seed fund collaborative solar procurement for public...

33
SEED Fund Collaborative Solar Procurement for Public Agencies Solar Project Installation and Technical Considerations August 2015

Upload: others

Post on 03-Aug-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SEED Fund Collaborative Solar Procurement for Public Agenciesresources.cleanenergyroadmap.com/SEED-Technical... · •Technical workshop next month to discuss project types and design

SEED Fund

Collaborative Solar Procurement for Public Agencies

Solar Project Installation and Technical Considerations

August 2015

Page 2: SEED Fund Collaborative Solar Procurement for Public Agenciesresources.cleanenergyroadmap.com/SEED-Technical... · •Technical workshop next month to discuss project types and design

Agenda

• Introductions

• SEED Fund Overview

• Overview of Technology and Installation Types

• Feasibility Assessments and Design Considerations

• Project Management and Commissioning

• Operations and Maintenance

• Next Steps

2

Page 3: SEED Fund Collaborative Solar Procurement for Public Agenciesresources.cleanenergyroadmap.com/SEED-Technical... · •Technical workshop next month to discuss project types and design

About SEI

3

Strategic Energy Innovations is committed to actions

that sustain our planet. We’re a certified green

business, community-based nonprofit organization

Committed to empowering under-served markets

Schools, colleges and universities

Local governments

Small and rural communities

Affordable housing providers and residents

Small businesses

…to embrace a climate-friendly future through

green building, clean energy, resource efficiency

and support of a local and qualified green

workforce.

Page 4: SEED Fund Collaborative Solar Procurement for Public Agenciesresources.cleanenergyroadmap.com/SEED-Technical... · •Technical workshop next month to discuss project types and design

Optony develops and deploys solar best practices across the entire solar project lifecycle for government agencies, schools, investors and commercial organizations.

Working with clients across all phases of solar projects creates deep insight into true performance drivers which is used to reduce costs and improve performance at any stage in the process.

www.optony.com

Program Management

Feasibility

Assessment

Procurement

Management

Project Management

System

Optimization

Maximum

Solar

Benefit

“Optony's consulting service is a must-have for any organization considering an

investment in solar. Based on Optony’s comprehensive analysis and

recommendations, we now have a low-risk, high-return solar strategy.”

4

About Optony

Page 5: SEED Fund Collaborative Solar Procurement for Public Agenciesresources.cleanenergyroadmap.com/SEED-Technical... · •Technical workshop next month to discuss project types and design

Goals of SEED Fund

• Use State funding to develop collaborative solar procurement for government agencies in the Monterey Bay Area

• Bring at least 5 MW of new public renewable energy on line

• Realize 10-12% in total project cost savings

• Reduce transaction costs and administrative effort by 50-70%

• Deliver collaboration support for 1.5-2% of total contracted solar project costs – NO upfront costs to participants

• Secure agreements to build collaboration costs into solar contracts

• Create significant new economic activity and jobs

• Leverage regional initiatives for education and workforce development

• Attract additional funding for long-term sustainability of the fund

5

Page 6: SEED Fund Collaborative Solar Procurement for Public Agenciesresources.cleanenergyroadmap.com/SEED-Technical... · •Technical workshop next month to discuss project types and design

Silicon Valley Regional Solar Project Overview

6

San Francisco

San Jose

Includes 43 sites

Collaboration across 9 jurisdictions

14.4MW of combined solar PV

Multiple Site Types:

Carports

Rooftops

Ground mounted

Largest multi-agency effort to date

County of Santa Clara

6 Cities

2 Special Districts

LESSONS:

Aggregated purchase discounts 12%+

Reduced admin and transactions costs 50%+

Better negotiated contract terms & conditions

Page 7: SEED Fund Collaborative Solar Procurement for Public Agenciesresources.cleanenergyroadmap.com/SEED-Technical... · •Technical workshop next month to discuss project types and design

7

Program Timeline

Q3 ‘15 Q4 ‘15 Q1 ‘16 Q2 ‘16Q2 ‘15 Q3 ‘16

High-level review of potential sites

for solar development

Decision 2:

Final decision about economic and environmental benefits of solar

installation for your facilities

Decision 1:Review potential for solar

development and sign MOU to proceed with viable projects

Site feasibility

assessments

Evaluation of vendor responses and

negotiation of contract terms

Council/Board approval of projects and start of

design activities

Project construction begins!

