    sTRANSFORMER HANDLING,

    INSTALLATION AND ASSEMBLING

    Numero doc. / Doc number:

    C07064/05/59Foglio/Sheet:

    1/38

    TRANSFORMER HANDLING,

    INSTALLATION AND ASSEMBLING

    CUSTOMER: Bekhma Company for Construction Contract

    INSTALLATION: NO. 1 Transformer SS ERBIL PARK (EP)SUMEIL SS

    ORDER: S/S STAGE 3 - B1 - 16/10/2007

    DESCRIPTION: Three-phase transformer

    Serial number 0706405/01

    Type: PO

    Rated power:44,1 / 35 / 28 ONAN

    63 / 50 / 40 ONAFMVA Frequency: 50 Hz

    Cooling type: ONAN / ONAF

    Voltage: 132 8 x 1,25 % / 33 2 x 2,5 % / 11,5

    Quantity: 1

    EdizioneEdition

    00 Data 10/11/08Date

    Redatto OdorizziEdited

    Controllato De PaoliCecked

    ApprovatoApproved

  • 8/6/2019 Seimense Transformer Manual

    2/38

    sTRANSFORMER HANDLING,

    INSTALLATION AND ASSEMBLING

    Numero doc. / Doc number:

    C07064/05/59Foglio/Sheet:

    2/38

    INDEX

    1 TRANSFORMER HANDLING..............................................................................................3

    1.1 TRANSFORMER LIFTING, ANCHORING AND TRAILING ...................................................................4

    1.1.1 Lifting............................................................................................................................................................ 41.1.2 Anchoring ..................................................................................................................................................... 61.1.3 Trailing ......................................................................................................................................................... 61.1.4 Precautions during the handling.................................................................................................................... 7

    1.2 TRANSFORMER BEARING...................................................................................................................8

    1.2.1 Assembly of sliding rollers mounted on forks whitout insulation (with/whitout border): ................................... 81.2.2 Bearing points............................................................................................................................................... 9

    2 TRANSFORMER INSTALLATION ....................................................................................10

    2.1 TRANSFORMER RECEPTION............................................................................................................11

    2.2 TRANSFORMER INSTALLATION.......................................................................................................11

    3 TRANSFORMER ASSEMBLY AND PREPARATION .......................................................12

    3.1 ASSEMBLY..........................................................................................................................................13

    3.1.1 Introduction..................................................................................................................................................133.1.2 Dismounting of the nitrogen maintaining system ..........................................................................................143.1.3 Pressure restore...........................................................................................................................................143.1.4 Transformer assembly and preparation sequence: .......................................................................................15

    3.1.5 Tighten torques............................................................................................................................................163.1.6 Radiator assembly .......................................................................................................................................173.1.7 Fan assembly ..............................................................................................................................................183.1.8 Conservator assembly .................................................................................................................................193.1.9 Piping Assembly ..........................................................................................................................................203.1.10 HV bushing assembly type P&V PSOPNO 52245 kV 8001250 A..................................................213.1.11 MV bushing assembly type CENELEC 12-24-36 kV / 1250-2000-3150 A.................................................233.1.12 MV bushing assembly type DIN 12-24-36 kV / 1000-2000-3150 A ............................................................273.1.13 Assemble the drive shaft - off-circuit tap-changer.......................................................................................31

    3.2 TRANSFORMER FILLING ...................................................................................................................35

    3.2.1 Filling of the tank and of the transformer conservator (with rubber bag) .......................................................353.2.2 Filling of the conservator of the On-Load Tap Changer................................................................................363.2.3 Oil level adjusting ........................................................................................................................................363.2.4 After the filling up.........................................................................................................................................363.2.5 Dehydrating breather assembly....................................................................................................................373.2.6 Other external accessories mounting ...........................................................................................................383.2.7 Auxiliary circuit connections.........................................................................................................................38

  • 8/6/2019 Seimense Transformer Manual

    3/38

    sTRANSFORMER HANDLING,

    INSTALLATION AND ASSEMBLING

    Section 3

    Numero doc. / Doc number:

    C07064/05/59Foglio/Sheet:

    3/38

    1 TRANSFORMER HANDLING

  • 8/6/2019 Seimense Transformer Manual

    4/38

    sTRANSFORMER HANDLING,

    INSTALLATION AND ASSEMBLING

    Section 3

    Numero doc. / Doc number:

    C07064/05/59Foglio/Sheet:

    4/38

    1.1 TRANSFORMER LIFTING, ANCHORING AND TRAILING

    1.1.1 Lifting

    NOTE: the position and the shape of the hitching points shown in the pictures of this section are justan indication; for a more detailed and real representation refer to the Assembly drawing and to

    other drawings referred in each paragraph.

