
UTR
ITIO
N/
EDU
CAT
ION
922
SF
Leve
l 170
BREA
KR
OO
MBA
CK
OF
HO
USE
STAF
F54
3 SF
Leve
l 180
LAU
ND
RY
BAC
K O
FH
OU
SEST
AFF
573
SF
Leve
l 190
MEC
HAN
ICA
L / D
ATA
BAC
K O
FH
OU
SEST
AFF
361
SF
No.
Des
crip
tion
Dat
e
87
10'-0"
VARI
ES A
6'-0"
10'-0"
BFU
LL H
EIG
HTG
LASS
DO
OR
FULL
HEI
GHT
SLI
DING
GLA
SS D
OO
R
CST
ANDA
RD D
OO
R
3'-0"
7'-0"
3'-0"
DST
ORE
FRO
NTG
LASS
DO
OR
VARI
ES
VARIES
10'-0"
3'-0" 1
6'-0"
10'-0"
2SI
DEW
OO
D FR
AME
DOUB
LE S
IDE
WO
OD
FRAM
E
3AL
L SI
DES
WO
OD
FRAM
E
3'-0"
4ST
ORE
FRO
NT F
RAM
E
VARI
ES
VARIES
3"3"
3"3"
3"3"
7'-3"
OPE
NO
PEN
OPE
NO
PEN
Scal
e
Proj
ect n
umbe
r
Dat
e
Dra
wn
by
Che
cked
byHar
rison
Wel
lnes
sC
ente
r10
398
New
Hav
en R
oad
Har
rison
, Ohi
o 45
030
Erin
Mac
Lenn
anEr
in E
lizab
eth
Des
ign
729
Edge
cliff
St.
Cov
ingt
on, K
Y 41
014
(312
) 231
-876
1w
ww
.gbb
n.co
m
1/4
" = 1
'-0"
3/28/2013 2:12:38 PM
A602
DO
OR
SC
HED
ULE
& D
ETAI
LS
1300
0.00
Issu
e D
ate
EEM
EEM
DO
OR
SC
HED
ULE
DO
OR
MAR
KDO
OR
LOCA
TIO
N
DOO
R IN
FORM
ATIO
NFR
AME
INFO
RMAT
ION
HARD
WAR
ESE
TCO
MM
ENTS
SIZE
STYL
EM
ATER
IAL
TYPE
MAT
ERIA
LDE
TAIL
SW
IDTH
HEI
GHT
JAM
BHE
ADO
THER
10A
LOBB
Y6'
- 2
1/4"
7' -
10 3
/4"
EXST
EXST
EXST
EXST
(non
e)10
BLO
BBY
8' -
7 17
/32"
6' -
10 3
/4"
EXST
EXST
EXST
EXST
(non
e)20
SPIN
E4'
- 0"
10' -
0"
AFG
L1
WD
(non
e)22
AJU
ICE
BAR
/ C
OO
KNG
DEM
OS
3' -
9 1/
2"8'
- 0"
DC
TG4
AL(n
one)
22B
JUIC
E BA
R /
CO
OKN
G D
EMO
S3'
- 9
1/2"
8' -
0"D
CTG
4AL
(non
e)31
THER
APY
RO
OM
3' -
0"10
' - 0
"A
FGL
1W
D(n
one)
41TH
ERAP
Y R
OO
M3'
- 0"
10' -
0"
AFG
L1
WD
(non
e)43
THER
APY
RO
OM
3' -
0"10
' - 0
"A
FGL
1W
D(n
one)
50C
OR
RID
OR
3' -
9 1/
2"7'
- 10
3/4
"D
CTG
4AL
(non
e)51
EXER
CIS
E ST
UD
IO6'
- 0"
10' -
0"
BFG
L2
WD
(non
e)52
THER
APY
RO
OM
3' -
0"10
' - 0
"A
FGL
1W
D(n
one)
53EX
ERC
ISE
STU
DIO
6' -
0"10
' - 0
"B
FGL
2W
D(n
one)
55EX
ERC
ISE
STU
DIO
6' -
0"10
' - 0
"B
FGL
2W
D(n
one)
61A
BOD
Y W
EIG
HT
TRAI
NIN
G S
TUD
IO6'
- 0"
10' -
0"
BFG
L2
WD
(non
e)61
BBO
DY
WEI
GH
T TR
AIN
ING
STU
DIO
6' -
0"10
' - 0
"B
FGL
2W
D(n
one)
62FE
MAL
E LO
CKE
R R
OO
M3'
- 0"
10' -
0"
AFG
L1
WD
(non
e)64
MAL
E LO
CKE
R R
OO
M3'
- 0"
10' -
0"
AFG
L1
WD
(non
e)65
CLA
SSR
OO
M6'
- 0"
10' -
0"
BFG
L2
WD
(non
e)70
BREA
K R
OO
M6'
- 0"
10' -
0"
BFG
L2
WD
(non
e)71
LAU
ND
RY
6' -
0"7'
- 0"
EXST
EXST
EXST
EXST
(non
e)75
MEC
HAN
ICAL
/ D
ATA
6' -
0"7'
- 0"
EXST
EXST
EXST
EXST
(non
e)77
MEC
HAN
ICAL
/ D
ATA
10' -
0"
10' -
0"
EXST
EXST
EXST
EXST
(non
e)80
LAU
ND
RY
3' -
0"7'
- 0"
CW
D3
WD
(non
e)90
MEC
HAN
ICAL
/ D
ATA
3' -
0"7'
- 0"
CW
D3
WD
(non
e)
SCAL
E: 1
/4" =
1'-0
"A6
021D
OO
R T
YPES
SCAL
E: 1
/4" =
1'-0
"A6
022FR
AME
TYPE
S
No.