Issuance of RFP

Page 8: SEED Fund Collaborative Solar Procurement for Public Agenciesresources.cleanenergyroadmap.com/SEED-Technical... · •Technical workshop next month to discuss project types and design

Recent updates:

Feasibility assessments received:

• San Juan Bautista

• Cabrillo College

Feasibility reports underway:

• Soledad

Site visits planned:

• North County Rec and Park

• Santa Cruz County

News:

• Technical workshop next month to

discuss project types and design

and construction considerations

Status of Current Participants

8

OrganizationRecommended

Sites

Recommended Solar Capacity

(kW-DC)

MOU’s Signed 29 10,230

Cabrillo College 1 3,561

North County Recreation and Park District 1 43

City of Pacific GroveCity of San Juan Bautista

32

219296

County of Santa Cruz 11 3,912

City of Soledad 11 3,199

MOU Under Consideration 35 13,866

Castroville Special Services District 3 75

City of Monterey 14 9,459

County of Monterey 4 350

Monterey County Regional Fire District 4 45

Monterey Peninsula College 3 3,269

North County Fire District 3 68

City of Seaside 3 520

Soquel Creek Water District 1 80

Site Screening Underway 6 509

Presidio of Monterey 3 150

City of Watsonville 3 359

Total 70 24,605

Page 9: SEED Fund Collaborative Solar Procurement for Public Agenciesresources.cleanenergyroadmap.com/SEED-Technical... · •Technical workshop next month to discuss project types and design

Recent Changes

Major Changes in the Solar Industry

• Dramatic Drop In Panel Prices

• Consolidation In The Industry

• New Financial Players In The Market

• Maturing Industry

• US Markets Are The New Focus

• Excess PV Capacity Coming Online

• Grid Parity Accelerating (without incentives)

o Better Project Economics

o Few, Stronger Players

o Lower Cost Of Capital

o Better Results For Clients

o Increased Competition

o Must Seek Long-Term Stability

o Mass Adoption Of Solar

Major Impact On:

9

Page 10: SEED Fund Collaborative Solar Procurement for Public Agenciesresources.cleanenergyroadmap.com/SEED-Technical... · •Technical workshop next month to discuss project types and design

Overview: Solar Energy Technology Examples

Solar Photovoltaic (PV) Panels/Modules

Solar Hot Water

10

Utility Scale Concentrated Solar Farm

Page 11: SEED Fund Collaborative Solar Procurement for Public Agenciesresources.cleanenergyroadmap.com/SEED-Technical... · •Technical workshop next month to discuss project types and design

How Solar Works: Grid-Tied System

Total energy generated: 1,171.86 kWh

Total energy used: 1,092.61 kWh

0

20

40

60

80

100

120

140

160

1a 3a 5a 7a 9a 11a 1p 3p 5p 7p 9p 11p

kWh generated

kWh used

11

Page 12: SEED Fund Collaborative Solar Procurement for Public Agenciesresources.cleanenergyroadmap.com/SEED-Technical... · •Technical workshop next month to discuss project types and design

Review of Installation Types

• Rooftop– Penetrating

– Ballasted (Hybrid)

– Standing-Seam

– Laminate

• Carport/Shade Structure– Fixed-tilt

– Tracking

• Ground-mount– Fixed-tilt

– Tracking

• Floating

• Building-Integrated PV (BIPV)

12

Page 13: SEED Fund Collaborative Solar Procurement for Public Agenciesresources.cleanenergyroadmap.com/SEED-Technical... · •Technical workshop next month to discuss project types and design