    The transformer is provided with four hitching points for the lifting (transformer lifting lugs),the only points dimensioned for its weight (both in shipping and in operating arrangement);

    This points are shown on the Assembly drawing.

    The lifting of the whole transformer by means of the lifting eyes on the cover (designed onlyfor internal core&coils lifting) is strictly prohibited; the illegitimate use of this eyes could

    cause heavy damage of the transformer itself, of the neighbouring goods and represent a

    danger for the life of the people.

    While lifting, the transformer should be kept as horizontal as possible.Ropes with adequate lifting capacity must be used, hitched to the points provided for this purpose;the angle formed by the ropes on each plane should be less than 30.

    Lifting lugs:

    type type B

    MAX 30MAX 30 MAX 30MAX 30

  • 8/6/2019 Seimense Transformer Manual

    5/38

    sTRANSFORMER HANDLING,

    INSTALLATION AND ASSEMBLING

    Section 3

    Numero doc. / Doc number:

    C07064/05/59Foglio/Sheet:

    5/38

    The on site lifting, for little displacements (for example for rollers mounting) can be carriedout by means of hydraulic jacks, placed under the proper points, marked on the Assembly

    drawing.

    The lifting with hydraulic jacks must be carried out very carefully; during the lifting the

    transformer must be levelled as much as possible, both to avoid any instability both to avoid

    dangerous stresses on the tank.

    All four bearing points must be used, by alternating the action of the jacks with a circular

    sequence.

    An incorrect use of the lifting jacks could cause a damage of the tank, of the neighbouring

    goods and represent a danger for the life of the people.

    Supporting point for jacks

    Type A

    Type B

  • 8/6/2019 Seimense Transformer Manual

    6/38

    sTRANSFORMER HANDLING,

    INSTALLATION AND ASSEMBLING

    Section 3

    Numero doc. / Doc number:

    C07064/05/59Foglio/Sheet:

    6/38

    1.1.2 Anchoring

    For the anchoring during the transportation, only the points marked on the shipmentdrawing can be used (and if necessary the transformer lifting lugs); the use of other points

    not suitable for this purpose could damage the transformer tank.

    The haulage of the transformer can be done by means of the rollers, if any, or by a trolley withadequate loading capacity.Sliding guides with suitable shape and capacity must be used (rails for railway type rollers, U type

    channels for flat rollers).The hitching points for the trailing ropes can be only those marked on the Assembly drawing.

    The transformer must never be hauled with its base directly on the ground, even if it is

    equipped with skids.

    1.1.3 Trailing

    The trailing eyes are placed on the four sides of the tank, in the lower part; their number andposition vary depending on the size and the arrangement of the transformer. Some typical layoutsare shown in the following pictures.In general, all the provided trailing eyes (on one side) must be used for the haulage.

    Trailing eyes:

    Type 1 Type 2

    Type 3 Type 4

  • 8/6/2019 Seimense Transformer Manual

    7/38

    sTRANSFORMER HANDLING,

    INSTALLATION AND ASSEMBLING

    Section 3

    Numero doc. / Doc number:

    C07064/05/59Foglio/Sheet:

    7/38

    1.1.4 Precautions during the handling

    During all the transportation and handling operations, impacts, pulls, wide oscillations,strong vibrations must be avoided.

    The lifting and the putting down of the transformer must be done smoothly andgradually.

    In any case, the accelerations applied to the transformer must be less than 2.5 g,

    in any direction.

  • 8/6/2019 Seimense Transformer Manual

    8/38

    sTRANSFORMER HANDLING,

    INSTALLATION AND ASSEMBLING

    Section 3

    Numero doc. / Doc number:

    C07064/05/59Foglio/Sheet:

    8/38

    1.2 TRANSFORMER BEARING

    1.2.1 Assembly of sliding rollers mounted on forks whitout insulation (with/whitoutborder):

    For mounting the sliding rollers:

    - Unpack the transformer of the possible packing;

    - lift the transformer following one of the two possibilities:o by means of a crane and the provided lifting hooks. In this case the angle formed by the

    ropes on each plane should be less than 30

    o by means of jacks, applied to the provided plates on the bottom tank.

    During this operations, all the necessary safety precautions (according the laws) must beadopted to avoid any injury to the people or damage to the goods.

    Depending on the situation, proceed according to the relevant following procedures.

    - Place the sliding rollers with the fork 1 in the correct position.

    - Fix the forks on the transformer base by means of the bolts 2, after placing properly the washer3 and the spring washer 4.

    1

    4

    3

    2

    In case ofroller with border, mount the roller so that the border is inside the rails.

