SCAN UPDATE Segment No. 17332, 17333 ROW OCS-G G28420
I n Reply Refer To: MS 5232 December 18, 2008
Ms. J i l l Fowler Kerr-McGee O i l & Gas Corporation (C/O Anadarko Petroleum Corporation) P.O. Box 1330 Houston, Texas 77251
The Minerals Management Service has reviewed your completion r e p o r t f o r the f o l l o w i n g p i p e l i n e s :
A p p l i c a t i o n Type: New Right-of-Way P i p e l i n e L e t t e r Date: August 19, 2008
Supplemental Data Dates: November 18, 2008, December 15, 2008
Segment ROW Size Length Number Number (inches) (f e e t ) Service From To 17332 G28420 04 32154 Bulk O i l PLET(Southern T i e - i n ) Platform A
Garden Banks Garden Banks Block 302 Block 260 OCS-G24479 OCS-G07462
17333 G28420 07 31654 Casing PLET(Southern T i e - i n ) P l atform A Garden Banks Garden Banks Block 302 Block 260 OCS-G24479 OCS-G07462
The t o t a l l e n g t h of the " a s - b u i l t " r ight-of-way i s 6.09 miles.
The r e p o r t i s submitted i n accordance w i t h 30 CFR 250.1008 ( b ) .
The data provided i n the re p o r t establishes the assigned maximum allowable ope r a t i n g pressure (MAOP) f o r the p i p e l i n e s :
Segment MAOP MAOP Number (psig) Determination
17332 12000 Hy d r o s t a t i c Test Pressure
The high and low-pressure sensors s h a l l be set no higher than 15 percent above and below the normal operating range, r e s p e c t i v e l y . The high p i l o t , however,
Page 2
s h a l l not be set higher than the MAOP of the p i p e l i n e . The pressure range s h a l l be e s t a b l i s h e d by the use of pressure recorders.
Sincerely,
•g. sgd.} Be ShrestSia Michael J. Saucier Regional Supervisor F i e l d Operations
bcc:1502-01 Segment No. 17332, 17333 ROW OCS-G G28420 (MS5232) 1502-01 ROW OCS-G G28420 (Scanning) (MS 5033) Bshrestha: Segment No. 17332, 17333
1 RE: PIPELINE SEGMENTS 17329, 173330, 17331, 17332, 17333, 17497, 17498 Page 1 of 4
. Shres tha , Bimal
From: Fowler, Jill [[email protected]]
Sent: Monday, December 15, 2008 9:21 AM
To: Dina Trejo; Lemker, Mike; Shrestha, Bimal
Cc: Davidson, Judy
Subject: RE: PIPELINE SEGMENTS 17329, 173330, 17331, 17332, 17333, 17497, 17498
Attachments: Fax-Dec-15-2008-09-19-14-6775.pdf
Bimal,
Please find attached the requested calibration certificate for Meter #1944. Thanks!
Jill Fowler 83^636-1554
From: Dina Trejo [mailto:[email protected]] Sent: Monday, December 15, 2008 8:52 AM To: Fowler, Jill; Lemker, Mike Cc: Davidson, Judy
Subject: RE: PIPELINE SEGMENTS 17329, 173330, 17331, 17332, 17333, 17497, 17498
Hi Mike, It's the calibration certificate associated with the PowerPlay flowline(s) hydrotest.
Regards, Dina Trejo Pegasus International, Inc. Sr. Project Engineer 777 North Eldridge Parkway, Suite 300 Houston.TX 77079
[email protected] Office: (713) 365-8315 - Fax: (713) 465-6886 Cell: (832)428-5090
From: Fowler, Jill [mailto:[email protected]] Sent: Monday, December 15, 2008 7:52 AM To: Lemker, Mike Cc: Davidson, Judy; Dina Trejo Subject: RE: PIPELINE SEGMENTS 17329, 173330, 17331, 17332, 17333, 17497, 17498
Mike,
I am just needing the calibration certificate for Meter#1944. Is this something that you can provide? Please advise. Thanks!
12/18/2008
V .
