seevic college -refurbishment of office block

19
Murray Higgs Head of Facilities and Estates 3 rd February 2011 Refurbishment Forum.

Upload: jisc-rsc-eastern

Post on 24-Jun-2015

493 views

Category:

Education


0 download

DESCRIPTION

Murray Hiigs Head of Facilities and Estatesat SEEVIC relayed experiences of setting up learning spaces in a town centre office block.

TRANSCRIPT

Page 1: SEEVIC College -Refurbishment of Office Block

Murray Higgs

Head of Facilities and Estates

3rd February 2011

Refurbishment Forum.

Page 2: SEEVIC College -Refurbishment of Office Block

Basildon – Where, What and WhyThe History

• An LSC competition was won by SEEVIC College in partnership with other providers to deliver key areas of learning currently unavailable or considered poor.

• LSC Funding was made available for a new town centre campus 100% funded from a mix of the FE fund and the 16-19 fund.

• The Campus was designed to be a “Debenhams of Learning” with delivery by a number of providers.

02 | Respect Responsibility Results | Seevic College | 03 February 2011

Page 3: SEEVIC College -Refurbishment of Office Block

Basildon – Where, What and WhyThe History

03 | Respect Responsibility Results | Seevic College | 03 February 2011

Page 4: SEEVIC College -Refurbishment of Office Block

Basildon – An Interim solution

04 | Respect Responsibility Results | Seevic College | 03 February 2011

• We needed to set up a learning solution very quickly to provide for the high level of NEETs in Basildon.

• Again LSC Funding was made available from the 16-19 fund for an interim solution.

• We received capital approval in April 2008 and needed to be ready for September 2008. It was always going to be a challenge.

Page 5: SEEVIC College -Refurbishment of Office Block

Basildon – An Interim solutionThe Icon

05 | Respect Responsibility Results | Seevic College | 03 February 2011

• Locating a suitable property led us to the Icon

• 4 retail units which could be joined together available as “Shell and Core” in a newly finished residential block.

Page 6: SEEVIC College -Refurbishment of Office Block

6 | Respect Responsibility Results | Seevic College | 03 February 2011

Page 7: SEEVIC College -Refurbishment of Office Block

07 | Respect Responsibility Results | Seevic College | 03 February 2011

Page 8: SEEVIC College -Refurbishment of Office Block

And then it all stopped!!

08 | Respect Responsibility Results | Seevic College | 03 February 2011

Page 9: SEEVIC College -Refurbishment of Office Block

A Refurbishment Option?

Page 10: SEEVIC College -Refurbishment of Office Block

Basildon – A Refurbishment Option

10 | Respect Responsibility Results | Seevic College | 03 February 2011

• What would suit for the learning Planned?

• How much to spend?

• How much space do we need?

• Vacant office accommodation in Basildon

• Location, Location, Location

Page 11: SEEVIC College -Refurbishment of Office Block

SEEVIC CollegeThe ICON

SEEVIC CollegeChurch Walk House

New Campus site

Basildon Town Centre

Town Square

CU Building

North

11 | Respect Responsibility Results | Seevic College | 03 February 2011

Page 12: SEEVIC College -Refurbishment of Office Block

CU Building 600m2 per floor 8 floors

12 | Respect Responsibility Results | Seevic College | 03 February 2011

Page 13: SEEVIC College -Refurbishment of Office Block

13| Respect Responsibility Results | Seevic College | 03 February 2011

Page 14: SEEVIC College -Refurbishment of Office Block

14 | Respect Responsibility Results | Seevic College | 03 February 2011

Page 15: SEEVIC College -Refurbishment of Office Block

Getting There

15 | Respect Responsibility Results | Seevic College | 03 February 2011

Page 16: SEEVIC College -Refurbishment of Office Block

16 | Respect Responsibility Results | Seevic College | 03 February 2011

Page 17: SEEVIC College -Refurbishment of Office Block

17 | Respect Responsibility Results | Seevic College | 03 February 2011

Page 18: SEEVIC College -Refurbishment of Office Block

18 | Respect Responsibility Results | Seevic College | 03 February 2011

Page 19: SEEVIC College -Refurbishment of Office Block

Any Questions????