Practices Treat the Largest Soil Particles
SandSilt Clay
Treated Untreated
Settleable Non-settleable0.01
1 m
m
Sand
Settling Soils is dependent upon:• Size of the particle• Energy keeping it in
suspension
Stokes’ Law: denser particles sink faster than less dense particles when suspended in a liquid.
Understand Runoff on the Site in order to Properly Site Controls
• How does water flow across and off the site?– What is the flow path and length?– What is the drainage area to the capture point?– Is the practice capturing sheet flow or concentrated flow?
Effective Pool Shape• Utilize entire shape of pond
• Optimum depth is ~ 3 feet
• Length to width especially for non-dewatering (optimum 4:1 or greater)
Ohio EPA CGP Requires Skimmers• Part II. G. d.ii “…sediment settling ponds shall
be dewatered at the pond surface using a skimmer or equivalent device.”
• Skimmers draw water from the water surface (the least turbid water) of the sediment basin.
Sediment Settling Process
vs
vw
Pond Inflow
Pond Discharge
Permanent Pool/Sediment Storage
vsand vsilt vclay
National Trends• Doubling of pond capacity
– From 67 to 134 yd3/ac (wtrshd)• Sometimes without detention time specified.
(Both Ohio EPA and the Rainwater and Land Development manual require 48 hours.)
Variety of Skimmers• 2 Commercial (constant head) skimmers:
– JW Faircloth and – Innovation Applied Systems.
• Delaware DOT skimmer (Variable head)• Or an alternative someone might design & build.
JW Faircloth Skimmer• Developed by Warren Faircloth who was a
former county Erosion Control Supervisor in NC.
(See www.fairclothskimmer.com)
IAS Water Quality Skimmer• Also developed in North Carolina.
IAS is Innovative Applied Solutions, LLC. See www.iasllcusa.com
Delaware DOT Skimmer
See Rainwater and Land Development Manual Ch. 6 and www.deldot.gov/stormwater/pdfs/EandS_fieldguide/V+SedimentTrapsAndBasins.pdf
Design Issues with Basins(Attaching a skimmers doesn’t undo poor basin design)
This outlet was sized (perforationsand spacing) for 100’s of acresversus the actual 10’s of acres going to it. It provided only a few hoursof detention instead of the required 48 hours.
Sediment Basin Requirements1. Basin capacity
– Dewatering volume, 67 yd3/ac of drainage area– Sediment storage volume, 37 yd3/ac of disturbed area
Sediment Storage
Dewatering Zone
(often planned wet, but may be dewatered as well)
Sediment Basin Requirements1. Basin capacity
– Dewatering volume, 67 yd3/ac of drainage area– Sediment storage volume, 37 yd3/ac of disturbed area
2. Drain time: min. 48 hours for the dewatering volume. – Recommend that the drain time be extended up to 72 hours if the
sediment storage volume is also dewatered.
Drain time is a function of the orifice size and/or the pipe size of the skimmer.
Sediment Basin Requirements1. Basin capacity
– Dewatering volume, 67 yd3/ac of drainage area– Sediment storage volume, 37 yd3/ac of disturbed area
2. Drain time: min. 48 hours for the dewatering volume. – Recommend that the drain time be extended up to 72 hours if the
sediment storage volume is also dewatered.
3. Area and shape of the basin– L:W = 4:1 or plan baffles to increase flow length or slow flow– Basin depth and surface area
Sediment Basin Requirements1. Basin capacity
– Dewatering volume, 67 yd3/ac of drainage area– Sediment storage volume, 37 yd3/ac of disturbed area
2. Drain time: min. 48 hours for the dewatering volume. – Recommend that the drain time be extended up to 72 hours if the
sediment storage volume is also dewatered.
3. Area and shape of the basin– L:W = 4:1 or plan baffles to increase flow length or slow flow– Basin depth and surface area
4. Principal Spillway- Barrel/riser pass 10-yr 24-hr discharge
Sediment Basin Requirements1. Basin capacity
– Dewatering volume, 67 yd3/ac of drainage area– Sediment storage volume, 37 yd3/ac of disturbed area
2. Drain time: min. 48 hours for the dewatering volume. – Recommend that the drain time be extended up to 72 hours if the
sediment storage volume is also dewatered.
