Standard Specification For Road Works
SECTION 4
FLEXIBLE PAVEMENT
Cawangan Jalan, Ibu Pejabat JKR, K.LPage 75
-
8/16/2019 Section4 Felxible Pavement
2/52
FOR INTERNAL USEONLY
Standard Specification For Road Works
SECTION 4 - FLEI!LE P"#E$ENT
Page
4%& 'N!O'N( P"#E$ENT CO'RSES S4-7)
4.1.1 Lower Subbase S4-78
4.1.1.1 Description S4-78
4.1.1.2 Materials S4-78
4.1.1.3 Construction Methos S4-78
4.1.2 Subbase S4-7!
4.1.2.1 Description S4-7!
4.1.2.2 Materials S4-7!
4.1.2.3 Construction Methos S4-8"
4.1.3 #ra$el Sur%acing S4-814.1.3.2 Materials S4-81
4.1.3.3 Construction Methos S4-82
4.1.4 Crushe &ggregate 'oabase S4-83
4.1.4.1 Description S4-83
4.1.4.2 Materials S4-83
4.1.4.3 Construction Methos S4-84
4%* !IT'$INO'S P"#E$ENT CO'RSES S4-)5
4.2.1 (itu)en Pri)e Coat S4-8*4.2.1.1 Description S4-8*
4.2.1.2 Materials S4-8*
4.2.1.3 +,uip)ent S4-8*
4.2.1.4 Construction Methos S4-87
4.2.2 (itu)inous ac Coat S4-88
4.2.2.1 Description S4-88
4.2.2.2 Materials S4-88
4.2.2.3 +,uip)ent S4-88
4.2.2.4 Construction Methos S4-8!
4.2.3 (itu)inous Sur%ace Dressing S4-!"
4.2.3.1 Description S4-!"
4.2.3.2 Materials S4-!"
4.2.3.3 +,uip)ent S4-!1
4.2.3.4 Construction Methos S4-!3
Cawangan Jalan, Ibu Pejabat JKR, K.LPage 7+
-
8/16/2019 Section4 Felxible Pavement
3/52
FOR INTERNAL USEONLY
Standard Specification For Road Works
Page
4.2.4 &sphaltic Concrete S4-!!
4.2.4.1 Description S4-!!
4.2.4.2 Materials S4-!!
4.2.4.3 &sphaltic Concrete Mi/ Design S4-1"2
4.2.4.4 +,uip)ent S4-1"*
4.2.4.* Construction Methos S4-11"
4.2.* (itu)inous Macaa) S4-110
4.2.*.1 Description S4-110
4.2.*.2 Materials S4-110
4.2.*.3 +,uip)ent S4-110
4.2.*.4 Construction Methos S4-110
4%, SO'L(ERS S4-&&.
4.3.1 Description S4-11!
4.3.2 Materials S4-11!
4.3.2.1 +arth Shoulers S4-11!
4.3.2.2 #ra$el Shoulers S4-11!
4.3.3 Construction Methos S4-11!
4%4 ORI/ONT"L "LI0N$ENT1 S'RF"CE LE#ELS "N(
S'RF"CE RE0'L"RIT2 OF P"#E$ENT CO'RSES S4-&*3
4.4.1 oriontal &lign)ent S4-12"
4.4.2 Sur%ace Le$els o% Pa$e)ent Courses S4-12"
4.4.3 Sur%ace 'egularit S4-121
Cawangan Jalan, Ibu Pejabat JKR, K.LPage 77
-
8/16/2019 Section4 Felxible Pavement
4/52
FOR INTERNAL USEONLY
Standard Specification For Road Works
SECTION 4 -
FLEI!LE P"#E$ENT
4%& 'N!O'N( P"#E$ENT
CO'RSES
4.1.1 Lower Subbase
4.1.1.1 Description
his wor shall consist o%
%urnishing placing co)pacting
an shaping lower subbase
)aterial on a prepare an
accepte subgrae in accorancewith this Speci%ication an the
lines le$els graes i)ensions
an cross-sections shown on the
Drawings an5or as re,uire b
the S.6.
4.1.1.2 Materials
Lower subbase )aterial shall be
inorganic soil san gra$el
weathere or %rag)ente rocor a )i/ture o% an o% these
)aterials essentiall %ree %ro)
$egetati$e an other organic
)atter an e/pansi$e cla
)inerals. t shall ha$e a
)a/i)u) particle sie o% 7* ))
or less an shall ha$e a C('
$alue not less than that shown on
the Drawings when co)pacte
to
!* o% the )a/i)u) rensit eter)ine in the (.S.
1377
Co)paction est 94.* g
ra))er )etho: an soae %or
4 as uner a surcharge o% 4.*
g.
4.1.1.3 Construction Methos
Prior to placing an lower
subbase )aterial the unerling
subgrae 9particularl the top 3""
)) o% the subgrae: shall ha$e
been shape an co)pacte in
accorance with the pro$isions o%
Sub-Section 2.2.7.
;otwithstaning an earlier
appro$al o% %inishe subgrae
an a)age to or eterioration
o% the subgrae shall be )ae
goo to the satis%action o% the
S.6. be%ore lower subbase is
constructe.
Lower subbase shall be place
o$er the %ull with o% the
%or)ation to the re,uire
thicness as shown on the
Drawings or irecte b the
S.6. in one laer or )ore each
laer not e/ceeing 2"" ))co)pacte thicness.
-
8/16/2019 Section4 Felxible Pavement
5/52
FOR INTERNAL USEONLY
Standard Specification For Road Works
he lower subbase shall be
%inishe in a neat an wor)an
lie )anner an shall ha$e an
a$erage thicness o$er an 1""
)etre length not less than the
re,uire thicness. he topsur%ace o% the lower subbase
shall ha$e the re,uire shape
superele$ation le$els an
graes an shall be e$erwhere
within the tolerances speci%ie in
Sub- Section 4.4.
4.1.2 Subbase
4.1.2.1 Description
his wor shall consist o%
%urnishing placing co)pacting
an shaping subbase )aterial
on
a prepare an accepte subgrae
or lower subbase in accorance
with this Speci%ication an the
lines le$els graes i)ensions
an cross-sections shown on the
Drawings an5or as re,uire b
the S.6.
4.1.2.2 Materials
Subbase )aterial shall be a
natural or prepare aggregate
co)prising crushe roc
weathere or %rag)ente roc
gra$el or crushe gra$el san
or a )i/ture o% an o% these
)aterials. t shall ha$e a s)all
proportion o% plastic or
non-plastic %ines an shall be
essentiall %ree %ro) $egetati$e
an other organic )atter
e/pansi$e cla )inerals an
lu)ps o% cla. he )aterial
shall con%or) to the %ollowing
phsical an )echanical ,ualit
re,uire)ents =-
i: the li,ui li)it shall be
not )ore than 2*>
ii: the plasticit ine/ shall be
not )ore than 0>
iii: the aggregate crushing $alue
when teste in accorance
with M.S. 3" shall be not
)ore than 3*>
i$: unless otherwise speci%ie on
the Drawings or irecte b
the S.6. the )aterial shall
ha$e a C(' $alue o% 3" or
)ore when co)pacte to
!* o% the )a/i)u) rensit eter)ine in the
(.S.
1377 Co)paction est 94.*
g ra))er )etho: an
soae %or 4 as uner a
surcharge
o% 4.* g>
$: the graation shall con%or)
to one o% the en$elopes
shown in able 4.1 with the%raction passing the (.S. 7*
u) sie$e not greater than 253
o% the %raction passing the
(.S. 42* u) sie$e.
Cawangan Jalan, Ibu Pejabat JKR, K.LPage 7.
-
8/16/2019 Section4 Felxible Pavement
6/52
FOR INTERNAL USEONLY
Standard Specification For Road Works
TABLE 4.1 - GRADATION LIMITS FOR SUBBASE MATERIAL
B.S.Sieve
Size
% Passing By eig!"
A B # D E F
$. &&'$. &&(.$ &&4.)$ &&'. &&4'$ *&)$ *&
1-
+-,$'$-$$1$-4-''-
1)(-($4-)$
+-,'-4$1$-+$-'
-1
$-$+$-,$'$-$1$-+$-'
-1
,-1$-$4-)'$-4$$-'
-1
-$$-14-1'-$,-'
-1
-)-1$$-1+-)-'$
4.1.2.3 Construction Methos
Prior to placing an subbase)aterial the unerling subgrae
9particularl the top 3"" )) o% the
subgrae: or lower subbase shall
ha$e been shape an co)pacte
in accorance with the pro$isions
o% Sub-Section 2.2.7 or Sub-Section
4.1.1.3 as appropriate.
;otwithstaning an earlier
appro$al o% %inishe subgrae or
lower subbase an a)age to or
eterioration o% the subgrae orlower subbase shall be )ae
goo
to the satis%action o% the S.6.
be%ore subbase is constructe.
Subbase shall be place with
e,uip)ent appro$e b the S.6.
o$er the %ull with o% the
%or)ation to the re,uire thicness
as shown on the Drawings or
irecte b the S.6. in one laer
or )ore each laer not e/ceeing
2"" )) co)pacte thicness.
-
8/16/2019 Section4 Felxible Pavement
7/52
FOR INTERNAL USEONLY
Standard Specification For Road Works
he subbase shall be %inishe in
a neat an wor)anlie )anner>
its with shall be e$erwhere at
least that speci%ie or shown on
the Drawings on both sies o%
the centre-line> an its a$eragethicness o$er an 1"" )etre
length shall be not less than the
re,uire thicness. he top
sur%ace o% the subbase shall ha$e
the re,uire shape
superele$ation le$els an graes
an shall be e$erwhere within
the tolerances speci%ie in Sub-
Section 4.4.
4.1.3 #ra$el Sur%acing
4.1.3.1 Description
his wor shall consist o%
%urnishing placing co)pacting
an shaping gra$el sur%acing
)aterial on a prepare an
accepte subgrae or lower
subbase in accorance with this
Speci%ication an the lines le$els
graes i)ensions ancross-sections shown on the
Drawings an5or as re,uire
b the S.6.
4.1.3.2 Materials
#ra$el sur%acing )aterial shall be
a natural or prepare soil-
aggregate )i/ture co)prising
gra$el an san sie particles
together with a s)all proportion
o% plastic %ines an shall be
essentiall %ree %ro) $egetati$e
an other organic )atter
e/pansi$e cla )inerals an
lu)ps o% cla. he )aterial
shall
con%or) to the %ollowing phsical
an )echanical ,ualit
re,uire)ents =-
i: the li,ui li)it shall be
not )ore than 3*>
ii: the plasticit ine/ shall be
in the range 4 to 1">
iii: the aggregate crushing $alue
when teste in accorance
with M.S. 3" shall be not
)ore than 3*>
i$: the graation shall con%or)
to one o% the en$elopes
shown in able 4.2 with the
%raction passing the (.S. 7*
u) sie$e not greater than
253 o% the %raction passing the
(.S. 42* u) sie$e.
