seep · 2017-05-31 · [email protected] for all communication purposes which includes getting...
TRANSCRIPT
(SEEC) is responsible for the demand-side of energy efficiency effort in Kingdom
SEEC has launched the Saudi Energy Efficiency Program
(SEEP)
SEEPin collaboration with several
other governmental and private entities
with the objective of improving the Kingdom’s energy efficiency by designing and implementing initiatives and their enablers
ScopeAll the upcoming new plants under Petrochemicals; Iron& Steel and Cement sub sectors which are either in planning, design or engineering phase are required to meet the energy intensity targets for the new plants.
Scope
The energy intensity design of the new plant shall reach (or outperform) their respective average of ١st quartiles based on the latest available benchmark. The plants (production processes1) in the petrochemical sub-sector that have no energy intensity benchmark, designs shall comply with SEEC Best Available Techniques (BAT2) requirements.
Targets
Connect with SEEC to seek the detailed requirements for their plants i.e. targets, BAT checklist; focal point appointment; document submission requirements; requirements during basic design; detailed design and operation phase etc. Comply with the detailed requirements as mentioned in item (a)Provide truthful (complete and error-free) data as
Initial Requirements
EnforcementThe enforcement of the “new plants” will be carried out by various governmental entities through their current mandates. An enforcement joint-agreement between SEEC and the government entities is in place to implement the penalties in case of non- compliance with the SEEC requirements. The government entities participating in the enforcement joint-agreement are: SEEC, MEIM, ECRA, PME, ECA, Saudi Industrial Property Authority (MODON), RCJY, SASO, SAGIA, CMA and SIDF.
CommunicationTo start the process, each company/new plant shall assign a focal point with the following responsibilities:
Follow-up to fulfill SEEC Energy intensity requirements by the company
Provide any requested information/clarifications by SEEC
Communicate all SEEC activities/requirements to the management of the company
The company should contact SEEC at the following email address: [email protected] for all communication purposes which includes getting the detailed requirements, any clarifications and next steps etc.
1- The method/route or technology used to produce a certain product
2- BAT checklist is an initial list that includes set of measures, practices and initiatives that can be considered during the design to optimize the energy efficiency during the design.