Installation Examples

• Rooftop– Penetrating

– Ballasted

– Standing-Seam

– Laminate

• Carport/Shade Structure– Fixed-tilt

– Tracking

• Ground-mount– Fixed-tilt

– Tracking

• Floating

• Building-Integrated PV (BIPV)

13

Page 14: SEED Fund Collaborative Solar Procurement for Public Agenciesresources.cleanenergyroadmap.com/SEED-Technical... · •Technical workshop next month to discuss project types and design

Example: Flush Mount Installation

14

Page 15: SEED Fund Collaborative Solar Procurement for Public Agenciesresources.cleanenergyroadmap.com/SEED-Technical... · •Technical workshop next month to discuss project types and design

Installation Examples

• Rooftop– Penetrating

– Ballasted

– Standing-Seam

– Laminate

• Carport/Shade Structure– Fixed-tilt

– Tracking

• Ground-mount– Fixed-tilt

– Tracking

• Floating

• Building-Integrated PV (BIPV)

15

Page 16: SEED Fund Collaborative Solar Procurement for Public Agenciesresources.cleanenergyroadmap.com/SEED-Technical... · •Technical workshop next month to discuss project types and design

Example: Low-Tilt, Ballasted Racking System

16

Page 17: SEED Fund Collaborative Solar Procurement for Public Agenciesresources.cleanenergyroadmap.com/SEED-Technical... · •Technical workshop next month to discuss project types and design

Example: High-Tilt, Ballasted Racking System

17

Page 18: SEED Fund Collaborative Solar Procurement for Public Agenciesresources.cleanenergyroadmap.com/SEED-Technical... · •Technical workshop next month to discuss project types and design

Installation Examples

• Rooftop– Penetrating

– Ballasted

– Standing-Seam

– Laminate

• Carport/Shade Structure– Fixed-tilt

– Tracking

• Ground-mount– Fixed-tilt

– Tracking

• Floating

• Building-Integrated PV (BIPV)

18

Page 19: SEED Fund Collaborative Solar Procurement for Public Agenciesresources.cleanenergyroadmap.com/SEED-Technical... · •Technical workshop next month to discuss project types and design

Installation Examples

• Rooftop– Penetrating

– Ballasted

– Standing-Seam

– Laminate

• Carport/Shade Structure– Fixed-tilt

– Tracking

• Ground-mount– Fixed-tilt

– Tracking

• Floating

• Building-Integrated PV (BIPV)

19

Page 20: SEED Fund Collaborative Solar Procurement for Public Agenciesresources.cleanenergyroadmap.com/SEED-Technical... · •Technical workshop next month to discuss project types and design

Installation Examples

• Rooftop– Penetrating

– Ballasted

– Standing-Seam

– Laminate

• Carport/Shade Structure– Fixed-tilt

– Tracking

• Ground-mount– Fixed-tilt

– Tracking

• Floating

• Building-Integrated PV (BIPV)

20

Page 21: SEED Fund Collaborative Solar Procurement for Public Agenciesresources.cleanenergyroadmap.com/SEED-Technical... · •Technical workshop next month to discuss project types and design

Installation Examples

• Rooftop– Penetrating

– Ballasted

– Standing-Seam

– Laminate

• Carport/Shade Structure– Fixed-tilt

– Tracking

• Ground-mount– Fixed-tilt

– Tracking

• Floating

• Building-Integrated PV (BIPV)

21

Page 22: SEED Fund Collaborative Solar Procurement for Public Agenciesresources.cleanenergyroadmap.com/SEED-Technical... · •Technical workshop next month to discuss project types and design

Installation Examples

• Rooftop– Penetrating

– Ballasted

– Standing-Seam

– Laminate

• Carport/Shade Structure– Fixed-tilt

– Tracking

• Ground-mount– Fixed-tilt

– Tracking

• Floating

• Building-Integrated PV (BIPV)