TABLE 4.' - GRADATION LIMITS FOR GRAEL SURFA#ING
B.S. SieveSize
% Passing By eig!"
A B # D
+).$ &&1'.$ &&4.)$ &&'. &&4'$ *&)$ *&
14$ - )$+ - ,' - 4$1$ - + - '
1$$ - $+$ - ,$'$ - $1$ - + - '
1, - 1$ - $4 - )'$ - 4$ - '
1-
$$ - (4 - )' - $ - '$
Cawangan Jalan, Ibu Pejabat JKR, K.LPage )&
-
8/16/2019 Section4 Felxible Pavement
8/52
FOR INTERNAL USEONLY
Standard Specification For Road Works
Material with a )a/i)u)
particle sie o% 37.* )) while
otherwise not con%or)ing to the
graation speci%ication but
satis%ing the other
re,uire)ents shall be acceptable pro$ie that it shall ha$e a
C(' $alue o% 3"
or )ore when co)pacte to
!* o% the )a/i)u) r
ensit eter)ine in the (.S.
1377
Co)paction est 94.* g
ra))er )etho: an soae %or
4 as uner a surcharge o% 4.*
g.
4.1.3.3 Construction Methos
Prior to placing an gra$el
sur%acing )aterial the unerling
subgrae 9particularl the top 3""
)) o% the subgrae: or lower
subbase shall ha$e been shape
an co)pacte in accorance
with the pro$isions o% Sub-
Section 2.2.7 or Sub-
Section4.1.1.3 as appropriate.
;otwithstaning an earlier
appro$al o% %inishe subgrae
or lower subbase an a)age
to or eterioration o% the
subgrae or lower subbase shall
be )ae goo to the satis%action
o% the S.6. be%ore gra$el
sur%acing is constructe.
#ra$el sur%acing shall be place
to the re,uire with an
thicness as shown on the
Drawings or irecte b the
S.6. in one laer or )ore each
laer not e/ceeing 2"" ))
co)pacte thicness. its with
shall be e$erwhere at least that
speci%ie or shown on the
Drawings on both sies o% the
centre-line> an its a$erage
thicness o$er an 1"" )etre
length shall be not less than the
re,uire thicness an its
)ini)u) thicness at an point
shall be not less than the
re,uire thicness )inus 2"
)).
Cawangan Jalan, Ibu Pejabat JKR, K.LPage )*
-
8/16/2019 Section4 Felxible Pavement
9/52
B.S. SieveSize
% Passing By eig!"
Ty/e I Ty/e II
$. &&+).$ &&'. &&'. &&1. &&$.% &&'.+, &&'.%% &&, *&4'$ *&)$ *&
1($ - 1
-, - 4 - ,'$ - 41$ - +
- 0 ''
- 0
1$ - 1) - 1, - (4 - ,$+ - $$
-' - 4
-1 - '$' - 1
FOR INTERNAL USEONLY
Standard Specification For Road Works
he top sur%ace o% the gra$el
sur%acing shall ha$e the
re,uire shape superele$ation
le$els an graes an shall be
e$erwhere within 1" )) o%
the re,uire plane or suchhigher appro/i)atel parallel
plane as the S.6. shall appro$e.
4.1.4 Crushe &ggregate 'oabase
4.1.4.1 Description
his wor shall consist o%
%urnishing placing co)pacting
an shaping crushe aggregate
roabase )aterial on a preparean accepte subgrae or lower
subbase or subbase in
accorance with this
Speci%ication an the lines
le$els graes i)ensions an
cross-sections shown on the
Drawings an5or as re,uire b
the S.6.
4.1.4.2 Materials
Crushe aggregate roabase
)aterial shall be crushe roc
or crushe gra$el or a )i/ture
o% crushe an natural
aggregates which is har
urable clean an essentiall
%ree %ro) cla an other
eleterious )aterials.
he )aterial shall con%or) to
the %ollowing phsical an
)echanical ,ualit re,uire)ents=-
i: the plasticit ine/ shall be
not )ore than 0>
ii: the aggregate crushing $alue
when teste in accorance
with M.S. 3" shall be not
)ore than
3">
iii: the %lainess ine/ when testein accorance with M.S. 3"
shall be not )ore than 3">
i$: not less than 8" o%
particles retaine on the (.S.
4.7* )) sie$e shall ha$e at
least one %racture %ace>
$: the weighte a$erage loss o%
weight in the soiu)
sulphate sounness test 9*
ccles:
when teste in accorance
with &&S6 est Metho
1"4 shall be not )ore
than
12>
$i: the )aterial shall ha$e a C('
$alue o% not less than 8"when co)pacte to !* o%
the )a/i)u) r ensit
eter)ine in the (.S. 1377
Co)paction est 94.* g
ra))er )etho: an
soae %or 4 as uner a
surcharge o% 4.* g>
$ii:the graation shall co)pl
with the en$elope shown
in able 4.3 %or the tpespeci%ie.
TABLE 4.+ - GRADATION LIMITS FOR
#RUSED AGGREGATE ROADBASE
Cawangan Jalan, Ibu Pejabat JKR, K.LPage ),
-
8/16/2019 Section4 Felxible Pavement
10/52
FOR INTERNAL USEONLY
Standard Specification For Road Works
4.1.4.3 Construction Methos
Prior to placing an crushe
aggregate roabase )aterial the
unerling subgrae or lower
subbase or subbase shall ha$e been shape an co)pacte in
accorance with the pro$isions o%
the appropriate Section o% this
Speci%ication. ;otwithstaning
an earlier appro$al o% %inishe
subgrae or lower subbase or
subbase an a)age to or
eterioration o% the subgrae or
lower subbase or subbase shall
be )ae goo to the satis%action
o% the S.6. be%ore crusheaggregate roabase is
constructe.
Crushe aggregate roabase shall
be place to the re,uire with
an thicness as shown on the
Drawings or irecte b the S.6.
in one laer or )ore each laer
not e/ceeing 2"" ))
co)pacte thicness. its with
shall be e$erwhere at least that
speci%ie or shown on the
Drawings on both sies o% the
centre-line> an its a$erage
thicness o$er an 1"" )etre
length shall be not less than the
re,uire thicness. he top
sur%ace o% the crushe aggregate
roabase shall ha$e the re,uire
shape superele$ation le$els an
graes an shall be e$erwhere
within the tolerances speci%ie in
Sub-Section 4.4.2.
Cawangan Jalan, Ibu Pejabat JKR, K.LPage )4
-
8/16/2019 Section4 Felxible Pavement
11/52
FOR INTERNAL USEONLY
Standard Specification For Road Works
4%* !IT'$INO'S P"#E$ENT
CO'RSES
4.2.1 (itu)en Pri)e Coat
4.2.1.1 Description
his wor shall consist o% the
care%ul an thorough cleaning o%
the sur%ace o% a prepare an
accepte crushe aggregate
roabase an the %urnishing an
application to the cleane
roabase sur%ace o% a bitu)inous
pri)ing )aterial all in
accorance with this
Speci%ication an the linesi)ensions an cross-sections
shown on the Drawings an5or
as re,uire b the S.6.
4.2.1.2 Materials
he bitu)inous pri)ing )aterial
shall be either cut-bac bitu)en
or bitu)en e)ulsion as state in
the (ill o% @uantities.
Cut-bac bitu)en shall be
grae 'C-7" or MC-7"
con%or)ing to the re,uire)ents
o% M.S. 1*!.
(itu)en e)ulsion shall be
slow setting grae SS-1 or SS-
1A con%or)ing to the
re,uire)ents
o% M.S. 101 as appropriate to
the tpe o% roabase )aterial to
be pri)e an appro$e b the
S.6.
4.2.1.3 +,uip)ent
he e,uip)ent use b the
Contractor shall inclue a
power broo) a co)presse air
blower a sel%-propelle pressure
istributor %or bitu)inous
)aterial an as necessar
e,uip)ent %or storing an heating bitu)inous )aterial.
9a: Power (roo)
he power broo) shall be
a rotar tpe speci%icall
esigne %or sweeping roa
sur%aces an shall be
appro$e b the S.6.
9b: Co)presse &ir (lower
he co)presse air blower
shall co)prise a portable air
co)pressor o% 3 cu.)5)in.
in capacit at ".7 ;5s,.))
eli$er pressure with a
suitable hose an nole %or
blowing clean a roa sur%acea%ter power broo)ing an
shall be appro$e b the
S.6.
9c: Pressure Distributor %or
(itu)inous Material
he istributor shall be a
purpose built )oel o%
recognise )anu%acture an
shall be appro$e b theS.6. t shall con%or) to the
re,uire)ents escribe
hereuner.
he istributor shall ha$e a
suitable capacit an shall be
e,uippe with a gas or oil
%ire heating sste) capable
o% heating a %ull charge o%
bitu)inous )aterial to
l8"BC. he heating sste)
shall be such that o$erheating
o% the bitu)inous )aterial
will not occur an shall be o%
a tpe in which %la)es %ro)
the burner o not co)e into
irect contact with the casing
o% the tan containing the
bitu)inous )aterial. he
tan shall be insulate in
such a )anner that when
%ille
with bitu)inous )aterial atl8"BC an not heate
Cawangan Jalan, Ibu Pejabat JKR, K.LPage )5
-
8/16/2019 Section4 Felxible Pavement
12/52
FOR INTERNAL USEONLY
Standard Specification For Road Works
the rop in te)perature shall be
less than 3BC per hour. &
ther)o)eter shall be pro$ie to
)easure continuousl the
te)perature o% the bitu)inous
)aterial in the tan an shall beso arrange that the highest
te)perature in the tan is
)easure. he tan shall be
%itte with an accuratel
calibrate ipstic or contents
gauge an the pipe %or %illing
the tan shall be %itte with an
easil replaceable %ilter.
he istributor shall run on
pneu)atic tre wheels o% suchwith an nu)ber that the loa
prouce on the roa sur%ace
when the $ehicle is %ull charge
shall not e/cee l2 g5)) o%
tre with. he $ehicle shall be
e,uippe with a %i%th wheel
tacheo)eter sste) to accuratel
)easure its %orwar spee uring
spraing operations.
he istributor shall be e,uippewith a %ull circulation tpe spra
bar with noles %ro) which the
bitu)inous )aterial is sprae
on to the roa sur%ace uni%or)l
o$er the %ull spraing with.
he spraing with shall be
$ariable
in incre)ents o% not )ore than
1"" )) up to a )a/i)u) o%
*." )etres. he spraing pu)p
shall be ri$en b a separate
power unit an shall be
e,uippe with
an accurate pressure gauge
an an accurate %low rate
gauge or )eter. 6n the suction
sie the pu)p shall be %itte
with an easil replaceable
%ilter. he spra bar an
pu)p shall be so
esigne that bitu)inous )aterial
at e$en te)perature an uni%or)
pressure )a be sprae uni%or)l o$er the spraing with at
controlle rates in the range
".2* to 8." litres5s,.) at nor)al
istributor operating spees
such that e$iation %ro) the
prescribe rate o% application
shall not
e/cee 1".
he istributor shall be e,uippe
with a han spraing sste).
he )eters %or the %i%th wheel
tacho)eter sste) an the
bitu)inous )aterial pu)ping
%low rate pu)ping pressure an
te)perature shall be locate in
such a )anner that the $ehicle
ri$er can easil rea the)while operating the istributor.
he spra bar shall be controlle
b a secon operator riing at
the rear o% the $ehicle in such a
position
that all the ischarge spras are
in his goo $iew.