12/15/2008 02:21 7135809797 WEATHERFORD P&SS
PAGE 01
6227 OOW ROAD • 77040 4 P.O. BOX58641 - MOUSTON. TX 77255 *PH, (713)263-9740 * FAX{7ia)a63-W41
INSTRUMENT CALIBR^XIOH
DATE OF CALIBRATION! 1/22/08
CUSTOMER; WEATHERFORD PIPELINE SERVICES
OGME JOB NUMBER: '7062
TYPE OF INSTRUMENT: LEO KELLER GAUGE
PRESSURE RANQE: 0- 20300 PSI
SERIAL NUMBSR: 1944
CALIBRATE) TO BBWJ WBIOHT TSSTBft TRACABLE TO NATlONXt BTOBAU OF STANDARPS. SERIAL tTOMBBRi 36509
CERTIFICATION DUE DATE: 7 /22/08
DEAD WEIGHT INSTRUMENT
o# o# 4000# 3993# ^
10000# 9982# ^
16000# 15970#
20000# 19966# ^=
10000# 9982#
o# 0#
CALIBRATION TECH
QUALITY CONTROL INSPECTOR:
0
o^hrh Q
'o
A N A D A R K O P E T R O L E U M C O R P O R A T I O N
TEL. 8 3 2 / 636
P.O. BOX 1330 • HOUSTON. TEXAS 77251 -1 330
^ n a d a i H ^ p
November 18, 2008
U.S. Department of the Interior Minerals Management Service 1201 Elmwood Park Boulevard New Orleans, LA 70123-2394
ATTN: MS 5232
RE: Revised "As-Built" Plats Pipeline Segments 17332, 17333 Garden Banks Block 302 to Garden Banks Block 260
Gentlemen:
Pursuant to 30 CFR 150.1008(b), enclosed are the revised as-built location plats and an as-built diskette for the referenced pipelines in the Garden Banks Area. Also enclosed is the Hydrostatic Test Data prepared by Weatherford. Please note that all pipeline segments were hydrotested together.
If you should have any questions or need additional information, please call me at 832/636-1554.
Sincerely,
Jill Fowler Regulatory Analyst
JF
Enclosures
f-OV f; 0 2003
Weatherford PIPELINE & SPECIALTY SERVICES FORM FORM NUMBER: 5-4-GL-GL-PSS-00033
REV:
04 PAGE:
1 Of 1 ORIGINAL ISSUE DATE:
05/27/2004 REVISION DATE:
06/27/2007 PREPARED BY:
BIRGIT THIELE
REVIEWED BY:
MALCOLM DUNCAN
APPROVED BY.
MALCOLM DUNCAN
APPROVED BY:
TITLE: HYDROSTATIC TESTING ACCEPTANCE CERTIFICATE
PROJECT; Power Play
COMPANY: Anadarko
CONTRACTOR: Weatherford PSS
CONTRACT NO.:
PRESSURE TEST NO.: PS-9234 DATE: 6-19-08
This is to certify that the pipeline or pipeiine section described below was hydrostatically tested in accordance with the Terms of the Specification.
PIPELINE: FROM: GB-260 TO: GB-258
LENGTH: 68634 PiPE O.D.: 4.5" WALL THK: .648-.S86 GRADE: X65
LOCATION OF TEST EQUIPMENT: GB-260
Nominal Test Pressure: ISOOOpsimin. 15300psimax
initial Test Pressure at Testing Location: 15258psi
Final Test Pressure at Testing Location: 15194psi
Initial Temperature of Test Medium: BOF
Final Temperature of Test Medium: 85F
Duration of Test Holding Period: 13.25 hours
Description and Cause of Leak (if any): No visible leaks and no leaks located with ROV Description and Cause of Leak (if any):
Total Water added to reach Final Test Pressure: Gallons
Pressure remaining in Pipeline upon Completion of ail Test Operations: 0-PS!
REMARKS: Pressure recorder-Keller S-N 1944 REMARKS:
Temp recorders-Keller S-N 1944
REMARKS:
Brass dead weights-
REMARKS:
Cpmpany Representative Client Representative Weath^fford P&SS Representative
/Signature Signature Signature ^
© 2007 Weatherford International, Inc, Wamino: This Information is controlled, and any printed version is deemed as uncontrolled unless suitably endorsed by a controlling authority or
accompanied by a controlled table of contents in order to ensure adequate revision control.
