Applying Systems Engineering
SYSE 511
Module 9: Systems Engineering Management Plan
2
Applying SE SYSE 511
AAObjectives
Understand the concept, function, and contents of a SEMP
Learn how to develop a SEMP
Review different suggested and tried SEMPS
3
Applying SE SYSE 511
AA
Mission Analysis /Requirements Analysis
Alternatives Analysis /System Synthesis
System Verification
SystemIntegration
Mission Analysis
Functional Analysis
TradeoffStudies
BaselineManagement
SystemsEngineering
Planning
Objectives: Plan the engineering effort on a
project Integrate with project
management activities
Where are We in theSE Process?
4
Applying SE SYSE 511
AAKey Terminology
SEMP Integrated Product Teams Cross Product Teams Illities System Products System Processes
5
Applying SE SYSE 511
AA
• This lecture material was taken from the SEMP Lecture given in SYSE 510
• Still good.
Origin of this material
6
Applying SE SYSE 511
AARecent Development
http://dod5000.dau.mil/ DAU = Defense Acquisition System Since SE is all about controlling acquisition,
this is effectively the evolution of 499B and related Mil-STDs
View Slides from http://dod5000.dau.mil/ there are 46 slides so we will rush through
7
Applying SE SYSE 511
AA
Program Management Plan (also Project Management Plan)
Function - Plan the management of a program
Scope - Cost, Schedule, Scope, and Organization
Contents - All over the place - different schools of thought
8
Applying SE SYSE 511
AAPMP Contents - Ideal
Organization Top-level Cost, Scope, and Schedule Source of funding, means of funds controls Responsibility Assignment Matrix Reporting and Communication Contracts, Conflict of Interest, QA, Audit
9
Applying SE SYSE 511
AA
PMP Checklist
from http://www.projectconnections.com/
1. Business case: the product or service description; the project charter
2. Project justification, deliverables and objectives i.e., scope3. Name of the project manager 4. Organizational and management strategy - what is the life-cycle,
what major activities, reviews, tests, life-cycle phases, etc. 5. Roster of required team members and their functional expertise6. Work Breakdown Structure. 7. Cost estimates, start dates, and responsibility assignments of the
work breakdown. 8. Performance level baselines for schedule and cost. 9. Major milestone descriptions and dates 10. Key risks, constraints, assumptions and planned responses11. Plans for managing product requirements, schedule management,
and project issue management 12. Open issues and pending decisions; a punch list
10
Applying SE SYSE 511
AAKerzner’s PMP
Kerzner is the main Project Management Text Objective Strategy Schedule Budget Organization Policy (guides for decision making and individual
actions) Procedures (for carrying out Policy) Standards WBS.
11
Applying SE SYSE 511
AAKerzner Alternative A Program Mgt Plan could consist of Scope and
Organizational Description plus individual plans for: Budgeting Configuration management Facilities Logistics Support Management Manufacturing Procurement Quality Assurance R&D Scheduling Tooling Training Transportation
12
Applying SE SYSE 511
AA
So what can a SEMP provide?
In project management courses and guidelines, one rarely finds requirements management, functional analysis, synthesis, interface control, integration, cyclic processes, model-based design, integrated modeling and design, integrated issues-risk-decision, systems analysis, document hierarchy, and measures of effectiveness.
Also, note above that Human factors, safety, reliability, maintainability, operability are not mentioned.
13
Applying SE SYSE 511
AA
System Engineering Management Plan
Function - Plan the engineering of a product Scope - Cost, Schedule, Scope, and
Organization of engineering and product Contents - different schools of thought
14
Applying SE SYSE 511
AASEMP Contents
INCOSE Handbook DSMC IEEE EIA Textbook Martin Marietta BWIP MWFA P-9
15
Applying SE SYSE 511
AA
SEMP, from INCOSE Handbook“A comprehensive document that describes how the fully integrated engineering effort will be managed and conducted. “
Cover Title Page Table of Contents Scope Applicable Documents Systems Engineering Process Transitioning Critical Technologies Integration of the Systems Engineering Effort Additional Systems Engineering Activities Notes Appendices
16
Applying SE SYSE 511
AAINCOSE Details
Processes Systems Engineering Process Planning Requirements Analysis Functional Analysis/Allocation Synthesis Systems Analysis and Control
17
Applying SE SYSE 511
AAINCOSE SEMP
Process inputs Decision database (deliverables and results) Technical objectives Contract work breakdown structure (WBS) Training Standards and procedures Resource allocation Constraints Work authorization Verification planning
18
Applying SE SYSE 511
AAINCOSE SEMP
The SEMP should list what technical reviews will be conducted, consider
TIM Technical Interchange Meeting SRR System Requirements Review SDR System Design Review SFR System Functional Review IPDR Internal Preliminary Design Review PDR Preliminary Design Review CDR Critical Design Review SWDR Software Design Reviews QPR Quarterly Progress Review FCA Functional Configuration Audit PCA Physical Configuration Audit
19
Applying SE SYSE 511
AADSMC Ch. 16
An introduction that states the purpose of the engineering effort and a description of the system being developed,
A technical strategy description that ties the engineering effort to the higher-level management planning,
A description of how the systems engineering process will be tailored and structured to complete the objectives stated in the strategy,
An organization plan that describes the organizational structure that will achieve the engineering objectives,
A resource plan that identifies the estimated funding and schedule necessary to achieve the strategy. Plus Details for each of these.