22

Page 23: SEED Fund Collaborative Solar Procurement for Public Agenciesresources.cleanenergyroadmap.com/SEED-Technical... · •Technical workshop next month to discuss project types and design

Installation Examples

• Rooftop– Penetrating

– Ballasted

– Standing-Seam

– Laminate

• Carport/Shade Structure– Fixed-tilt

– Tracking

• Ground-mount– Fixed-tilt

– Tracking

• Floating

• Building-Integrated PV (BIPV)

23

Page 24: SEED Fund Collaborative Solar Procurement for Public Agenciesresources.cleanenergyroadmap.com/SEED-Technical... · •Technical workshop next month to discuss project types and design

Installation Examples

• Rooftop– Penetrating

– Ballasted

– Standing-Seam

– Laminate

• Carport/Shade Structure– Fixed-tilt

– Tracking

• Ground-mount– Fixed-tilt

– Tracking

• Floating

• Building-Integrated PV (BIPV)

24

Page 25: SEED Fund Collaborative Solar Procurement for Public Agenciesresources.cleanenergyroadmap.com/SEED-Technical... · •Technical workshop next month to discuss project types and design

Installation Examples

• Rooftop– Penetrating

– Ballasted

– Standing-Seam

– Laminate

• Carport/Shade Structure– Fixed-tilt

– Tracking

• Ground-mount– Fixed-tilt

– Tracking

• Floating

• Building-Integrated PV (BIPV)

25

Page 26: SEED Fund Collaborative Solar Procurement for Public Agenciesresources.cleanenergyroadmap.com/SEED-Technical... · •Technical workshop next month to discuss project types and design

Solar Project Lifecycle Management

SolarStrategy

FeasibilityAssessments

Vendor Procurement& Financing

ProjectCommissioning

SystemOptimization

Define Right

Strategic

Approach

Find Best

Solar

Sites

Best-in-Class

Vendors &

Financing

Right

Components,

Design,

Construction

Highest

Long-term

Returns

Properly managing all phases of the project will create the greatest long-term value

26

Page 27: SEED Fund Collaborative Solar Procurement for Public Agenciesresources.cleanenergyroadmap.com/SEED-Technical... · •Technical workshop next month to discuss project types and design

Solar Site Feasibility Checklist

o Portfolio approach to site evaluation

o On-site survey

o Structural & Electrical evaluation

o Construction concerns and design considerations

o Utility rate evaluation

o Review of funding and incentive options

o 20 year LCOE Financial analysis

o Benchmark comparison of pricing & trends

o Technical risk assessment

o World-class tools & methods

27

Page 28: SEED Fund Collaborative Solar Procurement for Public Agenciesresources.cleanenergyroadmap.com/SEED-Technical... · •Technical workshop next month to discuss project types and design

Design Considerations: Rooftop

Considerations: Opportunities and Constraints:

• Building structural capacity Weight loading; wind loading; seismic

• Site-use planning Move or stop operations; re-purpose

• Parcel ownership Lease term? Usable? Able to interconnect?

• Building orientation South-facing = good; north = not so good

• Shading from trees, buildings, power lines Shade kills solar production

• Accessibility Expense of construction; operational impact

• Roof type Penetrations or ballasted; re-sealing

• Rafter spacing and type Weight loading; anchor point locations

• HVAC or other rooftop obstacles Parapets? Required walkpads?

• Location of interconnection points Electrical, data

• Damage or theft hazards Baseball fields? Copper swap meet?

Benefits: Use of available space; often hidden from view; more economical; close to interconnection point; typically more secure areas.

28

Page 29: SEED Fund Collaborative Solar Procurement for Public Agenciesresources.cleanenergyroadmap.com/SEED-Technical... · •Technical workshop next month to discuss project types and design

Design Considerations: Carports

Considerations: Opportunities and Constraints:

• Site-use planning Move or stop operations; re-purpose

• Parcel ownership Usable? Able to interconnect?