POWER PLAY CHARTS
WeatherfonT OPERATION: FLOW LINE HYDROSTATIC TEST DATE: 19-06-J UNE LOCATION: GB-260—, \ START TIME: 2200 HRS INSTRUMENT SSNM 944 V END TIME: 1123 HRS TEST ACCEPTED: BERNTHUDSON, RCI
18,000
17,000
16,000
15,000
14,000
13̂ )00
12,000
11,000
io,roo 9,000
CO 8,000 a
7,000
6,000
5,000
4,000
3,000
2,000
1,000'
0
-1,000
Save-Merval (dd - Irrmss AMPM): 00 -1200:05 AM
r
/ •
rf
i • /
if* I
r
I |
i. L T. /
! ..rf
120(100 18:00:00 00:00:00 19TO08 06:00:00 1200:00
--- — 112,00
110.00
108.00
-106.00
104.00
102,00
1 •100.00
H • • -98.00 i i
) l 96.00 i ; ; |
94.00 i |
/ i * 1
( i
-92.00 Si1-i |
/ i * 1
( i 90.00
1
/ ^ •88.00
86.00 1 X 1 1 1
• V i i
•84,00
82,00
i \ i
\ . . . -80,00 i
\ . . . 78,00 \ -76,00
74,00
72,00
WEATHERFORD REPRESENTATIVE:
KENNETH MOULDERJR. SIGNATURE/;
CLIENT REPRESENTATIVE:
BENNY HUDSON
SIGNATURE/DATE:
REPRESENTATIVE;,,-
'ATURE/DATC: 4h~P&&&
POWER PLAY CHARTS
WeatherfonT OPERATION: HIGH PRESSURE LEAK TEST AFTER ALL FINAL FLANGE UPS DATE: 10 J LOCATION: GB-260 START TIME: 21 55HRS INSTRUMENT SSN: 1944 END TIME: 2300 HRS TEST ACCEPTED: BENNY HUDSON, RCI
14,000.00
12,000.00
10,000.00
8,000.00
00 6,000.00 CL
4,000.00
2,000.00
0.00
Save-lnterval (dd - h:mm:ss AMPM): 00 -12:00:05 AM
105.00
100.00
95.00
90.00
85.00 ^
80.00
75.00
70.00
65.00
19TO08 19/06/08 19/06/08 20/06/08 20/06/08 20/06/08 20/06/08 18:00:00 20:00:00 22:00:00 00:00:00 02:00:00 04:00:00 06:00:00
WEATHERFORD REPRES^MTATIVEJ^
KEN MOULDFR J & f ,
SlGNATURE/C : ^ . . ^ ? ^ ^ S ^
CLIENT REPRESENTATIVE:
BENNY HUDSON
SIGNATURE/DATE:
CLIENTREPRESENTATlVEy
STCFIATURE/DATE. <£ < . r ^
Weathertonj Pipeline & Specially Services
PL05-051-QD-10 A Revision
Hydrotest Report
PIPELINE REFERENCE:
OPERATION:
SUBCONTRACTOR:
CONTRACTOR:
CLIENT:
THIRD PARTY:
CONTRACT NO.:
LOCATION;
Power Play System
Pegasus
Anadarko
WPSS-009234
bate Time Pressure psiG
Ambient Temp. "F
Pipewail Temp. U F
Near Shore Temp. "F
Remarks
06.18.08
10;00 15258 80 Begin Hydro-Test lOOOhrs
10:15 15255 SO 6/18/2008
10:30 I 5252 80
10:45 15249 80
11:00 15246 SO
11:15 15243 80
11:30 15242 80
11:45 15241 KO
06.19.08
12.00 15239 80
12:15 15238 80
12:30 15236 80
12:45 15235 80
1:00 1523? 80
1:15 15232 80
1:30 15230 80
1:45 15229 80
2:00 15228 80
2:15 15227 80
2:30 15223 80
2:45 15222 80
3:00 15222 80
3:15 15220 80
3:30 15220 80
3:45 15219 80
4:00 15217 80
4:15 15216 80
4:30 15214 80
Weatherford WFT
Contractor Client Anadarko
Third Party
Name: 1 •'^Pjt^}./ ..^Benny Hudson
Sign:
Date:
Page 1 14in sleds hydrotest.xls
Weathartord Pipeline tc Speciall) Sen ices
PL05-051-QD-10 f. Reviaion
Hydrotest Report
PIPELINE REFERENCE:
OPERATION:
SUBCONTRACTOR;
CONTRACTOR:
CLIENT:
THIRD PARTY:
CONTRACT NO.:
LOCATION:
Power Play System
Pegasus
Anadarko
WPSS-009234
Date Time Pressure Ambient Pipewail Near Shore Remarks