Des
crip
tion
Dat
e
88
FINI
SH L
EGEN
D
FLOO
R FI
NISH
ESCP
T-1
CODE
TYPE
MAN
UFAC
TURE
RST
YLE/
PATT
ERN
COM
MEN
TS
CARP
ET T
ILE
PORC
ELIN
ETI
LEPT
-1
INTE
RFAC
ECO
LLEC
TION
: URB
AN R
ETRE
ATST
YLE:
127
12CO
LOR:
100
641
SIZE
: 50c
m x
50c
mIN
STAL
L: Q
UART
ER T
URN
CRO
SSVI
LLE
TILE
STYL
E: S
HADE
S AV
241
HON
COLO
R: F
ROST
FINI
SH: H
ONE
DSI
ZE: 1
2" x
24"
INST
ALL:
MO
NOLI
THIC
RUBB
ERFL
OO
RING
R-1
NORA
COLL
ECTI
ON: N
ORA
PLAN
STYL
E: E
NVIR
ONC
ARE
COLO
R: L
ACE
VINE
294
5TH
ICKN
ESS:
3m
mSI
ZE: S
HEET
, 4' x
39'
SC GT-
1
USE
CORR
ESPO
NDIN
GHE
AT W
ELD
ROD,
COLO
R 29
45
SEAL
EDCO
NCRE
TE
EPO
XYG
ROUT
LATI
CRET
EST
YLE:
Spe
ctra
LOCK
PRO
Gro
utCO
LOR:
BRI
GHT
WHI
TE 4
4TH
ICKN
ESS:
1/8
"
WAL
L FI
NISH
ESP-
1PA
INT
(NEU
TRAL
)SH
ERW
INW
ILLI
AMS
COLO
R: S
W71
03 W
HITE
TAIL
E
P-2
PAIN
T(G
REEN
)SH
ERW
INW
ILLI
AMS
COLO
R: S
W77
26 L
EMO
N VE
RBEN
A
P-3
PAIN
T (M
ED)
SHER
WIN
WIL
LIAM
SCO
LOR:
SW
6126
NAV
AJO
WHI
TE
GL-
1G
LASS
GLA
SPRO
STYL
E: G
LAS-
PRO
CG
COLO
R: S
EA S
ALT
THIC
KNES
S: 1
/2"
RUBB
ERFL
OO
RING
R-2
TO M
ARKE
TCO
LLEC
TION
: ATM
OSP
HERE
STYL
E: B
OUN
CECO
LOR:
SO
DA F
OUN
TAIN
TM
113
THIC
KNES
S: 6
mm
SIZE
: 38"
x 3
8"
MIS
C. / C
ASEW
ORK
FINI
SHES
PL-1
PLAS
TIC
LAM
INAT
EW
ILSO
NART
STYL
E: W
INDS
OR
MAH
AGAN
Y 70
39FI
NISH
: 78
SS-1
SOLI
DSU
RFAC
ECO
RIAN
STYL
E: V
ENAR
O W
HITE
THIC
KNES
S: 1
/2"
WD-
1W
OO
DST
AINE
D TO
MAT
CH W
ILSO
NART
WIN
DSO
R M
AHAG
ANY
7039
P-3
PAIN
T(C
EILI
NG)
ICI/G
LIDD
ENCO
LOR:
CEI
LING
WHI
TE
RP-1
RESI
N PA
NEL
3FO
RMST
YLE:
VAR
IA E
CO-R
ESIN
COLO
R: H
IGH-
RES
IMAG
ERY
BLAD
ESLA
YOUT
: LAN
DSCA
PETH
ICKN
ESS:
1/2
"
RB-1
RUBB
ERBA
SEJO
HNSO
NITE
STYL
E: R
EVEA
LCO
LOR:
WHI
TE P
EARL
77
HEIG
HT: 4
"PT
B-1
PORC
ELIN
ETI
LE B
ASE
CRO
SSVI
LLE
STYL
E: S
HADE
SCO
LOR:
FRO
STFI
NISH
: HO
NED
HEIG
HT: 6
" X 2
4" B
ASE
PORC
ELIN
ETI
LEPT
-2CR
OSS
VILL
E TI
LEST
YLE:
SHA
DES
AV24
1 HO
NCO
LOR:
FRO
STFI
NISH
: HO
NED
SIZE
: 6" x
24"
INST
ALL:
MO
NOLI
THIC
COVE
BO
TTO
M T
OM
EET
WIT
H FL
OO
RTI
LE
GL-
2G
LASS
-ST
YLE:
CLE
AR T
EMPE
RED
GLA
SSTH
ICKN
ESS:
1/2
"
PL-2
PLAS
TIC
LAM
INAT
EW
ILSO
NART
STYL
E: W
HITE
157
0FI
NISH
: 60
Scal
e
Proj
ect n
umbe
r
Dat
e
Dra
wn
by
Che
cked
byHar
rison
Wel
lnes
sC
ente
r10
398
New
Hav
en R
oad
Har
rison
, Ohi
o 45
030
Erin
Mac
Lenn
anEr
in E
lizab
eth
Des
ign
729
Edge
cliff
St.