• Parking lot orientation South-facing = good; north = not so good

• Shading from trees, buildings, power lines Shade kills solar production

• Accessibility Vehicle heights; operational impact

• Soils report Water table; rock

• Obstacles Trees; light poles; grass/bio-swales; utility lines

• Structure type Fixed-tilt; tracking; “blanket”

• Location of interconnection points Electrical, data; trenching

• Aesthetics Paint; structure; trim

• Additional uses Shade; rain-proof?; truck wash; lighting

• Damage or theft hazards Baseball fields? Copper swap meet?

Benefits: Use of available space; secondary goals; high-visibility “green” project; often close to interconnection point.

29

Page 30: SEED Fund Collaborative Solar Procurement for Public Agenciesresources.cleanenergyroadmap.com/SEED-Technical... · •Technical workshop next month to discuss project types and design

Design Considerations: Ground-Mounts

Considerations: Opportunities and Constraints:

• Site-use planning Move or stop operations; re-purpose; CEQA

• Parcel ownership Usable? Able to interconnect?; setbacks

• Slope orientation South-facing = good; north = not so good

• Shading from trees, buildings, power lines Shade kills solar production

• Accessibility Roads, slope

• Soils report Water table; rock; brownfield?

• Obstacles Trees; grass/bio-swales; protected areas

• Structure type Fixed-tilt (ballasted, drilled, driven); tracking

• Location of interconnection points Electrical, data; trenching

• Damage or theft hazards Baseball fields? Copper swap meet?

• Extra maintenance Weed abatement; dirty locations

Benefits: Use of available space (brownfields); typically low visual-impact areas; more economical; greater viability of tracker systems.

30

Page 31: SEED Fund Collaborative Solar Procurement for Public Agenciesresources.cleanenergyroadmap.com/SEED-Technical... · •Technical workshop next month to discuss project types and design

Project Management & Commissioning

31

• Contract and scope review

• Design and engineering review

• CEQA compliance

• Materials acceptance

• Permitting

• Rebates and interconnection application

• Schedule and operational impacts

• Crew safety and accessibility

• Line locating

• Special inspections

• Drilling/trenching/boring

• Interconnection and shut-down

• Aesthetic issues

• Inspection and PTO

• As-Builts and staff training

• Data connection, monitoring, kiosk

• Independent performance verification

o Production and component requirements

o System sizing; code compliance

o Categorical Exemptions, Mitigated Neg Dec

o Stainless, galvanized, painted, Al, fiberglass

o Building, Planning, Fire

o PG&E (no more CSI)

o Planning

o Focus and logistics

o SAFETY

o Underground, welding, concrete, roof

o Operational impacts

o Operational impacts

o Paint, design, trim

o Building Dept and PG&E

o String charts, emergency operations

o Internet monitoring and public access

o Confirm expected performance

Page 32: SEED Fund Collaborative Solar Procurement for Public Agenciesresources.cleanenergyroadmap.com/SEED-Technical... · •Technical workshop next month to discuss project types and design

Operations & Maintenance Issues

Performance Management:• Monitoring

• On-site irradiance and power measurements

• On-line system monitoring

• Purchase or Lease• Self-perform• Installer or 3rd-party O&M provider

• Power Purchase Agreement• Owner/installer

Cleaning & Inspection:• Module cleaning• Inverter cleaning• Fuse and wiring check

32

Page 33: SEED Fund Collaborative Solar Procurement for Public Agenciesresources.cleanenergyroadmap.com/SEED-Technical... · •Technical workshop next month to discuss project types and design

Next Steps

• Provide information for potential sites

• If you haven’t already, sign MOU

• Review report recommendations and discuss participation in the RFP

• Build internal understanding and consensus

• Send follow-up questions to SEED team:– Jonathan Whelan [email protected] 415-450-7032

– Karly Zimmerman [email protected] 415-507-1430

– Tom Skawski [email protected] 773-332-8815

33