psiG Temp. 0 F Temp. 0 F Temp. 0 F
06.19.08
4:45 15214 79
5:00 15213 79
5:15 15212 79
5 JO 15210 79
5:45 15210 79
6:00 15209 79
6:15 15207 79
6:30 15207 79
6:45 15206 79
7:00 15204 79
7:15 15204 80
7:30 15203 80
7:45 15204 80
8:00 15202 81
8:15 15201 81
8:30 15201 81
8:45 15200 81
9:00 15200 82
9:15 15199 83
9:30 15197 83
9:45 15199 83
10:00 15199 85
10:15 15197 85
10:30 15197 86 End Hydro-Test @1100hrs 10:45 15197 86 6-19-08,Accepted by client 11:00 15196 86 as successful hydro-test 11:15 15194 81 Begin bleed down 1115
Weatherford WFT
Contractor Client Anadarko
Name: fan Moulder . a • . J J * i 1 — ? ~
Benny Hudson
Third Party
Date: 4'~
Page 2 14in sleds hydrotest.xls
Shres tha , Bimal
•From; Shrestha, Bimal "Sent: Wednesday, September 17, 2008 2:03 PM To: 'Davidson, Judy'
Subject: PIPELINE SEGMENTS 17329, 173330, 17331, 17332, 17333, 17497, 17498
Judy:
We received as-built reports for Segments 17329, 173330, 17331, 17332, 17333,17497, 17498. These pipelines were approved in three groups: 1. Segments 17329, 173330, 17331 2. Segments 17332, 17333 3. Segments 17497, 17498
Separate As-built reports should have been submitted for each group of pipelines. This is how we have filed paperworks in our office.
Please follow this procedure in future.
Problems:
1. Please submit 2 copies of as-built map for Segment 17331 with ASCII data points for the umbilical. 2. ForSegment 17329, 173330:
Please revise the plat map showing lengths from PLET to transition point and from PLET to touchdown point. 3. For Segment and 17332, 17333:
Please revise the plat map showing lengths from PLET to transition point and from PLET to touchdown point. 4. For hydrotest: You have submitted only one hydrotest for all of these pipelines. If you tested all pipelines together, please state so in writing Please send calibration certificate for Meter Serial no. 1944.
Bimal Shrestha Pipeline Section Minerals Management Service Phone: 504-736-2548 Fax: 504-736-2408
A N A D A R K O P E T R O L E U M C O R P O R A T I O N TEL. 832 / 636-1 OOO
P.O BOX 1 3 3 0 . HOUSTON, TEXAS 77251-1330
August 19, 2008
U.S. Department of the Interior Minerals Management Service 1201 Elmwood Park Boulevard New Orleans, LA 70123-2394
ATTN: MS 5232
RE: "As-Built" Plat Pipeline Segments r7329?J7330, 1733201333, 17497, 17498 Garden Banks Block 302 to Garden Banks Block 260"
Gentlemen:
Pursuant to 30 CFR 150.1008(b), enclosed are the as-built location plats and an as-built diskette for the referenced pipelines in the Garden Banks Area. Also enclosed is the Hydrostatic Test Data prepared by Weatherford.
I f you should have any questions or need additional information, please call me at 832/636-1554.
Sincerely,
J i l l rowle r^ Regulatory Analyst
JF
Enclosures
AUG 2 0 2008
Pipeiine Qectior.