&ll )easuring e,uip)ent on the
istributor shall ha$e been
recentl calibrate an accuratean satis%actor recors o% the
calibrations shall be sub)itte to
the S.6. % in the course o% the
wor the rates o% application o%
bitu)inous )aterial are %oun to
be inaccurate the istributor shall
be withrawn %ro) the
-
8/16/2019 Section4 Felxible Pavement
13/52
FOR INTERNAL USEONLY
Standard Specification For Road Works
9: Storage an eating
Eacilities %or (itu)inous
Material
ans %or storage o%
bitu)inous )aterial shallha$e a capacit suite to the
propose rate o% utilisation
o% the )aterial an the
)etho an %re,uenc o% its
eli$er to the
-
8/16/2019 Section4 Felxible Pavement
14/52
FOR INTERNAL USEONLY
Standard Specification For Road Works
% necessar in orer to
pre$ent the bitu)inous
)aterial %ro) %lowing on the
sprae sur%ace the pre
scribe pri)e coat shall be
applie in two separatespraing operations. the ,uantities applie shall not
e$iate b )ore than 1"
%ro) those prescribe. &reas
with insu%%icient bitu)inous
)aterial shall be resprae as
necessar to )ae up the
e%icienc all to the
satis%action o% the S.6.
he sur%aces o% structures
roa %urniture an treesa?acent to the areas being
sprae shall be protecte
in such a )anner as to
pre$ent their being spattere
or )arre b bitu)inous
)aterial. (itu)inous )aterial
shall not be ischarge into
roa rains gutters etc.
9: Curing an 6pening to
ra%%ic
Pri)e coat shall nor)all be
le%t unisturbe %or at least
24 hours a%ter application an
shall not be opene to tra%%ic
until in the opinion o% the
S.6. it has penetrate the
roabase an cure
su%%icientl so that it will not
be pice up b the wheels
o% $ehicles.
he Contractor shall )aintain
the pri)e coat all to the
satis%action o% the S.6. until
the o$erling pa$e)ent
course is constructe which
shall not be within 24 hours
a%ter the application o% the
bitu)inous pri)ing )aterial
nor within such longer perio
as is re,uire in the opinion
o% the S.6. %or the pri)e
coat to achie$e )a/i)u)
penetration o% the roabase
an beco)e %ull cure.
4.2.2 (itu)inous ac Coat
4.2.2.1 Description
his wor shall consist o% the
care%ul an thorough cleaning o%
the sur%ace o% a prepare an
accepte bitu)inous or bitu)en
pri)e pa$e)ent course an the
%urnishing an application to the
cleane sur%ace o% a bitu)inous
tac coat prior to the
construction o% an o$erling bitu)inous pa$e)ent course all
in accorance with this
Speci%ication an the lines
i)ensions an cross-sections
shown on the Drawings an5or
as re,uire b the S.6.
4.2.2.2 Materials
(itu)inous tac coat )aterial
shall be rapi setting bitu)en
e)ulsion o% grae 'S-1 or
'S-
1A con%or)ing to the
re,uire)ents o% M.S.
101.
4.2.2.3 +,uip)ent
he e,uip)ent shall be as
speci%ie in Sub-Section 4.2.1.3.
Cawangan Jalan, Ibu Pejabat JKR, K.LPage ))
-
8/16/2019 Section4 Felxible Pavement
15/52
FOR INTERNAL USEONLY
Standard Specification For Road Works
4.2.2.4 Construction Methos
9a: #eneral Conitions
(itu)inous tac coat shall
onl be applie to a cleanr bitu)inous or
bitu)en pri)e sur%ace.
(itu)inous tac coat shall
onl be applie as %ar in
a$ance o% the construction o%
the o$erling bitu)inous
pa$e)ent course as is
necessar to achie$e a satis
%actor egree o% taciness
be%ore the o$erling )aterialis place all to the
satis%action o% the
S.6.
9b: Sur%ace Preparation an
Cleaning
Prior to appling bitu)inous
tac coat the sur%ace to be
treate shall ha$e been
prepare in accorance withthe appropriate Sections o%
this Speci%ication.
;otwithstaning an earlier
appro$al o% this sur%ace an
a)age to it or eterioration
o% it shall be )ae goo
be%ore tac coat is applie.
))eiatel prior to appling
bitu)inous tac coat the %ull
with o% the sur%ace to be
treate shall be swept using a
power broo) %ollowe b a
co)presse air blower an i%
necessar scrape using han
tools to re)o$e all irt ust
an other ob?ectionable
)aterial all to the satis%action
o% the S.6.
9c: &pplication o% (itu)inous
Material
he bitu)inous tac coat
shall be sprae on to the
cleane bitu)inous or
bitu)en pri)e sur%ace b
)eans o% a pressure
istributor. &n areas
inaccessible to the
istributor spra bar shall be
treate using the istributors
han spraing sste). he
rate or
rates o% application shall be
as irecte b the S.6. base
on the results o% testapplications but shall usuall
be in the range ".2* to ".**
litres5s,.). he te)perature
o% the bitu)inous )aterial
shall be )aintaine in the
range 2*BC to 4*BC uring
spraing operations.
ac coat shall be istribute
uni%or)l o$er the sur%ace to
be treate without streaing>the ,uantities applie shall not
e$iate b )ore than 1"
%ro) those prescribe. &reas
with bitu)inous )aterial in
e/cess o% these li)its shall
ha$e the e/cess re)o$e at
the Contractors e/pense an
areas with insu%%icient
bitu)inous )aterial shall be
resprae as necessar to
)ae up the e%icienc all
to the satis%action o% the S.6.
he sur%aces o% structures
roa %urniture an trees
a?acent to the areas being
sprae shall be protecte in
such a )anner as to pre$ent
their being spattere or
)arre b bitu)inous
)aterial. (itu)inous )aterial
shall not be ischarge into
roa rains gutters etc.
Cawangan Jalan, Ibu Pejabat JKR, K.LPage ).
-
8/16/2019 Section4 Felxible Pavement
16/52
FOR INTERNAL USEONLY
Standard Specification For Road Works
ra%%ic shall be ept o%% the
tac coat at all ti)es an
the Contractor shall
)aintain the tac coat all to
the satis%action o% the S.6.
until the o$erling pa$e)entcourse is constructe.
4.2.3 (itu)inous Sur%ace Dressing
4.2.3.1 Description
his wor shall consist o% the
care%ul an thorough cleaning o%
the sur%ace o% a prepare an
accepte bitu)inous or bitu)en
pri)e pa$e)ent course an the%urnishing an placing on the
cleane sur%ace o% one or two
applications o% bitu)inous
)aterial an co$er aggregate all
in accorance with this
Speci%ication an the lines
i)ensions an cross-sections
shown on the Drawings an5or
as re,uire b the S.6.
-
8/16/2019 Section4 Felxible Pavement
17/52
FOR INTERNAL USEONLY
Standard Specification For Road Works
Eor ouble bitu)inous
sur%ace ressing the co$er
aggregate %or the %irst
application o% bitu)inous
)aterial an co$er aggregate
shall be no)inal 2" ))sie chippings an the co$er
aggregate %or the secon
application o% bitu)inous
)aterial an co$er
aggregate shall be no)inal
1" )) sie chippings.
Co$er aggregates shall be
screene crushe stone an
shall co)prise clean r
har tough soun angularan cubical chippings %ree
%ro) $egetati$e an other
organic )atter cla an
other eleterious substances
an containing %ew i% an
%la
or elongate particles. Dust
chippings shall be washe
clean all to the satis%action
o% the S.6. Co$er agregates
shall con%or) to the %ollowing phsical an )echanical
re,uire)ents =-
i: using the tpe o%
bitu)inous )aterial to be
use in the
ii: the aggregate crushing
$alue when teste in
accorance with M.S. 3"
shall be not )ore than
3">
iii: the weighte a$erage loss
o% weight in the soiu)
sulphate sounness test 9*
ccles: when teste in
accorance with
&&S6 est Metho
1"4 shall
be not )ore than 12>
i$: the %lainess ine/ when
teste in accorance with
M.S. 3" shall be not
)ore than 2*>
$: the polishe stone $alue
when teste in accorance
with M.S. 3" shall be notless than 4">
$i: the graation shall con
%or) to the appropriate
en$elope shown in
able
4.4.
4.2.3.3 +,uip)ent
he Contractor shall pro$ie allthe plant an e,uip)ent
necessar %or e/ecuting the wor
in accorance with this
Speci%ication an shall %urnish
the S.6. with such etails o%
particular ite)s o% e,uip)ent
e.g. )anu%acturer )oel tpe
capacit weight etc. as the
S.6. shall re,uire.
he e,uip)ent shall inclue a
power broo) a co)presse air
blower a sel%-propelle
pressure istributor %or
bitu)inous
)aterial all necessar e,uip)ent
%or storing an heating
bitu)inous )aterial aggregate
spreaing e,uip)ent a suitable
nu)ber o% tip-trucs an a sel%-
propelle pneu)atic tre
roller.
Cawangan Jalan, Ibu Pejabat JKR, K.L
-
8/16/2019 Section4 Felxible Pavement
18/52
Page .&
-
8/16/2019 Section4 Felxible Pavement
19/52
FOR INTERNAL USEONLY
Standard Specification For Road Works
TABLE 4.4 - GRADATION LIMITS FOR BITUMINOUS SURFA#E DRESSING
B.S.
SieveSize
% Passing By eig!"
N2&ina3' &&
#!i//ings
N2&ina314 &&
#!i//ings
N2&ina31 &&
#!i//ings
N2&ina3, &&
#!i//ings
'$. &&'. &&14. &&1. &&,.+ &&
4.)$ &&
'.+, &&
1$ - 1
- '--
- $
- '
-1
$ - 1 - '
- - $
- '
--
1$ - 1
- ' - 1
- '
---
1$ - 1
- '$
- 1
9a: Power (roo)
he power broo) shall be
as speci%ie in Sub-Section
4.2.1.39a:.
9b: Co)presse &ir
(lower he co)presse
air blower shall be as
speci%ie in Sub-Section
4.2.1.3 9b:.
