(see notes 2 & 3) · (see notes 2 & 3) lowest telus messenger (see es43 c2-03 and c2-04)...

11

Upload: others

Post on 16-Oct-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

1000

MIN

Additional height

if required by terrain Peak of road surface

or top of rail

Safety clearance zone

(See Note 1)

600 MIN

V

(See Notes 2 & 3)

Lowest TELUS

messenger

(See ES43 C2-03

and C2-04)

Lowest BC Hydro

neutral/secondary

conductor

Highest

communication

messenger

Highest communication

messenger

(TELUS or BC Hydro

3rd party licensee)

Lowest BC Hydro

neutral/secondary

conductor

Service drop and drive

hook may not be placed

within 600mm of lowest

BC Hydro conductor

Communication Drop Detail

1000 MINSafety

clearancezone

Use only for doing work with or for BC Hydro. Complete Legal Acknowledgement is at www.bchydro.com/distributionstandards.

Use only for doing work with or for BC Hydro. Complete Legal Acknowledgement is at www.bchydro.com/distributionstandards.

75 MIN clearance

as per CSA C22.3 No. 1-15

Line of sight

Line of sight

* "Ambient" means ambient temperature

Ground line

sag)

conductor

sag)

Neutral / secondary conductor (Ambient*

(Max. final design sag)Secondary

(Ambient*wirecommunicationTop

wirecommu

Top

(Max. final design sag)nication

Use only for doing work with or for BC Hydro. Complete Legal Acknowledgement is at www.bchydro.com/distributionstandards.

TELUS bracket encroachment

100mm (4") above TELUS pole space

'C'

'C'

'B'

'A'

40

0

(16

")

10

0

(4")

30

0

(12

")

20

0

(8")

60

0

(24

")

Top of TELUS pole space

(See Note 2)

Neutral location

120/240 V Secondary locations

TELUS pace

Highest TELUS wire

Use only for doing work with or for BC Hydro. Complete Legal Acknowledgement is at www.bchydro.com/distributionstandards.

-

-

Use only for doing work with or for BC Hydro. Complete Legal Acknowledgement is at www.bchydro.com/distributionstandards.

Use only for doing work with or for BC Hydro. Complete Legal Acknowledgement is at www.bchydro.com/distributionstandards.

'C'

See Note 3

BC Hydro third party communications

licensee attachment location

TELUS bracket encroachment

100 mm (4") above TELUS pole space

Neutral location

120/240 V Secondary locations'C'

'B'

'A'

40

0

(16

")

Top of TELUS pole space

(See Note 2)

Highest TELUS wire

TELUS pace

10

0

(4")

30

0

(12

")

20

0

(8")

'D'

20

0

(8")

60

0

(24

")

Use only for doing work with or for BC Hydro. Complete Legal Acknowledgement is at www.bchydro.com/distributionstandards.

-

-

-

-

Use only for doing work with or for BC Hydro. Complete Legal Acknowledgement is at www.bchydro.com/distributionstandards.

Use only for doing work with or for BC Hydro. Complete Legal Acknowledgement is at www.bchydro.com/distributionstandards.