Cov
ingt
on, K
Y 41
014
(312
) 231
-876
1w
ww
.gbb
n.co
m
12"
= 1
'-0"
3/28/2013 2:12:47 PM
A603
FIN
ISH
SC
EHD
ULE
& LE
GEN
D
1300
0.00
Issu
e D
ate
EEM
EEM
ROO
M F
INIS
H SC
HEDU
LERO
OM
NO
.RO
OM
NAM
EFL
OO
RBA
SEW
ALLS
CEI
LIN
GC
OM
MEN
TSN
ORT
HSO
UTH
EAST
WES
T10
LOBB
YPT
-1R
B-1
P-1
P-1
P-1
P-1
EXST
20SP
INE
PT-1
, R-2
RB-
1*
**
*W
DC
-1,
EXST
* SEE
FIN
ISH
FLO
OR
PLA
N&
ELEV
ATIO
NS
21R
ESEA
RC
HPT
-1*
**
*W
DC
-1,
EXST
22JU
ICE
BAR
/ C
OO
KNG
DEM
OS
PT-1
**
**
EXST
* SEE
FIN
ISH
FLO
OR
PLA
N&
ELEV
ATIO
NS
30R
ECEP
TIO
NC
PT-1
RB-
1P-
2W
D-1
P-2
P-4
31TH
ERAP
Y R
OO
MC
PT-1
RB-
1R
P-1
WD
-1P-
1*
P-4
* WAT
ER W
ALL
40W
AITI
NG
CPT
-1R
B-1
P-2
P-2
P-2
WD
-1P-
441
THER
APY
RO
OM
CPT
-1R
B-1
P-1
*R
P-1
WD
-1P-
4* W
ATER
WAL
L43
THER
APY
RO
OM
CPT
-1R
B-1
P-1
*R
P-1
RP-
1P-
4* W
ATER
WAL
L50
CO
RR
IDO
RPT
-1*,P
-1P-
1P-
1P-
4* W
ATER
WAL
L51
EXER
CIS
E ST
UD
IOR
-1R
B-1
P-1
P-3
WD
-1W
DC
-252
THER
APY
RO
OM
CPT
-1R
B-1
P-1
*P-
1R
P-1
P-4
* WAT
ER W
ALL
53EX
ERC
ISE
STU
DIO
R-1
RB-
1P-
1P-
3P-
3W
DC
-255
EXER
CIS
E ST
UD
IOR
-1R
B-1
P-1
P-1
P-3
WD
C-2
60C
OR
RID
OR
PT-1
RB-
1P-
1P-
1P-
1P-
461
BOD
Y W
EIG
HT
TRAI
NIN
G S
TUD
IOR
-1R
B-1
P-3
WD
-1P-
1W
DC
-2
62FE
MAL
E LO
CKE
RR
OO
MPT
-1PT
B-1
P-1,
PT-2
P-1.
GL-
1P-
1,PT
-2P-
1P-
4
63ST
AIR
R-1
P-3
P-3
P-3
P-3
P-4
64M
ALE
LOC
KER
RO
OM
PT-1
PTB-
1P-
1,PT
-2P-
1,PT
-2P-
1P-
1, G
L-1
P-4
65C
LASS
RO
OM
R-1
RB-
1P-
1P-
3P-
1W
DC
-270
BREA
K R
OO
MC
PT-1
RB-
1P-
2P-
1P-
1P-
1P-
480
LAU
ND
RY
SCR
B-1
P-1
P-1
P-1
P-1
P-4
90M
ECH
ANIC
AL /
DAT
ASC
RB-
1P-
1P-
1P-
1P-
1P-
4
No.