  • 8/6/2019 Seimense Transformer Manual

    9/38

    sTRANSFORMER HANDLING,

    INSTALLATION AND ASSEMBLING

    Section 3

    Numero doc. / Doc number:

    C07064/05/59Foglio/Sheet:

    9/38

    1.2.2 Bearing points

    The transformer is provided with bearing zones, dimensioned to carry its weight (both inshipping and in operating arrangement), marked on the Assembly drawing or on the

    Shipment drawing; if the transformer is intended for a mounting on sliding rollers or transformersupport, these zones correspond to the fixing zones of the rollers or transformer support.

    During the transportation or in case of putting down for handling (when the rollers are not mounted),the bearing of the transformer must be done only by means of the proper zones;

    the bearing of the transformer on other zones than those provided for the purpose is not

    admitted even for a short time.

    The bearing surface shall be level, horizontal, steady and designed to support themechanical stresses due to the transformer weight.

  • 8/6/2019 Seimense Transformer Manual

    10/38

    sTRANSFORMER HANDLING,

    INSTALLATION AND ASSEMBLING

    Section 3

    Numero doc. / Doc number:

    C07046/01/59Foglio/Sheet:

    10/38

    2 TRANSFORMER INSTALLATION

  • 8/6/2019 Seimense Transformer Manual

    11/38

    sTRANSFORMER HANDLING,

    INSTALLATION AND ASSEMBLING

    Section 3

    Numero doc. / Doc number:

    C07046/01/59Foglio/Sheet:

    11/38

    2.1 TRANSFORMER RECEPTION

    On delivery, check carefully the transformer and its accessory components for any damage sufferedduring transport.

    Any claims must be made immediately to the carrier, also informing the manufacturer.

    The transformer should be positioned in dry, covered areas, equipped for overhaul.

    In case of exposition to inclemency of the weather during the transport, when removing packing,make sure that any water in the packing does not contaminate the components which will later be

    immersed in the transformer oil.

    Check carefully the condition of the insulators and of the accessories.

    Pay particular attention to the state of the outer casing which contains the live parts of the

    transformer (core & windings).

    2.2 TRANSFORMER INSTALLATION

    The transformer is designed with an inclination sufficient to permit the water evacuation on theoutside and the gas evacuation on the inside.

    The surface on which the transformer lays must be horizontal.

    The transformer seat must be designed and built to support the weight and the mechanical stressestransmitted by the transformer.

    In the case the rollers are not used (or no rollers are provided), the bearing zones must have a levelsurface, with size not less than the bearing zones of the transformer.

    Once that the transformer is placed on its final position, the protections fitted fortransportation reason can be removed and, if the transformer has been delivered partiallydismantled, the assembly operations can be started.

  • 8/6/2019 Seimense Transformer Manual

    12/38

    sTRANSFORMER HANDLING,

    INSTALLATION AND ASSEMBLING

    Section 3

    Numero doc. / Doc number:

    C07064/05/59Foglio/Sheet:

    12/38

    3 TRANSFORMER ASSEMBLY AND PREPARATION

  • 8/6/2019 Seimense Transformer Manual

    13/38

    sTRANSFORMER HANDLING,

    INSTALLATION AND ASSEMBLING

    Section 3

    Numero doc. / Doc number:

    C07064/05/59Foglio/Sheet:

    13/38

    3.1ASSEMBLY

    3.1.1 Introduction

    When the overall dimensions of the transformer and its weight fit the transportation limits, it ispossible to ship the transformer completed assembled.In this case, if the transformer is sent without oil but filled by nitrogen, proceed with the oil fillingaccording to the procedure later in this manual.

    If the transformer dimensions and weight do not fit the transportation limits, some parts of thetransformer are dismantled and then re-assembled on site according to the instructions that refer to

    one of the following possible arrangements:

    1. The main body (tank containing core and windings) is filled with treated insulating oil, whose

    level in the tank is lowered to allow thermal expansion; the upper side of the tank is filled withnitrogen (to avoid the contact between oil and humid air).

    2. The main body (tank containing core and windings) ) is filled with nitrogen.

  • 8/6/2019 Seimense Transformer Manual

    14/38

    sTRANSFORMER HANDLING,

    INSTALLATION AND ASSEMBLING

    Section 3

    Numero doc. / Doc number:

    C07064/05/59Foglio/Sheet:

    14/38

    3.1.2 Dismounting of the nitrogen maintaining system

    If the transformer has been equipped with a system for maintaining the nitrogen pressure during theshipment, dismount this system before starting the assembling.