Weatherford PIPELINE & SPECIALTY SERVICES FORM FORM NUMBER:
5-4-GL-GL-PSS-00033 REV:
04 PAGE:
1 Ofl ORIGINAL ISSUE DATE:
05/27/2004 REVISION DATE:
06/27/2007 PREPARED BY:
BIRGIT THIELE
REVIEWED BY:
MALCOLM DUNCAN
APPROVED BY:
MALCOLM DUNCAN
APPROVED BY:
TITLE: HYDROSTATIC TESTING ACCEPTANCE CERTIFICATE
PROJECT: Power Play
COMPANY: Anadarko
CONTRACTOR: Weatherford PSS
CONTRACT NO.:
PRESSURE TEST NO.: PS-9234 DATE: 6-19-08
This is to certify that the pipeiine or pipeiine section described beiow was hydrostatically tested in accordance with the Terms of the Specification.
PIPELINE: FROM: GB-260 TO: GB-258
LENGTH: 68634 PIPE O.D.: 4.5" WALL THK: .648-.586 GRADE: X65
LOCATiON OF TEST EQUIPMENT: GB-260
Nominal Test Pressure: ISOOOpsi min. 15300psi max
initial Test Pressure at Testing Location: 15258psi
Final Test Pressure at Testing Location: 15194psi
initiai Temperature of Test Medium: 80F
Finai Temperature of Test Medium: 85F
Duration of Test Holding Period: 13.25 hours
Description and Cause of Leak (if any): No visible leaks and no leaks located with ROV
Total Water added to reach Final Test Pressure: Gallons
Pressure remaining In Pipeiine upon Completion of aii Test Operations: 10-PSI
REMARKS: Pressure recorder-Keller S-N 1944
Temp recorders-Keller S-N 1944
Brass dead weights-
Company Representative
/Signature
Client Representative Weath ntative
Signature
© 2007 Weatherford International, Inc. Warning: This information is controlled, and any printed version is deemed as uncontrolled unless suitably endorsed by a controlling authority or
accompanied by a controlled table of contents in order to ensure adequate revision control.
POWER PLAY CHARTS OPERATION: FLOW LINE HYDROSTATIC TEST
DATE: 19-06-JUNE LOCATION: GB-260 START TIME: 2200 HRS INSTRUMENT SSN: 1944 END TIME: 1123 HRS TEST ACCEPTED: BENNY HUDSON, RCI
18,000
17,000
16,000
15,000
14,00)
13,000
12,000
11,000
10,000
9,000
7,000
Save+terval (dd-h:mm:ssAI#M): 00-1200:05AM
tr I i
i
•: i - y r v t
•H • l 1 l
•J r
. ... ^ " V y f A -s /
/ S T ~J • • \/ -
L^IIS i \ . .\
112110
110.00
108,00
106.00
104D0
102D0
100,00
^D0
96,00
94,00
92.00 ^
90i)0
mm 86.00
84iM
82.00
80i]0 im
76D0
74D0
72.00
120Q.00 18fl&D8 18:0a00 OttOOOO
19JD6JD8 06:(X):00 1200:00
WEATHERFORD REPRESENTATIVE:
KENNETH MOULDERJR. SIGNATURE/:
CLIENT REPRESENTATIVE:
BENNY HUDSON
SIGNATURE/DATE:
EPRESENTATIVg;,
ATURE/DAT^: /£->~P&&&
POWER PLAY CHARTS
WeatherfonT OPERATION: HIGH PRESSURE LEAK TEST AFTER ALL FINAL FLANGE UPS WeatherfonT DATE: 10 J LOCATION: GB-260 START TIME: 2155HRS INSTRUMENT SSN: 1944 END TIME: 2300 HRS TEST ACCEPTED: BENNY HUDSON, RCI
14,000.00
12,000.00
10,000.00
8,000.00
CO 6,000.00 Q.