9c: Pressure Distributor %or
(itu)inous Material
he istributor shall be
as speci%ie in Sub-
Section
4.2.1.39c:.
9: Storage an eating
Eacilities %or
(itu)inous Material
Storage an heating
%acilities %or bitu)inous
)aterial shall be as
speci%ie in Sub-
Section
4.2.1.3 9:.
9e: &ggregate Spreaing
+,uip)ent
&ggregates shall be place
using )echanical
spreaers o% a tpe
appro$e b the S.6.
he spreaers shall be
capable o% appling
aggregate uni%or)l o$erthe %ull with o% the area
being treate an shall
ha$e controls to regulate
the
rate o% sprea as re,uire
b this Speci%ication all to
the satis%action o% the S.6.
9%: ip-rucs
he Contractor shall
pro$ie a suitable nu)ber
o% tip-trucs o% a tpe
appro$e b the S.6.
capable o% spreaing
aggregate in accorance
with this Speci%ication.
Cawangan Jalan, Ibu Pejabat JKR, K.LPage .*
-
8/16/2019 Section4 Felxible Pavement
20/52
FOR INTERNAL USEONLY
Standard Specification For Road Works
9g: Pneu)atic re 'oller
he pneu)atic tre roller
shall be o% recognise
)anu%cature an shall be
appro$e b the S.6. tshall con%or) to the
re,uire)ents escribe
hereuner.
he pneu)atic tre roller
shall be sel%-propelle an
capable o% being re$erse
without baclash> it shall
be e,uippe with power
steering an ual controls
allowing operation %ro)either the le%t or right
sie.
he roller shall ha$e nine
wheels e,uippe with
s)ooth treae tres all
o% the sa)e sie an
construction an capable
o% operating at in%lation
pressures o% up to ".!
;5s,.)). Ei$e wheelsshall be on the ri$en a/le
an %our on the steering
a/le all e,uall space on
both a/les an arrange so
that the tres on the
steering a/le trac )iwa
between those on the
ri$en a/le with a s)all
o$erlap. he roller shall
be e,uippe with water
tans sprinler sste)s
an pas o% coconut
)atting to eep all tres
e$enl wette uring
operation.
he roller shall be
e,uippe with )eans o%
a?usting its total weight
b ballasting so that the
loa per wheel can be
$arie in the range 1."
to2." tonnes.
n operation the ballaste
weight an the tre
in%lation pressure shall be
a?uste to )eet the
re,uire)ents o% each
particular operation. +ach
tre shall be ept in%late
at the speci%ie pressure
such that the pressure
i%%erence between an
two tres shall not e/cee
"."4 ;5s,.)). Means
shall be pro$ie %or
checing an a?usting
tre pressures at all ti)es
at the place o% the wors.
he Contractor shall
pro$ie the S.6. with a
calibration chart %or the
roller showing the
relationship between the
,uantit or epth o%
ballast an total weight
an also
a chart showing the
relationship between
wheel loa tre in%lation pressure an contact
pressure.
4.2.3.4 Construction Methos
9a: #eneral Conitions
(itu)inous sur%ace ressing
shall onl be carrie out in
r war) weather when
the sur%ace to be treate is
r.
-
8/16/2019 Section4 Felxible Pavement
21/52
N2&ina3 Size2 Agg5ega"e
Ra"e 2 A//3i6a"i2n 2 Pene"5a"i2n
G5a7e7Bi"*&en
'% &&
14 &&
1% &&
, &&
'. - +. 3i"5e8s9.&
1.$ - '.' 3i"5e8s9.&
1. - 1.$ 3i"5e8s9.&
.) - 1. 3i"5e8s9.&
FOR INTERNAL USEONLY
Standard Specification For Road Works
sur%ace to be treate or
such other conitions as he
shall consier etri)ental to
the wor.
9b: Sur%ace Preparation anCleaning
Prior to constructing a
bitu)inous sur%ace ressing
the sur%ace to be treate shall
ha$e been prepare in
accorance with the
appropriate Sections o% this
Speci%ication.;otwithstani
ng an earlier appro$al o% this
sur%ace an a)age to oreterioration o% it shall be
)ae goo be%ore sur%ace
ressing is co))ence.
))eiatel prior to
co))encing sur%ace
ressing the %ull with o% the
sur%ace to be treate together
with an aitional 3"" ))
with on each sie shall be
sweptusing a power broo)
%ollowe b a co)presse air
blower an i% necessar
scrape using han tools to
re)o$e all loose particles
irt ust an other
ob?ectionable )aterial all to
the satis%action o% the S.6.
n ouble bitu)inous sur%ace
ressing construction the
sur%ace o% the %irst
application o% bitu)inous
)aterial an co$er aggregate
shall be si)ilarl )ae goo
an cleane i))eiatel
prior to co))encing the
secon application.
9c: &pplication o% (itu)inous
Material
he bitu)inous )aterial %or a
single bitu)inous sur%ace
ressing or %or each
application o% bitu)inous
)aterial an co$er aggregate
o% a ouble bitu)inous
sur%ace ressing shall be
sprae on to the cleane
sur%ace to be treate b
)eans o% a pressure
istributor. &n areas
inaccessible to the istributor
spra bar shall be treate
using the istributors hanspraing sste).
he rate or rates o%
application shall be as
irecte b the S.6. base
on the results o% laborator
tests
an5or test applications but %or
penetration grae bitu)en
shall usuall be in the
appropriate range gi$en inable 4.*.
TABLE 4.$ - RATES OF APPLI#ATION
OF PENETRATION GRADED BITUMEN
Cawangan Jalan, Ibu Pejabat JKR, K.LPage .4
-
8/16/2019 Section4 Felxible Pavement
22/52
FOR INTERNAL USEONLY
Standard Specification For Road Works
he rates o% application
%or cut-bac bitu)ens an
bitu)en e)ulsions shall
be co))ensuratel higher
epening on their
resiual bitu)en contents.
he te)perature o% the
bitu)inous )aterial shall
be )aintaine uring
spraing operations within
the appropriate range
gi$en in able 4.0.
he bitu)inous )aterial
shall be istribute
uni%or)l o$er the sur%aceto be treate without
streaing> the ,uantities
applie shall not e$iate
b )ore than 1" %ro)
those prescribe. he rate
o% application shall be
chece %or each spraing
run b )easuring the
$olu)e o% bitu)inous
)aterial in the istributor
be%ore an a%ter spraingan the area treate.
&?ust)ents shall be
)ae as necessar to
ensure that the prescribe
rate o% application is
)aintaine
in subse,uent runs.
Spraing shall be
iscontinue i))eiatel
i% an e%ect e$elops in
the istributor an it shall
not be resu)e until the
%ault has been recti%ie to
the satis%action o% the
S.6.
he spraing o% bitu)inous
)aterial o$er an portion o%
the sur%ace to be treate
shall not be carrie out )ore
than two )inutes in a$ance
o% placing the co$er
aggregate
on that portion at the
speci%ie rate> an the progress
o% spraing the bitu)inous
)aterial shall be restricte as
necessar to co)pl with
this re,uire)ent.
TABLE 4., - SPRA:ING
TEMPERATURE FOR BITUMINOUS
Bi"*&in2*sMa"e5ia3
S/5ayingTe&/e5a"*5e
%-1%%/ene"5a"i2n g5a7e;i"*&en
#*"-;a6<;i"*&en g5a7eR#-) 25 M#-)
Bi"*&en e&*3si2ns
1$2# "2 1,$
2#
$%2# "2 ,$
2#
'$2# "2 4$
2#
(itu)inous )aterials
(itu)inous )aterials shall
not be heate to spraing
te)peratures too soon in
a$ance o% re,uire)ents.
&n bitu)inous )aterial
which has been heate to
spraing te)perature %or
)ore than ten hours or
which has been o$erheate
shall be re?ecte.
Cawangan Jalan, Ibu Pejabat JKR, K.LPage .5
-
8/16/2019 Section4 Felxible Pavement
23/52
FOR INTERNAL USEONLY
Standard Specification For Road Works
n cases where the
bitu)inous )aterial is
applie in lanes there
shall be a s)all o$erlap o%
bitu)inous )aterial at
the ?oints between lanese,ual in with to the ege
strip
o% the sprae area which
oes not recei$e the %ull
rate o% application o%
bitu)inous )aterial. Eor
ouble bitu)inous sur%ace
ressing ?oints in the
secon application o%
bitu)inous )aterial shall
be o%%set %ro) those inthe %irst application b
1*" -
3"" )) %or longituinal
?oints an b at least 1."
)etre where possible
%or trans$erse ?oints.
+ach spraing run shall
co))ence an
ter)inate on lengths o%
builing paper placeacross the %ull spraing
with i))eiatel
be%ore an a%ter the
section to be
sprae. Su%%icient builing
paper shall be
place so that the istributor
)a be starte an stoppe
with the spra bar o$er paper
an so that the correct
istributor roa spee an rate
o% spraing can be )aintaine
o$er the entire length o% the
section to be sprae all to
the satis%action o% the S.6.
))eiatel a%ter use an
be%ore application o%
co$er aggregate the
builing paper shall be
re)o$e
an ispose o% in a
)anner appro$e b the
S.6.
Pro$ision shall be )ae
%or a $olu)e o%
bitu)inous )aterial o% at
least 1" o% the capacit
o% the istributor or such
other ,uantit as the S.6.
shall irect to re)ain in
the istributor tan at the
co)pletion o% each spraing
run in orer to a$oi air
entrap)ent within the
bitu)en spraing sste).
he sur%aces o% structures
roa %urniture an trees
a?acent to the areas
being sprae shall be protecte
in such a )anner as to
pre$ent their being spattere
or
)arre b bitu)inous
)aterial. (itu)inous )aterial
shall not be ischarge into
roa rains gutters etc.
9: &pplication o% Co$er
&ggregate
(e%ore each spraing run
o% bitu)inous )aterial
co))ences su%%icient
aggregate to pro$ie %ull
co$er at the prescribe
rate o% application o$er the
entire area to be sprae
shall ha$e been loae in
trucs at the Site o% the
-
8/16/2019 Section4 Felxible Pavement
24/52
N2&ina3Size
Ra"e 2 A//3i6a"i2n2 Agg5ega"e
' &&
14 &&
1 &&
, &&
1) 0 ')
-
8/16/2019 Section4 Felxible Pavement
25/52
FOR INTERNAL USEONLY
Standard Specification For Road Works
than 3 )inutes between the
application o% the
bitu)inous )aterial an the
co))ence)ent o% rolling.
he pneu)atic tre rollershall be ballaste to an
operating weight o% ! - 1"
tonnes an its tre
in%lation pressure shall be
".*3
;5s,.)) %or sur%ace ressing
wor. 'olling shall be
continue %or as long as is
necessar to thoroughl
e)be the aggregate in the
bitu)inous )aterial all tothe satis%action o% the S.6.