    Safety valveJoint

    Pipe

    nitrogen bottle1 stage gaugeshows the pressure inside the bottle

    2 stage gauge

    shows the pressure inside the transformer

    regulating knob (2 stage)

    "DO NOT TOUCH"

    pressure reducer (2 stage)pressure reducer (1 stage)bottle valve

    Valve on the cover

    - Close the bottle valve- Close the valve to which the bottle is connected on the transformer cover.- Remove the connection tube between the bottle and the valve on the cover.- Remove the bottle and the joint on the valve (with the safety valve)

    3.1.3 Pressure restore

    Before starting the assembling of the transformer, according to the order and theinstructions reported in the following sections of this manual, is important to restore theinternal pressure of the tank to the normal level (atmospheric pressure).To do this, open the vacuum pump valve or the pressure gauge valve positioned on

    the transformer cover (see Assembly Drawing) to let out the nitrogen, then close the valve againThe opening of the valve must be done slowly and taking a great care because thenitrogen could be in overpressure.

  • 8/6/2019 Seimense Transformer Manual

    15/38

    sTRANSFORMER HANDLING,

    INSTALLATION AND ASSEMBLING

    Section 3

    Numero doc. / Doc number:

    C07064/05/59Foglio/Sheet:

    15/38

    3.1.4 Transformer assembly and preparation sequence:

    The steps outlined below should be carried out in the sequence indicated (as far as they areapplicable):

    Surge arrester supports mounting (on the tank wall)

    Radiator assembly

    Radiator support assembly

    Conservator assembly

    M.V. bushing assembly

    M.V. busbars and surge arresters assembly

    H.V. bushing assembly

    Assemble the drive shaft - off-circuit tap-changer

    Filling up of the transformer

    Dehydrating breather assembly

    Other external accessories mounting

    Auxiliary circuit connections

  • 8/6/2019 Seimense Transformer Manual

    16/38

    sTRANSFORMER HANDLING,

    INSTALLATION AND ASSEMBLING

    Section 3

    Numero doc. / Doc number:

    C07064/05/59Foglio/Sheet:

    16/38

    3.1.5 Tighten torques(generic table: refer to the mounted components)

    Joint type Torque[Nm]

    Bolt size

    Tank/Cover 150 M16

    Tank/Conservator 120 M20

    Surge arrester support 60 M12

    Air cooling support 120 M20

    Air cooling piping 60 M12

    Radiator 100 M16

    Buchholz relay 100 M12

    Valves 40 M10

    MT cable box 60 M12

    MV bushing 40 M12

    HV bushingP&V PSO ; Trench COT

    70 M12

    Flange 60 M12

    Control cubicle 60 M8

    NOTE: the above torque values are given as a reference and can vary.

  • 8/6/2019 Seimense Transformer Manual

    17/38

    sTRANSFORMER HANDLING,

    INSTALLATION AND ASSEMBLING

    Section 3

    Numero doc. / Doc number:

    C07064/05/59Foglio/Sheet:

    17/38

    3.1.6 Radiator assembly

    Some radiators may already be fitted with fans, auxiliary circuit cubicles, rating/item plates or other

    supports.Particular attention must be taken in case that thermometer pockets are installed on the radiatorcollectors.These radiators must be positioned as shown on the Assembly Drawing.

    1. Make sure the radiator intercepting valves are closed.

    2. Remove the blank flanges and the plastic caps from the valves themselves, bearing in mind that

    the valve fixing bolts are used to fix the radiators.Suggestion: the intercepting valves are not completely oil-tight and consequently some leakage

    of the insulating liquid may occur.It is therefore best to remove the blank flanges one at a time as you install each radiator.

    3. Remove the blank flanges which are bolted to the radiator flanges (one at a time), making sure

    that no extraneous matter enters the radiators and that the seal seats are thoroughly clean.

    4. Raise the radiators one at a time, by first positioning them horizontally on two blocks of wood.Then, taking care not damage the radiator through violent jerks or blows, hook it up to the crane

    by the upper eyebolt and raise to a vertical position.

    5. Fix the radiator to the tank, taking care to fit the corresponding seals between the flanges.

  • 8/6/2019 Seimense Transformer Manual

    18/38

    sTRANSFORMER HANDLING,

    INSTALLATION AND ASSEMBLING

    Section 3

    Numero doc. / Doc number:

    C07064/05/59Foglio/Sheet:

    18/38

    3.1.7 Fan assembly

    Sometimes the fans are sent on site not mounted on the radiators: usually this happens with the

    horizontal application.In this case, follow the assembling configuration shown in the figure below:

  • 8/6/2019 Seimense Transformer Manual

    19/38

    sTRANSFORMER HANDLING,

    INSTALLATION AND ASSEMBLING

    Section 3

    Numero doc. / Doc number:

    C07064/05/59Foglio/Sheet:

    19/38

    3.1.8 Conservator assembly

    1. Make sure that the valves of the Buchholz relay, on the conservator connection piping and thetransformer connection piping are closed, then remove the blank flanges.