4,000.00
2,000.00
0.00
Save-lnterval (dd - h:mm:ss AMPM): 00 -12:00:05 AM
wmm 18:00:00
19/06̂ 08 20:00:00
wmm 22:00:00
2msm 00:00:00
20/06/08 02:00:00
2msm 04:00:00
2Qmm 08:00:00
WEATHERFORD REPRES^MTATIVEJ
KEN MOULDFR SlGNATURE/C
CLIENT REPRESENTATIVE:
BENNY HUDSON
SIGNATURE/DATE:
CLIENT^EPRESENTATIVE^,
SIGWATURE/DATE. <^ - 2 ? ^ - ^
PL05-051 -QD-10 A Revision
WBatlienoro Pipeline & Spedalty Services
Hydrotest Report
PIPELINE REFERENCE: Power Play System
OPERATION: Flowline Hydrotest GB-260 to GB-258
SUBCONTRACTOR:
CONTRACTOR: Pegasus
CLIENT: Anadarko
THIRD PARTY:
CONTRACT NO.: WPSS-009234
LOCATION: GB-260
Date Time Pressure ps iG
Ambient Temp. "F
Pipewail Temp. " F
Near Shore Temp. "F
Remarks
06.18.08
10:00 15258 80 Begin Hydro-Test lOOOhrs
10:15 15255 80 6/18/2008
10:30 15252 80
10:45 15249 80
11:00 15246 80
11:15 15243 80
11:30 15242 80
11:45 15241 80
06.19.08
12:00 15239 80
12:15 15238 80
12:30 15236 80
12:45 15235 80
1:00 15233 80
1:15 15232 80
1:30 15230 80
1:45 15229 80
2:00 15228 80
2:15 15227 80
2:30 15223 80
2:45 15222 80
3:00 15222 80
3:15 15220 80
3:30 15220 80
3:45 15219 80
4:00 15217 80
4:15 15216 80
4:30 15214 80
Weatherford WFT
Contractor Client Anadarko
Third Party
Name: Mo^lder^ Jl x7Benny Hudson
Sign:
Date:
Pagel Mln sleds hydrotest.xls
PL06-061-QD-10 A Revision
Waatiiarfom Pipeline & Specialty Services
Hydrotest Report
PIPELINE REFERENCE:
OPERATION:
SUBCONTRACTOR:
CONTRACTOR:
CLIENT:
THIRD PARTY:
CONTRACT NO.:
LOCATION:
Power Play System
Flowline Hydrotest GB-260 to GB-258
Pegasus
Anadarko
WPSS-009234
GB-260
Date Time Pressure
psiG
Ambient
Temp. 0 F
Pipewail
Temp. 0 F
Near Shore
Temp. "F Remarks
06.19.08 4:45 15214 79 . 5:00 15213 79 5:15 15212 79 5:30 15210 79 5:45 15210 79 6:00 15209 79 6:15 15207 79
6:30 15207 79
6:45 15206 79
7:00 15204 79 7:15 15204 80
7:30 15203 80
7:45 15204 80 8:00 15202 81
8:15 15201 81 8:30 15201 81
8:45 15200 81
9:00 15200 82 9:15 15199 83 9:30 15197 83 9:45 15199 83 10:00 15199 85 10:15 15197 85 10:30 15197 86 End Hydro-Test @1100hrs 10:45 15197 86 6-19-08,Accepted by client 11:00 15196 86 as successful hydro-test 11:15 15194 81 Begin bleed down 1115
Weatherford WFT
Contractor Client Anadarko
Third Party
Name: fan Moulder „ / ^enny Hudson
t // Sign:
Date: /
0&
Page 2 14in sleds hydrotest.xls
GB302 OCS-G-24479
Anadarko, SheU, Walter
-Y=10.057.J20
-Y= 10,057,250
PLEM HUB
X - 1.934.218' Y= l O ^ ^ V Lot. 27" « ' •S.SSJ'N Lon. 92- 05' 29.958"W
PLET HUB
X= 1.934.232" Y - 10,057,223" Lot, 27" 42" 42.812"N Lon. 92' 05" 2 9 . 8 0 8 ' ^
AnodorWo
-Y= 10,057,200 + CmiFICD CORRECT AS TO THE HORIZONTAL POSITION OF THE AS-BUILT JUUPER BASED ON THE SURVEY UETHODS NOTED.
DIGITAL COPY ORIGmL PLAT SIGNED 07/11/08 MARK KEITH BUHRKE RPLS fSOBZ STATE OF TEXAS
1) JUUPER COORDINATES ARE THE POSITIONS OF THE R.O.V. LOCATED AT THE POINTS USING LONG BASELINE ACOUSTIC POSITIONING.
Z) SURVEYED COORDINATES TRANSFORUED FR0U NADSJ (GPS DATUU) TO NADZ7 (CHART DATUU) USING NADCON VER. Z.I.