'olling shall generall begin
at the outer ege o% sur%ace
ressing an progress
uni%or)l towars the centre
on each sie e/cept on
super ele$ate cur$es where
rolling shall begin at the
lower ege an progress
uni%or)l towars the higher ege. Consecuti$e roller
passes shall generall
o$erlap b about one hal% o%
the rollers with.
-
8/16/2019 Section4 Felxible Pavement
26/52
FOR INTERNAL USEONLY
Standard Specification For Road Works
%irst application shall be ept
to a practicable )ini)u) an
the secon application shall
be constructe as soon as
is practicable a%ter the
co)pletion o% the %irst.
4%*%4 "spatic Concrete
4.2.4.1 Description
his wor shall consist o%
%urnishing placing shaping an
co)pacting asphaltic concrete
biner course an5or wearing
course on a prepare anaccepte bitu)inous or bitu)en
pri)e pa$e)ent course an
shall inclue the care%ul an
thorough cleaning o% sur%aces
which are to be co$ere without
recei$ing a bitu)inous tac coat.
he wor shall be carrie out all
in accorance with this
Speci%ication an the lines
le$els graes i)ensions an
cross-sections shown on theDrawings an5or as re,uire b
the S.6.
4.2.4.2 Materials
9a: &ggregates
&ggregate %or asphaltic
concrete shall be a )i/ture o%
coarse an %ine aggregates
an i% necessar )ineral
%iller. he ini$iual aggregates
shall be o% sies suitable %or
blening to prouce the
re,uire graation o% the
co)bine aggregate all to the
satis%action o% the S.6.
Coarse aggregates shall be
screene crushe har roc
angular in shape an %ree
%ro) ust cla $egetati$e
an other
organic )atter an other
eleterious substances. he
shall con%or) to the %ollowing
phsical an )echanical ,ualit
re,uire)ents =-
i: the aggregate crushing $alue
when teste in accorance
with M.S. 3" shall be not
)ore than 3">
ii: the weighte a$erage loss o%
weight in the soiu)
sulphate sounness test 9*
ccles:
when teste in accorance
with &&S6 est Metho 1"4 shall be not )ore than
12>
iii: the %lainess ine/ when
teste in accorance with
M.S. 3" shall be not
)ore than 3">
i$: the water absorption when
teste in accorance with
M.S. 3" shall be not )orethan 2>
$: the polishe stone $alue
when teste in accorance
with
M.S. 3" shall be not less than
4" 9onl applicable to
aggregates %or
wearing course:.
Eine aggregates shall be clean
natural sans screene ,uarr
%ines or )ining san. Mining
san shall be thoroughl washe
be%ore use. 6ther tpes o% %ine
aggregate )a be use sub?ect
to the appro$al o% the S.6.
Eine aggregates shall be non-
plastic an %ree %ro) cla
loa) aggregations o% )aterial
$egetati$e an other organic
)atter an other eleterioussubstances.
Cawangan Jalan, Ibu Pejabat JKR, K.LPage ..
-
8/16/2019 Section4 Felxible Pavement
27/52
FOR INTERNAL USEONLY
Standard Specification For Road Works
he shall con%or) to the
%ollowing phsical an
)echanical ,ualit re,uire)ents=-
i: the weighte a$erage loss o%
weight in the soiu)sulphate sounness test 9*
ccles:
when teste in accorance
with &&S6 est Metho
1"4 shall be not )ore than
12>
ii: the water absorption when
teste in accorance with
M.S. 3" shall be not )orethan 2.
;otwithstaning co)pliance with
the re,uire)ents o% this
Speci%ication li)estone
aggregates shall not be per)itte
%or use in wearing course.
he graation o% the co)bine
coarse an %ine aggregates
together with orinar Portlan
ce)ent ae as an ahesion an
anti-stripping agent an i%
necessar an other )ineral
%iller shall con%or) to the
appropriate en$elope shown
in able 4.8
TABLE 4. - GRADATION LIMITS FOR ASPALTI# #ON#RETE
Mi= Ty/e ea5ing #2*5se Bin7e5 #2*5se
Mi=Designa"i2n
A# ' A#B '
B.S. Sieve % Passing ;y >eig!"
+).$ &&
'. &&
'. &&
14. &&
1. &&
$. &&
+.+$ &&
1.1 &&
4'$ *&
1$ *&
)$ *&
1
), - 1
,4 - (
$, - 1
4, - )1
+' - $
' - 4'
1' - '
, - 1,
4 -
1
- 1
)' - (+
$ - '
$ - )$
+, - $
+ - $'
1 - +
11 - '$
$ - 14
+ -
Cawangan Jalan, Ibu Pejabat JKR, K.LPage &33
-
8/16/2019 Section4 Felxible Pavement
28/52
FOR INTERNAL USEONLY
Standard Specification For Road Works
he graation en$elopes in the
abo$e able are purposel wier
than the tolerances %or goo
wors control o% asphaltic
concrete )i/es. Eor each tpe o%
)i/ re,uire in the
-
8/16/2019 Section4 Felxible Pavement
29/52
FOR INTERNAL USEONLY
Standard Specification For Road Works
all in accorance with the
)anu%acturers instructions. n such a
case the agent shall be ae to the
bitu)en biner use in the bitu)en
stripping tests in the appropriate
a)ount an )anner.
&ggregate which oes not per%or)
satis%actoril in the bitu)en stripping
tests using the appro$e ahesion
an anti-stripping agent when
appropriate shall not be use in
asphaltic concrete.
4.2.4.3 &sphaltic Concrete Mi/ Design
9a: Fob Mi/ Eor)ulae
&%ter obtaining supplies or
prouction 9as applicable: o% all
aggregates consistent as to graation
an other ,ualities the Contractor
shall propose a ?ob )i/ %or)ula %or
each class o% )i/ re,uire in the
ii: eter)ination o% the bul
speci%ic gra$it o% the speci)ens
in accorance with &&S6
est Metho 100>
iii: eter)ination o% the stabilit an
%low $alues in accorance with
&&S6 est Metho 24*>
i$: analsis o% the ensit an
$ois para)eters to eter)ine
the percentage o% $ois in the
co)pacte aggregate the
percentage o% $ois in the
co)pacte aggregate %ille
with bitu)en an hence the percentage o% air $ois in the
co)pacte )i/.
Eor each trial )i/ con%or)ing to a
propose ?ob )i/ %or)ula the
para)eters o% the abo$e tests an
analses shall con%or) to the
re,uire)ents o% the appropriate
tpe o% )i/ as gi$en in able 4.1".
A#14 - ea5ing $.% 0 ).% %
A#14 - Bin7e5 #2*5se 4.$ - ,.$ %
A#B ' - Bin7e5 #2*5se 4.% - ,.%
Cawangan Jalan, Ibu Pejabat JKR, K.LPage &3*
-
8/16/2019 Section4 Felxible Pavement
30/52
FOR INTERNAL USEONLY
Standard Specification For Road Works
TABLE 4.1 - TEST AND ANAL:SIS
PARAMETERS FOR ASPALTI#
#ON#RETE
Pa5a&e"e5 ea5ing #2*5se Bin7e5 #2*5se
S"a;i3i"y S
F32> F
S"iness S8F
Ai5 v2i7s in &i=
2i7s in agg5ega"ei33e7 >i"! ;i"*&en
? $
-
8/16/2019 Section4 Felxible Pavement
31/52
Cawangan Jalan, Ibu Pejabat JKR, K.LPage &3,
-
8/16/2019 Section4 Felxible Pavement
32/52
FOR INTERNAL USEONLY
Standard Specification For Road Works
$: the ?ob )i/ %or)ula graation
o% the co)bine aggregate an
%iller>
$i: the proportions %or co)bining
the hot bin aggregates an %iller>
$ii:the bitu)en content 9b weight
o% total )i/:>
$iii:the r an wet )i/ing ti)es i%
a batch plant is to be use or the
)i/ing ti)e i% a continuous )i/
plant is to be use>
i/: the %ull results o% the
co)prehensi$e Marshall)etho tests an analses as
escribe abo$e %or each trial
)i/ use in eter)ining the ?ob
)i/ %or)ula.
he S.6. )a re,uire changes o%
an o% the %actors in each propose
?ob )i/ %or)ula an %urther tests
an analses in orer to attain
opti)u) ,ualit o% the asphaltic
concrete )i/es.
9b: Plant rials
&%ter ha$ing recei$e the S.6.s
preli)inar appro$al o% his
propose ?ob )i/ %or)ulae the
Contractor
shall arrange to )i/ la an co)pact
asphaltic concrete con%or)ing to the
propose %or)ula %or each class o%
)i/ re,uire in the
-
8/16/2019 Section4 Felxible Pavement
33/52
FOR INTERNAL USEONLY
Standard Specification For Road Works
TABLE 4.11 - TOLERAN#ES FOR ASPALTI# #ON#RETE MI@ES
Pa5a&e"e5Pe5&issi;3e a5ia"i2n % By eig!" 2 T2"a3Mi=
Bi"*&en.
F5a6"i2ns 2 62&;ine7agg5ega"e /assing $. &&an7 3a5ge5 sieves.
F5a6"i2ns 2 62&;ine7agg5ega"e /assing +.+$ &&an7 1.1 && sieves.
F5a6"i2ns 2 62&;ine7agg5ega"e /assing 4'$ *&an7 1$ *& sieves.
F5a6"i2n 2 62&;ine7agg5ega"e /assing )$ *&sieve.
.'%
$.%
4.%
+.%
'.%
4.2.4.4 +,uip)ent
he Contractor shall pro$ie all the
plant an e,uip)ent necessar %or
e/ecuting the wor in accorance
with this Speci%ication an shall
%urnish the S.6. with such etails o%
particular ite)s o% e,uip)ent e.g.
)anu%acturer )oel tpe capacit
weight operating %eatures etc. as
the S.6. shall re,uire.
9a: 'oa Cleaning +,uip)ent
'oa cleaning e,uip)ent will be
re,uire where asphaltic concrete
is to be lai on a sur%ace which is
not to recei$e a tac coat. he
e,uip)ent shall be the sa)e as that
re,uire %or preparing a sur%ace %or
a tac coat an shall inclue a
power broo) an co)presse air
blower as speci%ie in Sub-Sections
4.2.1.3 9a: an 4.2.1.3 9b:
respecti$el. 9b: &sphalt Mi/ing Plant
he asphalt plant shall be either a
batch plant or a ru) )i/ plant or a
continuous )i/ plant o% recognie
)anu%acture an shall be appro$e
b the S.6. t shall con%or) to there,uire)ents escribe hereuner.
he )i/ing plant shall ha$e a capacit
suite to the
-
8/16/2019 Section4 Felxible Pavement
34/52
FOR INTERNAL USEONLY
Standard Specification For Road Works
concrete )i/es within the tolerances
prescribe in this Speci%ication all
to the satis%action o% the S.6.