Des
crip
tion
Dat
e
89
PERF
ORA
TED
ALUM
INUM
MET
ALPA
NEL,
VEN
EERE
D IN
WD-
1
6"
6"
1'-8"
1'-8"
0'-0
1/8"
0'-0
1/4"
0'-01/2
"
1/2"
1"1 1
/2"
ALUM
INUM
MET
AL P
IPE
EXST
GYP
BD
CEIL
ING
7"7"
7"7"
ALUM
INUM
MET
AL P
IPE
WIN
D CE
ILIN
G S
YSTE
MA7
003A7004
EXIS
TING
RO
OF
STRU
CTUR
E
1" M
ETAL
PIP
ECO
NNEC
TING
TO
CEIL
ING
PERF
ORA
TED
MET
AL P
ANEL
1" M
ETAL
PIP
E W
ELDE
DTO
ANO
THER
PIP
EW
HICH
CO
NNEC
TS T
HERO
WS
AND
COLU
MNS
TOG
ETHE
R
A7007
Scal
e
Proj
ect n
umbe
r
Dat
e
Dra
wn
by
Che
cked
byHar
rison
Wel
lnes
sC
ente
r10
398
New
Hav
en R
oad
Har
rison
, Ohi
o 45
030
Erin
Mac
Lenn
anEr
in E
lizab
eth
Des
ign
729
Edge
cliff
St.
Cov
ingt
on, K
Y 41
014
(312
) 231
-876
1w
ww
.gbb
n.co
m
As
indi
cate
d
3/28/2013 2:12:54 PM
A700
CEI
LIN
G D
ETAI
LS
1300
0.00
Issu
e D
ate
EEM
EEM
No.
Des
crip
tion
Dat
e
SCAL
E: 1
1/2
" = 1
'-0"
A7002
PLA
N C
ALL
OU
T O
F W
IND
CEI
LIN
G F
EATU
RE
SCAL
E: 1
" = 1
'-0"
A7001
SEC
TIO
N C
ALL
OU
T O
F W
IND
CEI
LIN
G F
EATU
RE
SCAL
E: 3
" = 1
'-0"
A7003
CO
NST
RU
CTI
ON
DET
AIL
OF
WIN
D C
EILI
NG
FEA
TUR
ESC
ALE:
3" =
1'-0
"A7
004TO
P D
ETA
IL O
F W
IND
CEI
LIN
G F
EATU
RE
SCAL
E: 1
1/2
" = 1
'-0"
A7005
CEI
LIN
G B
UB
BLE
DET
AIL
NOT
ACCU
RATE
- STI
LLNE
EDS
TO B
E DR
AWN
NOT
ACCU
RATE
- STI
LLNE
EDS
TO B
E DR
AWN
NOT
ACCU
RATE
- STI
LLNE
EDS
TO B
E DR
AWN
SCAL
E: 1
" = 1
'-0"
A7006
SEC
TIO
N C
ALL
OU
T O
F W
OO
D S
LAT
CEI
LIN
GSC
ALE:
1 1
/2" =
1'-0
"A7
007D
ETA
IL O
F SL
AT
CEI
LIN
G
NOT
ACCU
RATE
- STI
LLNE
EDS
TO B
E DR
AWN
90
3'-0"
3'-0"
3'-0"
3'-0"
6'-0"
10' -
0"
10' -
0"
10' -
0"
10' -
0"
10' -
0"
EQEQ
EQ
EQ
3'-0"
3'-0"
3'-0"
3'-0"
3'-0"
3'-2"
14'-6 1/2"
3'-0"
3'-0"
3'-0"
14' -
0"
14' -
0"
3'-0"
3'-0"
3'-0"
3'-0"
3'-0"
3'-0"
3'-0"
VARI
ES
VARI
ES
5'-6"
4'-0"
4'-0"
4'-0"
4'-0"
4'-0"
4'-0"
4'-0"
4'-0"
4'-0"
5'-2"
5'-1"
5'-2"
4'-0"
4'-0"
4'-0"
4'-0"
4'-0"
4'-0"
4'-0"
4'-0"
4'-0"
4'-0"
4'-0"
4'-0"
4'-0"
4'-0"
4'-0"
4'-0"
4'-0"
4'-0"
4'-0"
4'-0"
4'-0"
4'-0"
4'-0"
4'-0"
4'-0"
3'-0"
3'-0"
3'-0"
3'-0"
3'-0"
3'-0"
3'-0"
3'-0"
3'-0"
3'-0"
3'-0"
3'-0"
3'-0"
3'-0"
3'-0"
3'-0"
3'-0"
3'-0"
REFL
ECTE
D CE
ILIN
G P
LAN
GEN
ERAL
NO
TES
1.
REFE
R TO
SHE
ET A
601
& SP
ECIF
ICAT
ION
NOTE
BOO
K FO
R LI
GHT
FIX
TURE
SCHE
DULE
2.