3) THIS DRAWING IS NOT FOR NAVIGATION. ONLT PIPEUNES AND FZAIVRES IN WE IUUEDIATE VICINITY OF THE AS-BUILT ARE SHOWN.
4) INSTALUTION DATE: JUNE IS. ZOOB
LEGEND o 2 wta
AS-BUILT
EXISTINO
P a t r o i o u m C o r p o r a t i o n
POWER PLAY PROJECT AS-BUILT 6" JUMPER
BLOCK 302 GARDEN BANKS AREA
GULF OF MEXICO
HELIX
OfODfTIC DATUM: NA027 PROJECTIOM: U.T.M. 15 (NORTH) GRID UNfTS: US SURVEY FEEI
Job No. : 0 7 - 1 4 6 5 Dato: 0 7 / 1 0 / 0 8
FUGRO CHANCE INC.. • I M W l l e f B t l ( t a t a t a n . t - o . 7T0S1 ( 7 1 3 ) S * S - 5 7 0 D M
SCALE IN EEET
Drw,, MM
Dwgtllo: Q:\2007\071465\CAD\07146509 REV.1
Chart: Of:
1 1
- Y = 10.057.320
GB302 OCS-G-24479
Anadarko, Shell, Walter
MMS SEG. NO. 17497 TOTAL LENGTH = 60' = 0.01 Ml.
AS-BUILT 6" JUMPER
-Y= 10,057.260
-Y= 10,057,200 +
8 CQ
S > •
CO t-i-J CO
CERTIFIED CORRECT AS TO WE HORIZONTAL POSITION OF THE AS-BUILT JUUPER BASED ON THE SURVEY UETHODS NOTED.
DIGITAL COPY ORIGINAL PLAT SIGNED 07/11/08 UARK KEITH BUHRKE RPLS SSOBZ STATE OE TEXAS
NOTES:
1) JUUPER COORDINATES ARE WE POSITIONS OE THE R.O.V. LOCATED AT THE POINTS USING LONG BASEUNE ACOUSTIC POSITIONING.
Z) SURVEYED COORDINATES TRANSFORUED FROU NADBJ (GPS DATUU) TO NADZ7 (CHART DATUU) USING NADCON VER. Z.I.
3) THIS DRAWING IS NOT EOR NAVIGATION. ONLY PIPEUNES AND EEATURES IN WE IUUEDIATE VICINITY OE WE AS-BUILT ARE SHOWN.
4) INSTALLATION OATE: JUNE II, ZOOB
LEGEND o 2 vrea
AS-BUILT
EXISTING
_ _ _ P«t ro l«um Corporat ion
POWER PLAY PROJECT AS-BUILT 6" JUMPER
BLOCK 302 GARDEN BANKS AREA
GULF OF MEXICO
'HELIX
GEOOmC DATUM: NA027 PROJECTION: U.T.M. 15 (NORTH) GRID UNITS; US SURVEY FEET
Job No.: 07-1465 | Do1»: 07 /10/08
FUGRO CHANCE INC. S l t W HHlDroft K a u - h n . r » » 7 7 0 a i ( 7 1 J ) J 4 « - J 7 0 0 M M
SCALE IN EEET
Dnun: MM
Pwgdlo: Q:\200A071465\CAD\0714650B REV.1
Chort: Of:
I 1
GB213
- r- in-.a'cooa
GB257
smnn X-Y- 10,057,223' Lol Qr 42' 42.812-N Lon, 93- 05' 29.808'\V
INSET SCALE r^so1
GB214
GB258 0CS-G~27632
Anedorko, Newfield
-+-
GB301 K. '.I.Vi.'.l
111 in : ! ' LINt CROSSING X - 1.9*1.360* V- 10.0&e.4DO' Lal. 2 r 42' W.945"N 1 OA, 92" 04' '.0.160'NV
GB302 OCS-G-24479
Anadarko. Shell. Vfalter
GB215
•nn.:. i . w-i l l Hi ; 1.965,100'
Y- '0.064,452' Lot, 27' *3• 52.0*5^ Lon. flf 59" 4562B-W
GB259 OCS-G-07461
Iless
GB216
GB260 OCS-G-0746^
Hess
MMS SEG. NO. 17552 AND 17355
4- & r WW-IM-FHPE PWLW C'ICS • I Ml.? i
51.545
GB303 OCS-G-30781
Remington
8
+ v/ri
IK
\ Mf k \
HAlCA'f HANG-OFF tCALCULATEOj X- I,965,!t6^ Y- 10,065.17/' LOt. 27* 45' 59.18/4N uy*. 91" 59' 37.DBO"W
INSET GALE r=ioo-
GB304
GB217
GB261
44" 00" N
27* i ; ; no' N
GB305
^ ^ ^ ^ ^
if \ «
-• • MCIM
• i
I . A * ''
fan
£01 .•W».l
mm
LOCATION
or SURVEY
V I C I N I T Y M A P
..v.'> i o r *
a*x4 \ ,9J l 06 < y :.<•
10 | 1 . g J ? . ^ ^ 11 1 1.938.253
):"•' 1,936,659
13 1,939,257 14 I ' i
1.9*0.631
t 1,941.177
1B'X4 1.941,681
19 l / i - . , 1 . - . . ! ' .