Scales %or all weigh bo/es or hoppers
shall be o% the springless ial tpeaccurate to within ".* o% the
)a/i)u) loa that )a be re,uire.
Scale ials an pointers shall be
easil rea %ro) their operators
nor)al position without signi%icant
paralla/ errors. Scales shall be
substantiall constructe so that the
shall )aintain their accurac a%ter
initial a?ust)ent. he Contractor
shall %urnish not less than ten 2* g
test weights at the plant %or checinga?usting an calibrating scales.
ans %or storage o% bitu)en shall
ha$e a capacit suite to the propose
rate o% utiliation o% the )aterial an
the )etho an %re,uenc o% its
eli$er to the nor)all %our bins will be
re,uire. he %ee bins an gates shall
be so constructe an e,uippe that
the shall be reail accessible %or
calibrating at all ti)es an shall
pro$ie %or a continuous an uni%or)%low o% each aggregate re,uire in the
)i/.
he plant shall ha$e a rotar ru)
rer o% satis%actor esign %or ring
an heating the co)bine aggregate so
that its te)perature will be at the
re,uire le$el at the ti)e it is )i/e
with the bitu)en. he burner shall be
so esigne that co)plete co)bustion
o% the %uel will be obtaine an theaggregate will re)ain clean an not
beco)e coate with soot or oil.
he plant shall be e,uippe with %our
9or )ore: screens the s)allest o% which
shall generall be not )ore than 3.2
)). he screens shall ha$e a nor)al
capacit slightl in e/cess o% the
)a/i)u) output o% the )i/ing plant.
he screens shall be reail accessible
%or inspection.
he plant shall inclue %our 9or )ore:
storage bins %or screene aggregates
each with a capacit o% not less than
twice the pug)ill ea loa capacit.
he bins shall be arrange so as to
pro$ie separate r storage %or each
screene %raction o% the aggregate. +ach
bin shall be pro$ie with an o$er%low
pipe o% such sie an location as to
pre$ent an bacing up o% )aterial into
other bins. +ach bin shall be soconstructe that representati$e
aggregate sa)ples can be reail
obtaine an
Page &3+
-
8/16/2019 Section4 Felxible Pavement
35/52
FOR INTERNAL USEONLY
Standard Specification For Road Works
shall ha$e )eans %or obser$ing the
aggregate le$el. Separate r storage
shall be pro$ie %or )ineral %iller an
the plant shall be satis%actoril
e,uippe to %ee %iller into the )i/er.
Satis%actor )eans b either weighing
or )etering shall be pro$ie to obtain
the prescribe a)ount o% bitu)en in
the )i/ within the speci%ie tolerance.
Means shall be pro$ie %or checing
the ,uantit or %low rate o% biner
entering the )i/er. Suitable )eans
shall be pro$ie %or )aintaining the
prescribe te)perature o% the bitu)en
in the pipelines weigh bucet or %low
)eter an spra bars.
&n ar)oure ther)o)eter with a
range o% 3" oC to 2"" oC shall be
%itte in the bitu)en %ee line at a
suitable location near the ischarge
$al$e at the )i/er unit. Suitable ial-
scale )ercur actuate ther)o)eters
electric pro)eters or other
ther)o)etric instru)ents shall be %itte
at the ischarge chute o% the rer an
in each hot aggregate storage bin toinicate the te)peratures o% the heate
aggregates.
he plant shall be e,uippe with a ust
collector so constructe as to waste the
)aterial collecte or %ee it uni%or)l
to the heate aggregate.
he plant shall be e,uippe with
ae,uate an sa%e stairwas to the
)i/ing plat%or) an sa)pling locations
an guare laers an cat-wals shall
pro$ie access to all other positions as
necessar %or proper operation
inspection an )aintenance o% the plant
all to the satis%action o% the S.6. &ll
gears pulles chains sprocets an
other angerous )o$ing parts shall be
properl guare an protecte. &)ple
an unobstructe space shall be
pro$ie on the )i/ing plat%or) an
clear an unobstructe passage shall
be )aintaine at all ti)es in anaroun
the truc loaing area which shall be
ept %ree %ro) rippings %ro) the
)i/er.
Special 'e,uire)ents %or (atch Plants
+ach storage bin %or screene aggregate
shall be pro$ie with a botto) outlet
gate so constructe as to pre$ent
leaage when close. hese gates shall
ha$e a ,uic an co)plete closing
action.
he plant shall be e,uippe with a
weigh bo/ or hopper %or accuratel
weighing out aggregate %ro) each o%
the screene aggregate storage bins.he weigh bo/ or hopper shall be
suspene %ro) its scales le$er
)echanis) an shall be su%%icientl
large to hol a %ull batch e,ual to the
pug)ill capacit without han raing
or spilling o% the aggregate. he
ischarge gate shall be so constructe
as to allow rapi an co)plete
e)pting o% the weigh bo/ or hopper
into the )i/er an pre$ent leaage
when close.
he plant shall be e,uippe with a
biner weigh bucet which shall be
charge through a %ast acting non-rip
$al$e in the biner %ee pipe locate
irectl o$er the bucet. he bucet
shall be suspene %ro) its scales le$er
)echanis) an shall ha$e a capacit
su%%icient to weigh out biner up to
2" o% the weight o% the pug)ill ea
loa capacit. he bucet shall ha$e a
ischarge )echanis) which shall
pro$ie %or rapi an co)plete
e)pting o% the bucet in a thin
uni%or) sheet or )ultiple spras o$er
the %ull length an with o% the )i/er.
he icharge )echanis) shall not lea
or rip when close.
he batch )i/er shall be a suitable
twinsha%t pug)ill with a capacit o% at
least *"" g o% asphaltic concrete
capable o% proucing a thoroughlho)ogeneous )i/ture. he clearance o%
the pale blaes %ro) all %i/e an
Cawangan Jalan, Ibu Pejabat JKR, K.LPage &37
-
8/16/2019 Section4 Felxible Pavement
36/52
FOR INTERNAL USEONLY
Standard Specification For Road Works
)o$ing parts o% the )i/er shall be not
)ore than 2" )). % the pug)ill is not
enclose it shall be e,uippe with a
ust hoo to pre$ent loss o% %ines %ro)
the )i/ture. he ischarge gate shall
be so constructe as to allow rapi anco)plete e)pting o% the )i/er an
pre$ent leaage o% an )i/ constituent
when close.
he )i/er shall be e,uippe with
an accurate ti)e loc sste) %or
controlling the operations o% a co)plete
)i/ing ccle. t shall loc the
aggregate weigh bo/ or hopper gate
a%ter charging the )i/er with aggregate
until the closing o% the )i/er gate at theco)pletion o% the )i/ing ccle> it shall
loc the biner weigh bucet ischarge
)echanis) uring the r )i/ing an
wet )i/ing perios. 9he r )i/ing
perio is e%ine as the inter$al o% ti)e
between the opening o% the aggregate
weigh bo/ or hopper gate an the start
o% ischarging the biner weigh bucet.
he wet )i/ing perio is e%ine as the
inter$al o% ti)e between the start o%
ischarging the biner weigh bucetan the opening o% the )i/er gate.:
he r an wet )i/ing perios shall
both be a?ustable in incre)ents o% not
)ore
than * secons %ro) ero to not less
than
12" secons total %or r an
wet )i/ing.
Special 'e,uire)ents %or Dru) Mi/
Plants
he col )aterial %eeer unit shall
consist o% not less than * co)part)ents
with suitable heape capacit
appropriate %or the plant. +ach bin
shall be pro$ie with a control gate
an )easuring %eeer suitable %or
accurate
blening o% the aggregates on to the
col %ee collecting con$eor. he col
%ee sste) shall incorporate a e$ice
%or )oisture co)pensation capable o%
proucing an accurate an continuous
blen o% the ini$iual aggregate
sies %ro) the col %ee co)part)ent.
he ru) )i/er shall be o% an incline
oil-%ire an parallel %low tpe in which
the aggregates an e/haust gases %low
in the sa)e irection. he ru) )i/er
length to ia)eter ratio shall be such as
to ensure e%%icient ring an inti)ate
)i/ing o% aggregate %iller an biner
o$er the %ull range o% rate operating
e%%iciencies. & bpass chute shall be
incorporate %or sa)pling o% col
aggregate.
Ereshl )i/e )aterial shall beeli$ere an store in a surge
silo through a proper con$eor
sste).
Special 'e,uire)ents %or Continuous
Mi/ Plants
+ach storage bin %or screene aggregate
shall be pro$ie with an accuratel
controlle $ariable ori%ice gate
ischarging on to an aggregate %ee)echanis). he ischarge ori%ice shall
be rectangular with one i)ension
$ariable b )eans o% an a?ustable an
locable gate which shall ha$e an
inicator showing the istance it is
open. hese gates shall be use %or
accuratel proportioning the screene
aggregates
%or the )i/.
he plant shall ha$e )eans o%
calibrating the aggregate bin ischarge
gate openings b weighing test
sa)ples obtaine b i$erting the
aggregate %e out o% each bin into a
suitable test bo/. est bo/es shall ha$e
a capacit o% not less than 1"" g each.
he plant shall ha$e satis%actor )eans
o% e%%ecting positi$e interlocing control
between the %low o% screene
aggregates %ro) the storage bins an
the %low o% biner %ro) the )eter orother proportioning e$ice. his control
shall
Cawangan Jalan, Ibu Pejabat JKR, K.LPage &3)
-
8/16/2019 Section4 Felxible Pavement
37/52
FOR INTERNAL USEONLY
Standard Specification For Road Works
be acco)plishe b interlocing
)echanical )eans or another
positi$e )etho satis%actor to the
S.6.
he continuous )i/er shall be asuitable twin-sha%t pug)ill with an
a?ustable a) an pales with
re$ersible blae pitch %or a?usting the
$olu)e o%
)i/ture hel in the pug)ill. he
clearance o% the pale blaes %ro) all
%i/e parts o% the )i/er shall be not
)ore than 2" )). he biner shall be
%e into the )i/er through a spra bar
irecte on to the aggregate across the
%ull with o% the pug)ill at the %eeen. he ischarging )i/ture shall pass
o$er the a) into a hopper with a
ischarge gate so constructe as to
allow rapi an co)plete e)pting o%
the hopper an pre$ent leaage o% the
)i/ when close. he )i/er shall be
e,uippe with a per)anent gauge %or
)easuring the
epth o% )i/ture in the pug)ill an a
)anu%acturers calibration plate showing
the $olu)e o% )i/ture in the pug)ill ateach incre)ent o% epth.
he )i/ing ti)e shall be
eter)ine using the %or)ula =-
Mi/ing ti)e 9secons: I
Dea weight o% )i/ in pug)ill 9g:
Pug)ill output 9g per secon:
an %or a gi$en output it )a be $arie
slightl b a?usting the epth 9an
hence weight: o% the )i/ture hel in
the pug)ill b $aring the a) height
the con%iguration o% the pale blaes
or both. owe$er %or substantial
a?ust)ents o% the )i/ing ti)e in
orer to )aintain the epth at a le$el
co)patible with e%%icient )i/ing i.e. so
that the pale tips ?ust brea out o% the
)i/ture at the height o% their action the
rate o% %ee o% )aterials to the )i/er
9an hence output: shoul be change.