ALL
EXIS
TING
EXP
OSE
D CE
ILIN
G B
EAM
S TO
BE
PAIN
TED
P-4
3.AL
L SO
FFIT
S TO
BE
PAIN
TED
P-1
UNLE
SS O
THER
WIS
E NO
TED
4.RE
FER
TO S
HEET
A70
0 FO
R CE
ILIN
G D
ETAI
LS
5.LI
GHT
ING
LAY
OUT
S FO
R RE
FERE
NCE
ONL
Y, F
INAL
LAY
OUT
BY
LIG
HTIN
GCO
NSUL
TANT
REFL
ECTE
D CE
ILIN
G P
LAN
LEG
END
G
YP B
OAR
D CE
ILIN
G
RECE
SSED
CAN
LIG
HT
WAL
L W
ASHE
R
FLO
URES
CENT
LIG
HT F
IXTU
RE
SPRI
NKLE
R
SMO
KE D
ETEC
TOR
SUPP
LY A
IR D
IFFU
SER
RETU
RN A
IR G
RILL
E
EXIT
SIG
N
SD
Scal
e
Proj
ect n
umbe
r
Dat
e
Dra
wn
by
Che
cked
byHar
rison
Wel
lnes
sC
ente
r10
398
New
Hav
en R
oad
Har
rison
, Ohi
o 45
030
Erin
Mac
Lenn
anEr
in E
lizab
eth
Des
ign
729
Edge
cliff
St.
Cov
ingt
on, K
Y 41
014
(312
) 231
-876
1w
ww
.gbb
n.co
m
As
indi
cate
d
3/28/2013 2:13:07 PM
A701
FRAG
MEN
TR
EFLE
CTE
DC
EILI
NG
PLA
N 1300
0.00
Issu
e D
ate
EEM
EEM
SCAL
E: 1
/8" =
1'-0
"A7
011FI
RST
FLO
OR
REF
LEC
TED
CEI
LIN
G P
LAN
No.
Des
crip
tion
Dat
e
91
4'-0"
4'-0"
4'-0"
4'-0"
4'-0"
4'-0"
4'-0"
4'-0"
4'-0"
4'-0"
4'-0"
4'-0"
4'-0"
4'-0"
4'-0"
4'-0"
4'-0"
4'-0"
4'-0"
4'-0"
4'-0"
4'-0"
4'-0"
4'-0"
4'-0"
4'-0"
4'-0"
4'-0"
4'-0"
4'-0"
4'-0"
4'-0"
4'-0"
4'-0"
4'-0"
4'-0"
REFL
ECTE
D CE
ILIN
G P
LAN
GEN
ERAL
NO
TES
1.
REFE
R TO
SHE
ET A
601
& SP
ECIF
ICAT
ION
NOTE
BOO
K FO
R LI
GHT
FIX
TURE
SCHE
DULE
2.
ALL
EXIS
TING
EXP
OSE
D CE
ILIN
G B
EAM
S TO
BE
PAIN
TED
P-4
3.AL
L SO
FFIT
S TO
BE
PAIN
TED
P-1
UNLE
SS O
THER
WIS
E NO
TED
4.RE
FER
TO S
HEET
A70
0 FO
R CE
ILIN
G D
ETAI
LS
5.LI
GHT
ING
LAY
OUT
S FO
R RE
FERE
NCE
ONL
Y, F
INAL
LAY
OUT
BY
LIG
HTIN
GCO
NSUL
TANT
REFL
ECTE
D CE
ILIN
G P
LAN
LEG
END
G
YP B
OAR
D CE
ILIN
G
RECE
SSED
CAN
LIG
HT
WAL
L W
ASHE
R
FLO
URES
CENT
LIG
HT F
IXTU
RE
SPRI
NKLE
R
SMO
KE D
ETEC
TOR
SUPP
LY A
IR D
IFFU
SER
RETU
RN A
IR G
RILL
E
EXIT
SIG
N
SD
Scal
e
Proj
ect n
umbe
r
Dat
e
Dra
wn
by
Che
cked
byHar
rison
Wel
lnes
sC
ente
r10
398
New
Hav
en R
oad
Har
rison
, Ohi
o 45
030
Erin
Mac
Lenn
anEr
in E
lizab
eth
Des
ign
729
Edge
cliff
St.
Cov
ingt
on, K
Y 41
014
(312
) 231
-876
1w
ww
.gbb
n.co
m
As
indi
cate
d
3/28/2013 2:13:22 PM
A702
FRAG
MEN
TR
EFLE
CTE
DC
EILI
NG
PLA
N -
UPP
ER L
EVEL 13
000.
00Is
sue
Dat
eEE
MEE
M
SCAL
E: 1
/8" =
1'-0
"A7
021FI
RST
FLO
OR
REF
LEC
TED
CEI
LIN
G P
LAN
No.
Des
crip
tion
Dat
e
92
20' -
0"
0.78° TYP
16'-1
1/2"
6'-27/8
"
65'-31/4
"
3'-31/2"
PARALLEL
PARA
LLEL
2'-9 1/4"
PARA
LLEL
2"
35'-0"
A7002
Scal
e
Proj
ect n
umbe
r
Dat
e
Dra
wn
by
Che
cked
byHar
rison
Wel
lnes
sC
ente
r10
398
New
Hav
en R
oad
Har
rison
, Ohi
o 45
030
Erin
Mac
Lenn
anEr
in E
lizab
eth
Des
ign
729
Edge
cliff
St.