    2. Make sure that the valves of the O.L.T.C protection relay, on the conservator connection pipingand the transformer connection piping are closed, then remove the blank flanges.

    3. Remove the by-pass link between two valves on the OLTC head (this connection is provided to

    equalize the pressure inside the OLTC vessel during the transportation).

    4. Mount (if not already mounted) the Buchholz relay and the O.L.T.C. protection relay on the

    transformer as shown on the Assembly drawing, making sure that the arrow always is pointingtowards the conservator.

    5. Make sure the seal seats are thoroughly clean.

    6. Lift the empty conservator by means of the proper eyes.If the conservator is not completely empty, the ropes must be fitted around the conservator

    cylinderCheck carefully the rope lifting capacity before.

    The hitching eyes fitted on the conservator must only be used to lift the conservator when it

    is empty. The illegitimate use of this eyes could cause heavy damage of the component

    itself, of the neighbouring goods and represent a danger for the life of the people.

    7. Position the conservator as shown on the Assembly drawing, taking care to fit the correspondingseals between the flanges on the piping and on the Buchholz relay.Take care that the Buchholz relay doesnt suffer any damage.

    8. Insert all the conservator fixing bolts, but do not tighten them down.

    9. Interpose the gasket between the Buchholz relay and the flange on the conservator connection

    piping .

    10.Insert the Buchholz relay fixing bolts in the tank and conservator, but do not tighten them down.

    11.Mount (if not mounted already) the piping between the O.L.T.C. protection relay and theO.L.T.C.

    12.Interpose the gasket between the O.L.T.C. protection relay and the flange on the conservatorconnection piping .

    13.Insert the O.L.T.C. protection relay fixing bolts in the tank and conservator, but do not tighten

    them down.

  • 8/6/2019 Seimense Transformer Manual

    20/38

    sTRANSFORMER HANDLING,

    INSTALLATION AND ASSEMBLING

    Section 3

    Numero doc. / Doc number:

    C07064/05/59Foglio/Sheet:

    20/38

    14.Tighten down the bolts in the conservator supports, alternating between the bolts fixing theBuchholz relay and the O.L.T.C. protection relay so that they are locked at the same time.

    15.Make sure that all the bolts are duly tightened down (for an indication about the tighteningtorques, refer to the table in the Transformer Operating Instructions and Maintenance Manual).

    16.Connect the copper pipe coming from the gas collecting box, to the proper cock of the Buchholz

    (Buchholz instructions, see the Transformer Operating Instructions and Maintenance Manual).

    3.1.9 Piping Assembly

    1. Remove blind flanges, if present, from pipes sent unmounted;

    2. Clean all the gasket seats;

    3. Mount the piping as shown in the Outline Drawing and in the "Valves and Piping sketch" in

    TRANSFORMER OPERATING INSTRUCTIONS & MAINTENANCE MANUAL (section1).

  • 8/6/2019 Seimense Transformer Manual

    21/38

    sTRANSFORMER HANDLING,

    INSTALLATION AND ASSEMBLING

    Section 3

    Numero doc. / Doc number:

    C07064/05/59Foglio/Sheet:

    21/38

    3.1.10 HV bushing assembly type P&V PSOPNO 52245 kV 8001250 A

    Install the bushing in the position shown on the Assembly drawing, according the followingprocedure.

    NOTE: The items reported below are referred to the attached drawing.

    1. Unscrew the lock nuts of blank flange on the cover, take care that the lock nuts dont fall insidethe tank.

    2. Pull the terminal pin (2) out from the tank; the terminal pin is connected to the winding end bymeans of a flexible cable and is hung on the internal side of the blank flange during transport.

    3. Fit the gasket on the cover, making sure that its seat is thoroughly clean.

    4. Lift the bushing by means of a crane, slinging it as shown in the drawing, using the eyesprovided on the base flange of bushing.Use if possible hempen or nylon ropes having sufficient section.If metallic ropes are used, interpose wipers or similar between the ropes and the bushing

    porcelain, to avoid any damage of porcelain.

    5. Place the bushing exactly above the hole on the cover.

    6. Run a string with a threaded pin M12 through the bushing, starting from the top (until the string

    comes out from the bottom);Suggestion: if its possible use a pin made of insulating material, that could be left inside in caseof falling down.