9c: ip-rucs
he Contractor shall pro$ie a suitable
nu)ber o% tip-trucs o% a tpe appro$e
b the S.6. %or transporting asphaltic
concrete %ro) the )i/ing plant to the
pa$ing wors. he trucs shall ha$e
tras with s)ooth %lat bes an sies
an shall ha$e loa capacities o% not
less than * tonnes. Prior to loaing the
insie o% each truc tra shall be
lightl an e$enl coate with a soap
or etergent solution or such other
li,ui as the S.6. shall appro$e to
pre$ent ahesion o% the asphaltic
concrete. he trucs shall be e,uippe
with co$ers o% can$as or other suitable)aterial to protect the asphaltic
concrete.
9: &sphalt Pa$er
he asphalt pa$er shall be o%
recognie )anu%acture an shall be
appro$e b the S.6. t shall con%or)
to the re,uire)ents escribe
hereuner.
he pa$er shall be sel%-propelle an
capable o% re$erse as well as %orwar
tra$el. t shall be e,uippe with a
hopper at the %ront esigne to recei$e
the pa$ing )i/ture %ro) tip-trucs an
shall ha$e a )echanical istribution
sste) %or spreaing the )i/ture
e$enl
an without segregation o$er the
sur%ace to be pa$e in %ront o% a
screeing an co)pacting unit which
shall be e,uippe with a suitable
heating e$ice. he screeing an
co)pacting )echanis) shall be capable
o%
con%ining the eges o% the )aterial
being lai without the use o%
stationar sie %or)s shall be
a?ustable to strie o%% the )i/ture to
the thicness an cross-section shape
re,uire an shall be controlle b an
auto)atic le$elling e$ice to prouce
an e$en carpet o% bitu)inous )i/turewith a uni%or) sur %ace te/ture %ree
%ro) inentations
riges tear )ars or other irregularities.
-
8/16/2019 Section4 Felxible Pavement
38/52
Cawangan Jalan, Ibu Pejabat JKR, K.LPage &3.
-
8/16/2019 Section4 Felxible Pavement
39/52
FOR INTERNAL USEONLY
Standard Specification For Road Works
he pa$er shall be capable o% laing
the bitu)inous )i/ture in pa$ing
withs in the range 2.* to 3.7* ) an
o% %inishing the pa$e)ent laer true to
the re,uire lines graes le$els
i)ensions an cross-sections sub?ectto co)paction b rolling all to the
satis%action o% the S.6.
9e: 'ollers
& pneu)atic tre roller an two
steel wheele tane) rollers shall be
pro$ie. owe$er a three wheele
steel roller )a be substitute %or one
o% the tane) rollers i% the S.6. shall soappro$e. &ll rollers shall be o%
recognie )anu%acture an shall be
appro$e b the S.6.
he pneu)atic tre roller shall be
as speci%ie in Sub-Section 4.2.3.3
9g:. Steel wheele rollers shall
con%or) to the re,uire)ents
escribe hereuner.
Steel wheele rollers shall be sel%- propelle an capable o% being re$erse
without baclash> the shall be e,uippe
with power steering an ual controls
allowing operation %ro) either the le%t
or right sie. he shall be e,uippe
with water tans sprinler sste)s an
scraper blaes to eep all wheels e$enl
wette an clean uring operation.
+ach steel wheele roller shall be
ballaste so that its total
operating
weight is in the range 8 to 1" tonnes
an its ri$en roll 9or rolls: shall e/ert a
rolling %orce o% not less than 3.*
tonnes5)etre o% roll with. he
Contractor shall pro$ie the S.6. with a
calibration chart %or each roller showing
the relationships between the ,uantit
or epth o% ballast an total weight an
rolling %orce.
4.2.4.* Construction Methos
9a: #eneral Conitions
&sphaltic concrete pa$ing wor
shall onl be carrie out in r
weather when the sur%ace to be
co$ere is r or i% so
speci%ie has recei$e a
bitu)inous tac coat which shall
ha$e achie$e a satis%actor
egree o% taciness all to the
satis%action o% the S.6. &ll
laing rolling an %inishing
wor shall be carrie out uring
alight hours unless the Contractor
shall ha$e pro$ie suitable %loo-lighting %or the ?ob site to the
satis%action o% the S.6.
he S.6. )a orer the
iscontinuation o% wor on account
o% a$erse weather unsatis%actor
conition o% )aterials e,uip)ent
or sur%ace to be pa$e or such
other conitions as he shall
consier etri )ental to the wor.
9b: Sur%ace Preparation an Cleaning
Prior to constructing an asphaltic
concrete pa$e)ent laer the sur%ace
to be co$ere shall ha$e been
prepare in accorance with the
appropriate Sections o% this
Speci%ication. ;otwithstaning an
earlier appro$al o% this sur%ace an
a)age to or eterioration o% it shall
be )ae goo be%ore asphaltic
concrete pa$ing wor is co))ence.
% the sur%ace to be co$ere is not
to be pro$ie with a bitu)inous
tac coat then i))eiatel prior to
co))encing asphaltic concrete
pa$ing it shall be swept using a
power broo) %ollowe b a
co)presse air blower an i%
necessar scrape using han
tools to re)o$e all loose particles
irt ust an other ob?ectionable
Cawangan Jalan, Ibu Pejabat JKR, K.LPage &&3
-
8/16/2019 Section4 Felxible Pavement
40/52
FOR INTERNAL USEONLY
Standard Specification For Road Works
)aterial all to the satis%action o% the
S.6.
% the sur%ace to be co$ere is to be
pro$ie with a bitu)inous tac coat
then this shall be applie all inaccorance with the pro$isions o%
Sub- Section 4.2.2.
9c: &ggregate anling an eating
+ach aggregate to be use in the
asphaltic concrete )i/es shall be store
in a separate stocpile near the )i/ing
plant. Stocpiles o% san an other
%ine aggregates shall be ept r using
waterproo% co$ers an other )eans asnecessar. n placing the aggregates in
the stocpiles an loaing the) into
the )i/ing plants col aggregate %ee
bins care shall be taen to pre$ent
segregation or uncontrolle co)bination
o% )aterials o% i%%erent graation.
Segregate or conta)inate )aterials
shall be rescreene or re?ecte %or use in
the
-
8/16/2019 Section4 Felxible Pavement
41/52
FOR INTERNAL USEONLY
Standard Specification For Road Works
he hot aggregates an %iller shall
be ischarge into the pug)ill an
)i/e r %or the r )i/ing ti)e
prescribe in the ?ob )i/ %or)ula
which shall usuall be in the range
* to 1" secons. he hot binershall then be ae an wet )i/ing
per %or)e %or the wet )i/ing ti)e
prescribe in the ?ob )i/ %or)ula>
this shall be su%%icient so that all
particles o% aggregate are uni%or)l
coate with bitu)en an shall
usuall be 4* secons or )ore %or
ense grae )i/tures.
he $olu)e o% each batch shall be
such that the tips o% the pug)ill pale blaes ?ust brea out o% the
)i/ture at the height o% their
action.
&%ter the co)pletion o% wet )i/ing
each batch o% asphaltic concrete
shall be ischarge %ro) the pug)ill
either into a storage hopper or
irectl into a truc %or hauling to
the pa$ing site. Care shall be
taen that no segregation o% the)i/ occurs.
Mi/ing in Continuous Mi/ Plants
he screene hot aggregates an
%iller shall be %e continuousl %ro)
their storage bins in accorance with
the proportions prescribe in the
appropriate ?ob )i/ %or)ula
co)bine in the plant an %e
continuousl into the )i/er. he
hot biner shall be sprae on to the
co)bine aggregate as it enters the
pug)ill at the rate re,uire to
achie$e the bitu)en content pre
scribe in the ?ob )i/ %or)ula. he
)aterials shall then be carrie
through the pug)ill an in the
process be thoroughl )i/e b
the action o% the pales an is
charge o$er the a) into the stor
age hopper. he )i/ing ti)e 9as
e%ine in Sub-Section 4.2.4.4 9b:
Cawangan Jalan, Ibu Pejabat JKR, K.L
shall be as prescribe in the ?ob
)i/ %or)ula> this shall be
su%%icient so that all particles o%
aggregate are uni%or)l coate
with bitu)en an shall usuall be
4* secons or )ore %or ense
grae )i/tures.
he plant shall be so a?uste as to
)aintain the le$el o% )i/ture in the
pug)ill such that the tips o% the
pale blaes ?ust brea out o% the
)i/ture at the height o% their
action.
9%: ransportation o% &sphaltic
Concrete
&sphaltic concrete shall be
transporte %ro) the )i/ing plant
to the site o% the pa$ing wors in
loas o% not less than * tonnes
using
tip-trucs as speci%ie in
Sub-Section 4.2.4.4 9c:. +/cept
where asphaltic concrete is to be
han lai it shall be ischargeirectl into the pa$er hopper as
re,uire %ro) the tip-trucs. Care
shall be taen in the truc loaing
hauling an unloaing operations to
pre$ent segregation o% the )i/.
During transportation the asphaltic
concrete shall be protecte %ro)
conta)ination b water ust irt
an other eleterious )aterials.
he te)perature o% asphaltic
concrete i))eiatel be%ore
unloaing %ro) the truc either
into the pa$er hopper or on to the
roa %or han spreaing shall be
not less than 12*JC. &n loa
which has coole below the
speci%ie te)perature in the truc
shall be re?ecte %or use in the
-
8/16/2019 Section4 Felxible Pavement
42/52
S.6.
Page &&*
-
8/16/2019 Section4 Felxible Pavement
43/52
FOR INTERNAL USEONLY
Standard Specification For Road Works
#enerall each pa$ing laer shall
ha$e a co)pacte thicness o% not
less than twice the no)inal
)a/i)u) aggregate sie o% the
)i/ture an not )ore than 1""
)).