Cov
ingt
on, K
Y 41
014
(312
) 231
-876
1w
ww
.gbb
n.co
m
1/8
" = 1
'-0"
3/28/2013 2:13:37 PM
A703
REF
LEC
TED
CEI
LIIN
G P
LAN
-D
ESIG
NFE
ATU
RES
1300
0.00
Issu
e D
ate
EEM
EEM
SCAL
E: 1
/8" =
1'-0
"A7
031FI
RST
FLO
OR
REF
LEC
TED
CEI
LIN
G P
LAN
No.
Des
crip
tion
Dat
e
93
1'-0" 8"
2'-7 1
/4"
2"
WO
OD
FRAM
EST
AINE
D W
D-1
2"2'-
3 1/4"
SAW
CUT
EXS
T CO
NCRE
TE F
LOO
R
WAT
ERPR
OO
F M
EMBR
ANE
SOIL
UP
TO N
ECES
SARY
PLAN
TING
DEP
TH
FINI
SH F
LOO
RCR
YSTA
L BL
OCK
S
SPRI
NGS
POW
ER L
INES
FINI
SH F
ACE,
PL-
2
PL-1
ALL
SHEL
F FI
NISH
FAC
ES T
O B
E PL
-1
SSM
-1
FINI
SH F
ACE,
PL-
2
ALL
SHEL
F FI
NISH
FACE
S TO
BE
PL-1
PL-1 PL
-1PL
-1
1/4"
GL-
2
3'-0"
2" 9" 1" 10 1/2" 1" 9" 2"
3/4"
BUL
LNO
SE
Scal
e
Proj
ect n
umbe
r
Dat
e
Dra
wn
by
Che
cked
byHar
rison
Wel
lnes
sC
ente
r10
398
New
Hav
en R
oad
Har
rison
, Ohi
o 45
030
Erin
Mac
Lenn
anEr
in E
lizab
eth
Des
ign
729
Edge
cliff
St.
Cov
ingt
on, K
Y 41
014
(312
) 231
-876
1w
ww
.gbb
n.co
m
1 1
/2" =
1'-0
"
3/28/2013 2:13:50 PM
A801
INTE
RIO
RD
ETAI
LS
1300
0.00
Issu
e D
ate
Aut
hor
Che
cker
SCAL
E: 1
1/2
" = 1
'-0"
A8011
PLAN
TER
DETA
ILSC
ALE:
1 1
/2" =
1'-0
"A8
012FL
OO
R PO
WER
GEN
ERAT
ION
SYST
EM
SCAL
E: 1
1/2
" = 1
'-0"
A8013
PT-1
TO
CPT
-1 T
RA
NSI
TIO
N D
ETA
IL
NOT
ACCU
RATE
- STI
LLNE
EDS
TO B
E DR
AWN
No.
Des
crip
tion
Dat
e
SCAL
E: 1
1/2
" = 1
'-0"
A8014
JUIC
E B
AR
SEC
TIO
N
94
UPUP
A503
2
BREA
KRO
OM 70M
ALE
LOCK
ERRO
OM 64
FEM
ALE
LOCK
ERRO
OM 62
BODY
WEI
GHT
TRAI
NING
STUD
IO61
EXER
CISE
STUD
IO51
EXER
CISE
STUD
IO53
EXER
CISE
STUD
IO55
THER
APY
ROOM 52
THER
APY
ROOM 43
THER
APY
ROOM 41
THER
APY
ROOM 31
WAI
TING
40
RECE
PTIO
N30
CLAS
SROO
M65
CORR
IDOR
50
CORR
IDOR
60
LOBB
Y10
STAI
R63
LAUN
DRY
80
MEC
HANI
CAL
/ DAT
A90
SPIN
E20
JUIC
EBA
R /
COOK
NGDE
MOS
22
RESE
ARCH
21
ALIGN
RP-1
P-3
RP-1
RP-1
RP-1
RP-1
P-3
P-3
P-3
P-3
P-3
P-3
P-3
P-2
PT-2 PT
-2
P-3
PT-2
PT-2
A502
1
A8013
FINI
SH F
LOO
R PL
ANG
ENER
AL N
OTE
S1.
RE
FER
TO S
HEET
L20
0 FO
R PL
ANT
LAYO
UT A
ND S
PECI
FICA
TIO
NS
2.
ALL
WAL
LS T
O B
E PA
INTE
D P-
1 UN
LESS
OTH
ERW
ISE
NOTE
D
3.RE
FER
TO S
HEET
A60
3 FO
R FI
NISH
LEG
END
AND
SCHE
DULE
4.VE
RIFY
THA
T SU
B-FL
OO
RING
ISSM
OO
TH, L
EVEL
, AND
FRE
E FR
OM
DEFE
CTS
THAT
CO
ULD
AFFE
CTIN
STAL
LATI
ON.
DO
NO
T PR
OCE
ED W
ITH
WO
RK U
NTIL
DEF
ECTS
HAV
E BE
ENCO
RREC
TED.