    7. Screw the threaded pin in the hole M12 of the lug.

    8. Pull softly the upper end of the string.

    9. When the flexible cable is arranged inside the bushing, lower gently the bushing maintaining

    the cable tight.

    10.When the bushing is close to the cover, check the alignment of the flange holes with the stud onthe cover; check also that the bushing is correctly oriented

    11.Lower the bushing on the cover.

    12.Fix the bushing by tighten the nuts on the studs gently and thoroughly

    13.Check that the terminal pin stands out from the cap.

    14.Place the terminal pin (3) in the hole.

    15.Place the gasket on the top terminal (1) and fix its on the bushing.

  • 8/6/2019 Seimense Transformer Manual

    22/38

    sTRANSFORMER HANDLING,

    INSTALLATION AND ASSEMBLING

    Section 3

    Numero doc. / Doc number:

    C07064/05/59Foglio/Sheet:

    22/38

    2

    1

    37

    5

  • 8/6/2019 Seimense Transformer Manual

    23/38

    sTRANSFORMER HANDLING,

    INSTALLATION AND ASSEMBLING

    Section 3

    Numero doc. / Doc number:

    C07064/05/59Foglio/Sheet:

    23/38

    3.1.11 MV bushing assembly type CENELEC 12-24-36 kV / 1250-2000-3150 A

    For shipment reason, the bushing is assemble before packing.

    Before to proceed with the mounting of the bushing on the transformer cover, remove the porcelainfrom the rod (pos.2) referring to the following procedure:

    1. Loose the nut (pos.14)

    2. Remove all the washer (pos.4), the gasket (pos.5), the contact ring (pos.17), the cap (pos.3),the gasket (pos.7).

    3. Remove the porcelain from the rod (pos.2)

    Mount the bushing referring to the following procedure:

    1. Remove the hole protection on the transformer cover (2N-2U-2V-2W)

    2. Connect the rod (pos.2) with the internal connections (make use of the suitable screw)

    3. Check that the gasket (pos. 8) is fitted in the correct position on the cover hole

    4. Insert the pressing bits (pos. 18) and the clamping ring (pos. 16)

    5. Insert the porcelain on the threaded rod (pos. 2) and bring the rod in position by pulling thestring. Check that the rod fins enter in their set in the porcelain.

    6. Screw the fixing nuts at the base of the porcelain (pos. 15-19) and lift the clamping ring and fix itby means of the pressing bits by screwing the nuts alternately ensure a sufficient pressure onthe gasket.

    7. Insert on the porcelain all the parts gasket (pos.7), the cap (pos.3), the contact ring (pos.17), the

    gasket (pos.5), the washer (pos.4)

    8. Screw (ensure a sufficient pressure on the gasket but pay attention not to damage the porcelain)the nut (pos. 11)

  • 8/6/2019 Seimense Transformer Manual

    24/38

    sTRANSFORMER HANDLING,

    INSTALLATION AND ASSEMBLING

    Section 3

    Numero doc. / Doc number:

    C07064/05/59Foglio/Sheet:

    24/38

  • 8/6/2019 Seimense Transformer Manual

    25/38

    sTRANSFORMER HANDLING,

    INSTALLATION AND ASSEMBLING

    Section 3

    Numero doc. / Doc number:

    C07064/05/59Foglio/Sheet:

    25/38

  • 8/6/2019 Seimense Transformer Manual

    26/38

    sTRANSFORMER HANDLING,

    INSTALLATION AND ASSEMBLING

    Section 3

    Numero doc. / Doc number:

    C07064/05/59Foglio/Sheet:

    26/38

  • 8/6/2019 Seimense Transformer Manual

    27/38

    sTRANSFORMER HANDLING,

    INSTALLATION AND ASSEMBLING

    Section 3

    Numero doc. / Doc number:

    C07064/05/59Foglio/Sheet:

    27/38

    3.1.12 MV bushing assembly type DIN 12-24-36 kV / 1000-2000-3150 A

    For shipment reason, the bushing is assemble before packing.

    Before to proceed with the mounting of the bushing on the transformer cover, remove the porcelainfrom the rod (pos.2) referring to the following procedure:

    1. Remove the upper connecting flags (pos.11)

    2. Loose the nut (pos.14)

    3. Remove all the washer (pos.4), the gasket (pos.7), the contact ring (pos.23), the cap (pos.3),

    the gasket (pos.9).

    4. Remove the porcelain from the rod (pos.2)

    Mount the bushing referring to the following procedure:

    1. Remove the hole protection on the transformer cover (2N-2U-2V-2W)

    2. Connect the rod (pos.2) with the internal connections (make use of the suitable screw)

    3. Check that the gasket (pos. 10) is fitted in the correct position on the cover hole

    4. Insert the pressing bits (pos.24) and the clamping ring (pos.25)

    5. Insert the porcelain on the threaded rod (pos. 2) and bring the rod in position by pulling thestring. Check that the rod fins enter in their set in the porcelain.

