segment 4 - trimet · segment 4 gresham se 4 a g t 2 2 2 /v p îw r z }µpz^ }vd Ç 4 4 4 / ov í/v...

4
SE 174TH AVE GRESHAM PORTLAND SE 178TH AVE SE 176TH AVE SE 175TH PL SE 176TH PL SE DIVISION ST SE 179TH AVE SE 182ND AVE SE 185TH AVE SE 185TH CT SE 187TH PL LEGEND N 0 50’ 100’ 200’ I-205 SE Cesar Chavez Blvd SE 122nd Ave SE 82nd Ave SE 148th Ave SE 182nd Ave NW Eastman Pkwy SE 11th/12th Ave SEGMENT 4 GRESHAM • SE 174th Ave to Gresham Central Transit Center 2 2 Integrated 2 Pass-through Staon Type 2 4 4 Island 1 Intersecon Staon Type 4 Bus Staon Proposed Design Elements Business Access Transit Lane (BAT) Protected Bicycle Facility Sidewalk/Island Median Access Control Signal Improvement New Pedestrian Crossing Signal Downtown Stop Driveway Closure Downtown Bus Route Right-of-Way Acquision Integrated 1 By-pass Integrated 2 Pass-through Integrated 3 Rear Access Bus Staon Types 1 2 3 Island 1 Intersecon Island 2 Mid-block 4 5 Island 3 Rear Access 6 New Pedestrian Crossing Signal Outer Division Mul-Modal Safety Project Improvements Median Access Control Bioswale Tree Removed Property Line Temporary Construcon Easement 2a 1d 2b 2c 2d 2e 3a 3b 3c 3d 3e 3f 3g 4b 4c 4d 1c 1b 1a 4a OPEN HOUSE November 2017

Upload: others

Post on 05-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SEGMENT 4 - TriMet · SEGMENT 4 GRESHAM SE 4 A G T 2 2 2 /v P îW r Z }µPZ^ }vd Ç 4 4 4 / ov í/v }v^ }vd Ç µ ^ }v Proposed Design Elements Business Access Transit Lane (BAT)

SE

168

TH A

VE

SE

170

TH A

VE

SE

170

TH A

VE

SE

171

ST

AV

E

SE

174

TH A

VE

GR

ES

HA

M

PO

RTL

AN

D

SE

178

TH A

VE

SE

176

TH A

VE

SE

175

TH P

L

SE

176

TH P

L

SE DIVISION ST

SE

179

TH A

VE

SE

182

ND

AV

E

SE

185

TH A

VE

SE

185

TH C

T

SE

187

TH P

L

LEGEND

N0 50’ 100’ 200’

I-205SE Cesar Chavez Blvd SE 122nd AveSE 82nd Ave SE 148th Ave SE 182nd Ave NW Eastman PkwySE 11th/12th Ave

SEGMENT 4GRESHAM • SE 174th Ave to Gresham Central Transit Center

2

2

Integrated 2 Pass-through Station Type2

4

4

Island 1 Intersection Station Type4

Bus Station

Proposed Design Elements

Business Access Transit Lane (BAT)Protected Bicycle FacilitySidewalk/Island

Median Access Control

Signal Improvement

New Pedestrian Crossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

Downtown Stop

Driveway ClosureDowntown Bus Route

Right-of-Way Acquisition

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

Integrated 1 By-passIntegrated 2 Pass-throughIntegrated 3 Rear Access

Bus Station Types

1

2

3

Island 1 IntersectionIsland 2 Mid-block

4

5Island 3 Rear Access6

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

New Pedestrian Crossing Signal

Outer Division Multi-Modal Safety Project Improvements LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

Median Access Control

Bioswale

Tree Removed

Property Line

Temporary Construction Easement

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

2a1d 2b 2c 2d 2e 3a 3b 3c 3d 3e 3f 3g 4b 4c 4d

1c

1b

1a

4a

OPEN HOUSE November 2017

Page 2: SEGMENT 4 - TriMet · SEGMENT 4 GRESHAM SE 4 A G T 2 2 2 /v P îW r Z }µPZ^ }vd Ç 4 4 4 / ov í/v }v^ }vd Ç µ ^ }v Proposed Design Elements Business Access Transit Lane (BAT)

NW DIVISION ST

SE

190

TH P

L

NW

EA

STW

OO

D A

VE

GRE

SHAM

-FAI

RVIE

W T

RAIL

SE

202

ND

AV

EN

W B

IRD

SD

ALE

AV

E

NW

WO

ND

ER

VIE

W C

TN

W W

ON

DE

RV

IEW

DR

NW

RIV

ER

VIE

W A

VE

NW

RIV

ER

VIE

W A

VE

NW

BE

LLA

VIS

TA P

L

LEGEND

N0 50’ 100’ 200’

I-205SE Cesar Chavez Blvd SE 122nd AveSE 82nd Ave SE 148th Ave SE 182nd Ave NW Eastman PkwySE 11th/12th Ave

