semi-private boat ramp facility and conservation area impact permit requests independence community...

Download Semi-Private Boat Ramp Facility and Conservation Area Impact Permit Requests Independence Community Association, Inc. Environmental Protection Division

If you can't read please download the document

Upload: marian-joseph

Post on 18-Jan-2018

216 views

Category:

Documents


0 download

DESCRIPTION

Location Map Proposed Ramp Eden Isle Eden’s Hammock Signature Lakes Lake Speer Summerport Village Center

TRANSCRIPT

Semi-Private Boat Ramp Facility and Conservation Area Impact Permit Requests Independence Community Association, Inc. Environmental Protection Division December 15, 2015 Location Map Speer Lake Drive Location Map Proposed Ramp Eden Isle Edens Hammock Signature Lakes Lake Speer Summerport Village Center Site Plan Proposed Ramp Companion Dock Proposed Dredged Area 0.20 acres Proposed 12 x 12 wetland impact Existing Conditions Mitigation Proposed Ramp Wetland Mitigation Areas Lake Speer Variance Requests The Application to Construct a Boat Ramp Facility includes three (3) variance requests: 1.Section (b)(8) (companion dock). The Code states, No semi-private companion boat mooring dock shall exceed the length of the boat ramp (measured from the normal high water mark to the waterward end of the ramp) and a width of four (4) feet. The proposed companion dock will be four feet wide, but will extend 25 feet beyond the end of the boat ramp. 2. Section (b)(20) (more than one ramp per subdivision). The Code states, There shall be no more than one (1) boat ramp per subdivision or planned development. The proposed boat ramp is within Phase 3 of Signature Lakes on Lake Speer. There is an existing semi- private boat ramp in Phase 2 of Signature Lakes that is located on Lake Hancock. The two lakes are not connected. Variance Requests 3. Section (b)(14) (letter of credit). The Code requires, the applicant to post a one-year irrevocable letter of credit, in favor of Orange County, in the amount of 10% of the assessed value of the boat ramp facility site... The applicant proposes to post an irrevocable letter of credit or cash escrow in favor of Orange County in the amount of ten percent (10%) of the estimated cost to construct the boat ramp facility multiplied by 125%. The County has accepted this in the past. EPD supports the three variance requests. Objector Location David Mikush Proposed Ramp Deborah Belcore Action Requested Approval of Semi-Private Boat Ramp Facility Permit (BR ) with approval of the three (3) variance requests, subject to the conditions listed in the staff report. Approval of the Conservation Area Impact Permit (CAI ), subject to the conditions listed in the staff report. District 1 Environmental Protection Division Environmental Protection Division 800 Mercy Drive Orlando, Florida FAX Mercy Drive Orlando, Florida FAX Variance 1 Exhibit Companion dock extends 25 feet beyond end of proposed boat ramp Companion Dock Proposed Ramp Variance 2 Exhibit Proposed Ramp Signature Lakes Phase 3 Lake Speer Existing Ramp Signature Lakes Phase 2 Lake Hancock Variance 3 Exhibit Code: The assessed value of the ramp parcel is $ % of $ = $ Proposed: The estimated cost to construct the ramp is $69,721. (125% x $69,721 = $87,151) 10% x $87,151 = $8,715 Staff Report Conditions 17. A variance to Section (b)(8) (companion dock) is hereby granted to allow the companion dock to extend 25 feet beyond the end of the boat ramp. 18. A variance to Section (b)(20) (more than one ramp per subdivision) is hereby granted to allow an additional ramp within Signature Lakes Subdivision. 19. A variance to Section (b)(14) (letter of credit) is hereby granted. The applicant shall provide a letter of credit or cash escrow, in the amount of ten (10) percent of the cost to construct the boat ramp facility, multiplied by 125%, in favor of OC.