5.AL
L M
ATER
IALS
TO
BE
INST
ALLE
D PE
RM
ANUF
ACTU
RER'
S IN
STRU
CTIO
NS.
REFE
RENC
E SP
ECIF
ICAT
IONS
NOTE
BOO
K FO
R IN
STAL
LATI
ON
GUI
DELI
NES.
6.CO
NTRA
CTO
R RE
SPO
NSIB
LE F
OR
PRO
PER
TRAN
SITI
ON
STRI
PS A
TCE
NTER
LINE
OF
DOO
R TH
RESH
OLD
OR
AS IN
DICA
TED
ON
THE
FINI
SH P
LAN.
COLO
R TO
BE
SELE
CTED
BY
DESI
GNE
R.
7.
ALL
COLU
MNS
TO
BE
VENE
ERED
IN W
D-1
FINI
SH P
LAN
LEG
END
PT-1
Scal
e
Proj
ect n
umbe
r
Dat
e
Dra
wn
by
Che
cked
byHar
rison
Wel
lnes
sC
ente
r10
398
New
Hav
en R
oad
Har
rison
, Ohi
o 45
030
Erin
Mac
Lenn
anEr
in E
lizab
eth
Des
ign
729
Edge
cliff
St.
Cov
ingt
on, K
Y 41
014
(312
) 231
-876
1w
ww
.gbb
n.co
m
As
indi
cate
d
3/28/2013 2:14:07 PM
A901
FIR
ST F
LOO
RFI
NIS
H F
LOO
RPL
AN
1300
0.00
Issu
e D
ate
EEM
EEM
SCAL
E: 1
/16"
= 1
'-0"
A9011
FIR
ST F
LOO
R A
RC
HIT
ECTU
RA
L PL
AN
No.
Des
crip
tion
Dat
e
95
UP
3
D
D
D
D
D
D
2
BREA
KRO
OM 70
MAL
ELO
CKER
ROOM 64
FEM
ALE
LOCK
ERRO
OM 62
BODY
WEI
GHT
TRAI
NING
STUD
IO61
EXER
CISE
STUD
IO51
EXER
CISE
STUD
IO53
EXER
CISE
STUD
IO55
THER
APY
ROOM 52
THER
APY
ROOM 43
THER
APY
ROOM 41
THER
APY
ROOM 31
WAI
TING
40
RECE
PTIO
N30
CLAS
SROO
M65
CORR
IDOR
50
CORR
IDOR
60
LOBB
Y10
STAI
R63
LAUN
DRY
80
MEC
HANI
CAL
/ DAT
A90
SPIN
E20
JUIC
EBA
R /
COOK
NGDE
MOS
22
RESE
ARCH
21
Scal
e
Proj
ect n
umbe
r
Dat
e
Dra
wn
by
Che
cked
byHar
rison
Wel
lnes
sC
ente
r10
398
New
Hav
en R
oad
Har
rison
, Ohi
o 45
030
Erin
Mac
Lenn
anEr
in E
lizab
eth
Des
ign
729
Edge
cliff
St.
Cov
ingt
on, K
Y 41
014
(312
) 231
-876
1w
ww
.gbb
n.co
m
1/1
6" =
1'-0
"
3/28/2013 2:14:28 PM
A902
FIR
ST F
LOO
RFU
RN
ITU
RE
PLAN
1300
0.00
Issu
e D
ate
EEM
EEM
SCAL
E: 1
/16"
= 1
'-0"
A9021
FIR
ST F
LOO
R F
UR
NIT
UR
E PL
AN
No.
Des
crip
tion
Dat
e
96
POW
ER A
ND D
ATA
PLAN
GEN
ERAL
NO
TES
1.
THIS
SHE
ET IS
FO
R IN
TENT
ONL
Y. F
INAL
LAY
OUT
TO
BE
DETE
RMIN
ED B
YEL
ECTR
ICAL
ENG
INEE
R.
POW
ER A
ND D
ATA
PLAN
LEG
END
DI
MM
ER S
WIT
CH
THRE
E W
AY S
WIT
CH
FLO
OR
OUT
LET
WAL
L O
UTLE
T
S D S 3
Scal
e
Proj
ect n
umbe
r
Dat
e
Dra
wn
by
Che
cked
byHar
rison
Wel
lnes
sC
ente
r10
398
New
Hav
en R
oad
Har
rison
, Ohi
o 45
030
Erin
Mac
Lenn
anEr
in E
lizab
eth
Des
ign
729
Edge
cliff
St.
Cov
ingt
on, K
Y 41
014
(312
) 231
-876
1w
ww
.gbb
n.co
m
As
indi
cate
d
3/28/2013 2:14:56 PM
E201
FIR
ST F
LOO
REL
ECTR
ICAL
PLA
N
1300
0.00
Issu
e D
ate
EEM
EEM
No.