20 1,945.156 21»X4 1.945,776
23 ','(•(•1,1 \ •
1,944.60*
7 1.945.059
20''A 1,946,0*3
11 '.946.569
1 ' 1
I J ' l ^ C . V l V
10,060,441'
10,060.529" I0.060,!>96'
.060 .flll 1'
la 7.13.
: i11 .•'
'5 '4
O.uh 5.808
M l I r i '
.LNC 10.065.177 6.09 Murs
WEIL
»MCH0« Pllt
OBSIIWCTI0H
t«ISIINC
ABANDONED
AS-BUIIT
CAIT NARY
RIGHT-OF-WAY
pmum coomuAKs 2 THWUCH B2 m m posirms or rne ff.o.v. (morar OKRAIZD VEHKU} IOCWO AT THC pants OSm BOTH SfAWttoDCPS POSIWftm AMI oat (Mto SHORT BAsam) ACOUSTK posnmrn. cooRmAiti i. ei THROUGH es AK THt POSITIONS Of THt BOV (RtMItir Oi mTtD VfMCtt) lOCAltD AI THt POIHTS USING ( f t OOM tASOM) ACWSK TOSffWMWS SimtYCD COOITOINATtS TRANSfORUfD TfKM NADS3 (CPS DATIM) TO HAD27 (CHART DATUU) OSING NAOCOH W.m 2.T. IHC UHtW Of THt PIPIUMC IS CAICIAATTD OSNC SVBVtr COORDmitS AND tXClt/DtS RtSIR ItHCTHS. THIS DRAWING IS NOT fOR NAVIGATION. ONIY PfifUNCS AND ftAWPtS IN IHC lUUCBIATC VKmiT Of THt AS-BVIII ARC SHOWN. • DtNOTCS ANOOC (UAI HOT RCmStHI AU ANDOtS). TD DCNOTtS TOUCHDOWN, TRANS DtNOTtS TltAVSIim. CAIC DtNOTCS CAICUIAICD AHD H DCNOTtS HANC-OfT. SVRVTt OATC: UAT IS THROUGH MMC 9. 2001
CTRmtD CORRtCT AS 10 THC HOm/ON', POSITION Of THt AS-BVUT PIPtlINt BA ON THt SURVCT MfTHOOS NOTED.
HARK KBTH BmfKC BPIS /$09J 5 I A 7 r * , m S
MARK Kii i fH BUHRKE
POWER PLAY P R O J E C T AS-BUILT 4" & 7" PIPE-IN-PIPE PIPELINE
FROM BLOCK 302 TO BLOCK 260 GARDEN BANKS AREA
GULF OF MEXICO
HELIX •N|ikL.YS-H.l,'ll<>NS
FUGRO CHANCE INC. ~|ua C B O
MCO " l l l ^ i u l l l l i . i . . In l / t H I ( H i ) M l - V O '
GEODETIC DATUM NAI)27 PROJECIION: U.T.M. 15 (NORTH) GRID UNITS: US SURVEY FEET
TEET SCALE
MILES
?.ooo'
0.2 0.4 0,6 ^ssue No. i ld le Descripl lon Inter
i i i . , - , Drwn Chhd Apr«