Sekoko Resources STRATFOR Presentation
17 October 2011
![Page 2: Sekoko Resources...Waterberg Project • Total of 8 tenements, with total surface area of 7,500 ha • Adjacent to existing Exxaro Mine, Grootegeluk • Initial drilling by Sekoko](https://reader033.vdocuments.mx/reader033/viewer/2022042804/5f5013a79638ff2e8968ad73/html5/thumbnails/2.jpg)
Sekoko Resources
• Chairman and Founder: Timothy Tebeila
• Wholly black owned company
• Original Focus: Mining projects in located in Limpopo of RSA
• Strategy: Move into other provinces and neighbouring countries
• Widen business focus by mining additional commodities
![Page 3: Sekoko Resources...Waterberg Project • Total of 8 tenements, with total surface area of 7,500 ha • Adjacent to existing Exxaro Mine, Grootegeluk • Initial drilling by Sekoko](https://reader033.vdocuments.mx/reader033/viewer/2022042804/5f5013a79638ff2e8968ad73/html5/thumbnails/3.jpg)
Sekoko Projects
![Page 4: Sekoko Resources...Waterberg Project • Total of 8 tenements, with total surface area of 7,500 ha • Adjacent to existing Exxaro Mine, Grootegeluk • Initial drilling by Sekoko](https://reader033.vdocuments.mx/reader033/viewer/2022042804/5f5013a79638ff2e8968ad73/html5/thumbnails/4.jpg)
Waterberg Project, Smitspan
![Page 5: Sekoko Resources...Waterberg Project • Total of 8 tenements, with total surface area of 7,500 ha • Adjacent to existing Exxaro Mine, Grootegeluk • Initial drilling by Sekoko](https://reader033.vdocuments.mx/reader033/viewer/2022042804/5f5013a79638ff2e8968ad73/html5/thumbnails/5.jpg)
Waterberg Locality Map
![Page 6: Sekoko Resources...Waterberg Project • Total of 8 tenements, with total surface area of 7,500 ha • Adjacent to existing Exxaro Mine, Grootegeluk • Initial drilling by Sekoko](https://reader033.vdocuments.mx/reader033/viewer/2022042804/5f5013a79638ff2e8968ad73/html5/thumbnails/6.jpg)
Waterberg Project
• Total of 8 tenements, with total surface
area of 7,500 ha
• Adjacent to existing Exxaro Mine,
Grootegeluk
• Initial drilling by Sekoko from 2007
• 1.8bn tonnes GTIS
• Definitive Feasibility Study (DFS)
completed in October 2010
• Mining Rights Application granted as off
August 2011
![Page 7: Sekoko Resources...Waterberg Project • Total of 8 tenements, with total surface area of 7,500 ha • Adjacent to existing Exxaro Mine, Grootegeluk • Initial drilling by Sekoko](https://reader033.vdocuments.mx/reader033/viewer/2022042804/5f5013a79638ff2e8968ad73/html5/thumbnails/7.jpg)
Waterberg Project
![Page 8: Sekoko Resources...Waterberg Project • Total of 8 tenements, with total surface area of 7,500 ha • Adjacent to existing Exxaro Mine, Grootegeluk • Initial drilling by Sekoko](https://reader033.vdocuments.mx/reader033/viewer/2022042804/5f5013a79638ff2e8968ad73/html5/thumbnails/8.jpg)
Drilling on Smitspan
Borehole Positions and Stripping Ratio on Smitspan
![Page 9: Sekoko Resources...Waterberg Project • Total of 8 tenements, with total surface area of 7,500 ha • Adjacent to existing Exxaro Mine, Grootegeluk • Initial drilling by Sekoko](https://reader033.vdocuments.mx/reader033/viewer/2022042804/5f5013a79638ff2e8968ad73/html5/thumbnails/9.jpg)
Geology
• Zone 11 -7:
• Overburden = 32m
• Avg. seam width = 9m
• Zone 11–1: Sulphur ≈ 1
Moisture ≈ 3
Zone 11 – 7
•CV ≈ 22
•Ash ≈ 29
•Volatiles ≈ 29
Zone 6 – 4
• CV ≈ 19
•Ash ≈ 35
•Volatiles ≈ 24
Zone 3 – 1
•CV ≈ 24
•Ash ≈ 22
•Volatiles ≈ 22