Des
crip
tion
Dat
e
SCAL
E: 1
/8" =
1'-0
"E2
011PO
WER
AN
D DA
TA F
IRST
FLO
OR
PLA
N
97
Scal
e
Proj
ect n
umbe
r
Dat
e
Dra
wn
by
Che
cked
byHar
rison
Wel
lnes
sC
ente
r10
398
New
Hav
en R
oad
Har
rison
, Ohi
o 45
030
Erin
Mac
Lenn
anEr
in E
lizab
eth
Des
ign
729
Edge
cliff
St.
Cov
ingt
on, K
Y 41
014
(312
) 231
-876
1w
ww
.gbb
n.co
m
1/8
" = 1
'-0"
3/28/2013 2:15:08 PM
E701
FIR
ST F
LOO
RSW
ITC
HIN
G P
LAN
1300
0.00
Issu
e D
ate
Aut
hor
Che
cker
No.
Des
crip
tion
Dat
e
SCAL
E: 1
/8" =
1'-0
"E7
011SW
ITC
HIN
G P
LAN
FIR
ST F
LOO
R L
OW
ER P
LAN
98
Scal
e
Proj
ect n
umbe
r
Dat
e
Dra
wn
by
Che
cked
byHar
rison
Wel
lnes
sC
ente
r10
398
New
Hav
en R
oad
Har
rison
, Ohi
o 45
030
Erin
Mac
Lenn
anEr
in E
lizab
eth
Des
ign
729
Edge
cliff
St.
Cov
ingt
on, K
Y 41
014
(312
) 231
-876
1w
ww
.gbb
n.co
m
3/28/2013 2:15:21 PM
L200
PLAN
TIN
G P
LAN
1300
0.00
Issu
e D
ate
EEM
EEM
PRO
VIDE
D BY
LAN
DSCA
PECO
NSUL
TANT
No.
Des
crip
tion
Dat
e
99
100
10
101
Appendix
1 Material Palette Evolution2 Bibliography
10
102
Fall Quarter Materials Palette
10
12
13
14
15
11
103
Schematic Design Materials Palette
10
16
17
18
19
20
21
22
23
24 25
26
27
104
Design Development Materials Palette
10
11
12
141521
22
19
25
26
27
28
29
105
Final Materials Palette
14
11
25
19
10
30
31
32
106
Image Index
1. http://www.flickr.com/photos/21654792@N03/4145203398/2. http://www.ewallpapers.eu/w_show/green-leaf-close-up-1440-900-6955.jpg3. http://hawaiidermatology.com/beautiful/beautiful-patterns-in-nature-from-national-geographic-64-photos-.htm4. http://klsbear.wordpress.com/2010/09/03/patterns-in-nature/5. http://media.kickstatic.com/kickapps/images/63278/photos/PHOTO_16004529_63278_37980819_ap.jpg6. http://www.a-gc.com/close-up-nature-flowers-white-flowers-19160/7. http://onesmallstitch.wordpress.com/2011/04/25/patterns-in-nature/8. http://www.etsy.com/listing/93126860/saffron-yellow-flower-5-x-7-macro9. http://treasurefield.tumblr.com/post/16801147923/elinka-natures-pattern-by-brian-pflanz10. http://www.tomkt.com/atmosphere/acolor1/acolor1.html11. http://www.3-form.com/highres/image_gallery/blades/12. http://www.formica.com/en/home/dna.aspx?color=369913. http://www.lgviaterausa.com/productLines/16/87/viatera-international14. http://gh-design.net/images/objects/wtw_001.jpg15. http://users.tkk.fi/~mliukka/textures/Floor_Stone.jpg16. http://www.glas-pro.com/color_toolbox.php?category=69¤t=3117. http://www.glas-pro.com/color_toolbox.php?category=69¤t=3118. http://www.glas-pro.com/color_toolbox.php?category=69¤t=3119. http://www.glas-pro.com/color_toolbox.php?category=69¤t=3120. http://www.wilsonartcontract.com/samples/product-detail/16-laminate/160-fusion-maple-7909/21. http://www.glas-pro.com/color_toolbox.php?category=69¤t=3122. http://www.glas-pro.com/color_toolbox.php?category=69¤t=3123. http://www.glas-pro.com/color_toolbox.php?category=69¤t=3124. http://www.polygonblog.com/wp-content/uploads/2010/04/concrete-texture-high-resolution.jpg25. https://www.interfaceflor.com/Default.aspx?ProductNumber=12712100641&Section=2&Sub=1&Ter=326. http://www.nora.com/us/products/flooring/noraplan/product/environcare/art-1462-1/2930/27. http://www.nora.com/us/products/flooring/noraplan/product/environcare/art-1462-1/2931/28. http://www.crossvilleinc.com/contract/products/porcelain_stone/shades_by_crossville/av244_hon-mist_honed29. http://www.laminart.com/us/products-samples/java-342.html30. http://www.formica.com/en/home/dna.aspx?color=775931. http://www.crossvilleinc.com/contract/products/porcelain_stone/shades_by_crossville/av244_hon-frost_honed32. http://www.nora.com/us/products/flooring/noraplan/product/environcare/art-1462-1/2945/
107
108
t