3. Area and shape of the basin– L:W = 4:1 or plan baffles to increase flow length or slow flow– Basin depth and surface area
4. Principal Spillway- Barrel/riser pass 10-yr 24-hr discharge5. Emergency Spillway - 25 yr 24hr discharge capacity
Sediment Basin Requirements1. Basin capacity
– Dewatering volume, 67 yd3/ac of drainage area– Sediment storage volume, 37 yd3/ac of disturbed area
2. Drain time: min. 48 hours for the dewatering volume. – Recommend that the drain time be extended up to 72 hours if the
sediment storage volume is also dewatered.
3. Area and shape of the basin– L:W = 4:1 or plan baffles to increase flow length or slow flow– Basin depth and surface area
4. Principal Spillway- Barrel/riser pass 10-yr 24-hr discharge5. Emergency Spillway - 25 yr 24hr discharge capacity6. Other requirements: embankment height, width and side
slopes; anti-seep collars, outlet and inlet protection, non-floating riser…
Sediment Basin Requirements1. Basin capacity
– Dewatering volume, 67 yd3/ac of drainage area– Sediment storage volume, 37 yd3/ac of disturbed area
2. Drain time: min. 48 hours for the dewatering volume. – Recommend that the drain time be extended up to 72 hours if the
sediment storage volume is also dewatered.
3. Area and shape of the basin– L:W = 4:1 or plan baffles to increase flow length or slow flow– Basin depth and surface area
4. Principal Spillway- Barrel/riser pass 10-yr 24-hr discharge5. Emergency Spillway - 25 yr 24hr discharge capacity6. Other requirements: anti-seep collars, outlet and inlet
protection, non-floating riser…7. Seed and mulch within 7 days of constructing the basin
Plan Review and Field Inspectors
1 1⁄2" Red
2" Yellow
2 1/2" Green
3" Blue
4" Orange
5" Silver
6" White and unique shape of vent
8" None; distinguished by it size
Color Codes For Faircloth Skimmers
IAS colors generally correspond but add black for 1.75” (http://www.iasllcusa.com/downloads.html)
• Plans: show specific skimmer to be used including pipe size, connections, and orifice size.
• Use Colors to field check against plans.
Maintenance of Skimmers• Pull the skimmer to the side and inspect.• This is primarily cleaning debris from the intake.• Insure the orifice is fixed as planned (size).• Insure the flexible pipe is whole without cracks.
14 Acre Site (12 acres Disturbed)• Total Drainage Area x 67 yd3= 938 yd3
• Disturbed Area x 37 yd3 = 444 yd3
• Total Pond Capacity = 1382 yd3
444 cubic yards
938 cubic yards
Temp Modifications to SW Ponds• Permanent pond used for temporary sediment• Follows sediment basin and trap specifications
Ponding Volumes for Different LUsePonding Volumes for Sediment & WQv-Commercial
0.0
1.0
2.0
0.0 20.0 40.0 60.0 80.0
Basin Bottom
Dep
th
Pond Site Sed PoolWQv-Dry ED WQv-Wet
Ponding Volumes for Sediment & WQv-Med. Residential
80.0 100.0 120.0 140.0
Basin Bottom
Sed Pool + DwtrngWQv-Wet P WQv-Wet P+ED
Storm Drain Inlet Protection• Promotes settling by ponding muddy runoff outside a
storm drain inlet• For storm systems where diverting storm system outfall
to sediment basin isn’t possible, short time periods or extra level of treatment
Inlet Protection
• 2 x 4 frame;• Wire mesh;• Geotextile;• 2”stone placed on geotextile and wire mesh or
trenched (18”), backfilled and compacted similar to silt fence.
Inlet Protection• Inlets on a slope will route runoff downstream. In other
words, they block the inlet rather than pond runoff.
Inlet Protection Fails• Where construction personnel are inconvenienced by ponding
and mud on the streets
Inlet Protection• Must be maintained after every significant rainfall or• Sediments will be re-suspended and nuisance complaints will
abound