selected details

17
CHRISTOPHER CROSLEY Graduate Portfolio. University of Cincinnati Selected Details

Upload: christopher-crosley

Post on 07-Mar-2016

216 views

Category:

Documents


0 download

DESCRIPTION

A selection of detail drawings including some works-in-progress.

TRANSCRIPT

Page 1: Selected details

CHRISTOPHER CROSLEYGraduate Portfolio. University of Cincinnati

Selected Details

Page 2: Selected details
Page 3: Selected details
Page 4: Selected details
Page 5: Selected details
Page 6: Selected details
Page 7: Selected details
Page 8: Selected details

Rainwater collection

Solar collection

10

1112 13

Amphitheater SeatingMax. occupancy: 720 people

12

3

4

56

7

8

9

10

11

FFE: 0’0”

FFE: +13’6”

FFE: +7’6”

Page 9: Selected details

Program Key:

1. Main Entrance2. Permanent Display 3. Stair and Elevator Core4. Ambulatory5. Amphitheater Seating6. Translucent Glass7. ADA Ramps8. Belvedere9. Overhead Canopy

Notes:10. Restored Castle Wall11. Infill

1

2

3

4

56

7

5

8

9

10

11

12

13

Details:

1. Restored masonry2. Limestone cap3. 32” Dia. Conc pier4. 1” Dia. Anchor bolts5. 1” Non-shrunk structural grout6. 1” Steel plate7. 16” - 12” Dia. Tapered steel tube column8. Pinned connection- weld to plate and girder9. Tubular steel girder10. Lightweight steel joists 5’ o.c.11. Steel perlins 3’ o.c. span joists12. Paneled metal cladding13. Standing seam metal roof

Page 10: Selected details
Page 11: Selected details
Page 12: Selected details

Botique Hotel South Wall Detail

Details:

1. Steel Web Joists @ 3’ o.c.2. Concrete pad on corrugated decking3. Vertical truss, 3’ deep @ 15’ o.c.4. Aluminum framed windows, upper and lower units operable5. 1’ deep operable shading system, dual color -Changes seasonally: White during summer: mitigating solar gain Black during winter: maximizing solar gain6. Service catwalk7. Operable Louvers8. Point fixing glass curtain wall

9. Stack effect ventilation -During summer10. Trombe wall effect -During winter

1

1

2

3

10

5

5

6

6

7

7

8

9

Page 13: Selected details

West Building Section

Page 14: Selected details

Work in progress: Studio project Wall Section Detail

Page 15: Selected details
Page 16: Selected details

Work in progress: Barnes Foundation Case Study

Page 17: Selected details