-
8/16/2019 Section4 Felxible Pavement
44/52
FOR INTERNAL USEONLY
Standard Specification For Road Works
ne$ertheless the te)perature o%
asphaltic concrete at the
co))ence)ent o% rolling shall be
not less than 11"JC.
n an areas inaccessible to the
rollers proper co)paction shall be
carrie out using $ibrating plate
co)pactors han ta)pers or other
suitable )eans all to the
satis%action o% the S.6.
nitial 9or breaown: rolling shall
be carrie out with an appro$e
steel wheele tane) roller or three
wheele steel roller. he principal
hea$ rolling shall be carrie out
with an appro$e pneu)atic tre
roller i))eiatel %ollowing the
initial rolling> the pneu)atic tre
roller shall be ballaste to an
operating weight o% not less than 1*
tonnes an its tre in%lation pressure
shall be not less than ".7 ;5s,.)).
he %inal rolling shall be carrie out
with an appro$e steel wheele
tane) roller an shall ser$e to
eli)inate )inor sur%ace
irregularities le%t b the pneu)atictre roller.
&ll rollers shall operate in a
longituinal irection along the
carriagewa with their ri$en wheels
towars the pa$er. 'olling shall
generall co))ence at the lower
ege o% the pa$e with an
progress uni%or)l to the higher
ege e/cept that where there is a
longituinal construction ?oint at thehigher ege this shall be rolle %irst
ahea o% the nor)al pattern o%
rolling. #enerall successi$e roller
passes shall o$erlap b hal% the
with o% the roller an
the points at which the roller is
re$erse shall be staggere.
owe$er when operating on
graients in e/cess o% 4 the
breaown roller shall not pass
o$er an pre$iousl unrolle )i/
when operating in the ownhill
irection.
n all cases co)paction shall be
carrie out in such a )anner
that each section recei$es e,ual
co)pacti$e e%%ort all to the
satis%action o% the S.6.
he steel wheele rollers shall
operate at spees o% not )ore than
* )5hr an the pneu)atic trerollers shall operate at spees o%
not )ore than 8 )5hr. ;o roller
or
Cawangan Jalan, Ibu Pejabat JKR, K.L
-
8/16/2019 Section4 Felxible Pavement
45/52
Page &&4
-
8/16/2019 Section4 Felxible Pavement
46/52
FOR INTERNAL USEONLY
Standard Specification For Road Works
hea$ $ehicle shall be allowe to
stan on newl lai bitu)inous )i/
be%ore co)paction has been
co)plete an the )aterial has
thoroughl coole an set. 'olling
shall continue as long as isnecessar to achie$e the appropriate
re,uire)ent as %ollows =-
Ty/e 2 Pave&en"
Laye5
Re9*i5e7 #2&/a6"e7
Densi"y
ea5ing 62*5se ( - 1% Ma5s!a33
7ensi"y
Bin7e5 62*5se ($ - 1% Ma5s!a33
7ensi"y
Care shall be taen to pre$ent
o$er- co)paction o% asphaltic
concrete.
their withs shall be e$erwhere at
least those speci%ie or shown on the
Drawings on both sies o% the
centre-line> >
the a$erage thicness o$er an
1"" )etre length shall be not less
than the re,uire thicness an
the )ini)u) thicness at an
point shall be not less than the
re,uire thicness )inus * )).
he top sur%ace o% a wearing or
biner course shall ha$e the
re,uire shape superele$ation
le$els an graes an shall be
e$erwhere within the tolerances
speci%ie in
Sub-Section 4.4.
9: 6pening to ra%%ic
&sphaltic concrete shall not be
opene to tra%%ic until co)paction
has been co)plete an the
)aterial has thoroughl coole an
set in the
opinion o% the S.6. his will
usuall be not less than 4 hours
a%ter the co))ence)ent o% rolling.
-
8/16/2019 Section4 Felxible Pavement
47/52
Ty/e 2 Pave&en"
Laye5
Re9*i5e7 #2&/a6"e7
Densi"y
B2*n7 52a7;ase ( - 1% Ma5s!a33
7ensi"y
Leve33ing 62*5se ( - 1% Ma5s!a33
7ensi"y
Bin7e5 62*5se ($ - 1% Ma5s!a33
7ensi"y
ea5ing 62*5se ( - 1% Ma5s!a33
7ensi"y
FOR INTERNAL USEONLY
Standard Specification For Road Works
4%*%5 !it6ino6s $acada
4.2.*.1 Description
his wor shall consist o%
%urnishing placing shaping anco)pacting bitu)inous )acaa)
roabase
an5or le$elling course an5or biner
course an5or wearing course on a
prepare an accepte bitu)inous or
bitu)en pri)e pa$e)ent course
an shall inclue the care%ul an
thorough cleaning o% sur%aces which
are to be co$ere without recei$ing
a bitu)inous tac coat. he wor
shall be carrie out all in accorancewith this Speci%ication an the lines
le$els graes i)ensions an cross-
sections shown on the Drawings
an5or as re,uire b the S.6.
4.2.*.2 Materials
he )aterials %or bitu)inous
)acaa) 9aggregates )ineral %iller
bitu)inous biner an anti-stripping
agent: shall co)pl with all there,uire)ents o% Sub-Section 4.2.4.2
e/cept %or the co)bine graation
re,uire)ents.
Eor each bitu)inous )acaa) )i/
the graation o% the co)bine
coarse an %ine aggregates together
with orinar Portlan ce)ent
ae as
an ahesion an anti-stripping
agent an i% necessar an other
)ineral %iller shall con%or) to the
appropriate en$elope gi$en in able
4.12. he biner content shall also
be in accorance with able 4.12.
-
8/16/2019 Section4 Felxible Pavement
48/52
FOR INTERNAL USEONLY
Standard Specification For Road Works
he Marshall ensit o% a
bitu)inous )acaa) )i/ is
e%ine as the a$erage ensit o% a
set o% three test speci)ens )oule
in the sa)e wa as asphaltic
concrete speci)ens are prepare %or the stanar stabilit an %low test
in accorance with &&S6 est
Metho 24* using the 7* blows
per %ace co)paction stanar. he
bul speci%ic gra$it o% the
speci)ens shall be eter)ine in
accorance with &&S6 est
Metho 100.
he Marshall ensit o% each )i/
shall be eter)ine using a sa)ple9or sa)ples: taen %ro) the )i/ing
plant soon a%ter the co))ence)ent
o% preparing each )i/ %or the
its with shall
be e$erwhere at least that speci%ie
or shown on the Drawings on both
sies o% the centre-line> an its
a$erage thicness o$er an 1""
)etre length shall be not less
than the re,uire thicness. he
top sur%ace o% bitu)inous
)acaa) roabase shall ha$e the
re,uire shape superele$ation
le$els an graes an shall be
e$erwhere within the tolerances
speci%ie in Sub-Section 4.4.2.
(itu)inous )acaa) le$elling
course shall be %inishe in a neat
an wor)anlie )anner> its
i)ensions shall be as speci%ie or
shown on the Drawings or as
irecte b the S.6. all to the
satis%action o% the S.6. he top
sur%ace o% bitu)inous )acaa)
le$elling course shall ha$e the
re,uire shape superele$ation
le$els an graes an shall be
e$er where within the tolerances
%or biner course speci%ie in Sub-
Section 4.4.
(itu)inous )acaa) biner anwearing courses shall be %inishe in
a neat an wor)anlie )anner>
their withs shall be e$erwhere at
least those speci%ie or shown on the
Drawings on both sies o% the
centre-line> the a$erage thicness
o$er an 1"" )etre length shall be
not less than the re,uire thicness
an the )ini)u) thicness at an
point shall be not less than the
re,uire thicness )inus * )). hetop sur%ace o% a wearing or biner
course shall ha$e the re,uire shape
superele$ation le$els an graes
an shall be e$erwhere within the
tolerances speci%ie in Sub-
Section
4.4.
Cawangan Jalan, Ibu Pejabat JKR, K.LPage &&7
-
8/16/2019 Section4 Felxible Pavement
49/52
FOR INTERNAL USEONLY
Standard Specification For Road Works
TABLE 4.1' - GRADATION LIMITS AND BINDER #ONTENTS
FOR BITUMINOUS MA#ADAM
Mi= Ty/e B2*n7R2a7;
as e
B2*n7R2a7;ase
Leve33ing#2*5se
Bin7e5 #2*5se
Bin7e5 #2*5se
ea5ing#2*5se
ea5ing#2*5se=
Mi=Designa"
i2 n
BMR4 BMR' BML1 BMB' BMB' BM14 BM'
B.S. Tes"Sieve
%Passing
;y eig!"
$. &&+).$ &&'. &&'. &&
14. &&1. &&,.+ &&+.+$ &&1.1 &&+ &&)$ &&
1($ - 1) - (4
-
$, - ),-
44 - ,+' - 4,
-) - '1' - (
-1
( - 1)1 - ($
$, - -
44 - ,+1 - 4$
-) - '1' -
----
1$ - 1+ - ,1$ - '$
--
' - ,
-1
( - 1)1 - ($
$ - '-
44 - ,+' - 4,
-) - '1' -
--
1($ - 1
,$ - $$' - )'+( - $$+' - 4,
-) - '1' -
---
1
($ - 1) - (4$ - ,$+ - 4$1$ - +
-+ - )
--
1($ - 1
,$ - $$' - )'+( - $$+' - 4,
-) - '1' -
Bin7e5 #2n"en"
+.$
K
.$%
4.
K
.$%
$.1
K
.$%
4.)
K
.,%
4.)
K
.,%
$.
K
.$%
4.(
K
.$%
Cawangan Jalan, Ibu Pejabat JKR, K.LPage &&)
-
8/16/2019 Section4 Felxible Pavement
50/52
FOR INTERNAL USEONLY
Standard Specification For Road Works
4%, SO'L(ERS
4.3.1 Description
his wor shall consist o%
%urnishing co)pacting an shapingearth or gra$el shouler )aterial on
a prepare an accepte subbase or
lower subbase or subgrae all in
accorance with this Speci%ication
an the lines le$els graes
i)ensions an cross-sections shown
on the Drawings an5or as re,uire
b the S.6.
Eor pa$e shoulers the bitu)inous
sur%acing an unerling pa$e)entcourses shall be constructe as
escribe in the appropriate Sections
o% this Speci%ication.
4.3.2 Materials
4.3.2.1 +arth Shoulers
+arth shouler )aterial shall
be suitable )aterial as
escribe in Sub-Section2.2.1.
4.3.2.2 #ra$el Shoulers
#ra$el shouler )aterial shall
con%or) to the re,uire)ents %or
gra$el sur%acing )aterial set
%orth in Sub-Section 4.1.3.2.
4.3.3 Construction Methos
Shoulers shall be constructe in
stages or in one operation as
irecte or appro$e b the S.6.
but in no instance shall a shouler
be built up to a le$el higher than
that part o% the abutting carriagewa
structure which has been co)plete
an accepte.
Prior to placing an shouler
)aterial the unerling subbase or
lower subbase or subgrae shallha$e been shape an co)pacte in
accorance with the pro$isions o%
Cawangan Jalan, Ibu Pejabat JKR, K.L
Sub-Section 4.1.2.3 an the abutting
carriagewa structure course or
courses shall liewise ha$e been
shape an co)pacte in accorance
with