![Page 10: Sekoko Resources...Waterberg Project • Total of 8 tenements, with total surface area of 7,500 ha • Adjacent to existing Exxaro Mine, Grootegeluk • Initial drilling by Sekoko](https://reader033.vdocuments.mx/reader033/viewer/2022042804/5f5013a79638ff2e8968ad73/html5/thumbnails/10.jpg)
Smitspan Mine Design
![Page 11: Sekoko Resources...Waterberg Project • Total of 8 tenements, with total surface area of 7,500 ha • Adjacent to existing Exxaro Mine, Grootegeluk • Initial drilling by Sekoko](https://reader033.vdocuments.mx/reader033/viewer/2022042804/5f5013a79638ff2e8968ad73/html5/thumbnails/11.jpg)
Railway Logistics
• Conceptual
design completed
• Three (3) options
identified
• Specialist studies
conducted on
options
• ROD expected in
February 2012
(DEA process and
timelines)
![Page 12: Sekoko Resources...Waterberg Project • Total of 8 tenements, with total surface area of 7,500 ha • Adjacent to existing Exxaro Mine, Grootegeluk • Initial drilling by Sekoko](https://reader033.vdocuments.mx/reader033/viewer/2022042804/5f5013a79638ff2e8968ad73/html5/thumbnails/12.jpg)
The Customer: Eskom
• Existing MOU allocated for 525 000t is being
reviewed and a possible allocation of 10mt to be
resolved by September 2011, for a 30-40year
supply
• Coal to be supplied to Tutuka and Majuba Power Stations located in Mpumalanga
• Additional production of export quality (CV ≈ 24)
• Determined agreements, dictate project timeline
![Page 13: Sekoko Resources...Waterberg Project • Total of 8 tenements, with total surface area of 7,500 ha • Adjacent to existing Exxaro Mine, Grootegeluk • Initial drilling by Sekoko](https://reader033.vdocuments.mx/reader033/viewer/2022042804/5f5013a79638ff2e8968ad73/html5/thumbnails/13.jpg)
Key Milestones
Completed
DFS
Mining Right
Rail – Preliminary
design
Infrastructure
CHPP design
Outstanding
WULA
EIA/ROD: Smitspan
EIA/ROD: Rail
Eskom final MOU
![Page 14: Sekoko Resources...Waterberg Project • Total of 8 tenements, with total surface area of 7,500 ha • Adjacent to existing Exxaro Mine, Grootegeluk • Initial drilling by Sekoko](https://reader033.vdocuments.mx/reader033/viewer/2022042804/5f5013a79638ff2e8968ad73/html5/thumbnails/14.jpg)
Capricorn Iron Ore, Limpopo
![Page 15: Sekoko Resources...Waterberg Project • Total of 8 tenements, with total surface area of 7,500 ha • Adjacent to existing Exxaro Mine, Grootegeluk • Initial drilling by Sekoko](https://reader033.vdocuments.mx/reader033/viewer/2022042804/5f5013a79638ff2e8968ad73/html5/thumbnails/15.jpg)
Capricorn Iron Ore – Locality Plan
The Capricorn project involves the development of a greenfield open-cast iron ore mine 30km
NE of Polokwane, Limpopo. The project area includes 4 farms(A) located adjacent to the
Zandrivierspoort low-grade magnetite iron ore deposit of Kumba Resources(B).
![Page 16: Sekoko Resources...Waterberg Project • Total of 8 tenements, with total surface area of 7,500 ha • Adjacent to existing Exxaro Mine, Grootegeluk • Initial drilling by Sekoko](https://reader033.vdocuments.mx/reader033/viewer/2022042804/5f5013a79638ff2e8968ad73/html5/thumbnails/16.jpg)
Capricorn Iron Ore
Sekoko has 2 Iron Ore Prospecting Rights on the
farms DeLoskop, Roodewal, Ruigedraai and
Kalkfontein with a total exploration target of iron ore
mineralisation estimated at 200Mt at a
grade of between 30% Fe and 40% Fe. The
target formation, the Zandrivierspoort Banded
Ironstone Formation (BIF), hosts mineralisation
at a locality 35km to the SE at a grade of 35%
Fe where the geology of the regional deposits
is well understood as a result of historical
exploration having been undertaken previously
by ISCOR/Kumba.