    6. Screw the fixing nuts at the base of the porcelain (pos. 21-22) and lift the clamping ring and fix itby means of the pressing bits by screwing the nuts alternately; ensure a sufficient pressure onthe gasket.

    7. Insert on the porcelain all the parts gasket (pos.9), the cap (pos.3), the contact ring (pos.23), thegasket (pos.7), the washer (pos.4)

    8. Screw (ensure a sufficient pressure on the gasket but pay attention not to damage the porcelain)the nut (pos. 14)

    9. Mount the upper connecting flag (pos.11)

    10.If arcing horns are present, check they are in the correct position.

  • 8/6/2019 Seimense Transformer Manual

    28/38

    sTRANSFORMER HANDLING,

    INSTALLATION AND ASSEMBLING

    Section 3

    Numero doc. / Doc number:

    C07064/05/59Foglio/Sheet:

    28/38

  • 8/6/2019 Seimense Transformer Manual

    29/38

    sTRANSFORMER HANDLING,

    INSTALLATION AND ASSEMBLING

    Section 3

    Numero doc. / Doc number:

    C07064/05/59Foglio/Sheet:

    29/38

  • 8/6/2019 Seimense Transformer Manual

    30/38

    sTRANSFORMER HANDLING,

    INSTALLATION AND ASSEMBLING

    Section 3

    Numero doc. / Doc number:

    C07064/05/59Foglio/Sheet:

    30/38

  • 8/6/2019 Seimense Transformer Manual

    31/38

    sTRANSFORMER HANDLING,

    INSTALLATION AND ASSEMBLING

    Section 3

    Numero doc. / Doc number:

    C07064/05/59Foglio/Sheet:

    31/38

    3.1.13 Assemble the drive shaft - off-circuit tap-changer

    -Keep the bevel gear 1.12.204 blocked in position 3-Place the control box drive 1.12.201 in the same position 3

    -Block the Drive 1.12.201 in position 3-Place the bevel gear 1.12.203-Assemble the drive shaft pipes 25x25 mm, vertical and horizontal, like indicated on ISTR08-0001-Check the complete position range, passing from position 3 to pos. 1 and from 1 to 5; after pos. 1and after pos. 5 you should be able to rotate, more or less, for the same degrees.

  • 8/6/2019 Seimense Transformer Manual

    32/38

    sTRANSFORMER HANDLING,

    INSTALLATION AND ASSEMBLING

    Section 3

    Numero doc. / Doc number:

    C07064/05/59Foglio/Sheet:

    32/38

  • 8/6/2019 Seimense Transformer Manual

    33/38

    sTRANSFORMER HANDLING,

    INSTALLATION AND ASSEMBLING

    Section 3

    Numero doc. / Doc number:

    C07064/05/59Foglio/Sheet:

    33/38

  • 8/6/2019 Seimense Transformer Manual

    34/38

    sTRANSFORMER HANDLING,

    INSTALLATION AND ASSEMBLING

    Section 3

    Numero doc. / Doc number:

    C07064/05/59Foglio/Sheet:

    34/38

  • 8/6/2019 Seimense Transformer Manual

    35/38

    sTRANSFORMER HANDLING,

    INSTALLATION AND ASSEMBLING

    Section 3

    Numero doc. / Doc number:

    C07064/05/59Foglio/Sheet:

    35/38

    3.2 TRANSFORMER FILLING

    3.2.1 Filling of the tank and of the transformer conservator (with rubber bag)

    These instructions apply to a transformer delivered with lowered oil in the tank; the operationconsists in completing of the filling of the upper tank and of the conservator with rubber bag.

    Before starting, check that the valves are as indicated on the Transformer Operating Instructions

    and Maintenance Manual (section OPERATING INSTRUCTIONS, chapter Final revision, tableState of the valves)

    1. Open all the lower intercepting valves of the radiators.

    2. Open all the upper intercepting valves of the radiators.

    3. Connect the vacuum pump to the transformer dehydrating breather pipe (pos. 49).

    4. Open the rubber bag compensation valve (pos. 60).

    5. Connect the oil filling pipe to the tank drain valve (pos. 34).

    6. Evacuate the transformer; filling can be started.

    7. Open the drain valve (pos. 34) to make the oil flow in the tank.

    8. Fill the conservator up to the maximum indication of the oil level.

    9. Close the rubber bag compensation valve (pos. 60).

    10. Maintain the vacuum in the rubber bag.

    11. Continue with the conservator filling up to the upper part of them.

    12. Vent the conservator by open the air vent plug (open gas release cock of electrical alarmpos 74).

    13. Break down vacuum.

    14. When the oil arrives in the rubber bag damage detector (pos. 74), vent them by open itsscrew.

    15. Break down the filling and close the drain valve (pos. 34).

    16. Remove the vacuum pipe and mount the dehydrating breather to allow the air access intothe rubber bag.

    17. Open the conservator drain valve (pos. 46) for to drain the excessive oil (if necessary).

    Drain the oil to restore the correct level, corresponding to the temperature indicated on the oilthermometer.