GRESHAM • SE 174th Ave to Gresham Central Transit CenterSEGMENT 4

2

2

Integrated 2 Pass-through Station Type2

Bus Station

Proposed Design Elements

Business Access Transit Lane (BAT)Protected Bicycle FacilitySidewalk/Island

Median Access Control

Signal Improvement

New Pedestrian Crossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

Downtown Stop

Driveway ClosureDowntown Bus Route

Right-of-Way Acquisition

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

Integrated 1 By-passIntegrated 2 Pass-throughIntegrated 3 Rear Access

Bus Station Types

1

2

3

Island 1 IntersectionIsland 2 Mid-block

4

5Island 3 Rear Access6

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

New Pedestrian Crossing Signal

Outer Division Multi-Modal Safety Project Improvements LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

Median Access Control

Bioswale

Tree Removed

Property Line

Temporary Construction Easement

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

2a1d 2b 2c 2d 2e 3a 3b 3c 3d 3e 3f 3g 4a 4c 4d

1c

1b

1a

4b

OPEN HOUSE November 2017

Page 3: SEGMENT 4 - TriMet · SEGMENT 4 GRESHAM SE 4 A G T 2 2 2 /v P îW r Z }µPZ^ }vd Ç 4 4 4 / ov í/v }v^ }vd Ç µ ^ }v Proposed Design Elements Business Access Transit Lane (BAT)

NW DIVISION ST

NW

RIV

ER

VIE

W A

VE

NW

RIV

ER

VIE

W A

VE

NW

BE

LLA

VIS

TA P

L

NW

AN

GE

LIN

E S

T

NW

TO

WLE

AV

E

NW

212

TH A

VE

NW

WA

LLU

LA A

VE

NW

FLO

RE

NC

E A

VE

NW

OV

ER

LOO

K D

R

NW

CIV

IC D

R

NW

NO

RM

AN

AV

E

NW

NO

RM

AN

AV

E

NW

EAS

TMAN

PKW

Y

MAX BLUE LINE

NW

VIC

TOR

IA A

VE

NW

MIG

NO

NE

TTE

AV

E

NW 10TH DR

LEGEND

N0 50’ 100’ 200’

I-205SE Cesar Chavez Blvd SE 122nd AveSE 82nd Ave SE 148th Ave SE 182nd Ave NW Eastman PkwySE 11th/12th Ave

GRESHAM • SE 174th Ave to Gresham Central Transit CenterSEGMENT 4

2

2

12

22

Integrated 2 Pass-through Station Type2Integrated 1 By-pass Station Type1

Bus Station

Proposed Design Elements

Business Access Transit Lane (BAT)Protected Bicycle FacilitySidewalk/Island

Median Access Control

Signal Improvement

New Pedestrian Crossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

Downtown Stop

Driveway ClosureDowntown Bus Route

Right-of-Way Acquisition

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

Integrated 1 By-passIntegrated 2 Pass-throughIntegrated 3 Rear Access

Bus Station Types

1

2

3

Island 1 IntersectionIsland 2 Mid-block

4

5Island 3 Rear Access6

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

New Pedestrian Crossing Signal

Outer Division Multi-Modal Safety Project Improvements LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

Median Access Control

Bioswale

Tree Removed

Property Line

Temporary Construction Easement

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

2a1d 2b 2c 2d 2e 3a 3b 3c 3d 3e 3f 3g 4a 4b 4d

1c

1b

1a

4c

OPEN HOUSE November 2017

Page 4: SEGMENT 4 - TriMet · SEGMENT 4 GRESHAM SE 4 A G T 2 2 2 /v P îW r Z }µPZ^ }vd Ç 4 4 4 / ov í/v }v^ }vd Ç µ ^ }v Proposed Design Elements Business Access Transit Lane (BAT)

NW

EAS

TMAN

PKW

Y

MAX BLUE LINE

NW

VIC

TOR

IA A

VE

NW

MIG

NO

NET

TE A

VE

NW 10TH DR

NW

EAR

L AV

E

N M

AIN

AVE

N M

AIN

AVE

NW DIVISION ST

NE DIVISION ST

NE

RO

BER

TS A

VE

NE 10TH DR

NE

HO

OD

AVE

GRESHAM TC

NE

KELL

Y AV

E

NE

CLE

VELA

ND

AVE

NE

LIN

DEN

AVE

NE 9TH ST

NE 8TH ST

NE 8TH ST

NE BURNSIDE RD

LEGEND

0 50’ 100’ 200’

I-205SE Cesar Chavez Blvd SE 122nd AveSE 82nd Ave SE 148th Ave SE 182nd Ave NW Eastman PkwySE 11th/12th Ave

N

GRESHAM • SE 174th Ave to Gresham Central Transit CenterSEGMENT 4

2

2

22

Integrated 2 Pass-through Station Type2

Bus Station

Proposed Design Elements

Business Access Transit Lane (BAT)Protected Bicycle FacilitySidewalk/Island

Median Access Control

Signal Improvement

New Pedestrian Crossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

Downtown Stop

Driveway ClosureDowntown Bus Route

Right-of-Way Acquisition

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

Integrated 1 By-passIntegrated 2 Pass-throughIntegrated 3 Rear Access

Bus Station Types

1

2

3

Island 1 IntersectionIsland 2 Mid-block

4

5Island 3 Rear Access6

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

New Pedestrian Crossing Signal

Outer Division Multi-Modal Safety Project Improvements LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

Median Access Control

Bioswale

Tree Removed

Property Line

Temporary Construction Easement

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

2a1d 2b 2c 2d 2e 3a 3b 3c 3d 3e 3f 3g 4a 4b 4c

1c

1b

1a

4d

OPEN HOUSE November 2017