![Page 17: Sekoko Resources...Waterberg Project • Total of 8 tenements, with total surface area of 7,500 ha • Adjacent to existing Exxaro Mine, Grootegeluk • Initial drilling by Sekoko](https://reader033.vdocuments.mx/reader033/viewer/2022042804/5f5013a79638ff2e8968ad73/html5/thumbnails/17.jpg)
Roodewal & Ruigedraai
Zandrivierspoort
Roodewal
Ruigedraai
![Page 18: Sekoko Resources...Waterberg Project • Total of 8 tenements, with total surface area of 7,500 ha • Adjacent to existing Exxaro Mine, Grootegeluk • Initial drilling by Sekoko](https://reader033.vdocuments.mx/reader033/viewer/2022042804/5f5013a79638ff2e8968ad73/html5/thumbnails/18.jpg)
Kalkfontein
![Page 19: Sekoko Resources...Waterberg Project • Total of 8 tenements, with total surface area of 7,500 ha • Adjacent to existing Exxaro Mine, Grootegeluk • Initial drilling by Sekoko](https://reader033.vdocuments.mx/reader033/viewer/2022042804/5f5013a79638ff2e8968ad73/html5/thumbnails/19.jpg)
Timeline Project Planning
2008/09 •Drilling
2010 •Reserve 2011
•Compilation of Mining Right
Application; EIA/EMP
2012 •Mining Right Application
2014 • Construction
•Commissioning
2016 •Production
2013 •Mining Right Granted
2015 •Production
Production
Exploration
![Page 20: Sekoko Resources...Waterberg Project • Total of 8 tenements, with total surface area of 7,500 ha • Adjacent to existing Exxaro Mine, Grootegeluk • Initial drilling by Sekoko](https://reader033.vdocuments.mx/reader033/viewer/2022042804/5f5013a79638ff2e8968ad73/html5/thumbnails/20.jpg)
Tuli Block Coal, Musina, Limpopo
![Page 21: Sekoko Resources...Waterberg Project • Total of 8 tenements, with total surface area of 7,500 ha • Adjacent to existing Exxaro Mine, Grootegeluk • Initial drilling by Sekoko](https://reader033.vdocuments.mx/reader033/viewer/2022042804/5f5013a79638ff2e8968ad73/html5/thumbnails/21.jpg)
Tuli Block – Locality Plan
![Page 22: Sekoko Resources...Waterberg Project • Total of 8 tenements, with total surface area of 7,500 ha • Adjacent to existing Exxaro Mine, Grootegeluk • Initial drilling by Sekoko](https://reader033.vdocuments.mx/reader033/viewer/2022042804/5f5013a79638ff2e8968ad73/html5/thumbnails/22.jpg)
Tuli Drilling
![Page 23: Sekoko Resources...Waterberg Project • Total of 8 tenements, with total surface area of 7,500 ha • Adjacent to existing Exxaro Mine, Grootegeluk • Initial drilling by Sekoko](https://reader033.vdocuments.mx/reader033/viewer/2022042804/5f5013a79638ff2e8968ad73/html5/thumbnails/23.jpg)
Exploration Results
• Main coal zone at shallow depths ranging
from 22 to 26 metres
• The coal zone varies in thickness from 13
to 22 metres
• Free Swelling Indices were mostly in the
range 5 to 7 indicating that the coal has
coking potential
• Coal qualities are quite attractive with
theoretical yields of up to 50% for a 12%
ash product
![Page 24: Sekoko Resources...Waterberg Project • Total of 8 tenements, with total surface area of 7,500 ha • Adjacent to existing Exxaro Mine, Grootegeluk • Initial drilling by Sekoko](https://reader033.vdocuments.mx/reader033/viewer/2022042804/5f5013a79638ff2e8968ad73/html5/thumbnails/24.jpg)
2008/09 •Drilling
2010 •Reserve 2011
•Compilation of Mining Right
Application; EIA/EMP
2012 •Mining Right Application
2014 • Construction
•Commissioning
2016 •Production
2013 •Mining Right Granted
2015 •Production
Production
Exploration
Timeline Project Planning
![Page 25: Sekoko Resources...Waterberg Project • Total of 8 tenements, with total surface area of 7,500 ha • Adjacent to existing Exxaro Mine, Grootegeluk • Initial drilling by Sekoko](https://reader033.vdocuments.mx/reader033/viewer/2022042804/5f5013a79638ff2e8968ad73/html5/thumbnails/25.jpg)
Acknowledgements
• Management of Sekoko Resources and
Board of Firestone Energy Ltd. for
permission to present
• Staff of Sekoko for assistance
• Chris Goodale; Consulting Geologist
• Dave Newman; Wirtgen South Africa, and
WirtgenGmbH
• Parsons Brinckerhoff; who carried out the
feasibility study of the project