  • 8/6/2019 Seimense Transformer Manual

    36/38

    sTRANSFORMER HANDLING,

    INSTALLATION AND ASSEMBLING

    Section 3

    Numero doc. / Doc number:

    C07064/05/59Foglio/Sheet:

    36/38

    3.2.2 Filling of the conservator of the On-Load Tap Changer

    Before starting, check that the valves are as indicated on the Transformer Operating Instructionsand Maintenance Manual (section OPERATING INSTRUCTIONS, chapter Final revision, table

    State of the valves)

    Check that the its dehydrating breather pipe end is free

    Connect the filling hose and the pump to the lower drain valve to the oil outlet valve on the OLTC

    head (note the outlet and inlet indications are referred to the oil treatment operation; use theoutlet valve for the oil filling).

    Start the filling and check the insulating liquid level on the level gauge of the conservator (OLTCcompartment); the oil level is correct when the level gauge reading corresponds to the temperature

    indicated on the oil thermometer.

    Vent the O.L.T.C. by opening the air vent plug on the top of the head. Then close the plug again.

    3.2.3 Oil level adjustingTo restore the oil level (that could be lower due to the venting operations), put in again oil in theconservator (both for the transformer and for the OLTC compartment ) from the conservator drainvalves.

    3.2.4 After the filling up

    After the filling operation, positioned all the valve open-closed device as shown on the "State ofvalve table chapter of the Transformer Operating Instructions and Maintenance Manual.

    Disconnect the filling plug from the barrel.

    Before energizing the transformer await two or three days to calm-down the oil (rest period) andrepeat the vent operations.

  • 8/6/2019 Seimense Transformer Manual

    37/38

    sTRANSFORMER HANDLING,

    INSTALLATION AND ASSEMBLING

    Section 3

    Numero doc. / Doc number:

    C07064/05/59Foglio/Sheet:

    37/38

    3.2.5 Dehydrating breather assembly

    NOTE: the following instructions apply to all the dehydrating breathers mounted on the transformer.

    If the piping is not disassembled for the transport, skip to point 4:

    1. Remove the flange from the lower piping of the conservator, placed a vessel down theconservator piping for collect the eventually oil converged in the piping during the transport.

    2. Remove the flange from the piping.

    3. Mount the connection piping, interposed the gasket between the flanges.

    4. Remove the upper and lower plugs from the dehydrating breather.

    5. Check the colour of the salt, with the label on the dehydrating breather. If the salt is saturated,

    refer to the instructions given in the "Preventive maintenance" chapter of the TransformerOperating Instructions and Maintenance Manual.

    6. Mount the dehydrating breather:

    - If threaded connection, screwing it on the proper pipe after binding the thread with Teflontape.

    - If flanged connection, mount the dehydrating breather interposed the gasket, between theflanges

    7. For dehydrating breathers with hydraulic closure, pour oil in the lower sump until the oil levelcovers the bottom half of the inspection glass.

    8. The dehydrating breathers and piping must be positioned as shown on the Assembly drawing.

  • 8/6/2019 Seimense Transformer Manual

    38/38

    sTRANSFORMER HANDLING,

    INSTALLATION AND ASSEMBLING

    Section 3

    Numero doc. / Doc number:

    C07064/05/59Foglio/Sheet:

    38/38

    3.2.6 Other external accessories mounting

    After the transformer main components assembling and oil filling, it is possible to mount the other

    components not in contact with the oil (external components).

    3.2.7 Auxiliary circuit connections

    The electrical cables are already pre-connected to the various accessories disassembled

    for shipment.

    Simply connect the cables to the accessories as shown in the Electrical circuit drawing.

    The electrical protection of the transformer tank is foreseen; therefore the tank must be

    isolated from the mass and the only earthing point must be the one shown on the outline

    drawing.

    Potential additional wiring must be disconnected from the tank before energizing.

    SIEMENS TRANSFORMERS S.p.A.

    Via di Spini n9

    38100 TRENTO ITALY