20
Applying SE SYSE 511
AAIEEE
Functional Orientation Identify the SE Functions and define how
they will be done
21
Applying SE SYSE 511
AAEIA
Similar to IEEE
22
Applying SE SYSE 511
AATextbook
Strangely Silent Chapter 7 and 8 and 13 address it but never
suggest that a SEMP exists.
23
Applying SE SYSE 511
AAFrom Andrew Sage
See following page
24
Applying SE SYSE 511
AA
Title PagePrefaceTable of ContentsList of FiguresList of Tables1. Executive summary2. Introduction2.1. Program Objectives2.2. Program Description2.3. Program Scope2.4. Program Overview2.5. Program Organization and Responsibilities2.6. Program Deliverables2.7. The Systems Engineering Management Plan
Components2.8. Program Milestones3. Program Management Approach3.1. Systems Management Assumptions, Needs, Constraints3.2. Systems Management Objectives3.3. Program Risk Management3.4. Program Staffing3.5. Program Monitoring and Control3.6. Program Integration Approach4. Program Technology4.1. Technical Description of System Development Projects4.2. Project Methods, Tools, and Techniques4.3. Project Procedures and Support Functions5. Program Quality Assurance5.1. Quality Assurance Plan
5.2. Maintenance Plan
5.3. Documentation Plan5.4. Operational Deployment Plan
5.5. Configuration Management Plan
55.1. CM Objectives and Overview
5.52. CM Organization, Charter, Members, Duties
5.53. CM Methods
5.5.3.1. Baselines
5.5.3.2. Configuration Identification
5.5.3.3. Configuration Control
5.5.3.4. Configuration Auditing
5.5.3.5. Configuration Status Accounting
5.5.4. CM Implementation Plan
5.5.4.1. Procedures
5.5.4.2. Personnel
5.5.4.3. Budget
5.4.4.4. Implementation milestones
5.6. System Security Plan
6. Budget and Resource Management Plan
6.1. Work Breakdown Structure
6.2. Cost Breakdown Structure
6.3. Resource Requirements
6.4. Budget and Resource Allocation
6.5. Program Performance Schedule
Additional Contents
Reference Materials
Definitions and Acronyms
Index
Appendix
Appendices of Supporting Material
From Andrew Sage – SEMP Outline
25
Applying SE SYSE 511
AA
1. Introduction2. Scope (6.2.1)3. Roles and Responsibilities4. Systems Engineering Process
(6.2.2 is task oriented, or discuss as below)
5. Mission Definition and Analysis6. Functional Analysis and
Requirements Allocation7. Alternative Analysis and
Selection8. Validation and Verification9. Technical Management10. Work Integration and Control
(6.23 – 6.29)11. The Work Breakdown Structure
(6.2.3)12. Cost Management (6.2.7)13. Design Management (6.2.8)
Chapter 6, B.S. Blanchard, Systems Engineering Management
14. Specifications and Standards Listing (6.2.4)
15. Technical Performance Management (6.2.5)
16. Schedule Management (6.2.6)17. Reporting (6.2.9)18. Specialty Plans and Program
Interfaces (6.3 and 6.4)19. Technical Management Tools and
Methods (6.5)20. Risk Management (6.6)21. Performance Measurement Factors
(6.7)22. Specialty Disciplines Integration
(3.3)23. Additional Systems Engineering
Activities (catch all)24. Acronyms/Glossary25. References26. Appendices
26
Applying SE SYSE 511
AAMartin Marietta
Wiring Diagram Emphasis on Flow of Information Organizational Interfaces
27
Applying SE SYSE 511
AA
BWIPHigh Level Waste Repository Project circa 1985
Issues Driven Program Issues – How to get a License Demonstrate issue resolution with computer model Identify parameters required to run models Collect Data Verify and validate models Resolve cost estimate with detailed conceptual design. Test
and verify crucial components of design with Prototype repository
Emphasis on Document Hierarchy Also included Technical Scope and SE
Processes.
28
Applying SE SYSE 511
AAMWFA
Identify SE Functions: Requirements, Functions, Synthesis, Analysis, Integration and Test
Define Program specific documents to accomplish those functions
MWFA was at the development phase, but the problem was to tie problems to requirements to development programs, and to define the program product.
29
Applying SE SYSE 511
AAP9
IPT oriented Plus a bit of Text Book Plus plus some IEEE Primary thrust was to establish IPT.
30
Applying SE SYSE 511
AASEMP Errors
One size fits all – Just write a SEMP and put it on the shelf – The Rick Harwell/INEEL SEMP
Generic, not Project specific – The 1992 ER/Bechtel SEMP
We need one of those too – The old DOE-Order 4700 Guidelines – Told how to engineer, how to plan, specified a Risk Mgt Plan, IPT, Review cycle and process, WBS, and a SEMP; or the old EG&G approach where the SEMP was Chapter 13 of the PMP.
31
Applying SE SYSE 511
AAClass work shop
Select a general approach for MRS
Develop an outline for MRS SEMP